1.1 Please inform us the construction cost per kilometer of the bridge as below. 1.2 If there is no such information/data, please provide us relevant information/data of a road bridge which has similar specifications of span, width, etc.
4.4m
16m
Span = 40m
Var.
2. We would like to know what kind of items can be procured in Indonesia. Please fill out the below table.
Items
Rail/Track Turnout Sleeper Fastening
Procurement Ratio
Remarks
3. Railway operational cost 3.1 Please provide us the information of annual local operational cost per km in Indonesia * The cost can be calculated out of the total length (km) of the railway operated by PT.KAI and its annual operational cost (labor costs, utility costs, maintenance costs, etc.). 4. If there is the Master Plan for SHIA 2010, please supply us with it.