Open decks open deck spaces excluding hazardous area.

Notes from discussion with Adrian 1) The pipe rack is located above the Laboratory / Workshop. 2) In accordance with joiner work guidance laboratory / workshop guidance, the external walls were not classed unless require by Fire and Explosion Safety Study. Reason is because if something when wrong during the construction of the firewalls, MODEC can used this to protect themselves. 3) SRU / Water Treatment Area no potential for HC fire scenarios. TO CHECK.

4) Metering Skid Can be either classified as Classified Area or Process Areas . Requirements are stringent for Process Area . 5) The basic requirement is that a door must be provided for every 7 meters for escape purpose. 6) Proposed to use ABS minimum requirement to justify fire rated walls. Fire and Explosion study will be conducted at a later stage. Based upon the F&E study, the walls should be rated accordingly.