You are on page 1of 1

Summary of Longitudinal Steel Requirement

North/South Ramp
Type
Ramp Segment 1
Ramp Segment 2
Ramp Segment 3
Ramp Segment 4 Wing
Ramp Segment 4 Thick Base
Ramp Segment 5 Wing
Ramp Segment 5 Thick Base
Ramp Segment 6
Ramp Segment 7
Ramp Segment 8
Ramp Segment 9
Ramp Segment 10

Base Slab
Thk. (m)
0.50
1.0
1.2
1.2

Rebar
T20-125
T20-100
T25-100
T25-100

Wall Thk.
(m)
0.25
0.25/0.75
0.25/1.2
0.25/1.2

Rebar
T16-125
T16-125 / T20-125
T16-125 / T25-100
T16-125 / T25-100

2.0

T32-125

0.25/1.2

T16-125 / T25-100

1.2

T25-100

1.2

T25-100

2.3

T32-100

1.2

T25-100

1.2
1.2
1.2
1.0
0.75

T25-100
T25-100
T25-100
T20-100
T20-125

1.2
0.25/1.2
0.25/1.0
0.25/1.0
0.25

T25-100
T16-125 / T25-100
T16-125 / T20-100
T16-125 / T20-100
T16-125

North/South Tunnel
Type
Tunnel Segment 1
Tunnel Segment 2
Plantroom
Roundabout
GSE Tunnel
Connection

Base Slab
Thk. (m)
1.0
1.2
1.0
1.5
1.8

Rebar
T20-100
T25-100
T20-100
T25-100
T32-125

Wall Thk.
(m)
1.0
1.0
1.0
1.5
1.2

Rebar
T20-100
T20-100
T20-100
T25-100
T25-100

Roof Slab
Thk. (m)
1.0
1.2
1.0
2.0
1.5

Rebar
T20-100
T25-100
T20-100
T32-125
T25-100

East/West Ramp
Type
Ramp Segment 1
Ramp Segment 2
Ramp Segment 3
Ramp Segment 4
Ramp Segment 5

Base Slab
Thk. (m)
0.50
0.75
1.25
1.65
1.65

Rebar
T20-125
T20-125
T25-100
T25-100
T25-100

Wall Thk.
(m)
0.25
0.25/0.50
0.25/0.75
0.25/1.2
1.2

Rebar
T16-125
T16-125 / T20-125
T16-125 / T20-125
T16-125 / T25-100
T25-100

You might also like