Clarification on Scheme on Rooftop and other Small Power Plants connected to distribution network (below 33 kV) Guidelines
All the Project Proponents who have been issued Registration Letters confirming the eligibility of GBI under the Scheme on Rooftop and other Small Power Plants connected to distribution network (below 33 kV) may kindly note that the change in the following is NOT ALLOWED as per the RPSSGP guidelines: Name of the Project Proponent / Company Name and location of the Sub-station Power Purchase Agreement signed with the Project Proponent selected by the Programme Administrator
They should adhere to the original name of the company / promoter, name and location of the Sub-station of the project, PPA entered with the utility as per the Pre-registration Certificate issued by State Competent Authority and also final Registration Letter issued by the Programme Administrator No request for the change of above will be entertained by the Programme Administrator.