Task Precedence A * B A C A D B E B F C G C H D I E J F,G K H,I L J,K Total Task Time

Time (in sec) 15 24 6 12 18 7 11 9 14 7 15 10 148 7.5 27000 1000 27 5.5 91%

Task prioritized based on time Task Time (in sec) B 24 E 18 A 15 K 15 I 14 D 12 G 11 L 10 H 9 F 7 J 7 C 6

Total Available Time(Hrs) Total Available Time(Sec) Output Required (Units) Cycle Time = Minimum WorkStation Required = Total Task Time/Cycle Time Efiifciency = Total Task Time/(Actual WorkStation Number*Cycle Time)

WorkStation No Station 1 Station 2

Task Allocated B E H A

Station 3 D K Station 4 G I L F J C

Station 5

Station 6

18 F 24 B 15 A 7 F C 12 D

14 I 9 H 10 L 7 J 15 K

11
G Remaining time to be allocated 3 9 0 12 0 12 1 13 3 20 13 7 Feasible Task that can be None H,F,J,C None D,G,L,F,J,C None G,L,F,J,C None L,F,J,C None J,C C None

Total Available Time(Hrs) Total Available Time(Sec)

New Output Required (Units

Cycle Time = Avaialable Time/Output Requi Minimum WorkStation Require

Efiifciency = Total Task Time/(Actual W Number*Cycle Time)

10

Total Available Time(Hrs) Total Available Time(Sec) New Output Required (Units)

7.5 27000 1100 24.54545 6.03

Cycle Time = Avaialable Time/Output Required Minimum WorkStation Required =

cy = Total Task Time/(Actual WorkStation Number*Cycle Time)

86%