Summary of Longitudinal Steel Requirement
Summary of Longitudinal Steel Requirement
North/South Ramp
Type
Ramp Segment 1
Ramp Segment 2
Ramp Segment 3
Ramp Segment 4 Wing
Ramp Segment 4 Thick Base
Ramp Segment 5 Wing
Ramp Segment 5 Thick Base
Ramp Segment 6
Ramp Segment 7
Ramp Segment 8
Ramp Segment 9
Ramp Segment 10
Base Slab
Thk. (m)
0.50
1.0
1.2
1.2
Rebar
T20-125
T20-100
T25-100
T25-100
Wall Thk.
(m)
0.25
0.25/0.75
0.25/1.2
0.25/1.2
Rebar
T16-125
T16-125 / T20-125
T16-125 / T25-100
T16-125 / T25-100
2.0
T32-125
0.25/1.2
T16-125 / T25-100
1.2
T25-100
1.2
T25-100
2.3
T32-100
1.2
T25-100
1.2
1.2
1.2
1.0
0.75
T25-100
T25-100
T25-100
T20-100
T20-125
1.2
0.25/1.2
0.25/1.0
0.25/1.0
0.25
T25-100
T16-125 / T25-100
T16-125 / T20-100
T16-125 / T20-100
T16-125
North/South Tunnel
Type
Tunnel Segment 1
Tunnel Segment 2
Plantroom
Roundabout
GSE Tunnel
Connection
Base Slab
Thk. (m)
1.0
1.2
1.0
1.5
1.8
Rebar
T20-100
T25-100
T20-100
T25-100
T32-125
Wall Thk.
(m)
1.0
1.0
1.0
1.5
1.2
Rebar
T20-100
T20-100
T20-100
T25-100
T25-100
Roof Slab
Thk. (m)
1.0
1.2
1.0
2.0
1.5
Rebar
T20-100
T25-100
T20-100
T32-125
T25-100
East/West Ramp
Type
Ramp Segment 1
Ramp Segment 2
Ramp Segment 3
Ramp Segment 4
Ramp Segment 5
Base Slab
Thk. (m)
0.50
0.75
1.25
1.65
1.65
Rebar
T20-125
T20-125
T25-100
T25-100
T25-100
Wall Thk.
(m)
0.25
0.25/0.50
0.25/0.75
0.25/1.2
1.2
Rebar
T16-125
T16-125 / T20-125
T16-125 / T20-125
T16-125 / T25-100
T25-100