غطاس
غطاس
G.F
1ST Floor
roof
Ground floor extension
grand total
building area
m2
241
272.34
135.34
36.06
684.74
MATERIAL
3
R.C m
1 Item
Excavation
foundation
39
G.F BEAM
25
Column & neck column
32
ceiling
215
stairs
9
plain concrete
11
Water tank & vent
22
grand total
block work
black block
red block
hordy block
700.00
180.00
4,000.00
total
65 l.m
steel S.R
8,190.00
9,000.00
15,360.00
77,400.00
4,320.00
7,900.00
block
16,625.00
9,900.00
concrete S.R
226.00
226.00
236.00
48,590.00
226.00
2,420.00
4,972.00
cement
5,600.00
1,440.00
total S.R
3000
14,266.00
12,976.00
20,396.00
158,240.00
4,696.00
2,490.00
16,172.00
232,236.00
sand
2,100.00
540.00
S.R
total
30,625.00
13,500.00
12,000.00
56,125.00
13,000.00
grand total
301,361.00