You are on page 1of 3

QUOTATION GODOWNS EXTENSIONS

Description PROPOSED WITHERING BLOCK - NEW EXTENSIONS AT KIPTAGICH TEA ESTATES DEMOLITIONS Allow for cutting existing T& G boarding to make access to the second floor beams/columns for welding plates m/s and include making good after Sub-Total for Demolitions carried to summary Deck Floor Structural steel works ,to be fixed at height of 9000mm high above g.l In mild steel 100 x 100 x 4mm rhs columns welded to the base plates to the existing columns m/s and welded to the ceiling joists(m/s) 200 x 133 x 25kg/m universal beams welded to SHS columns 300 X 300 X10mm thick base plate including 4no 16mm dia rawl bolts Allow for cleats to receive timber joists m/s 900mm high hand rail and balustraded infill and painted to match existing Allow a provisional sum for the extension of staircase to the new floor -Timber staircase In prime grade treated cypress Wrought timber 200 x 75mm thick timber joists at 700mm c/c supported on to the girder beams m/s 150 x 35mm thick T & G glued & nailed to the joists Paint & Decoration Prepare and apply three caots of gloss oil paints to :

Unit Qty

Rate

Amount

Total

Item

50,000 50,000.00

2 3

LM L.M

73

5,040

367,920 1,680,000

160 10,500

4 5

No

102

3,000 Sum

306,000 150,000

L.M

75

8,000

600,000

Sum

350,000

7 8

LM SM

1050 700

2,100 8,500

2,205,000 5,950,000

General surfaces of steel Sand ,prepare and apply three caots of clear varnish

m2

220

400

88,000

10 Timber surfaces

m2

1899

550

1,044,450 12,741,370.00

Total for deck floor

Page 1 of 2

QUOTATION GODOWNS EXTENSIONS

Description

Unit Qty

Rate

Amount

Total

PROPOSED WITHERING BLOCK - NEW EXTENSIONS AT KIPTAGICH TEA ESTATES SUMMARY 1 2 Demolitions Deck Floor Sub -Total Main Works Carried To Main Summary 50,000 12,741,370 12,791,370.00

Page 2 of 2

Description

Amount

PROPOSED WITHERING BLOCK - NEW EXTENSIONS AT KIPTAGICH TEA ESTATES

MAIN SUMMARY 1 PRELIMINARIES 650,000.00

2 MAIN WORKS

12,791,370.00

Sub-Total Add 16% V.A.T

13,441,370.00 2,150,619.20

TOTAL AMOUNT INCLUSIVE VAT

15,591,989.20

CONTRACTOR'S SIGNATURE NAME ADDRESS DATE .

CLIENT SIGNATURE .. NAME .. ADDRESS . DATE .

M/S