Surcharges

7.00m

1.00m

2.00m
1.00m

9.00m
11.00m
From Ch. 6900m to Ch. 7300m - height surcharge 2m
Area A :
Volume :

(7.00m + 9.00m) x
2
8.00m x 400.00m =

1.00m =

Duration of surcharge - 8 month.

8.00m2
3,200.00m3

8.00m

A
A

0.50m

1.50m
1.00m

9.00m
11.00m
From Ch. 7300m to Ch. 7925m - height surcharge 1.50m
Area A :
Volume :

(8.00m + 9.00m) x
0.50m =
2
4.250m x 625.00m =

Total Volume =

Duration of surcharge - 8 month.

4.25m2
2,656.25m3

5,856.25m3 (3,200.00m3 + 2,656.25m3)

Filling Imported Earth


480.00m3 / day:
5,856.25m3/480m3= 12.2 days

say , 15 days

Excavation surcharge
320m3 / day :
5,856.25m3/320m3= 18.30 days say, 20 days
To fill at shoulder and compacted
320m3 / day:

5,856.25m3/320m3= 18.30 days say, 20 days