You are on page 1of 1

Analysrs WellIntegrity 5A.

Was Not Established Failed or

2 AnnulusCementBarrier
Theannulus cement barrier failed prevent to hydrocarbons entering annulus from the after cementplacement. investigation The possible teamassessed failure modesandpathsthat ledto hydrocarbon (Refer Figure migration from the formation the wellbore. into to 1.)

Figure1. Hydrocarbon Zonesand Potential FlowPaths. A combination factorscouldhavecontributed the lossof well integrity, hydrocarbons of to if entered wellbore the before, duringor aftercementplacement. To evaluate whetherhydrocarbons couldhaveentered wellbore the beforecementplacement, the investigation team conducted detailed a fluid analysis actual of downhole mud density, pumped, swabandsurgepressures volume and whilerunning casing. volumetric A analysis indicated evenif hydrocarbons that were presentin the wellbore, they wouldhavebeen gaveno indication circulated of the well priorto the lossof well control. out Dataanalysis that priorto cementplacement. hydrocarbons entered wellbore the

t)eepwaterHorizon Accident lnvesrigation Report

TREX-04545 EXHIBIT

You might also like