You are on page 1of 1

# 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.

9 2

DESCRIPTION ML LH Implementation Services (Take Delivery of equipment to site, Installation, configuration, testing & traffic cut-over) Delivery of Equipment/materials to sites from the warehouse Installation of ML LH Hop (Indoor and Outdoor equipment) 2x(1+1) HSB with Space Diversity- X-PIC (4 Antenna average 1.2 m up to 3.0m ML LH Cabinet installation with Power, grounding, internal/external transmission cabling & testing Dehydrator Installation Waveguide installation (EW63 - L6/U6 GHz) -Total of 8 runs max 75m length per hop Alignment of 2x Antenna (from 1.2 to 3.0m) per hop Waveguide testing and Soak Test Measurement Site Acceptance Recover existing NEC Transmission equipment- photos to be taken prior to decommissioning Packaging and transporting of recovered equipment back to the warehouse in Ouaga

COMMENTS

Please see list of priority sites in the attachment to determine distances. The rest of the sites to follow

Tentative. Pls put this as separate scope DHU 150 model

Will be present during both PAC & FAC to rectify any anomalies pointed out This is not in our offer but is likely to be offered. Treat separately Also not in our offer but likely to be done. Treat separately

The warehouse is in Ouaga. The equipment to be recovered are the NEC Paso link microwave, then Mini-link Long Haul (ML LH) is to be installed. NOTE that this is not a Greenfield installation - Swap out is to be done one antenna at a time due to tower loading & space limitations. So the number of times the site will be revisited is at least twice. See the Method of Procedure attached.

You might also like