ANALISIS UNITARIO

OBRA: BASE DE DATOS S.E.D


ITEM
ALQUILER CAMPAMENTO SHELTER OFICINA 40
I.EQUIPO
DESCRIPCION
TRANSPORTE CONTENEDOR
MONTACARGAS 5 TONELADAS

No. ITEM
UNIDAD:

TARIFA DIA
150,000.00
272,000.00

II.MATERIALES DE OBRA
DESCRIPCION
UNIDAD
CONTRATO ALQUILER CAMPAMENTO SHELTER OFICINA MES
40

1.1.1
und
MS

RENDIM.
0.50
4.00

VALOR UNI.
$300,000.00
$68,000.00
subtotal

VALOR PARCIAL
$300,000.00
$68,000.00
$368,000.00

CANTIDAD
3.00

VALOR UNI.
$1,200,000.00

VALOR PARCIAL
$3,600,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
-

$3,600,000.00

VALOR UNI.
$0.00
$0.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$0.00
$0.00
$0.00
3,968,000
$793,600.00
$793,600.00

20.0%

COSTO TOTAL UNITARIO

ANALISIS UNITARIO
OBRA: BASE DE DATOS S.E.D
ITEM
CAMPAMENTO MADERA TEJA ASBESTO PISO E=5 CM
I.EQUIPO
DESCRIPCION
TARIFA DIA
RENDIM.
HERRAMIENTA MENOR
5,000.00
6.00
II.MATERIALES DE OBRA
DESCRIPCION
VARA DE CLAVO
PUNTILLA CON C/C 2"
TABLA CHAPA ORD. .3
BISAGRA COMUN 3"
PORTACANDADO SIMPLE 3
RECEBO COMUN
CONCRETO 2.000 PSI E= 5CMS PISO
TEJA ETERNIT No 6
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
ML
LB
ML
UNIDAD
UNIDAD
M3
M3
UNIDAD

CANTIDAD
1.23
0.23
8.83
0.17
0.06
0.13
0.05
0.78

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$4,761,600

No. ITEM
UNIDAD:

1.1.2
und
M2

VALOR UNI.
$833.33
subtotal

VALOR PARCIAL
$833.33
$833.33

VALOR UNI.
$850.00
$1,500.00
$1,716.00
$500.00
$1,500.00
$25,000.00
$190,000.00
$23,000.00
subtotal

VALOR PARCIAL
$1,045.50
$345.00
$15,152.28
$85.00
$90.00
$3,250.00
$10,070.00
$17,940.00
$47,977.78

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

$13,610.83

20.0%

62,422
$12,484.39
$12,484.39
$74,906

ANALISIS UNITARIO
OBRA: BASE DE DATOS S.E.D
ITEM
CAMPAMENTO 36 M2 MADERA TEJA PISO 5 CMS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
VARA DE CLAVO
PUNTILLA CON C/C 2"
TABLA CHAPA ORD. .3
BISAGRA COMUN 3"
PORTACANDADO SIMPLE 3
RECEBO COMUN
CONCRETO 2.000 PSI E= 5CMS PISO
TEJA ETERNIT No 6
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

1.1.3
und
UN

TARIFA DIA
5,000.00

RENDIM.
7.00

VALOR UNI.
$714.29
subtotal

VALOR PARCIAL
$714.29
$714.29

UNIDAD
ML
LB
ML
UNIDAD
UNIDAD
M3
M3
UNIDAD

CANTIDAD
44.20
8.00
318.00
6.00
2.00
4.68
1.89
28.00

VALOR UNI.
$850.00
$1,500.00
$1,716.00
$500.00
$1,500.00
$25,000.00
$190,000.00
$23,000.00
subtotal

VALOR PARCIAL
$37,570.00
$12,000.00
$545,688.00
$3,000.00
$3,000.00
$117,000.00
$359,100.00
$644,000.00
$1,721,358.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.1667
0.1667

VALOR UNI.
$309,702.00
$180,288.00

VALOR PARCIAL
$309,702.00
$180,288.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$489,990.00
2,212,062
$442,412.46
$442,412.46

20.0%

COSTO TOTAL UNITARIO

$2,654,475

ANALISIS UNITARIO
OBRA: BASE DE DATOS S.E.D
ITEM
CERRAMIENTO EN ALAMBRE DE PUA H= 2 MTS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.00

1.1.4
und
ML

VALOR UNI.
$500.00

VALOR PARCIAL
$500.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VARA DE CLAVO
PUNTILLA CON CABEZA 2"
ALAMBRE DE PUAS No. 12
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
ML
LB
KG

CANTIDAD
1.80
0.06
8.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$500.00

VALOR UNI.
$850.00
$1,500.00
$2,810.00
subtotal

VALOR PARCIAL
$1,530.00
$90.00
$22,480.00
$24,100.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
32,767
$6,553.30
$6,553.30

20.0%

COSTO TOTAL UNITARIO

$39,320

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

1.1.5
und

CERRAMIENTO EN LAMINA. H = 2.25


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

ML
TARIFA DIA
5,000.00

RENDIM.
4.50

VALOR UNI.
$1,111.11

VALOR PARCIAL
$1,111.11

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
TORNILLO PARA MADERA 1" No. 6
PERFIL ABIERTO GALVANIZADO 120X60 CAL. 16
CUBiERTA TRAPEZOIDAL ACESCO 3,05
AGUA
ARENA DE PEA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
UN

CANTIDAD
5.16
6.55

UN
ML
M3
M3

TARIFA DIA
51,617.00
30,048.00

2.45
0.54
0.00
0.01

RENDIM.
4.50
4.50

$1,111.11

VALOR UNI.
$400.00
$20.00

VALOR PARCIAL
$2,064.00
$131.00

$79,000.00
$13,000.00
$8,000.00
$30,000.00
subtotal

$193,550.00
$7,020.00
$24.00
$300.00
$203,089.00

VALOR UNI.
$11,470.44
$6,677.33

VALOR PARCIAL
$11,470.44
$6,677.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,147.78
222,348
$44,469.58
$44,469.58

20.0%

COSTO TOTAL UNITARIO

$266,817

ANALISIS UNITARIO
ITEM
CERRAMIENTO EN TABLA. H=1.80
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
11.00

1.1.6
und
ML

VALOR UNI.
$454.55

VALOR PARCIAL
$454.55

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VARA DE CLAVO
PUNTILLA CON CABEZA 2"
TABLA CHAPA 3 M
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
ML
LB
ML

CANTIDAD
2.25
0.30
9.00

TARIFA DIA
51,617.00
30,048.00

11.00
11.00

$454.55

VALOR UNI.
$850.00
$1,500.00
$1,716.00
subtotal

VALOR PARCIAL
$1,912.50
$450.00
$15,444.00
$17,806.50

VALOR UNI.
$4,692.45
$2,731.64

VALOR PARCIAL
$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
25,685
$5,137.03
$5,137.03

20.0%

COSTO TOTAL UNITARIO

$30,822

ANALISIS UNITARIO
ITEM
CERRAMIENTO VARA CLAVO Y LAMINA H = 2.00
I.EQUIPO

No. ITEM
UNIDAD:

1.1.7
und
ML

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
15.00

VALOR UNI.
$333.33

VALOR PARCIAL
$333.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VARA DE CLAVO
LAMINA DE ZINC
PUNTILLA CON CABEZA 2"
RECEBO COMUN
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
ML
UN
LB
M3

CANTIDAD
2.25
1.00
0.05
0.02

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$333.33

VALOR UNI.
$850.00
$14,500.00
$1,500.00
$25,000.00
subtotal

VALOR PARCIAL
$1,912.50
$14,500.00
$75.00
$500.00
$16,987.50

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo

Total Costo Indirecto

$5,444.33
22,765
$4,553.03
$4,553.03

20.0%

COSTO TOTAL UNITARIO

$27,318

ANALISIS UNITARIO
ITEM
CERRAMIENTO EN REPISA Y LONA VERDE H = 2.00
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
16.00

1.1.8
und
ML

VALOR UNI.
$312.50

VALOR PARCIAL
$312.50

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REPISA ORDINARIO 3M.
LONA VERDE 2,1*1,0
PUNTILLA CON CABEZA 2"
MATERIAL DE EXCAVACION

UNIDAD
ML
ML
LB
M3

CANTIDAD
3.30
1.00
0.80
0.02

$312.50

VALOR UNI.
$1,360.00
$1,800.00
$1,500.00
$6,200.00

VALOR PARCIAL
$4,488.00
$1,800.00
$1,200.00
$93.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.00
16.00

$7,581.00

VALOR UNI.
$3,226.06
$1,878.00

VALOR PARCIAL
$3,226.06
$1,878.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,104.06
12,998
$2,599.51
$2,599.51

20.0%

COSTO TOTAL UNITARIO

$15,597

ANALISIS UNITARIO
ITEM
LIMPIEZA, DESCAPOTE, RETIRO SOBR. MANUAL
I.EQUIPO

No. ITEM
UNIDAD:

1.1.9
und
M2

DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA

TARIFA DIA
5,000.00
135,000.00

RENDIM.
15.00
18.00

VALOR UNI.
$333.33
$7,500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$333.33
$7,500.00
$7,833.33
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA

RENDIM.

30,048.00

$0.00

VALOR UNI.

15.00

VALOR PARCIAL

$2,003.20

$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,003.20
9,837
$1,967.31
$1,967.31

20.0%

COSTO TOTAL UNITARIO

$11,804

ANALISIS UNITARIO
ITEM
LIMPIEZA, DESCAPOTE, RETIRO SOBR. MECAN.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA 3 M3
CARGADOR FRONTAL
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.1.10
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
100.00
21.00
300.00

VALOR UNI.
$50.00
$6,428.57
$766.67
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$50.00
$6,428.57
$766.67
$6,478.57
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
6,479
$1,295.71
$1,295.71

20.0%

COSTO TOTAL UNITARIO

$7,774

ANALISIS UNITARIO
ITEM
LOCALIZACION Y REPLANTEO CIMIENTOS

No. ITEM
UNIDAD:

1.1.11
und
M2

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
20.00

VALOR UNI.
$250.00

VALOR PARCIAL
$250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BASTIDOR OTOBO 2" X 2 " X 2,9
PUNTILLA CON CABEZA 2"

UNIDAD
ML
LB

CANTIDAD
2.00
0.02

$250.00

VALOR UNI.
$600.00
$1,500.00

VALOR PARCIAL
$1,200.00
$30.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
29.50
29.50

$1,230.00

VALOR UNI.
$1,749.73
$1,018.58

VALOR PARCIAL
$1,749.73
$1,018.58

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,768.31
4,248
$849.66
$849.66

20.0%

COSTO TOTAL UNITARIO

$5,098

ANALISIS UNITARIO
ITEM
LOCALIZACION Y REPLANTEO CON EQUIPO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
EQUIPO DE NIVELACION
ESTACION ELECTRONICA TOTAL
MIRA AUTONIVELANTE
CINTA METALICA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
12,000.00
50,000.00
10,000.00
6,000.00

RENDIM.
60.00
60.00
60.00
60.00
60.00

1.1.12
und
M2

VALOR UNI.
$83.33
$200.00
$833.33
$166.67
$100.00

VALOR PARCIAL
$83.33
$200.00
$833.33
$166.67
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MOJON DE CONCRETO
PUNTILLA CON CABEZA 2"

UNIDAD
UNIDAD
LB

CANTIDAD
0.05
0.02

III.MANO DE OBRA
DESCRIPCION
COMISION DE TOPOGRAFIA

TARIFA DIA
180,000.00

RENDIM.
8.00

$1,383.33

VALOR UNI.
$1,800.00
$1,500.00
subtotal

VALOR PARCIAL
$90.00
$22.50
$112.50

VALOR UNI.
$22,500.00

VALOR PARCIAL
$22,500.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,500.00
23,996
$4,799.17
$4,799.17

20.0%

COSTO TOTAL UNITARIO

$28,795

ANALISIS UNITARIO
ITEM
LOCALIZACION Y REPLANTEO MANUAL
I.EQUIPO

No. ITEM
UNIDAD:

1.1.13
und
M2

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
33.00

VALOR UNI.
$151.52

VALOR PARCIAL
$151.52

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BASTIDOR OTOBO 2" X 2 " X 2,9
PUNTILLA CON CABEZA 2"

UNIDAD
ML
LB

CANTIDAD
2.00
0.02

$151.52

VALOR UNI.
$600.00
$1,500.00

VALOR PARCIAL
$1,200.00
$30.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
33.00
33.00

$1,230.00

VALOR UNI.
$1,564.15
$910.55

VALOR PARCIAL
$1,564.15
$910.55

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,474.70
3,856
$771.24
$771.24

20.0%

COSTO TOTAL UNITARIO

$4,627

ANALISIS UNITARIO
ITEM
LOCALIZACION Y REPLANTEO MUROS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
40.00

1.1.14
und
M2

VALOR UNI.
$125.00

VALOR PARCIAL
$125.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BASTIDOR OTOBO 2" X 2 " X 2,9
PUNTILLA CON CABEZA 2"

UNIDAD
ML
LB

CANTIDAD
2.00
0.02

$125.00

VALOR UNI.
$600.00
$1,500.00

VALOR PARCIAL
$1,200.00
$30.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
40.00
40.00

$1,230.00

VALOR UNI.
$1,290.43
$751.20

VALOR PARCIAL
$1,290.43
$751.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,041.63
3,397
$679.33
$679.33

20.0%

COSTO TOTAL UNITARIO

$4,076

ANALISIS UNITARIO
ITEM
VALLA INFORMATIVA 2.00 X 1.00
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

1.1.15
und
UN
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

4.00

$1,250.00

$1,250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VALLA INFORMATIVA 2*1

UNIDAD
UNIDAD

CANTIDAD
1.00

$1,250.00

VALOR UNI.
$350,000.00

VALOR PARCIAL
$350,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$350,000.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
371,666
$74,333.25
$74,333.25

20.0%

COSTO TOTAL UNITARIO

$446,000

ANALISIS UNITARIO
ITEM
TRANSPORTE E INST. CERRAM. VARA CLAVO Y LAMINA H = 2.00
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
VOLQUETA
135,000.00
II.MATERIALES DE OBRA
DESCRIPCION
VARA DE CLAVO
LAMINA DE ZINC
PUNTILLA CON CABEZA 2"
RECEBO COMUN
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

1.1.16
und
ML

RENDIM.
15.00
80.00

VALOR UNI.
$333.33
$1,687.50
subtotal

VALOR PARCIAL
$333.33
$1,687.50
$2,020.83

UNIDAD
ML
UN
LB
M3

CANTIDAD
2.25
1.00
0.05
0.02

VALOR UNI.
$850.00
$14,500.00
$1,500.00
$25,000.00
subtotal

VALOR PARCIAL
$1,912.50
$14,500.00
$75.00
$500.00
$16,987.50

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
24,453
$4,890.53
$4,890.53

20.0%

COSTO TOTAL UNITARIO

$29,343

ANALISIS UNITARIO
ITEM
RETIRO CERRAM. VARA CLAVO Y LAMINA H = 2.01
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00

RENDIM.
30.00
50.00

VALOR UNI.
$166.67
$2,700.00
subtotal

1.1.17
und
ML
VALOR PARCIAL
$166.67
$2,700.00
$2,866.67

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

$0.00

VALOR UNI.
$1,720.57
$1,001.60

VALOR PARCIAL
$1,720.57
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,722.17
5,589
$1,117.77
$1,117.77

20.0%

COSTO TOTAL UNITARIO

$6,707

ANALISIS UNITARIO
ITEM
REPLANTEO Y NIVELACIN DE TERRENO NATURAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
CARGADOR FRONTAL
VOLQUETA 3 M3
BULDOZER D-6
II.MATERIALES DE OBRA
DESCRIPCION
BASTIDOR OTOBO 2" X 2 " X 2,9
PUNTILLA CON CABEZA 2"

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
230,000.00
135,000.00
680,000.00

RENDIM.
30.00
250.00
50.00
350.00

UNIDAD
ML
LB

CANTIDAD
2.00
0.02

1.1.18
und
M2

VALOR UNI.
$166.67
$920.00
$2,700.00
$1,942.86
subtotal

VALOR PARCIAL
$166.67
$920.00
$2,700.00
$1,942.86
$5,729.52

VALOR UNI.
$600.00
$1,500.00

VALOR PARCIAL
$1,200.00
$30.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

$1,230.00

VALOR UNI.
$1,720.57
$1,001.60

VALOR PARCIAL
$1,720.57
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,722.17
9,682
$1,936.34
$1,936.34

20.0%

COSTO TOTAL UNITARIO

$11,618

ANALISIS UNITARIO
ITEM
RED AGUA PROVISIONAL. L = 50 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.50

VALOR UNI.
$10,000.00

1.2.1
und
UN
VALOR PARCIAL
$10,000.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REPISA ORDINARIO 3 M
REGISTRO TOYA 1/2 "
TUBO PRESION /13,5 PVC 1/2 "
CODOS 45 GRAD.PRESION PVC 1/2 "
LLAVE TERMINAL CORRIENTE LIVIANA 1/2 "
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
ML
UN
ML
UN
UN

CANTIDAD
10.00
1.00
55.00
5.00
5.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.50

$10,000.00

VALOR UNI.
$1,360.00
$21,300.00
$1,788.00
$425.00
$4,000.00
subtotal

VALOR PARCIAL
$13,600.00
$21,300.00
$98,340.00
$2,125.00
$20,000.00
$155,365.00

VALOR UNI.
$103,234.00
$60,096.00

VALOR PARCIAL
$103,234.00
$60,096.00

subtotal

$163,330.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

328,695
$65,739.00
$65,739.00

20.0%

COSTO TOTAL UNITARIO

$394,434

ANALISIS UNITARIO
ITEM
RED ELECTRICA PROVISIONAL. L = 50 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.50

1.2.2
und
UN

VALOR UNI.
$10,000.00

VALOR PARCIAL
$10,000.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
DURMIENTE ORDINARIO 4 M
CABLE ALUMINIO AISLADO PVC 1/0 AWG
CABLE ALUMINIO AISLADO PVC 2/0 AWG
TACO TERMOMAGNETICO UNIPOLAR HOP 30 A
CAJA PARA TACO 100 A 4 CIRCUITOS
VARA DE CLAVO
TOMA TRIFASICA

UNIDAD
ML
ML
ML
UN
UN
ML
UN

CANTIDAD
5.00
65.00
130.00

$10,000.00

VALOR UNI.
$450.00
$4,675.00
$5,700.00

VALOR PARCIAL
$2,250.00
$303,875.00
$741,000.00

$5,280.00
$8,491.00
$850.00
$4,800.00

$21,120.00
$8,491.00
$29,750.00
$24,000.00
$1,130,486.00

VALOR UNI.
$118,720.00
$66,096.00

VALOR PARCIAL
$118,720.00
$66,096.00

4.00
1.00
35.00
5.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
0.50
0.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$184,816.00
1,325,302
$265,060.40
$265,060.40

20.0%

COSTO TOTAL UNITARIO

$1,590,362

ANALISIS UNITARIO
ITEM
RED TELEFONICA PROVISIONAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
0.50
0.50

VALOR UNI.
$10,000.00
$140.00

1.2.3
und
UN
VALOR PARCIAL
$10,000.00
$140.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VARA DE CLAVO
CABLE TELEFONOS 2 PARES
TOMA TELEFONICA
CAJA GALVANIZADA 5800

UNIDAD
ML
ML
UN
UN

CANTIDAD
30.00
65.00
5.00
6.00

$10,140.00

VALOR UNI.
$850.00
$461.00
$4,430.00
$350.00

VALOR PARCIAL
$25,500.00
$29,965.00
$22,150.00
$2,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
0.50
0.50

$79,715.00

VALOR UNI.
$118,720.00
$66,096.00

VALOR PARCIAL
$118,720.00
$66,096.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$184,816.00
274,671
$54,934.20
$54,934.20

20.0%

COSTO TOTAL UNITARIO

$329,605

ANALISIS UNITARIO
ITEM
DEMOLICION CIELO RASO FALSO CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.1
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
20.00
90.00
300.00
8.00

VALOR UNI.
$250.00
$1,500.00
$766.67
$8.75
subtotal

VALOR PARCIAL
$250.00
$1,500.00
$766.67
$8.75
$2,525.42

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$0.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
20.00
20.00

$0.00

VALOR UNI.
$1,502.40
$1,502.40

VALOR PARCIAL
$1,502.40
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,004.80
5,530
$1,106.04
$1,106.04

20.0%

COSTO TOTAL UNITARIO

$6,636

ANALISIS UNITARIO
ITEM
DEMOLICION CIMIENTOS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
II.MATERIALES DE OBRA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
220,000.00
135,000.00

RENDIM.
1.50
3.00
6.00

VALOR UNI.
$3,333.33
$73,333.33
$22,500.00
subtotal

1.3.2
und
M3
VALOR PARCIAL
$3,333.33
$73,333.33
$22,500.00
$99,166.67

DESCRIPCION
ACPM

UNIDAD
GL

CANTIDAD
1.67

VALOR UNI.
$3,500.00

VALOR PARCIAL
$5,833.33

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
1.50
1.50

$5,833.33

VALOR UNI.
$20,032.00
$20,032.00

VALOR PARCIAL
$20,032.00
$20,032.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,064.00

145064.00
$29,012.80
$29,012.80

20.0%

COSTO TOTAL UNITARIO

$174,077

ANALISIS UNITARIO
ITEM
DEMOLICION CONCRETOS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
II.MATERIALES DE OBRA
DESCRIPCION
ACPM
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

1.3.3
und
M3

TARIFA DIA
5,000.00
220,000.00
135,000.00

RENDIM.
1.00
3.00
6.00

VALOR UNI.
$5,000.00
$73,333.33
$22,500.00
subtotal

VALOR PARCIAL
$5,000.00
$73,333.33
$22,500.00
$100,833.33

UNIDAD
GL

CANTIDAD
1.67

VALOR UNI.
$3,500.00
subtotal

VALOR PARCIAL
$5,833.33
$5,833.33

TARIFA DIA
30,048.00
30,048.00

RENDIM.
1.50
1.50

VALOR UNI.
$20,032.00
$20,032.00

VALOR PARCIAL
$20,032.00
$20,032.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,064.00
146,731
$29,346.13
$29,346.13

20.0%

COSTO TOTAL UNITARIO

$176,077

ANALISIS UNITARIO
ITEM
DEMOLICION CONSTRUCC. EXIST. CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
15.00
50.00
50.00
0.20

VALOR UNI.
$333.33
$2,700.00
$4,600.00
$350.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
15.00

VALOR UNI.
$2,003.20

1.3.4
und
M2
VALOR PARCIAL
$333.33
$2,700.00
$4,600.00
$350.00
$7,983.33
VALOR PARCIAL
$0.00
VALOR PARCIAL
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,003.20
9,987
$1,997.31
$1,997.31

20.0%

COSTO TOTAL UNITARIO

$11,984

ANALISIS UNITARIO
ITEM
DEMOLICION ENCHAPES CON R. SOB
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
12.00
250.00
220.00

1.3.5
und
M2

VALOR UNI.
$416.67
$540.00
$1,045.45

VALOR PARCIAL
$416.67
$540.00
$1,045.45

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$2,002.12

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
12.00

$0.00

VALOR UNI.
$2,504.00

VALOR PARCIAL
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,506.12
6,508
$1,301.65
$1,301.65

20.0%

COSTO TOTAL UNITARIO

$7,810

ANALISIS UNITARIO
ITEM
DEMOLICION ORINAL LAVAM. CORRIDO CON R. SOB
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
VOLQUETA
135,000.00
CARGADOR
230,000.00
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

No. ITEM
UNIDAD:

1.3.6
und
ML

RENDIM.
16.00
50.00
220.00

VALOR UNI.
$312.50
$2,700.00
$1,045.45
subtotal

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
16.00

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$0.00

VALOR UNI.
$1,878.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$312.50
$2,700.00
$1,045.45
$4,057.95

VALOR PARCIAL
$2,937.50
$2,937.50

20.0%

6,995
$1,399.09
$1,399.09
$8,395

ITEM
DEMOLICION MUROS EN BLOQUE CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.7
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
8.00
80.00
200.00

VALOR UNI.
$625.00
$1,687.50
$1,150.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$625.00
$1,687.50
$1,150.00
$3,462.50
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
7.00

$0.00

VALOR UNI.
$4,292.57

VALOR PARCIAL
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,292.57
7,755
$1,551.01
$1,551.01

20.0%

$9,306

COSTO TOTAL UNITARIO


ANALISIS UNITARIO
ITEM
DEMOLICION MUROS PANELES PREF/R. SOBR.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.8
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
10.00
80.00
200.00

VALOR UNI.
$500.00
$1,687.50
$1,150.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$500.00
$1,687.50
$1,150.00
$3,337.50
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
10.00

$0.00

VALOR UNI.
$3,004.80

VALOR PARCIAL
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,004.80
6,342
$1,268.46
$1,268.46

20.0%

COSTO TOTAL UNITARIO

$6,342

ANALISIS UNITARIO
ITEM
DEMOLICION MUROS TOLETE 0.12 CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
15.00
25.00
200.00

VALOR UNI.
$333.33
$5,400.00
$1,150.00
subtotal

1.3.9
und
M2
VALOR PARCIAL
$333.33
$5,400.00
$1,150.00
$6,883.33

DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
15.00

$0.00

VALOR UNI.
$2,003.20

VALOR PARCIAL
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,003.20
8,887
$1,777.31
$1,777.31

20.0%

COSTO TOTAL UNITARIO

$10,664

ANALISIS UNITARIO
ITEM
DEMOLICION MUROS TOLETE 0.25 CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.10
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
6.00
25.00
180.00

VALOR UNI.
$833.33
$5,400.00
$1,277.78
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$833.33
$5,400.00
$1,277.78
$7,511.11
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
6.00

$0.00

VALOR UNI.
$5,008.00

VALOR PARCIAL
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,008.00
12,519
$2,503.82
$2,503.82

20.0%

COSTO TOTAL UNITARIO

$15,023

ANALISIS UNITARIO
ITEM
DEMOLICION PAETES CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.11
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
8.00
180.00
240.00

VALOR UNI.
$625.00
$750.00
$958.33
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
8.00

VALOR PARCIAL
$0.00

VALOR UNI.
$3,756.00
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$625.00
$750.00
$958.33
$2,333.33

VALOR PARCIAL
$3,756.00
$3,756.00

20.0%

6,089
$1,217.87

Total Costo Indirecto

$1,217.87

COSTO TOTAL UNITARIO

$7,307

ANALISIS UNITARIO
ITEM
DEMOLICION PAVIMENTO ASFALTICO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.12
und
M3

TARIFA DIA
5,000.00
220,000.00
135,000.00

RENDIM.
2.50
5.00
6.00

VALOR UNI.
$2,000.00
$44,000.00
$22,500.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$2,000.00
$44,000.00
$22,500.00
$68,500.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
2.50
2.50

$0.00

VALOR UNI.
$12,019.20
$12,019.20

VALOR PARCIAL
$12,019.20
$12,019.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$24,038.40
92,538
$18,507.68
$18,507.68

20.0%

COSTO TOTAL UNITARIO

$111,046

ANALISIS UNITARIO
ITEM
DEMOLICION PISOS EN BALDOSIN CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.13
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
8.00
180.00
240.00

VALOR UNI.
$625.00
$750.00
$958.33
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$625.00
$750.00
$958.33
$2,333.33
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
8.00

$0.00

VALOR UNI.
$3,756.00

VALOR PARCIAL
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,756.00
6,089
$1,217.87
$1,217.87

20.0%

COSTO TOTAL UNITARIO

$7,307

ANALISIS UNITARIO
ITEM
DEMOLICION PISOS EN TABLON CON R. SOB.
I.EQUIPO

No. ITEM
UNIDAD:

1.3.14
und
M2

DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
8.00
150.00
200.00

VALOR UNI.
$625.00
$900.00
$1,150.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$625.00
$900.00
$1,150.00
$2,675.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
8.00

$0.00

VALOR UNI.
$3,756.00

VALOR PARCIAL
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,756.00
6,431
$1,286.20
$1,286.20

20.0%

COSTO TOTAL UNITARIO

$7,717

ANALISIS UNITARIO
ITEM
DEMOLICION PLACA ALIGER. 0.25 CON R.SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.15
und
M2

TARIFA DIA
5,000.00
220,000.00
135,000.00
230,000.00

RENDIM.
8.00
20.00
36.00
140.00

VALOR UNI.
$625.00
$11,000.00
$3,750.00
$1,642.86
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$625.00
$11,000.00
$3,750.00
$1,642.86
$17,017.86
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
10.00
10.00

$0.00

VALOR UNI.
$3,004.80
$3,004.80

VALOR PARCIAL
$3,004.80
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,009.60
23,027
$4,605.49
$4,605.49

20.0%

COSTO TOTAL UNITARIO

$27,633

ANALISIS UNITARIO
ITEM
DEMOLICION PLACA ALIGER. 0.45 CON R.SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
230,000.00
135,000.00
350,000.00

RENDIM.
5.00
20.00
18.00
140.00

VALOR UNI.
$1,000.00
$11,500.00
$7,500.00
$2,500.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

1.3.16
und
M2
VALOR PARCIAL
$1,000.00
$11,500.00
$7,500.00
$2,500.00
$22,500.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
5.00
5.00

$0.00

VALOR UNI.
$6,009.60
$6,009.60

VALOR PARCIAL
$6,009.60
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,019.20
34,519
$6,903.84
$6,903.84

20.0%

COSTO TOTAL UNITARIO

$18,923

ANALISIS UNITARIO
ITEM
DEMOLICION PLACA MACIZA 0.10 CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.17
und
M2

TARIFA DIA
5,000.00
220,000.00
135,000.00
230,000.00

RENDIM.
10.00
20.00
35.00
140.00

VALOR UNI.
$500.00
$11,000.00
$3,857.14
$1,642.86
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$500.00
$11,000.00
$3,857.14
$1,642.86
$17,000.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
10.00
10.00

$0.00

VALOR UNI.
$3,004.80
$3,004.80

VALOR PARCIAL
$3,004.80
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,009.60
23,010
$4,601.92
$4,601.92

20.0%

COSTO TOTAL UNITARIO

$27,612

ANALISIS UNITARIO
ITEM
DEMOLICION PLACA MACIZA 0.15 CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
220,000.00
135,000.00
230,000.00

RENDIM.
8.00
16.00
30.00
140.00

VALOR UNI.
$625.00
$13,750.00
$4,500.00
$1,642.86
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
8.00
8.00

VALOR UNI.
$3,756.00
$3,756.00
subtotal

1.3.18
und
M2
VALOR PARCIAL
$625.00
$13,750.00
$4,500.00
$1,642.86
$20,517.86
VALOR PARCIAL
$0.00
VALOR PARCIAL
$3,756.00
$3,756.00
$7,512.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

28,030
$5,605.97
$5,605.97

20.0%

COSTO TOTAL UNITARIO

$33,636

ANALISIS UNITARIO
ITEM
DEMOLICION PLACA MACIZA 0.30 CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.19
und
M2

TARIFA DIA
5,000.00
220,000.00
135,000.00
230,000.00

RENDIM.
6.00
10.00
27.00
140.00

VALOR UNI.
$833.33
$22,000.00
$5,000.00
$1,642.86
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$833.33
$22,000.00
$5,000.00
$1,642.86
$29,476.19
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
5.00
5.00

$0.00

VALOR UNI.
$6,009.60
$6,009.60

VALOR PARCIAL
$6,009.60
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,019.20
41,495
$8,299.08
$8,299.08

20.0%

COSTO TOTAL UNITARIO

$49,794

ANALISIS UNITARIO
ITEM
DEMOLICION PLACA PISO 0.10 CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.20
und
M2

TARIFA DIA
5,000.00
220,000.00
135,000.00
230,000.00

RENDIM.
10.00
20.00
40.00
140.00

VALOR UNI.
$500.00
$11,000.00
$3,375.00
$1,642.86
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
10.00
10.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$0.00

VALOR UNI.
$3,004.80
$3,004.80

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$500.00
$11,000.00
$3,375.00
$1,642.86
$16,517.86

VALOR PARCIAL
$3,004.80
$3,004.80
$6,009.60

20.0%

22,527
$4,505.49
$4,505.49
$27,033

ANALISIS UNITARIO
ITEM
DEMOLICION VIGAS Y COLUMNAS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.21
und
M3

TARIFA DIA
5,000.00
220,000.00
135,000.00
230,000.00

RENDIM.
2.00
6.00
4.00
90.00

VALOR UNI.
$2,500.00
$36,666.67
$33,750.00
$2,555.56
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$2,500.00
$36,666.67
$33,750.00
$2,555.56
$75,472.22
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
2.00
2.00

$0.00

VALOR UNI.
$15,024.00
$15,024.00

VALOR PARCIAL
$15,024.00
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$30,048.00
105,520
$21,104.04
$21,104.04

20.0%

COSTO TOTAL UNITARIO

$126,624

ANALISIS UNITARIO
ITEM
DESMONTE APARATOS SANITARIOS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.22
und
UN

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
8.00
37.00
100.00

VALOR UNI.
$625.00
$3,648.65
$2,300.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$625.00
$3,648.65
$2,300.00
$6,573.65
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$0.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
16,782
$3,356.35
$3,356.35

20.0%

COSTO TOTAL UNITARIO

$20,138

ANALISIS UNITARIO
ITEM
DESMONTE C. RASOS ACRILICOS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00

RENDIM.
20.00
70.00

VALOR UNI.
$250.00
$1,928.57

1.3.23
und
M2
VALOR PARCIAL
$250.00
$1,928.57

CARGADOR
ANDAMIO

230,000.00
70.00

300.00
0.14

$766.67
$500.00

$766.67
$500.00
$3,445.24

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
20.00
20.00

$0.00

VALOR UNI.
$2,580.85
$1,502.40

VALOR PARCIAL
$2,580.85
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,083.25
7,528
$1,505.70
$1,505.70

20.0%

COSTO TOTAL UNITARIO

$9,034

ANALISIS UNITARIO
ITEM
DESMONTE CANALES Y BAJANTES CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.24
und
ML

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
20.00
100.00
450.00
0.30

VALOR UNI.
$250.00
$1,350.00
$511.11
$233.33
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$250.00
$1,350.00
$511.11
$233.33
$2,344.44
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
25.00
25.00

$0.00

VALOR UNI.
$1,201.92
$1,201.92

VALOR PARCIAL
$1,201.92
$1,201.92

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,403.84
4,748
$949.66
$949.66

20.0%

COSTO TOTAL UNITARIO

$5,698

ANALISIS UNITARIO
ITEM
DESMONTE CBTAS ASBESTO CEMENTO/R.SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
10.00
35.00
160.00
0.16

VALOR UNI.
$500.00
$3,857.14
$1,437.50
$437.50
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

1.3.25
und
M2
VALOR PARCIAL
$500.00
$3,857.14
$1,437.50
$437.50
$6,232.14
VALOR PARCIAL
$0.00

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
10.00
10.00

VALOR UNI.
$3,004.80
$3,004.80

VALOR PARCIAL
$3,004.80
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,009.60
12,242
$2,448.35
$2,448.35

20.0%

COSTO TOTAL UNITARIO

$14,690

ANALISIS UNITARIO
ITEM
DESMONTE CBTAS LAMINA ZINC CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.26
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
20.00
35.00
160.00
0.16

VALOR UNI.
$250.00
$3,857.14
$1,437.50
$437.50
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$250.00
$3,857.14
$1,437.50
$437.50
$5,982.14
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
20.00
20.00

$0.00

VALOR UNI.
$1,502.40
$1,502.40

VALOR PARCIAL
$1,502.40
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,004.80
8,987
$1,797.39
$1,797.39

20.0%

COSTO TOTAL UNITARIO

$10,784

ANALISIS UNITARIO
ITEM
DESMONTE CERRAMIENTO MALLA ESLAB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.27
und
M2

TARIFA DIA
5,000.00
70.00

RENDIM.
10.00
0.18

VALOR UNI.
$500.00
$388.89
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
10.00
10.00

VALOR PARCIAL
$0.00

VALOR UNI.
$3,004.80
$3,004.80
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$500.00
$388.89
$888.89

VALOR PARCIAL
$3,004.80
$3,004.80
$6,009.60

20.0%

6,898
$1,379.70

Total Costo Indirecto

$1,379.70

COSTO TOTAL UNITARIO

$8,278

ANALISIS UNITARIO
ITEM
DESMONTE PUERTAS CON MARCOS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.28
und
UN

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
29.00
70.00
320.00

VALOR UNI.
$172.41
$1,928.57
$718.75
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$172.41
$1,928.57
$718.75
$2,819.74
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
29.00
29.00

$0.00

VALOR UNI.
$1,779.90
$1,036.14

VALOR PARCIAL
$1,779.90
$1,036.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,816.03
5,636
$1,127.15
$1,127.15

20.0%

COSTO TOTAL UNITARIO

$6,763

ANALISIS UNITARIO
No. ITEM
UNIDAD:

1.3.29
und
M2

ITEM
DESMONTE REJAS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
12.00
50.00
160.00

VALOR UNI.
$416.67
$2,700.00
$1,437.50
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$416.67
$2,700.00
$1,437.50
$4,554.17
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
12.00
12.00

$0.00

VALOR UNI.
$2,504.00
$2,504.00

VALOR PARCIAL
$2,504.00
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,008.00
9,562
$1,912.43
$1,912.43

20.0%

COSTO TOTAL UNITARIO

$11,475

ANALISIS UNITARIO
ITEM
DESMONTE TEJA DE BARRO CON R. SOB.

No. ITEM
UNIDAD:

1.3.30
und
M2

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
9.00
50.00
160.00
0.16

VALOR UNI.
$555.56
$2,700.00
$1,437.50
$437.50
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$555.56
$2,700.00
$1,437.50
$437.50
$5,130.56
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
9.00
9.00

$0.00

VALOR UNI.
$3,338.67
$3,338.67

VALOR PARCIAL
$3,338.67
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,677.33
11,808
$2,361.58
$2,361.58

20.0%

COSTO TOTAL UNITARIO

$14,169

ANALISIS UNITARIO
ITEM
DESMONTE VENTANAS Y VIDRIOS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.31
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
16.00
70.00
320.00
0.16

VALOR UNI.
$312.50
$1,928.57
$718.75
$437.50
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$312.50
$1,928.57
$718.75
$437.50
$3,397.32
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
16.00
16.00

$0.00

VALOR UNI.
$1,878.00
$1,878.00

VALOR PARCIAL
$1,878.00
$1,878.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,756.00
7,153
$1,430.66
$1,430.66

20.0%

COSTO TOTAL UNITARIO

$8,584

ANALISIS UNITARIO
ITEM
ESCARIFICAR PAETES CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
16.00
100.00
320.00
0.16

VALOR UNI.
$312.50
$1,350.00
$718.75
$437.50
subtotal

1.3.32
und
M2
VALOR PARCIAL
$312.50
$1,350.00
$718.75
$437.50
$2,818.75

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
16.00
16.00

$0.00

VALOR UNI.
$1,878.00
$1,878.00

VALOR PARCIAL
$1,878.00
$1,878.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,756.00
6,575
$1,314.95
$1,314.95

20.0%

COSTO TOTAL UNITARIO

$7,890

ANALISIS UNITARIO
ITEM
ESCARIFICAR PISOS CON R. SOB.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.33
und
M2

TARIFA DIA
5,000.00
135,000.00
230,000.00
70.00

RENDIM.
15.00
100.00
320.00
0.16

VALOR UNI.
$333.33
$1,350.00
$718.75
$437.50
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$333.33
$1,350.00
$718.75
$437.50
$2,839.58
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
15.00
15.00

$0.00

VALOR UNI.
$2,003.20
$2,003.20

VALOR PARCIAL
$2,003.20
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,006.40
6,846
$1,369.20
$1,369.20

20.0%

COSTO TOTAL UNITARIO

$8,215

ANALISIS UNITARIO
ITEM
RETIRO DE MANTOS ASFALTICOS CON RETIRO DE SOB.
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
VOLQUETA
135,000.00
CARGADOR
230,000.00
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

No. ITEM
UNIDAD:

RENDIM.
18.00
60.00
116.00

VALOR UNI.
$277.78
$2,250.00
$1,982.76
subtotal

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
18.00
18.00

VALOR UNI.
$1,669.33
$1,669.33

1.3.34
und
M2
VALOR PARCIAL
$277.78
$2,250.00
$1,982.76
$4,510.54
VALOR PARCIAL
$0.00
VALOR PARCIAL
$1,669.33
$1,669.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,338.67
7,849
$1,569.84
$1,569.84

20.0%

COSTO TOTAL UNITARIO

$9,419

ANALISIS UNITARIO
ITEM
DESMONTE Y RETIRO DE CERRAMIENTO EN LMINA H=2.00
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
VOLQUETA
135,000.00
CARGADOR
230,000.00
ANDAMIO
70.00
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

No. ITEM
UNIDAD:

1.3.35
und
M2

RENDIM.
5.00
35.00
80.00
0.08

VALOR UNI.
$1,000.00
$3,857.14
$2,875.00
$875.00
subtotal

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$1,000.00
$3,857.14
$2,875.00
$875.00
$8,607.14
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
4.00
4.00

$0.00

VALOR UNI.
$7,512.00
$7,512.00

VALOR PARCIAL
$7,512.00
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$15,024.00
23,631
$4,726.23
$4,726.23

20.0%

COSTO TOTAL UNITARIO

$28,357

ANALISIS UNITARIO
ITEM
DEMOLICION MESN CORRIDO CON R. SOB
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.36
und
ML

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
11.00
60.00
200.00

VALOR UNI.
$454.55
$2,250.00
$1,150.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
11.00
11.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$0.00

VALOR UNI.
$2,731.64
$2,731.64

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$454.55
$2,250.00
$1,150.00
$3,854.55

VALOR PARCIAL
$2,731.64
$2,731.64
$5,463.27

20.0%

9,318
$1,863.56
$1,863.56
$11,181

ANALISIS UNITARIO
ITEM
DESMONTE TANQUES ELEVADOS CON R. SOB. (INC. CONEXIONES)
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
VOLQUETA
135,000.00
CARGADOR
230,000.00
ANDAMIO
70.00
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

No. ITEM
UNIDAD:

1.3.37
und
UN

RENDIM.
1.30
9.00
25.00
0.20

VALOR UNI.
$3,846.15
$15,000.00
$9,200.00
$350.00
subtotal

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$3,846.15
$15,000.00
$9,200.00
$350.00
$28,396.15
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.30
1.30

$0.00

VALOR UNI.
$39,705.38
$23,113.85

VALOR PARCIAL
$39,705.38
$23,113.85

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$62,819.23
91,215
$18,243.08
$18,243.08

20.0%

COSTO TOTAL UNITARIO

$109,458

ANALISIS UNITARIO
ITEM
SUSPENSIN DE SALIDA SANITARIA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
TAPON PVC S
CINTA TEFLON
SOLDADURA PVC

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

UNIDAD
UNIDAD
ROLLO
1/4GL

CANTIDAD
1.00
0.50
0.03

1.3.38
und
UN

VALOR UNI.
$625.00
subtotal

VALOR PARCIAL
$625.00
$625.00

VALOR UNI.
$450.00
$1,300.00
$46,120.00

VALOR PARCIAL
$450.00
$650.00
$1,383.60

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$2,483.60

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
13,317
$2,663.35
$2,663.35

20.0%

COSTO TOTAL UNITARIO

$15,980

ANALISIS UNITARIO
ITEM
DESMONTE DE TUBERA SANITARIA
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

1.3.39
und
ML
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

17.00

$294.12

$294.12
$294.12

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
17.00
17.00

$0.00

VALOR UNI.
$1,767.53
$1,767.53

VALOR PARCIAL
$1,767.53
$1,767.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,535.06
3,829
$765.84
$765.84

20.0%

COSTO TOTAL UNITARIO

$4,595

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CAMBIO DE ACOPLE SANITARIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
12.00

II.MATERIALES DE OBRA
DESCRIPCION
ACOPLE SANITARIO
CINTA TEFLON
SOLDADURA PVC

UNIDAD
UNIDAD
ROLLO
1/4GL

CANTIDAD
1.00
0.50
0.01

1.3.40
und
UN

VALOR UNI.
$416.67
subtotal

VALOR PARCIAL
$416.67
$416.67

VALOR UNI.
$2,500.00
$850.00
$46,120.00

VALOR PARCIAL
$2,500.00
$425.00
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
12.00
12.00

$3,386.20

VALOR UNI.
$2,504.00
$2,504.00

VALOR PARCIAL
$2,504.00
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,008.00
8,811
$1,762.17
$1,762.17

20.0%

COSTO TOTAL UNITARIO

$10,573

ANALISIS UNITARIO
ITEM
INSTALACION TANQUE PSANITARIO (M.O.)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

VALOR UNI.
$5,735.22
$3,338.67

1.3.41
und
UN
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL
$0.00
VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
9,629
$1,925.89
$1,925.89

20.0%

COSTO TOTAL UNITARIO

$11,555

ANALISIS UNITARIO
No. ITEM
1.3.42
ITEM
UNIDAD:
und
REVISIN y REP. TANQUE PSANITARIO (LAVADO, CAMBIO FLOTADOR y ACCESORIOS)
UN
I.EQUIPO
DESCRIPCION
TARIFA DIA
RENDIM.
VALOR UNI.
VALOR PARCIAL
HERRAMIENTA MENOR
5,000.00
8.00
$625.00
$625.00
subtotal
$625.00
II.MATERIALES DE OBRA
DESCRIPCION
UNIDAD
CANTIDAD
VALOR UNI.
VALOR PARCIAL
ACOPLE DE ALUMINIO DE 1/2"
UNIDAD
1.00
$1,800.00
$1,800.00
GRIFERIA SANITARIO GRIVAL
JGO
1.00
$10,000.00
$10,000.00
subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$11,800.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
22,633
$4,526.63
$4,526.63

20.0%

COSTO TOTAL UNITARIO

$27,160

ANALISIS UNITARIO
ITEM
REVISION Y REPARACION DE BAJANTES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

1.3.43
und
UN

TARIFA DIA
5,000.00
70.00

RENDIM.
22.00
0.05

VALOR UNI.
$227.27
$1,400.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
22.00
22.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$0.00

VALOR UNI.
$2,346.23
$1,365.82

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$227.27
$1,400.00
$1,627.27

VALOR PARCIAL
$2,346.23
$1,365.82
$3,712.05

20.0%

5,339
$1,067.86
$1,067.86
$6,407

ANALISIS UNITARIO
ITEM
REPARACIN DE DOMOS ACRLICOS (INC. SOPORTES METLICOS)
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
ANDAMIO
70.00
II.MATERIALES DE OBRA
DESCRIPCION
ARREGLO DOMO ACRILICO
SOPORTES METALICOS

UNIDAD
M2
KG

No. ITEM
UNIDAD:

RENDIM.
8.00
0.04

CANTIDAD
1.00
3.00

1.3.44
und
M2

VALOR UNI.
$625.00
$1,750.00
subtotal

VALOR PARCIAL
$625.00
$1,750.00
$2,375.00

VALOR UNI.
$112,000.00
$3,200.00

VALOR PARCIAL
$112,000.00
$9,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$121,600.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
134,183
$26,836.63
$26,836.63

20.0%

COSTO TOTAL UNITARIO

$161,020

ANALISIS UNITARIO
ITEM
SUSPENSIN DE SALIDA HIDRULICA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
TAPON PVC P
SOLDADURA PVC
CINTA TEFLON

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.00

UNIDAD
UNIDAD
1/4GL
ROLLO

CANTIDAD
1.00
0.01
0.50

1.3.45
und
UN

VALOR UNI.
$714.29
subtotal

VALOR PARCIAL
$714.29
$714.29

VALOR UNI.
$450.00
$49,500.00
$850.00

VALOR PARCIAL
$450.00
$49,500.00
$850.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$50,800.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
63,181
$12,636.14
$12,636.14

20.0%

COSTO TOTAL UNITARIO

$75,817

ANALISIS UNITARIO
ITEM
DEMOLICION ESCALERAS EN CONC. REFZDO. CON R. SOB.
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00

No. ITEM
UNIDAD:

RENDIM.
1.10

VALOR UNI.
$4,545.45

1.3.46
und
M3
VALOR PARCIAL
$4,545.45

COMPRESOR DE 2 MARTILLOS
VOLQUETA
II.MATERIALES DE OBRA
DESCRIPCION

220,000.00
135,000.00

UNIDAD

3.20
4.00

CANTIDAD

$68,750.00
$33,750.00
subtotal
VALOR UNI.

$68,750.00
$33,750.00
$107,045.45
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.10
1.10

$0.00

VALOR UNI.
$46,924.55
$27,316.36
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$46,924.55
$27,316.36
$74,240.91
181,286
$36,257.27
$36,257.27

20.0%

COSTO TOTAL UNITARIO

$217,544

ANALISIS UNITARIO
ITEM
DESMONTE Y RETIRO DE DIVISIONES MET. PBAOS
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
VOLQUETA
135,000.00
CARGADOR
230,000.00
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

No. ITEM
UNIDAD:

1.3.47
und
M2

RENDIM.
10.00
50.00
182.00

VALOR UNI.
$500.00
$2,700.00
$1,263.74
subtotal

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$500.00
$2,700.00
$1,263.74
$4,463.74
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
10.00
10.00

$0.00

VALOR UNI.
$3,004.80
$3,004.80

VALOR PARCIAL
$3,004.80
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,009.60
9,418
$1,883.70
$1,883.70

20.0%

COSTO TOTAL UNITARIO

$11,302

ANALISIS UNITARIO
ITEM
DESMONTE Y RETIRO DE DIVISIONES MODULARES
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
VOLQUETA
135,000.00
CARGADOR
230,000.00
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

No. ITEM
UNIDAD:

RENDIM.
12.00
50.00
182.00

VALOR UNI.
$416.67
$2,700.00
$1,263.74
subtotal

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
12.00

VALOR UNI.
$2,504.00

1.3.48
und
M2
VALOR PARCIAL
$416.67
$2,700.00
$1,263.74
$4,380.40
VALOR PARCIAL
$0.00
VALOR PARCIAL
$2,504.00

Ayudante ( incluye 100% de prestaciones)

30,048.00

12.00

$2,504.00

$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,008.00
9,388
$1,877.68
$1,877.68

20.0%

COSTO TOTAL UNITARIO

$11,266

ANALISIS UNITARIO
ITEM
DEMARCACION EXTERIOR SEGURIDAD
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
PINTURA TRAFICO AMARILLA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
30.00

UNIDAD
GLN

CANTIDAD
0.02

1.4.1
und
ML

VALOR UNI.
$166.67
subtotal

VALOR PARCIAL
$166.67
$166.67

VALOR UNI.
$57,700.00

VALOR PARCIAL
$920.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

$920.00

VALOR UNI.
$1,720.57
$1,001.60

VALOR PARCIAL
$1,720.57
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,722.17
3,809
$761.77
$761.77

20.0%

COSTO TOTAL UNITARIO

$4,571

ANALISIS UNITARIO
ITEM
DESMONTE CANCHA MULTIPLE CON R. SOB. NO INCLUYE ROTURA DE PLACA
I.EQUIPO
DESCRIPCION
TARIFA DIA
RENDIM.
HERRAMIENTA MENOR
5,000.00
0.85
VOLQUETA
135,000.00
1.90
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

No. ITEM
UNIDAD:

1.4.2
und
UN

VALOR UNI.
$5,882.35
$71,052.63
subtotal
VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.85
0.85

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$0.00

VALOR UNI.
$60,725.88
$35,350.59

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$5,882.35
$71,052.63
$76,934.98

VALOR PARCIAL
$60,725.88
$35,350.59
$96,076.47

20.0%

173,011
$34,602.29
$34,602.29
$207,614

ANALISIS UNITARIO
No. ITEM
UNIDAD:

1.4.3
und
M3

ITEM
RETIRO DE SOBRANTES
I.EQUIPO
DESCRIPCION
VOLQUETA
HERRAMIENTA MENOR

TARIFA DIA
135,000.00
5,000.00

RENDIM.
10.00
15.00

VALOR UNI.
$13,500.00
$333.33
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$13,500.00
$333.33
$13,833.33
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
15.00
15.00

$0.00

VALOR UNI.
$2,003.20
$2,003.20
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$2,003.20
$2,003.20
$4,006.40
17,840
$3,567.95
$3,567.95

20.0%

COSTO TOTAL UNITARIO

$21,408

ANALISIS UNITARIO
No. ITEM
UNIDAD:

1.4.4
und
UN

ITEM
TALA ARBOLES. H = 5 - 10 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
MOTOSIERRA
RETROEXCAVADORA
VOLQUETA

TARIFA DIA
5,000.00
30,000.00
325,000.00
135,000.00

RENDIM.
2.50
9.00
27.00
10.00

VALOR UNI.
$2,000.00
$3,333.33
$12,037.04
$13,500.00
subtotal

VALOR PARCIAL
$2,000.00
$3,333.33
$12,037.04
$13,500.00
$30,870.37

II.MATERIALES DE OBRA
DESCRIPCION
LASO
GASOLINA

UNIDAD
ML
GL

CANTIDAD
0.20
0.25

VALOR UNI.
$500.00
$4,600.00
subtotal

VALOR PARCIAL
$100.00
$1,150.00
$1,250.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.50
2.50

VALOR UNI.
$20,646.80
$12,019.20

VALOR PARCIAL
$20,646.80
$12,019.20

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$32,666.00
64,786
$12,957.27
$12,957.27

20.0%

COSTO TOTAL UNITARIO

$77,744

ANALISIS UNITARIO
ITEM
TRASIEGO CARRETILLA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
12.00

VALOR UNI.
$416.67
subtotal

1.4.5
und
M3
VALOR PARCIAL
$416.67
$416.67

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00

RENDIM.
12.00

$0.00

VALOR UNI.
$4,301.42

VALOR PARCIAL
$4,301.42

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,301.42
4,718
$943.62
$943.62

20.0%

COSTO TOTAL UNITARIO

$5,662

ANALISIS UNITARIO
ITEM
BASE ARENA CEMENTO 1:20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADORA A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
GASOLINA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
35,000.00

RENDIM.
3.63
8.00

UNIDAD
KG
M3
M3
GL

CANTIDAD
65.00
0.02
1.25
0.25

2.1.1
und
M3

VALOR UNI.
$1,377.41
$4,375.00
subtotal

VALOR PARCIAL
$1,377.41
$4,375.00
$5,752.41

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$4,600.00

VALOR PARCIAL
$26,000.00
$187.20
$37,500.00
$1,150.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.63
3.63

$64,837.20

VALOR UNI.
$14,219.56
$8,277.69

VALOR PARCIAL
$14,219.56
$8,277.69

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,497.25
93,087
$18,617.37
$18,617.37

20.0%

COSTO TOTAL UNITARIO

$111,704

ANALISIS UNITARIO
ITEM
ENTIBADOS EN MADERA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
16.00

VALOR UNI.
$312.50
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VARA DE CLAVO
PUNTILLA CON C/C 2"
TABLA CHAPA ORD. .3

UNIDAD
ML
LB
ML

CANTIDAD
1.23
0.23
3.33

VALOR UNI.
$850.00
$1,500.00
$1,716.00

2.1.2
und
M2
VALOR PARCIAL
$312.50
$312.50
VALOR PARCIAL
$1,045.50
$345.00
$5,714.28

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.00
16.00

$7,104.78

VALOR UNI.
$3,226.06
$1,878.00

VALOR PARCIAL
$3,226.06
$1,878.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,104.06
12,521
$2,504.27
$2,504.27

20.0%

COSTO TOTAL UNITARIO

$15,026

ANALISIS UNITARIO
No. ITEM
UNIDAD:

2.1.3
und
M3

ITEM
EXCAVACION EN ROCA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR 2 MARTILLOS
VOLQUETA VIAJE DE 3 m

TARIFA DIA
5,000.00
220,000.00
135,000.00

RENDIM.
100.00
3.00
10.00

VALOR UNI.
$50.00
$73,333.33
$13,500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$50.00
$73,333.33
$13,500.00
$86,883.33
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
5.30
5.30

$0.00

VALOR UNI.
$5,669.43
$5,669.43
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$5,669.43
$5,669.43
$11,338.87
98,222
$19,644.44
$19,644.44

20.0%

COSTO TOTAL UNITARIO

$117,867

ANALISIS UNITARIO
ITEM
EXCAVACION MANUAL EN RECEBO COMPACTADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA VIAJE DE 3 m
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00

RENDIM.
6.00
10.00

VALOR UNI.
$833.33
$13,500.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

2.1.4
und
M3
VALOR PARCIAL
$833.33
$13,500.00
$14,333.33
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
6.00
6.00

$0.00

VALOR UNI.
$5,008.00
$5,008.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$5,008.00
$5,008.00
$10,016.00
24,349
$4,869.87
$4,869.87

20.0%

COSTO TOTAL UNITARIO

$29,219

ANALISIS UNITARIO
ITEM
EXCAVACION MANUAL TIERRA. H=2.50 CON RET. DE SOB.
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
VOLQUETA VIAJE DE 3 m
135,000.00
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

No. ITEM
UNIDAD:

2.1.5
und
M3

RENDIM.
6.00
10.00

VALOR UNI.
$833.33
$13,500.00
subtotal

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$833.33
$13,500.00
$14,333.33
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
6.00
6.00

$0.00

VALOR UNI.
$5,008.00
$5,008.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$5,008.00
$5,008.00
$10,016.00
24,349
$4,869.87
$4,869.87

20.0%

COSTO TOTAL UNITARIO

$29,219

ANALISIS UNITARIO
ITEM
EXCAVACION MANUAL TIERRA. H=2.50-3.50 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA VIAJE DE 3 m
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00

RENDIM.
5.20
10.00

VALOR UNI.
$961.54
$13,500.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

2.1.6
und
M3
VALOR PARCIAL
$961.54
$13,500.00
$14,461.54
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
5.20
5.20

$0.00

VALOR UNI.
$5,778.46
$5,778.46
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$5,778.46
$5,778.46
$11,556.92
26,018
$5,203.69
$5,203.69

20.0%

COSTO TOTAL UNITARIO

$31,222

ANALISIS UNITARIO
ITEM
EXCAVACION MANUAL TIERRA. H=3.50-5.00 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA VIAJE DE 3 m
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

2.1.7
und
M3

TARIFA DIA
5,000.00
135,000.00

RENDIM.
80.00
10.00

VALOR UNI.
$62.50
$13,500.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$62.50
$13,500.00
$13,562.50
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
4.50
4.50

$0.00

VALOR UNI.
$6,677.33
$6,677.33
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$6,677.33
$6,677.33
$13,354.67
26,917
$5,383.43
$5,383.43

20.0%

COSTO TOTAL UNITARIO

$32,301

ANALISIS UNITARIO
ITEM
EXCAVACION MECANICA EN MATERIAL COMUN CON RET/SOB.
I.EQUIPO
DESCRIPCION
TARIFA DIA
CARGADOR FRONTAL
230,000.00
VOLQUETA VIAJE DE 3 m
135,000.00
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

No. ITEM
UNIDAD:

RENDIM.
50.00
10.00

VALOR UNI.
$4,600.00
$13,500.00
subtotal

CANTIDAD

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

2.1.8
und
M3
VALOR PARCIAL
$4,600.00
$13,500.00
$18,100.00
VALOR PARCIAL

$0.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
18,100
$3,620.00
$3,620.00

20.0%

COSTO TOTAL UNITARIO

$21,720

ANALISIS UNITARIO
ITEM
EXPLANACION MANUAL Y EXTENDIDA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.50

2.1.9
und
M3

VALOR UNI.
$769.23

VALOR PARCIAL
$769.23

subtotal

$769.23

subtotal

$0.00

II.MATERIALES DE OBRA

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00
30,048.00

RENDIM.
6.50
6.50

VALOR UNI.
$4,622.77
$4,622.77
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$4,622.77
$4,622.77
$9,245.54
10,015
$2,002.95
$2,002.95

20.0%

COSTO TOTAL UNITARIO

$12,018

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
EXPLANACION Y EXTENDIDA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
MOTONIVELADORA 120 G

TARIFA DIA
5,000.00
450,000.00

RENDIM.
12.00
70.00

VALOR UNI.
$416.67
$6,428.57
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
12.00

VALOR UNI.
$2,504.00
subtotal

2.1.10
und
M3
VALOR PARCIAL
$416.67
$6,428.57
$6,845.24
VALOR PARCIAL

$0.00
VALOR PARCIAL
$2,504.00
$2,504.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

9,349
$1,869.85
$1,869.85

20.0%

COSTO TOTAL UNITARIO

$11,219

ANALISIS UNITARIO
No. ITEM
UNIDAD:

2.1.11
und
M3

ITEM
EXPLANACION Y RETIRO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA VIAJE DE 3 m
MOTONIVELADORA 120 G
CARGADOR FRONTAL

TARIFA DIA
5,000.00
135,000.00
450,000.00
230,000.00

RENDIM.
10.00
13.00
75.00
56.00

VALOR UNI.
$500.00
$10,384.62
$6,000.00
$4,107.14
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$500.00
$10,384.62
$6,000.00
$4,107.14
$20,991.76
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
10.00

$0.00

VALOR UNI.
$3,004.80

VALOR PARCIAL
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,004.80
23,997
$4,799.31
$4,799.31

20.0%

COSTO TOTAL UNITARIO

$28,796

ANALISIS UNITARIO
ITEM
PERFILACION TALUDE. 1 MS DE PROFUNDIDAD
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
11.00

VALOR UNI.
$454.55
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PLANCHON X 4 m PARA CARRETILLERO

UNIDAD
UN

CANTIDAD
0.10

VALOR UNI.
$13,920.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
11.00

VALOR UNI.
$2,731.64
subtotal

Total Costo Directo

2.1.12
und
M3
VALOR PARCIAL
$454.55
$454.55
VALOR PARCIAL
$1,392.00

$1,392.00
VALOR PARCIAL
$2,731.64
$2,731.64
4,578

A.I.U.
Total Costo Indirecto

20.0%

$915.64
$915.64

COSTO TOTAL UNITARIO

$5,494

ANALISIS UNITARIO
ITEM
RECEBO COMPACTADO B-200
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR TIPO RANA
II.MATERIALES DE OBRA
DESCRIPCION
TRANSPORTE EQUIPO
RECEBO B 200

No. ITEM
UNIDAD:

2.1.13
und
M3

TARIFA DIA
5,000.00
35,000.00

RENDIM.
15.50
20.00

VALOR UNI.
$322.58
$1,750.00
subtotal

VALOR PARCIAL
$322.58
$1,750.00
$2,072.58

UNIDAD
GB
M3

CANTIDAD
1.00
1.34

VALOR UNI.
500.00
25,000.00

VALOR PARCIAL
$500.00
$33,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.50
15.50

$34,000.00

VALOR UNI.
$3,330.13
$1,938.58

VALOR PARCIAL
$3,330.13
$1,938.58

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,268.71
41,341
$8,268.26
$8,268.26

20.0%

COSTO TOTAL UNITARIO

$49,610

ANALISIS UNITARIO
ITEM
RECEBO COMPACTADO COMUN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR TIPO RANA
II.MATERIALES DE OBRA
DESCRIPCION
TRANSPORTE EQUIPO
RECEBO COMPACTADO COMUN

No. ITEM
UNIDAD:

2.1.14
und
M3

TARIFA DIA
5,000.00
35,000.00

RENDIM.
15.50
20.00

VALOR UNI.
$322.58
$1,750.00
subtotal

VALOR PARCIAL
$322.58
$1,750.00
$2,072.58

UNIDAD
GL
M3

CANTIDAD
1.00
1.34

VALOR UNI.
500.00
25,000.00

VALOR PARCIAL
$500.00
$33,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.50
15.50

$34,000.00

VALOR UNI.
$3,330.13
$1,938.58
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$3,330.13
$1,938.58
$5,268.71

20.0%

41,341
$8,268.26

Total Costo Indirecto

$8,268.26

COSTO TOTAL UNITARIO

$49,610

ANALISIS UNITARIO
ITEM
RELLENOS COMPACTOS TIERRA RECEBO 1:1
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR TIPO RANA
II.MATERIALES DE OBRA
DESCRIPCION
TRANSPORTE EQUIPO
RECEBO COMPACTADO COMUN
TIERRA NEGRA

No. ITEM
UNIDAD:

2.1.15
und
M3

TARIFA DIA
5,000.00
35,000.00

RENDIM.
16.00
20.00

VALOR UNI.
$312.50
$1,750.00
subtotal

VALOR PARCIAL
$312.50
$1,750.00
$2,062.50

UNIDAD
GL
M3
M3

CANTIDAD
1.00
0.67
0.67

VALOR UNI.
500.00
25,000.00
29,850.00

VALOR PARCIAL
$500.00
$16,750.00
$19,999.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.00
16.00

$37,249.50

VALOR UNI.
$3,226.06
$1,878.00

VALOR PARCIAL
$3,226.06
$1,878.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,104.06
44,416
$8,883.21
$8,883.21

20.0%

COSTO TOTAL UNITARIO

$53,299

ANALISIS UNITARIO
ITEM
RELLENOS MATERIAL COMUN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR TIPO RANA
II.MATERIALES DE OBRA
DESCRIPCION
RECEBO COMPACTADO COMUN

No. ITEM
UNIDAD:

2.1.16
und
M3

TARIFA DIA
5,000.00
35,000.00

RENDIM.
16.00
35.00

VALOR UNI.
$312.50
$1,000.00
subtotal

VALOR PARCIAL
$312.50
$1,000.00
$1,312.50

UNIDAD
M3

CANTIDAD
1.34

VALOR UNI.
25,000.00

VALOR PARCIAL
$33,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.00
16.00

$33,500.00

VALOR UNI.
$3,226.06
$1,878.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$3,226.06
$1,878.00
$5,104.06

20.0%

39,917
$7,983.31
$7,983.31

COSTO TOTAL UNITARIO

$47,900

ANALISIS UNITARIO
ITEM
RELLENOS MATERIAL SELECCIONADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR TIPO RANA
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

2.1.17
und
M3

TARIFA DIA
5,000.00
35,000.00

RENDIM.
12.00
50.00

VALOR UNI.
$416.67
$700.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$416.67
$700.00
$1,116.67
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$0.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
7,922
$1,584.42
$1,584.42

20.0%

COSTO TOTAL UNITARIO

$9,507

ANALISIS UNITARIO
ITEM
RELLENOS EN TRITURADO 2,5"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR TIPO RANA
II.MATERIALES DE OBRA
DESCRIPCION
GRAVILLA PASA 2" RETIENE 1

No. ITEM
UNIDAD:

2.1.18
und
M3

TARIFA DIA
5,000.00
35,000.00

RENDIM.
12.00
20.00

VALOR UNI.
$416.67
$1,750.00
subtotal

VALOR PARCIAL
$416.67
$1,750.00
$2,166.67

UNIDAD
M3

CANTIDAD
1.30

VALOR UNI.
58,000.00

VALOR PARCIAL
$75,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$75,400.00

VALOR UNI.
$4,301.42
$2,504.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$4,301.42
$2,504.00
$6,805.42

20.0%

84,372
$16,874.42
$16,874.42

COSTO TOTAL UNITARIO

$101,247

ANALISIS UNITARIO
ITEM
CONCRETO CICLOPEO - 40% CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
PIEDRA MEDIA ZONGA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

UNIDAD
M3
M3

CANTIDAD
0.42
0.63

2.2.1
und
M3

VALOR UNI.
$2,500.00
subtotal

VALOR PARCIAL
$2,500.00
$2,500.00

VALOR UNI.
$220,000.00
$31,900.00

VALOR PARCIAL
$92,400.00
$20,097.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

$112,497.00

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
155,830
$31,165.90
$31,165.90

20.0%

COSTO TOTAL UNITARIO

$186,995

ANALISIS UNITARIO
ITEM
CONCRETO CICLOPEO - 40% CONC.2500 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 2.500 PSI
PIEDRA MEDIA ZONGA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

UNIDAD
M3
M3

CANTIDAD
0.42
0.63

2.2.2
und
M3

VALOR UNI.
$2,500.00
subtotal

VALOR PARCIAL
$2,500.00
$2,500.00

VALOR UNI.
$200,000.00
$31,900.00

VALOR PARCIAL
$84,000.00
$20,097.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

$104,097.00

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
147,430
$29,485.90
$29,485.90

20.0%

COSTO TOTAL UNITARIO

$176,915

ANALISIS UNITARIO
ITEM
CONCRETO CICLOPEO - 60% CONC. 2500 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

VALOR UNI.
$2,500.00

2.2.3
und
M3
VALOR PARCIAL
$2,500.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 2.500 PSI
PIEDRA MEDIA ZONGA

UNIDAD
M3
M3

CANTIDAD
0.63
0.42

$2,500.00

VALOR UNI.
$200,000.00
$31,900.00

VALOR PARCIAL
$126,000.00
$13,398.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

$139,398.00

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
182,731
$36,546.10
$36,546.10

20.0%

COSTO TOTAL UNITARIO

$219,277

ANALISIS UNITARIO
ITEM
CONCRETO CICLOPEO - CONC. 60% 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
PIEDRA MEDIA ZONGA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

UNIDAD
M3
M3

CANTIDAD
0.63
0.42

2.2.4
und
M3

VALOR UNI.
$2,500.00
subtotal

VALOR PARCIAL
$2,500.00
$2,500.00

VALOR UNI.
$220,000.00
$25,000.00

VALOR PARCIAL
$138,600.00
$10,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

$149,100.00

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
192,433
$38,486.50
$38,486.50

20.0%

COSTO TOTAL UNITARIO

$230,919

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CONCRETO DADOS. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR

TARIFA DIA
5,000.00
25,000.00

RENDIM.
9.00
25.00

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
VARA DE CLAVO
PLANCHON ORDINARIO *3M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
1.05
2.00
2.00
2.38
0.06

2.2.5
und
M3

VALOR UNI.
$555.56
$1,000.00
subtotal

VALOR PARCIAL
$555.56
$1,000.00
$1,555.56

VALOR UNI.
$220,000.00
$850.00
$8,120.00
$580.00
$1,500.00

VALOR PARCIAL
$231,000.00
$1,700.00
$16,240.00
$1,380.40
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.95
0.95

$250,410.40

VALOR UNI.
$54,333.68
$31,629.47

VALOR PARCIAL
$54,333.68
$31,629.47

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$85,963.16
337,929
$67,585.82
$67,585.82

20.0%

COSTO TOTAL UNITARIO

$405,515

ANALISIS UNITARIO
ITEM
CONCRETO POBRE DE LIMPIEZA 2000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 2000 PSI

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
32.00

UNIDAD
M3

CANTIDAD
0.05

2.2.6
und
M3

VALOR UNI.
$156.25
subtotal

VALOR PARCIAL
$156.25
$156.25

VALOR UNI.
$241,000.00

VALOR PARCIAL
$12,050.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
32.00
32.00

$12,050.00

VALOR UNI.
$1,613.03
$939.00

VALOR PARCIAL
$1,613.03
$939.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,552.03
14,758
$2,951.66
$2,951.66

20.0%

COSTO TOTAL UNITARIO

$17,710

ANALISIS UNITARIO
ITEM
CONCRETO VIGAS DE CIMENTACION 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
REPISA ORDINARIO *3 M
TABLA BURRA ORD. 3 M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
0.90
30.00

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
1.05
3.11
3.52
2.38
0.06

VALOR UNI.
$5,555.56
$833.33
subtotal

VALOR PARCIAL
$5,555.56
$833.33
$6,388.89

VALOR UNI.
$220,000.00
$9,280.00
$1,353.00
$580.00
$1,500.00

VALOR PARCIAL
$231,000.00
$28,860.80
$4,762.56
$1,380.40
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.90
0.90

2.2.7
und
M3

VALOR UNI.
$57,352.22
$33,386.67

$266,093.76
VALOR PARCIAL
$57,352.22
$33,386.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$90,738.89
363,222
$72,644.31
$72,644.31

20.0%

COSTO TOTAL UNITARIO

$435,866

ANALISIS UNITARIO
ITEM
CONCRETO VIGAS TEE 25x25 20x40. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
REPISA ORDINARIO *3 M
TABLA BURRA ORD. 3 M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
9.00
30.00

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
1.05
3.11
2.50
2.38
0.06

2.2.8
und
M3

VALOR UNI.
$555.56
$833.33
subtotal

VALOR PARCIAL
$555.56
$833.33
$1,388.89

VALOR UNI.
$220,000.00
$1,360.00
$1,353.00
$580.00
$1,500.00

VALOR PARCIAL
$231,000.00
$4,229.60
$3,382.50
$1,380.40
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.77
0.77

$240,082.50

VALOR UNI.
$67,035.06
$39,023.38

VALOR PARCIAL
$67,035.06
$39,023.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$106,058.44
347,530
$69,505.97
$69,505.97

20.0%

COSTO TOTAL UNITARIO

$417,036

ANALISIS UNITARIO
ITEM
CONCRETO VIGAS TEE 25x25 20x50. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
REPISA ORDINARIO *3 M
TABLA BURRA ORD. 3 M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
0.77
30.00

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
1.05
4.00
3.80
4.00
0.06

VALOR UNI.
$6,493.51
$833.33
subtotal

VALOR PARCIAL
$6,493.51
$833.33
$7,326.84

VALOR UNI.
$220,000.00
$1,360.00
$1,353.00
$580.00
$1,500.00

VALOR PARCIAL
$231,000.00
$5,440.00
$5,141.40
$2,320.00
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.77
0.77

2.2.9
und
M3

VALOR UNI.
$67,035.06
$39,023.38

$243,991.40
VALOR PARCIAL
$67,035.06
$39,023.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$106,058.44
357,377
$71,475.34
$71,475.34

20.0%

COSTO TOTAL UNITARIO

$428,852

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CONCRETO ZAPATAS. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR

TARIFA DIA
5,000.00
25,000.00

RENDIM.
0.96
30.00

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
VARA DE CLAVO
PLANCHON ORDINARIO *3M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
1.05
2.00
2.00
2.38
0.06

2.2.10
und
M3

VALOR UNI.
$5,208.33
$833.33
subtotal

VALOR PARCIAL
$5,208.33
$833.33
$6,041.67

VALOR UNI.
$220,000.00
$850.00
$8,120.00
$580.00
$1,500.00

VALOR PARCIAL
$231,000.00
$1,700.00
$16,240.00
$1,380.40
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.96
0.96

$250,410.40

VALOR UNI.
$53,767.71
$31,300.00

VALOR PARCIAL
$53,767.71
$31,300.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$85,067.71
341,520
$68,303.96
$68,303.96

20.0%

COSTO TOTAL UNITARIO

$409,824

ANALISIS UNITARIO
ITEM
MUROS DE CONTENCION CONCRETO. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
VARA DE CLAVO
PLANCHON ORDINARIO *3M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C
ALQUILER FORMALETA EN MADERA MES
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

2.2.11
und
M3

TARIFA DIA
5,000.00
25,000.00

RENDIM.
0.80
30.00

VALOR UNI.
$6,250.00
$833.33
subtotal

VALOR PARCIAL
$6,250.00
$833.33
$7,083.33

UNIDAD
M3
ML
ML
ML
LB
M2

CANTIDAD
1.05
2.00
2.00
2.38
0.06
10.00

VALOR UNI.
$220,000.00
$850.00
$8,120.00
$580.00
$1,500.00
$85.00
subtotal

VALOR PARCIAL
$231,000.00
$1,700.00
$16,240.00
$1,380.40
$90.00
$850.00
$251,260.40

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.80
0.80

VALOR UNI.
$64,521.25
$37,560.00

VALOR PARCIAL
$64,521.25
$37,560.00

subtotal

$102,081.25

Total Costo Directo


A.I.U.
Total Costo Indirecto

360,425
$72,085.00
$72,085.00

20.0%

COSTO TOTAL UNITARIO

$432,510

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PEDESTALES CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR

TARIFA DIA
5,000.00
25,000.00

RENDIM.
0.92
30.00

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
VARA DE CLAVO
PLANCHON ORDINARIO *3M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
1.05
2.00
2.00
2.38
0.06

2.2.12
und
M3

VALOR UNI.
$5,434.78
$833.33
subtotal

VALOR PARCIAL
$5,434.78
$833.33
$6,268.12

VALOR UNI.
$220,000.00
$850.00
$8,120.00
$580.00
$1,500.00

VALOR PARCIAL
$231,000.00
$1,700.00
$16,240.00
$1,380.40
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.92
0.92

$250,410.40

VALOR UNI.
$56,105.43
$32,660.87

VALOR PARCIAL
$56,105.43
$32,660.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$88,766.30
345,445
$69,088.96
$69,088.96

20.0%

COSTO TOTAL UNITARIO

$414,534

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PILOTES HINCADOS DE 25 x 25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
38.00

II.MATERIALES DE OBRA
DESCRIPCION
PILOTE HINCADO 25*25

UNIDAD
ML

CANTIDAD
1.03

2.2.13
und
ML

VALOR UNI.
$131.58
subtotal

VALOR PARCIAL
$131.58
$131.58

VALOR UNI.
$75,400.00

VALOR PARCIAL
$77,662.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
38.00
38.00

$77,662.00

VALOR UNI.
$1,358.34
$790.74
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,358.34
$790.74
$2,149.08

20.0%

79,943
$15,988.53
$15,988.53
$95,931

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PILOTES HINCADOS DE 30 x 30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
38.00

II.MATERIALES DE OBRA
DESCRIPCION
PILOTE HINCADO 30*30

UNIDAD
ML

CANTIDAD
1.03

2.2.14
und
ML

VALOR UNI.
$131.58
subtotal

VALOR PARCIAL
$131.58
$131.58

VALOR UNI.
$92,800.00

VALOR PARCIAL
$95,584.00
$0.00
$95,584.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
38.00
38.00

VALOR UNI.
$1,358.34
$790.74

VALOR PARCIAL
$1,358.34
$790.74

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,149.08
97,865
$19,572.93
$19,572.93

20.0%

COSTO TOTAL UNITARIO

$117,438

ANALISIS UNITARIO
ITEM
PILOTES PRE-EXCAVADOS CON RFZO. - 30 cm.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
ACERO DE REFUERZO
ALAMBRE NEGRO No 18

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
10.00
50.00
182.00

UNIDAD
KG
KG
M3

CANTIDAD
0.10
5.00
0.15

2.2.15
und
ML

VALOR UNI.
$500.00
$2,700.00
$1,263.74
subtotal

VALOR PARCIAL
$500.00
$2,700.00
$1,263.74
$4,463.74

VALOR UNI.
$220,000.00
$1,750.00
$2,000.00

VALOR PARCIAL
$22,000.00
$8,750.00
$300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$31,050.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
55,930
$11,186.00
$11,186.00

20.0%

COSTO TOTAL UNITARIO

$67,116

ANALISIS UNITARIO
ITEM
PLACA CONTRAPISO DE 0.08. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

2.2.16
und
M2
VALOR PARCIAL

HERRAMIENTA MENOR
VIBRADOR

5,000.00
25,000.00

9.00
50.00

$555.56
$500.00

$555.56
$500.00
$1,055.56

VALOR UNI.
$220,000.00

VALOR PARCIAL
$18,480.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI

UNIDAD
KG

CANTIDAD
0.084

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$18,480.00

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
28,609
$5,721.89
$5,721.89

20.0%

COSTO TOTAL UNITARIO

$34,331

ANALISIS UNITARIO
ITEM
PLACA CONTRAPISO DE 0.10. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
9.00
50.00

UNIDAD
M3

CANTIDAD
0.105

2.2.17
und
M2

VALOR UNI.
$555.56
$500.00
subtotal

VALOR PARCIAL
$555.56
$500.00
$1,055.56

VALOR UNI.
$220,000.00

VALOR PARCIAL
$23,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$23,100.00

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
33,229
$6,645.89
$6,645.89

20.0%

COSTO TOTAL UNITARIO

$39,875

ANALISIS UNITARIO
ITEM
PLACA CONTRAPISO DE 0.12. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
9.00
50.00

UNIDAD
KG

CANTIDAD
0.105

VALOR UNI.
$555.56
$500.00
subtotal

VALOR PARCIAL
$555.56
$500.00
$1,055.56

VALOR UNI.
$220,000.00

VALOR PARCIAL
$23,100.00

subtotal
III.MANO DE OBRA

2.2.18
und
M2

$23,100.00

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
33,229
$6,645.89
$6,645.89

20.0%

COSTO TOTAL UNITARIO

$39,875

ANALISIS UNITARIO
ITEM
PLACA CONTRAPISO DE 0.15. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
9.00
50.00

UNIDAD
M3

CANTIDAD
0.16

2.2.19
und
M2

VALOR UNI.
$555.56
$500.00
subtotal

VALOR PARCIAL
$555.56
$500.00
$1,055.56

VALOR UNI.
$220,000.00

VALOR PARCIAL
$34,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$34,100.00

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
44,229
$8,845.89
$8,845.89

20.0%

COSTO TOTAL UNITARIO

$53,075

ANALISIS UNITARIO
ITEM
PLACA FLOTANTE DE 0.70. CONC 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
REPISA ORD
PLANCHON ORDINARIO *3M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
2.50
25.00

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
0.40
0.40
0.50
2.38
0.06

VALOR UNI.
$2,000.00
$1,000.00
subtotal

VALOR PARCIAL
$2,000.00
$1,000.00
$3,000.00

VALOR UNI.
$220,000.00
$1,360.00
$8,120.00
$580.00
$1,500.00

VALOR PARCIAL
$88,000.00
$544.00
$4,060.00
$1,380.40
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.50
2.50

2.2.20
und
M2

VALOR UNI.
$20,646.80
$12,019.20
subtotal

$94,074.40
VALOR PARCIAL
$20,646.80
$12,019.20
$32,666.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

129,740
$25,948.08
$25,948.08

20.0%

COSTO TOTAL UNITARIO

$155,688

ANALISIS UNITARIO
ITEM
PLACA FLOTANTE DE 0.80. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
REPISA ORD
PLANCHON ORDINARIO *3M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
2.50
25.00

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
0.44
0.40
0.50
2.38
0.06

2.2.21
und
M2

VALOR UNI.
$2,000.00
$1,000.00
subtotal

VALOR PARCIAL
$2,000.00
$1,000.00
$3,000.00

VALOR UNI.
$220,000.00
$1,360.00
$8,120.00
$580.00
$1,500.00

VALOR PARCIAL
$96,800.00
$544.00
$4,060.00
$1,380.40
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.50
2.50

$102,874.40

VALOR UNI.
$20,646.80
$12,019.20

VALOR PARCIAL
$20,646.80
$12,019.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$32,666.00
138,540
$27,708.08
$27,708.08

20.0%

COSTO TOTAL UNITARIO

$166,248

ANALISIS UNITARIO
ITEM
SUBMURACION CONCRETO CICLOPEO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 2.500 PSI
PIEDRA MEDIA ZONGA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

UNIDAD
M3
M3

CANTIDAD
0.63
0.42

2.2.22
und
M3

VALOR UNI.
$2,500.00
subtotal

VALOR PARCIAL
$2,500.00
$2,500.00

VALOR UNI.
$200,000.00
$31,900.00

VALOR PARCIAL
$126,000.00
$13,398.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

$139,398.00

VALOR UNI.
$25,808.50
$15,024.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$25,808.50
$15,024.00
$40,832.50

20.0%

182,731
$36,546.10
$36,546.10

COSTO TOTAL UNITARIO

$219,277

ANALISIS UNITARIO
ITEM
ZAPATAS EN CONCRETO. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
VARA DE CLAVO
PLANCHON ORDINARIO *3M
TIRAS DE ALISTADO 3*3*3M
PUNTILLA 2" C/C

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
9.00
25.00

UNIDAD
M3
ML
ML
ML
LB

CANTIDAD
1.05
2.00
2.00
2.38
0.06

2.2.23
und
M3

VALOR UNI.
$555.56
$1,000.00
subtotal

VALOR PARCIAL
$555.56
$1,000.00
$1,555.56

VALOR UNI.
$220,000.00
$850.00
$8,120.00
$580.00
$1,500.00

VALOR PARCIAL
$231,000.00
$1,700.00
$16,240.00
$1,380.40
$90.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.90
0.90

$250,410.40

VALOR UNI.
$57,352.22
$33,386.67

VALOR PARCIAL
$57,352.22
$33,386.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$90,738.89
342,705
$68,540.97
$68,540.97

20.0%

COSTO TOTAL UNITARIO

$411,246

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
ACERO DE REFUERZO 34000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
150.00

II.MATERIALES DE OBRA
DESCRIPCION
ACERO DE REFUERZO 34000 PSI
ALAMBRE NEGRO No 18

UNIDAD
KG
KG

CANTIDAD
1.00
0.03

2.3.1
und
KG

VALOR UNI.
$33.33
subtotal

VALOR PARCIAL
$33.33
$33.33

VALOR UNI.
$1,750.00
$2,000.00

VALOR PARCIAL
$1,750.00
$60.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
150.000

$1,810.00

VALOR UNI.
$200.32

VALOR PARCIAL
$200.32

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$200.32
2,044
$408.73
$408.73

20.0%

COSTO TOTAL UNITARIO

$2,452

ANALISIS UNITARIO
ITEM
ACERO DE REFUERZO 60000 PSI

No. ITEM
UNIDAD:

2.3.2
und
KG

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
150.00

II.MATERIALES DE OBRA
DESCRIPCION
ACERO DE REFUERZO 60000 PSI
ALAMBRE NEGRO No 18

UNIDAD
KG
KG

CANTIDAD
1.00
0.03

VALOR UNI.
$33.33
subtotal

VALOR PARCIAL
$33.33
$33.33

VALOR UNI.
$1,780.00
$2,000.00

VALOR PARCIAL
$1,780.00
$60.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
150.000

$1,840.00

VALOR UNI.
$200.32

VALOR PARCIAL
$200.32

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$200.32
2,074
$414.73
$414.73

20.0%

COSTO TOTAL UNITARIO

$2,488

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
GRAFIL DE 6 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
150.00

II.MATERIALES DE OBRA
DESCRIPCION
GRAFIL DE 6 MM

UNIDAD
KG

CANTIDAD
1.00

2.3.3
und
KG

VALOR UNI.
$33.33
subtotal

VALOR PARCIAL
$33.33
$33.33

VALOR UNI.
$2,400.00

VALOR PARCIAL
$2,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
150.000

$2,400.00

VALOR UNI.
$200.32

VALOR PARCIAL
$200.32

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$200.32
2,634
$526.73
$526.73

20.0%

COSTO TOTAL UNITARIO

$3,160

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MALLAS ELECTROSOLDADAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
150.00

II.MATERIALES DE OBRA
DESCRIPCION
MALLA ELECTROSOLDADA

UNIDAD
UNIDAD

CANTIDAD
1.00

VALOR UNI.
$33.33
subtotal

VALOR PARCIAL
$33.33
$33.33

VALOR UNI.
$58,500.00

VALOR PARCIAL
$58,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

2.3.4
und
und

VALOR UNI.

$58,500.00
VALOR PARCIAL

Ayudante ( incluye 100% de prestaciones)

30,048.00

150.000

$200.32

$200.32

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$200.32
58,734
$11,746.73
$11,746.73

20.0%

COSTO TOTAL UNITARIO

$70,480

ANALISIS UNITARIO
No. ITEM
UNIDAD:

2.4.1
und
M3

ITEM
DEMOLICION CABEZAS PILOTES
I.EQUIPO
DESCRIPCION
RETROEXCAVADORA 5-10
COMPRESOR DE 2 MARTILLOS
VOLQUETA
CARGADOR

TARIFA DIA
325,000.00
220,000.00
135,000.00
230,000.00

RENDIM.
25.00
1.18
8.00
80.00

VALOR UNI.
$13,000.00
$186,440.68
$16,875.00
$2,875.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$13,000.00
$186,440.68
$16,875.00
$2,812.50
$219,128.18
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.00
1.00

$0.00

VALOR UNI.
$51,617.00
$30,048.00

VALOR PARCIAL
$51,617.00
$30,048.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$81,665.00
300,793
$60,158.64
$60,158.64

20.0%

COSTO TOTAL UNITARIO

$360,952

ANALISIS UNITARIO
ITEM
DEMOLICION CIMIENTOS ENTERRADOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
COMPRESOR DE 2 MARTILLOS
VOLQUETA
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

2.4.2
und
M3

TARIFA DIA
5,000.00
220,000.00
135,000.00

RENDIM.
1.00
2.70
3.70

VALOR UNI.
$5,000.00
$81,481.48
$36,486.49
subtotal

UNIDAD

CANTIDAD

VALOR UNI.
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.10
1.10

VALOR PARCIAL
$0.00

VALOR UNI.
$46,924.55
$27,316.36
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$5,000.00
$81,481.48
$36,486.49
$122,967.97

VALOR PARCIAL
$46,924.55
$27,316.36
$74,240.91

20.0%

197,209
$39,441.78
$39,441.78

COSTO TOTAL UNITARIO

$236,651

ANALISIS UNITARIO
ITEM
GAVIONES EN MALLA DE TRIPLE TORSIN PIEDRA ZONGA
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
II.MATERIALES DE OBRA
DESCRIPCION
PIEDRA MEDIA ZONGA
MALLA PARA GAVIONES
ALAMBRE GALVANIZADO NO. 12

UNIDAD
M3
M2
KG

No. ITEM
UNIDAD:

RENDIM.
1.40

CANTIDAD
1.10
12.00
0.30

2.4.3
und
M3

VALOR UNI.
$3,571.43
subtotal

VALOR PARCIAL
$3,571.43
$3,571.43

VALOR UNI.
$31,900.00
$1,900.00
$2,200.00

VALOR PARCIAL
$35,090.00
$22,800.00
$660.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.40
1.40

$58,550.00

VALOR UNI.
$36,869.29
$21,462.86

VALOR PARCIAL
$36,869.29
$21,462.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$58,332.14
120,454
$24,090.71
$24,090.71

20.0%

COSTO TOTAL UNITARIO

$144,544

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
ICOPOR AISLAMIENTO 1 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

II.MATERIALES DE OBRA
DESCRIPCION
ICOPOR 1 CM

UNIDAD
M2

CANTIDAD
1.05

2.4.4
und
M2

VALOR UNI.
$50.00
subtotal

VALOR PARCIAL
$50.00
$50.00

VALOR UNI.
$7,000.00

VALOR PARCIAL
$7,350.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
100.00

$7,350.00

VALOR UNI.
$300.48

VALOR PARCIAL
$300.48

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$300.48
7,700
$1,540.10
$1,540.10

20.0%

COSTO TOTAL UNITARIO

$9,241

ANALISIS UNITARIO
ITEM
PAETES TALUDES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
25.00

VALOR UNI.
$200.00

2.4.5
und
M2
VALOR PARCIAL
$200.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
AGUA DE CARROTANQUE
ARENA DE PEA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
0.00
0.02
3.50

$200.00

VALOR UNI.
$8,000.00
$30,000.00
$400.00

VALOR PARCIAL
$12.80
$600.00
$1,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
25.00

$2,012.80

VALOR UNI.
$2,064.68
$1,201.92

VALOR PARCIAL
$2,064.68
$1,201.92

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,266.60
5,479
$1,095.88
$1,095.88

20.0%

COSTO TOTAL UNITARIO

$6,575

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PILOTE MADERA HINCADO (18/25)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
15.00

II.MATERIALES DE OBRA
DESCRIPCION
PILOTE MADERA HINCADO (18/25)

UNIDAD
ML

CANTIDAD
1.00

2.4.6
und
ML

VALOR UNI.
$333.33
subtotal

VALOR PARCIAL
$333.33
$333.33

VALOR UNI.
$25,000.00

VALOR PARCIAL
$25,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$25,000.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
30,778
$6,155.53
$6,155.53

20.0%

COSTO TOTAL UNITARIO

$36,933

ANALISIS UNITARIO
ITEM
ACCESORIO PVC-S 2". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
30.00

VALOR UNI.
$166.67
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CODO 90 C X C PVC - S 2"
TEE PVC - S 2"

UNIDAD
UN
UN

CANTIDAD
0.50
0.75

VALOR UNI.
$1,908.00
$6,900.00

3.2.1
und
UN
VALOR PARCIAL
$166.67
$166.67
VALOR PARCIAL
$954.00
$5,175.00
$0.00

$0.00
$0.00
$0.00
$6,129.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

VALOR UNI.
$1,720.57
$1,001.60

VALOR PARCIAL
$1,720.57
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,722.17
9,018
$1,803.57
$1,803.57

20.0%

COSTO TOTAL UNITARIO

$10,821

ANALISIS UNITARIO
ITEM
ACCESORIO PVC-S 3". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
17.00

3.2.2
und
UN

VALOR UNI.
$294.12

VALOR PARCIAL
$294.12

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CODO 90 C X C PVC - S 3"
TEE PVC - S 3"

UNIDAD
UN
UN

CANTIDAD
0.50
0.75

$294.12

VALOR UNI.
$11,968.00
$11,968.00

VALOR PARCIAL
$5,984.00
$8,976.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

$14,960.00

VALOR UNI.
$3,036.29
$1,767.53

VALOR PARCIAL
$3,036.29
$1,767.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,803.82
20,058
$4,011.59
$4,011.59

20.0%

COSTO TOTAL UNITARIO

$24,070

ANALISIS UNITARIO
ITEM
ACCESORIO PVC-S 4". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
16.00

VALOR UNI.
$312.50
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CODO 90 C X C PVC - S 4"
TEE PVC - S 4"

UNIDAD
UN
UN

CANTIDAD
0.50
0.75

VALOR UNI.
$7,803.00
$10,068.00

3.2.3
und
UN
VALOR PARCIAL
$312.50
$312.50
VALOR PARCIAL
$3,901.50
$7,551.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.00
16.00

$11,452.50

VALOR UNI.
$3,226.06
$1,878.00

VALOR PARCIAL
$3,226.06
$1,878.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,104.06
16,869
$3,373.81
$3,373.81

20.0%

COSTO TOTAL UNITARIO

$20,243

ANALISIS UNITARIO
ITEM
ACCESORIO PVC-S 6". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

3.2.4
und
UN

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CODO 90 C X C PVC - S 6"
TEE PVC - S 6"

UNIDAD
UN
UN

CANTIDAD
0.50
0.75

$555.56

VALOR UNI.
$63,133.00
$35,319.00

VALOR PARCIAL
$31,566.50
$26,489.25

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$58,055.75

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
67,685
$13,537.04
$13,537.04

20.0%

COSTO TOTAL UNITARIO

$81,222

ANALISIS UNITARIO
ITEM
ACCESORIOS DE GRES 4". C/A - S/EXC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
16.00

VALOR UNI.
$312.50
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CODO GRES 4"
TEE GRES 4"

UNIDAD
UN
UN

CANTIDAD
0.50
0.50

VALOR UNI.
$6,500.00
$6,500.00

3.2.4
und
UN
VALOR PARCIAL
$312.50
$312.50
VALOR PARCIAL
$3,250.00
$3,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.00
16.00

$6,500.00

VALOR UNI.
$3,226.06
$1,878.00

VALOR PARCIAL
$3,226.06
$1,878.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,104.06
11,917
$2,383.31
$2,383.31

20.0%

COSTO TOTAL UNITARIO

$14,300

ANALISIS UNITARIO
ITEM
ACCESORIOS DE GRES 6". C/A - S/EXC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
16.00

3.2.5
und
UN

VALOR UNI.
$312.50

VALOR PARCIAL
$312.50

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CODO GRES 6"
TEE GRES 6"

UNIDAD
UN
UN

CANTIDAD
0.50
0.50

$312.50

VALOR UNI.
$7,500.00
$7,500.00

VALOR PARCIAL
$3,750.00
$3,750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.00
16.00

$7,500.00

VALOR UNI.
$3,226.06
$1,878.00

VALOR PARCIAL
$3,226.06
$1,878.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,104.06
12,917
$2,583.31
$2,583.31

20.0%

COSTO TOTAL UNITARIO

$15,500

ANALISIS UNITARIO
ITEM
TUBERIA CONCRETO 10". C/A - S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

VALOR UNI.
$625.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO CONCRETO 10"
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
ML
KG
M3
M3

CANTIDAD
1.03
4.36
0.00
0.02

VALOR UNI.
$20,230.00
$400.00
$8,000.00
$30,000.00

3.2.6
und
ML
VALOR PARCIAL
$625.00
$625.00
VALOR PARCIAL
$20,836.90
$1,744.00
$29.60
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$23,210.50

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
34,044
$6,808.73
$6,808.73

20.0%

COSTO TOTAL UNITARIO

$40,852

ANALISIS UNITARIO
ITEM
TUBERIA CONCRETO 12". C/A - S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

3.2.7
und
ML

VALOR UNI.
$1,000.00

VALOR PARCIAL
$1,000.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO CONCRETO 12"
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
ML
KG
M3
M3

CANTIDAD
1.03
6.20
0.01
0.03

$1,000.00

VALOR UNI.
$30,000.00
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$30,900.00
$2,480.00
$42.40
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$34,322.40

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
51,655
$10,331.08
$10,331.08

20.0%

COSTO TOTAL UNITARIO

$61,986

ANALISIS UNITARIO
ITEM
TUBERIA CONCRETO 8". C/A - S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.00

VALOR UNI.
$500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO CONCRETO 8"
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
ML
KG
M3
M3

CANTIDAD
1.03
2.50
0.00
0.01

VALOR UNI.
$15,000.00
$400.00
$8,000.00
$30,000.00

subtotal

3.2.8
und
ML
VALOR PARCIAL
$500.00
$500.00
VALOR PARCIAL
$15,450.00
$1,000.00
$20.00
$300.00

$16,770.00

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
25,437
$5,087.30
$5,087.30

20.0%

COSTO TOTAL UNITARIO

$30,524

ANALISIS UNITARIO
ITEM
TUBERIA DE GRES 10". C/A - S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

3.2.9
und
ML

VALOR UNI.
$625.00

VALOR PARCIAL
$625.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO GRES 10"
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
ML
KG
M3
M3

CANTIDAD
1.03
3.96
0.00
0.02

$625.00

VALOR UNI.
$25,500.00
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$26,265.00
$1,584.00
$26.40
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$28,475.40

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
39,309
$7,861.71
$7,861.71

20.0%

COSTO TOTAL UNITARIO

$47,170

ANALISIS UNITARIO
ITEM
TUBERIA DE GRES 4". C/A - S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.00

VALOR UNI.
$500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO GRES 4"
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
ML
KG
M3
M3

CANTIDAD
1.03
1.56
0.00
0.01

VALOR UNI.
$13,920.00
$400.00
$8,000.00
$30,000.00

subtotal
III.MANO DE OBRA

3.2.10
und
ML
VALOR PARCIAL
$500.00
$500.00
VALOR PARCIAL
$14,337.60
$624.00
$26.40
$300.00

$15,288.00

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
23,955
$4,790.90
$4,790.90

20.0%

COSTO TOTAL UNITARIO

$28,745

ANALISIS UNITARIO
ITEM
TUBERIA DE GRES 6". C/A - S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
13.50

3.2.11
und
ML

VALOR UNI.
$370.37

VALOR PARCIAL
$370.37

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO GRES 6"
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
ML
KG
M3
M3

CANTIDAD
1.03
1.87
0.00
0.01

$370.37

VALOR UNI.
$7,500.00
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$7,725.00
$748.00
$16.00
$300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
13.50
13.50

$8,789.00

VALOR UNI.
$3,823.48
$2,225.78

VALOR PARCIAL
$3,823.48
$2,225.78

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,049.26
15,209
$3,041.73
$3,041.73

20.0%

COSTO TOTAL UNITARIO

$18,250

ANALISIS UNITARIO
ITEM
TUBERIA DE GRES 8". C/A - S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
11.00

VALOR UNI.
$454.55
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO GRES 8"
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
ML
KG
M3
M3

CANTIDAD
1.03
2.48
0.00
0.01

VALOR UNI.
$9,500.00
$400.00
$8,000.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

3.2.12
und
ML
VALOR PARCIAL
$454.55
$454.55
VALOR PARCIAL
$9,785.00
$992.00
$16.00
$300.00

$11,093.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

51,617.00
30,048.00

11.00
11.00

$4,692.45
$2,731.64

$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
18,972
$3,794.33
$3,794.33

20.0%

COSTO TOTAL UNITARIO

$22,766

ANALISIS UNITARIO
ITEM
TUBERIA PVC-SANITARIA 2". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
25.00

3.2.13
und
ML

VALOR UNI.
$200.00

VALOR PARCIAL
$200.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBERIA PVC SANITARIA 2"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
GL
GL

CANTIDAD
1.00
0.02
0.02

$200.00

VALOR UNI.
$6,900.00
$46,120.00
$25,788.00

VALOR PARCIAL
$6,900.00
$922.40
$515.76

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
25.00

$8,338.16

VALOR UNI.
$2,064.68
$1,201.92

VALOR PARCIAL
$2,064.68
$1,201.92

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,266.60
11,805
$2,360.95
$2,360.95

20.0%

COSTO TOTAL UNITARIO

$14,166

ANALISIS UNITARIO
ITEM
TUBERIA PVC-SANITARIA 3". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
24.00

VALOR UNI.
$208.33
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBERIA PVC SANITARIA 3"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
GL
GL

CANTIDAD
1.00
0.02
0.02

VALOR UNI.
$11,968.00
$46,120.00
$25,788.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
51,617.00

RENDIM.
24.00

VALOR UNI.
$2,150.71

3.2.14
und
ML
VALOR PARCIAL
$208.33
$208.33
VALOR PARCIAL
$11,968.00
$922.40
$515.76

$13,406.16
VALOR PARCIAL
$2,150.71

Ayudante ( incluye 100% de prestaciones)

30,048.00

24.00

$1,252.00

$1,252.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,402.71
17,017
$3,403.44
$3,403.44

20.0%

COSTO TOTAL UNITARIO

$20,421

ANALISIS UNITARIO
ITEM
TUBERIA PVC-SANITARIA 4". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
23.00

3.2.15
und
ML

VALOR UNI.
$217.39

VALOR PARCIAL
$217.39

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBERIA PVC SANITARIA 4"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
GL
GL

CANTIDAD
1.00
0.03
0.03

$217.39

VALOR UNI.
$16,678.00
$46,120.00
$25,788.00

VALOR PARCIAL
$16,678.00
$1,153.00
$644.70

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
23.00
23.00

$18,475.70

VALOR UNI.
$2,244.22
$1,306.43

VALOR PARCIAL
$2,244.22
$1,306.43

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,550.65
22,244
$4,448.75
$4,448.75

20.0%

COSTO TOTAL UNITARIO

$26,692

ANALISIS UNITARIO
ITEM
TUBERIA PVC-SANITARIA 6". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.70

VALOR UNI.
$515.46
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBERIA PVC SANITARIA 6"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
GL
GL

CANTIDAD
1.00
0.07
0.07

VALOR UNI.
$35,319.00
$46,120.00
$25,788.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.70
9.70

VALOR UNI.
$5,321.34
$3,097.73

3.2.16
und
ML
VALOR PARCIAL
$515.46
$515.46
VALOR PARCIAL
$35,319.00
$3,228.40
$1,805.16

$40,352.56
VALOR PARCIAL
$5,321.34
$3,097.73

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,419.07
49,287
$9,857.42
$9,857.42

20.0%

COSTO TOTAL UNITARIO

$59,145

ANALISIS UNITARIO
ITEM
TUBERIA PVC-L 2". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
30.00

3.2.17
und
ML

VALOR UNI.
$166.67

VALOR PARCIAL
$166.67

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBERIA PVC L 2"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
GL
GL

CANTIDAD
1.00
0.02
0.02

$166.67

VALOR UNI.
$10,220.00
$46,120.00
$25,788.00

VALOR PARCIAL
$10,220.00
$922.40
$515.76

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

$11,658.16

VALOR UNI.
$1,720.57
$1,001.60

VALOR PARCIAL
$1,720.57
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,722.17
14,547
$2,909.40
$2,909.40

20.0%

COSTO TOTAL UNITARIO

$17,456

ANALISIS UNITARIO
ITEM
PUNTO DESAGUE PVC 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

VALOR UNI.
$1,000.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBERIA PVC SANITARIA 2"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
CODO 90 C X C PVC SANITARIO 2"

UNIDAD
ML
GL
GL
UN

CANTIDAD
0.93
0.01
0.01
2.77

VALOR UNI.
$3,777.00
$46,120.00
$25,788.00
$1,908.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

VALOR UNI.
$10,323.40
$6,009.60

3.2.18
und
UN
VALOR PARCIAL
$1,000.00
$1,000.00
VALOR PARCIAL
$3,512.61
$461.20
$257.88
$5,285.16

$9,516.85
VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
26,850
$5,369.97
$5,369.97

20.0%

COSTO TOTAL UNITARIO

$32,220

ANALISIS UNITARIO
ITEM
PUNTO DESAGUE PVC 3";4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

3.2.19
und
UN

VALOR UNI.
$1,000.00

VALOR PARCIAL
$1,000.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBERIA PVC SANITARIA 3"
TUBERIA PVC SANITARIA 4"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
CODO 90 C X C PVC SANITARIO 3"
CODO 90 C X C PVC SANITARIO 4"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
ML
ML
GL
GL
UN
UN

CANTIDAD
0.93
0.27
0.01
0.01
2.77
1.37

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$1,000.00

VALOR UNI.
$11,968.00
$16,678.00
$46,120.00
$25,788.00
$4,144.00
$7,803.00
subtotal

VALOR PARCIAL
$11,130.24
$4,503.06
$461.20
$257.88
$11,478.88
$10,690.11
$38,521.37

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
55,854
$11,170.87
$11,170.87

20.0%

COSTO TOTAL UNITARIO

$67,025

ANALISIS UNITARIO
ITEM
TAPON SOLDADO PVC 3"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
30.00

VALOR UNI.
$166.67
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TAPON SOLDADO PVC 3"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
UN
GL
GL

CANTIDAD
1.00
0.01
0.01

VALOR UNI.
$13,518.00
$46,120.00
$25,788.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

VALOR UNI.
$1,720.57
$1,001.60
subtotal

3.2.20
und
UN
VALOR PARCIAL
$166.67
$166.67
VALOR PARCIAL
$13,518.00
$461.20
$257.88

$14,237.08
VALOR PARCIAL
$1,720.57
$1,001.60
$2,722.17

Total Costo Directo


A.I.U.
Total Costo Indirecto

17,126
$3,425.18
$3,425.18

20.0%

COSTO TOTAL UNITARIO

$20,551

ANALISIS UNITARIO
ITEM
TAPON SOLDADO PVC 4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
30.00

3.2.21
und
UN

VALOR UNI.
$166.67

VALOR PARCIAL
$166.67

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TAPON SOLDADO PVC 4"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
UN
GL
GL

CANTIDAD
1.00
0.01
0.01

$166.67

VALOR UNI.
$24,580.00
$46,120.00
$25,788.00

VALOR PARCIAL
$24,580.00
$461.20
$257.88

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

$25,299.08

VALOR UNI.
$1,720.57
$1,001.60

VALOR PARCIAL
$1,720.57
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,722.17
28,188
$5,637.58
$5,637.58

20.0%

COSTO TOTAL UNITARIO

$33,825

ANALISIS UNITARIO
ITEM
TAPON SOLDADO PVC 6"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.00

VALOR UNI.
$500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TAPON SOLDADO PVC 6"
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
UN
GL
GL

CANTIDAD
1.00
0.02
0.02

VALOR UNI.
$32,500.00
$46,120.00
$25,788.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

VALOR UNI.
$5,161.70
$3,004.80
subtotal

3.2.22
und
UN
VALOR PARCIAL
$500.00
$500.00
VALOR PARCIAL
$32,500.00
$922.40
$515.76

$33,938.16
VALOR PARCIAL
$5,161.70
$3,004.80
$8,166.50

Total Costo Directo


A.I.U.
Total Costo Indirecto

42,605
$8,520.93
$8,520.93

20.0%

COSTO TOTAL UNITARIO

$51,126

ANALISIS UNITARIO
ITEM
RELLENO GRAVILLA DE RIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
GRAVILLA DE RIO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
35,000.00

RENDIM.
15.00
32.00

UNIDAD
M3

CANTIDAD
1.00

3.3.1
und
M3

VALOR UNI.
$333.33
$1,093.75
subtotal

VALOR PARCIAL
$333.33
$1,093.75
$1,427.08

VALOR UNI.
$58,000.00

VALOR PARCIAL
$58,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$58,000.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
64,871
$12,974.28
$12,974.28

20.0%

COSTO TOTAL UNITARIO

$77,846

ANALISIS UNITARIO
ITEM
TUBERIA DRENAJE GRES 4". S/E. S/FIL.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
13.00

VALOR UNI.
$384.62
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO DRENAJE GRES
AGUA
ARENA DE PEA
CEMENTO GRIS
BASE AGREGADO PETREO

UNIDAD
UN
M3
M3
KG
M3

CANTIDAD
1.03
0.00
0.01
1.50
0.03

VALOR UNI.
$13,920.00
$8,000.00
$30,000.00
$400.00
$17,500.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
13.00
13.00

VALOR UNI.
$3,970.54
$2,311.38
subtotal

Total Costo Directo

3.3.2
und
ML
VALOR PARCIAL
$384.62
$384.62
VALOR PARCIAL
$14,337.60
$12.80
$300.00
$600.00
$525.00
$15,775.40
VALOR PARCIAL
$3,970.54
$2,311.38
$6,281.92
22,442

A.I.U.
Total Costo Indirecto

20.0%

$4,488.39
$4,488.39

COSTO TOTAL UNITARIO

$26,930

ANALISIS UNITARIO
ITEM
TUBERIA DRENAJE PVC 100mm. S/E - C/FIL.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
20.00

3.3.3
und
ML

VALOR UNI.
$250.00

VALOR PARCIAL
$250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO DRENAJE 100 mm
TRITURADO DE RIO

UNIDAD
ML
M3

CANTIDAD
1.00
0.03

$250.00

VALOR UNI.
$16,200.00
$53,000.00

VALOR PARCIAL
$16,200.00
$1,590.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
20.00
20.00

$17,790.00

VALOR UNI.
$2,580.85
$1,502.40

VALOR PARCIAL
$2,580.85
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,083.25
22,123
$4,424.65
$4,424.65

20.0%

COSTO TOTAL UNITARIO

$26,548

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
GEOTEXTIL PARA FILTRO REF. T-1600
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
150.00

3.3.4
und
M2

VALOR UNI.
$33.33
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
GEOTEXTIL NO TEJIDO 1600

UNIDAD
M2

CANTIDAD
0.02

$33.33

VALOR UNI.
$2,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
150.00
150.00

VALOR PARCIAL
$42.00

$42.00

VALOR UNI.
$344.11
$200.32
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$33.33

VALOR PARCIAL
$344.11
$200.32
$544.43

20.0%

620
$123.95

Total Costo Indirecto

$123.95

COSTO TOTAL UNITARIO

$744

ANALISIS UNITARIO
ITEM
CAJAS INSPECCION 100 x 100 x 95. S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1.50

3.4.1
und
UN

VALOR UNI.
$3,333.33

VALOR PARCIAL
$3,333.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO TOLETE RECOCIDO
ARENA DE PEA
ACERO FIGURADO 60000 PSI 1/2"
ACERO FIGURADO 60000 PSI 1"
GRAVILLA DE RIO
ARENA LAVADA DE RIO
RECEBO COMUN
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
UN
M3
KG
KG
M3
M3
M3

CANTIDAD
118.00
236.00
0.22
4.00
0.11
0.11
0.07
0.83

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.50
1.50

$3,333.33

VALOR UNI.
$400.00
$455.00
$30,000.00
$1,780.00
$1,780.00
$58,000.00
$58,000.00
$25,000.00
subtotal

VALOR PARCIAL
$47,200.00
$107,380.00
$6,600.00
$7,120.00
$195.80
$6,380.00
$4,060.00
$20,750.00
$199,685.80

VALOR UNI.
$34,411.33
$20,032.00

VALOR PARCIAL
$34,411.33
$20,032.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$54,443.33
257,462
$51,492.49
$51,492.49

20.0%

COSTO TOTAL UNITARIO

$308,955

ANALISIS UNITARIO
ITEM
CAJAS INSPECCION 40 x 40 x 35. S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

VALOR UNI.
$2,500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO TOLETE RECOCIDO
ARENA DE PEA
ACERO FIGURADO 60000 PSI 1/2"
ALAMBRE NEGRO No 18
GRAVILLA DE RIO
ARENA LAVADA DE RIO
RECEBO COMUN
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
UN
M3
KG
KG
M3
M3
M3

CANTIDAD
30.74
36.82
0.05
0.60
0.01
0.04
0.02
0.07

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

3.4.2
und
UN
VALOR PARCIAL
$2,500.00
$2,500.00

VALOR UNI.
$400.00
$455.00
$30,000.00
$1,780.00
$2,000.00
$58,000.00
$58,000.00
$25,000.00
subtotal

VALOR PARCIAL
$12,296.00
$16,753.10
$1,500.00
$1,068.00
$20.00
$2,320.00
$1,160.00
$1,750.00
$36,867.10

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal

$40,832.50

Total Costo Directo


A.I.U.
Total Costo Indirecto

80,200
$16,039.92
$16,039.92

20.0%

COSTO TOTAL UNITARIO

$96,240

ANALISIS UNITARIO
ITEM
CAJAS INSPECCION 60 x 60 x 55. S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1.80

3.4.3
und
UN

VALOR UNI.
$2,777.78

VALOR PARCIAL
$2,777.78

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO TOLETE RECOCIDO
ARENA DE PEA
ACERO FIGURADO 60000 PSI 1/2"
ALAMBRE NEGRO No 18
GRAVILLA DE RIO
ARENA LAVADA DE RIO
RECEBO COMUN
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
UN
M3
KG
KG
M3
M3
M3

CANTIDAD
57.20
93.00
0.11
0.90
0.00
0.06
0.03
0.11

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.80
1.80

$2,777.78

VALOR UNI.
$400.00
$455.00
$30,000.00
$1,780.00
$2,000.00
$58,000.00
$58,000.00
$25,000.00
subtotal

VALOR PARCIAL
$22,880.00
$42,315.00
$3,300.00
$1,602.00
$6.00
$3,480.00
$1,740.00
$2,750.00
$78,073.00

VALOR UNI.
$28,676.11
$16,693.33

VALOR PARCIAL
$28,676.11
$16,693.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$45,369.44
126,220
$25,244.04
$25,244.04

20.0%

COSTO TOTAL UNITARIO

$151,464

ANALISIS UNITARIO
ITEM
CAJAS INSPECCION 80 x 80 x 75. S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1.70

VALOR UNI.
$2,941.18
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO TOLETE RECOCIDO
ARENA DE PEA
ACERO FIGURADO 60000 PSI 1/2"
ALAMBRE NEGRO No 18
GRAVILLA DE RIO
ARENA LAVADA DE RIO
RECEBO COMUN
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

UNIDAD
KG
UN
M3
KG
KG
M3
M3
M3

CANTIDAD
94.38
189.00
0.19
3.20
0.09
0.09
0.05
0.16

TARIFA DIA
51,617.00

RENDIM.
1.70

3.4.4
und
UN
VALOR PARCIAL
$2,941.18
$2,941.18

VALOR UNI.
$400.00
$560.00
$30,000.00
$1,780.00
$2,000.00
$58,000.00
$58,000.00
$25,000.00
subtotal

VALOR PARCIAL
$37,752.00
$105,840.00
$5,700.00
$5,696.00
$180.00
$5,220.00
$2,900.00
$4,000.00
$167,288.00

VALOR UNI.
$30,362.94

VALOR PARCIAL
$30,362.94

Ayudante ( incluye 100% de prestaciones)

30,048.00

1.70

$17,675.29

$17,675.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$48,038.24
218,267
$43,653.48
$43,653.48

20.0%

COSTO TOTAL UNITARIO

$261,921

ANALISIS UNITARIO
ITEM
CARCAMO PROTECCION TUB. A. LL. 60 x 40
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

3.4.5
und
ML

VALOR UNI.
$1,000.00

VALOR PARCIAL
$1,000.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ACERO FIGURADO 37000 PSI
CONCRETO CORRIENTE 3000 PSI
LADRILLO RECOCIDO
MORTERO CONVENCIONAL 2000 PSI

UNIDAD
KG
M3
UNIDAD
M3

CANTIDAD
13.00
0.11
72.00
0.03

$1,000.00

VALOR UNI.
$1,750.00
$220,000.00
$455.00
$166,200.00

VALOR PARCIAL
$22,750.00
$24,200.00
$32,760.00
$4,986.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$84,696.00

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
102,029
$20,405.80
$20,405.80

20.0%

COSTO TOTAL UNITARIO

$122,435

ANALISIS UNITARIO
ITEM
POZO DE INSPECCION D=1.80 MS. H=1.80 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1.95

VALOR UNI.
$2,564.10
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ACERO FIGURADO 60000 PSI 1/2"
CONCRETO CORRIENTE 2000 PSI
CONCRETO CORRIENTE 3000 PSI

UNIDAD
KG
M3
M3

CANTIDAD
65.80
0.20
0.70

VALOR UNI.
$1,780.00
$190,000.00
$220,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.95
1.95

VALOR UNI.
$26,470.26
$15,409.23

3.4.6
und
UN
VALOR PARCIAL
$2,564.10
$2,564.10
VALOR PARCIAL
$117,124.00
$38,000.00
$154,000.00

$309,124.00
VALOR PARCIAL
$26,470.26
$15,409.23

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$41,879.49
353,568
$70,713.52
$70,713.52

20.0%

COSTO TOTAL UNITARIO

$424,281

ANALISIS UNITARIO
ITEM
SUMIDERO A. LLUVIA 100 x 30 x 100. S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.30

3.4.7
und
UN

VALOR UNI.
$943.40

VALOR PARCIAL
$943.40

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 2000 PSI
CONCRETO CORRIENTE 3500 PSI
FORMALETA SUMIDEROS
HIERRO FIGURADO 1/2 A 60
HIERRO FIGURADO 1/4 A 37
REJILLA Y MARCO HTA 0.7 X 0.3
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
M3
M3
UNIDAD
KG
KG
UNIDAD

CANTIDAD
0.13
1.50
9.14
76.81
40.00
1.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.30
5.30

$943.40

VALOR UNI.
$241,000.00
$220,000.00
$14,000.00
$1,400.00
$2,100.00
$78,000.00
subtotal

VALOR PARCIAL
$31,330.00
$330,000.00
$127,960.00
$107,534.00
$84,000.00
$78,000.00
$758,824.00

VALOR UNI.
$9,739.06
$5,669.43

VALOR PARCIAL
$9,739.06
$5,669.43

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$15,408.49
775,176
$155,035.18
$155,035.18

20.0%

COSTO TOTAL UNITARIO

$930,211

ANALISIS UNITARIO
ITEM
EXCAVACION MANUAL EN RECEBO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA 3 m3 VIAJE
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00

RENDIM.
1.30
10.00

VALOR UNI.
$3,846.15
$13,500.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
1.30

VALOR UNI.
$23,113.85
subtotal

3.5.1
und
M3
VALOR PARCIAL
$3,846.15
$13,500.00
$17,346.15
VALOR PARCIAL

$0.00
VALOR PARCIAL
$23,113.85
$23,113.85

Total Costo Directo


A.I.U.
Total Costo Indirecto

40,460
$8,092.00
$8,092.00

20.0%

COSTO TOTAL UNITARIO

$48,552

ANALISIS UNITARIO
ITEM
EXCAVACION MANUAL TIERRA. H=2.50 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA 3 m3 VIAJE
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

3.5.2
und
M3

TARIFA DIA
5,000.00
135,000.00

RENDIM.
2.50
10.00

VALOR UNI.
$2,000.00
$13,500.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$2,000.00
$13,500.00
$15,500.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
2.50

$0.00

VALOR UNI.
$12,019.20

VALOR PARCIAL
$12,019.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,019.20
27,519
$5,503.84
$5,503.84

20.0%

COSTO TOTAL UNITARIO

$33,023

ANALISIS UNITARIO
ITEM
RECEBO COMPACTADO COMUN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
RECEBO COMUN

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
35,000.00

RENDIM.
10.00
35.00

UNIDAD
M3

CANTIDAD
1.34

VALOR UNI.
$500.00
$1,000.00
subtotal

VALOR PARCIAL
$500.00
$1,000.00
$1,500.00

VALOR UNI.
$25,000.00

VALOR PARCIAL
$33,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

3.5.3
und
M3

VALOR UNI.
$5,161.70
$3,004.80
subtotal

Total Costo Directo

$33,500.00
VALOR PARCIAL
$5,161.70
$3,004.80
$8,166.50
42,667

A.I.U.
Total Costo Indirecto

20.0%

$8,533.30
$8,533.30

COSTO TOTAL UNITARIO

$51,200

ANALISIS UNITARIO
ITEM
RELLENOS COMPACTOS TIERRA RECEBO 1:1
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
RECEBO COMUN
TIERRA SECA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
35,000.00

RENDIM.
10.00
35.00

UNIDAD
M3
M3

CANTIDAD
0.67
0.85

3.5.4
und
M3

VALOR UNI.
$500.00
$1,000.00
subtotal

VALOR PARCIAL
$500.00
$1,000.00
$1,500.00

VALOR UNI.
$25,000.00
$52,000.00

VALOR PARCIAL
$16,750.00
$44,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$60,950.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
70,617
$14,123.30
$14,123.30

20.0%

COSTO TOTAL UNITARIO

$84,740

ANALISIS UNITARIO
ITEM
RELLENOS MATERIAL COMUN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
RECEBO COMUN

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
35,000.00

RENDIM.
4.00
60.00

UNIDAD
M3

CANTIDAD
1.34

3.5.5
und
M3

VALOR UNI.
$1,250.00
$583.33
subtotal

VALOR PARCIAL
$1,250.00
$583.33
$1,833.33

VALOR UNI.
$25,000.00

VALOR PARCIAL
$33,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
4.00

$33,500.00

VALOR UNI.
$7,512.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$7,512.00
$7,512.00

20.0%

42,845
$8,569.07
$8,569.07

COSTO TOTAL UNITARIO

$51,414

ANALISIS UNITARIO
ITEM
RELLENOS MATERIAL SELECCIONADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
RECEBO COMUN

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
35,000.00

RENDIM.
4.00
35.00

UNIDAD
M3

CANTIDAD
1.34

3.5.6
und
M3

VALOR UNI.
$1,250.00
$1,000.00
subtotal

VALOR PARCIAL
$1,250.00
$1,000.00
$2,250.00

VALOR UNI.
$25,000.00

VALOR PARCIAL
$33,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
4.00

$33,500.00

VALOR UNI.
$7,512.00

VALOR PARCIAL
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,512.00
43,262
$8,652.40
$8,652.40

20.0%

COSTO TOTAL UNITARIO

$51,914

ANALISIS UNITARIO
ITEM
CAJA CONTADOR AGUA FIBRIT. S/EXC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.50

3.6.1
und
UN

VALOR UNI.
$769.23
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CAJA CONTADOR ACUEDUCTO
RECEBO COMUN
BASE GRANULAR

UNIDAD
UN
M3
M3

CANTIDAD
1.00
0.02
0.02

$769.23

VALOR UNI.
$38,000.00
$25,000.00
$17,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
6.50

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$38,000.00
$500.00
$350.00

$38,850.00

VALOR UNI.
$7,941.08
$4,622.77

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$769.23

VALOR PARCIAL
$7,941.08
$4,622.77
$12,563.85

20.0%

52,183
$10,436.62
$10,436.62
$62,620

ANALISIS UNITARIO
ITEM
CAMARAS ELECTRICAS DOBLES. S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.80

3.6.2
und
UN

VALOR UNI.
$6,250.00

VALOR PARCIAL
$6,250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO TOLETE RECOCIDO
ARENA LAVADA DE PEA
ACERO FIGURADO 60000 PSI 1/2"
ALAMBRE NEGRO No 18
GRAVILLA DE RIO
ARENA LAVADA DE RIO
RECEBO COMUN
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
UN
M3
KG
KG
M3
M3
M3

CANTIDAD
256.00
528.00
0.46
20.63
0.62
0.34
0.16
0.36

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.80
0.80

$6,250.00

VALOR UNI.
$400.00
$560.00
$25,000.00
$1,780.00
$2,000.00
$58,000.00
$58,000.00
$25,000.00
subtotal

VALOR PARCIAL
$102,400.00
$295,680.00
$11,500.00
$36,721.40
$1,240.00
$19,720.00
$9,280.00
$9,000.00
$485,541.40

VALOR UNI.
$64,521.25
$37,560.00

VALOR PARCIAL
$64,521.25
$37,560.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$102,081.25
593,873
$118,774.53
$118,774.53

20.0%

COSTO TOTAL UNITARIO

$712,647

ANALISIS UNITARIO
ITEM
DUCTO ELECTRICO PVC 3". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.80

3.6.3
und
ML

VALOR UNI.
$1,785.71
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
UNION CONDUIT PVC 3"
DUCTO ELECTRICO LIVIANO 3"
RECEBO COMUN

UNIDAD
UN
ML
M3

CANTIDAD
0.21
1.03
0.01

$1,785.71

VALOR UNI.
$4,817.00
$6,000.00
$25,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.80
2.80

VALOR PARCIAL
$1,011.57
$6,180.00
$250.00

$7,441.57

VALOR UNI.
$21,200.00
$11,802.86
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$1,785.71

VALOR PARCIAL
$21,200.00
$11,802.86
$33,002.86

20.0%

42,230
$8,446.03
$8,446.03

COSTO TOTAL UNITARIO

$50,676

ANALISIS UNITARIO
ITEM
DUCTOS ELECTRICOS A.C. 4". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.80

3.6.4
und
ML

VALOR UNI.
$1,785.71

VALOR PARCIAL
$1,785.71

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
DUCTO ETERNIT 4"
UNION A.C. CONICA 4"
RECEBO COMUN

UNIDAD
ML
UN
M3

CANTIDAD
1.03
0.21
0.01

$1,785.71

VALOR UNI.
$23,600.00
$2,500.00
$25,000.00

VALOR PARCIAL
$24,308.00
$525.00
$250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.80
2.80

$25,083.00

VALOR UNI.
$21,200.00
$11,802.86

VALOR PARCIAL
$21,200.00
$11,802.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$33,002.86
59,872
$11,974.31
$11,974.31

20.0%

COSTO TOTAL UNITARIO

$71,846

ANALISIS UNITARIO
ITEM
DUCTOS ELECTRICOS PVC 4". S/E
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.80

3.6.5
und
ML

VALOR UNI.
$1,785.71
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
UNION CONDUIT PVC 4"
DUCTO ELECTRICO LIVIANO 4"
RECEBO COMUN

UNIDAD
UN
ML
M3

CANTIDAD
0.21
1.03
0.01

$1,785.71

VALOR UNI.
$7,169.00
$10,450.00
$25,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.80
2.80

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,505.49
$10,763.50
$250.00

$12,518.99

VALOR UNI.
$21,200.00
$11,802.86

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$1,785.71

VALOR PARCIAL
$21,200.00
$11,802.86
$33,002.86

20.0%

47,308
$9,461.51
$9,461.51
$56,769

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
COLUMNAS F=12 M2/M3. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
0.50

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
PARAL TELESCOPICO
SECCION ANDAMIO
MORDAZA METALICA ($127/DIA JUEGO)
VIBRADOR A GASOLINA

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
DIA
DIA
DIA/JUEGO
UNIDAD

CANTIDAD
1.03
8.26
4.02
3.64
0.40
2.00
2.00
0.20
0.20
0.70

4.1.2
und
M3

VALOR UNI.
$10,000.00
subtotal

VALOR PARCIAL
$10,000.00
$10,000.00

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$70.00
$70.00
$120.00
$25,000.00

VALOR PARCIAL
$226,600.00
$11,233.60
$1,809.00
$4,924.92
$1,460.00
$3,000.00
$140.00
$14.00
$24.00
$17,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.50

$266,705.52

VALOR UNI.
$103,234.00
$60,096.00

VALOR PARCIAL
$103,234.00
$60,096.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$163,330.00
440,036
$88,007.10
$88,007.10

20.0%

COSTO TOTAL UNITARIO

$528,043

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
COLUMNAS F=7.00 M2/M3. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
0.80

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
PARAL TELESCOPICO
SECCION ANDAMIO
MORDAZA METALICA ($127/DIA JUEGO)
VIBRADOR A GASOLINA

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
DI
DIA
DIA/JUEGO
UNIDAD

CANTIDAD
1.03
8.26
4.02
3.64
0.40
2.00
2.00
0.20
0.20
0.70

VALOR UNI.
$6,250.00
subtotal

VALOR PARCIAL
$6,250.00
$6,250.00

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$70.00
$70.00
$120.00
$25,000.00

VALOR PARCIAL
$226,600.00
$11,233.60
$1,809.00
$4,924.92
$1,460.00
$3,000.00
$140.00
$14.00
$24.00
$17,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.80
0.80

4.1.3
und
M3

VALOR UNI.
$64,521.25
$37,560.00

$266,705.52
VALOR PARCIAL
$64,521.25
$37,560.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$102,081.25
375,037
$75,007.35
$75,007.35

20.0%

COSTO TOTAL UNITARIO

$450,044

ANALISIS UNITARIO
No. ITEM
UNIDAD:

4.1.4
und
M3

ITEM
COLUMNAS F=8.35 M2/M3. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
0.60

VALOR UNI.
$8,333.33
subtotal

VALOR PARCIAL
$8,333.33
$8,333.33

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
PARAL TELESCOPICO
SECCION ANDAMIO
MORDAZA METALICA ($127/DIA JUEGO)
VIBRADOR A GASOLINA

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
DI
DIA
DIA/JUEGO
UNIDAD

CANTIDAD
1.03
8.26
4.02
3.64
0.40
2.00
2.00
0.20
0.20
0.70

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$70.00
$70.00
$120.00
$25,000.00
subtotal

VALOR PARCIAL
$226,600.00
$11,233.60
$1,809.00
$4,924.92
$1,460.00
$3,000.00
$140.00
$14.00
$24.00
$17,500.00
$266,705.52

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.60
0.60

VALOR UNI.
$86,028.33
$50,080.00

VALOR PARCIAL
$86,028.33
$50,080.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$136,108.33
411,147
$82,229.44
$82,229.44

20.0%

COSTO TOTAL UNITARIO

$493,377

ANALISIS UNITARIO
ITEM
MUROS EN CONCRETO DE 0.10. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
ALQUILER FORMALETA
SECCION ANDAMIO
VIBRADOR A GASOLINA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.50

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
M2/MES
DIA
DIA

CANTIDAD
1.03
8.26
4.02
3.64
0.40
2.00
4.00
0.20
0.70

4.1.5
und
M3

VALOR UNI.
$10,000.00
subtotal

VALOR PARCIAL
$10,000.00
$10,000.00

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$85.00
$70.00
$25,000.00

VALOR PARCIAL
$226,600.00
$11,233.60
$1,809.00
$4,924.92
$1,460.00
$3,000.00
$340.00
$14.00
$17,500.00

subtotal

$266,881.52

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.50

VALOR UNI.
$103,234.00
$60,096.00

VALOR PARCIAL
$103,234.00
$60,096.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$163,330.00
440,212
$88,042.30
$88,042.30

20.0%

COSTO TOTAL UNITARIO

$528,254

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
VIGAS AEREAS. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
0.70

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
ALQUILER FORMALETA
SECCION ANDAMIO
VIBRADOR A GASOLINA

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
M2
DIA
DIA

CANTIDAD
1.03
8.26
2.00
2.00
0.40
2.00
2.00
0.20
0.70

4.2.1
und
M3

VALOR UNI.
$7,142.86
subtotal

VALOR PARCIAL
$7,142.86
$7,142.86

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$85.00
$70.00
$25,000.00

VALOR PARCIAL
$226,600.00
$11,233.60
$900.00
$2,706.00
$1,460.00
$3,000.00
$170.00
$14.00
$17,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.70
0.70

$263,583.60

VALOR UNI.
$73,738.57
$42,925.71

VALOR PARCIAL
$73,738.57
$42,925.71

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$116,664.29
387,391
$77,478.15
$77,478.15

20.0%

COSTO TOTAL UNITARIO

$464,869

ANALISIS UNITARIO
ITEM
VIGAS AMARRE SOBRE MUROS. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.50

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB

CANTIDAD
1.03
8.26
2.00
2.00
0.40
2.00

4.2.2
und
M3

VALOR UNI.
$10,000.00
subtotal

VALOR PARCIAL
$10,000.00
$10,000.00

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00

VALOR PARCIAL
$226,600.00
$11,233.60
$900.00
$2,706.00
$1,460.00
$3,000.00

ALQUILER FORMALETA
SECCION ANDAMIO
VIBRADOR A GASOLINA

M2
DIA
DIA

2.00
0.20
0.70

$85.00
$70.00
$25,000.00

$170.00
$14.00
$17,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.50

$263,583.60

VALOR UNI.
$103,234.00
$60,096.00

VALOR PARCIAL
$103,234.00
$60,096.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$163,330.00
436,914
$87,382.72
$87,382.72

20.0%

COSTO TOTAL UNITARIO

$524,296

ANALISIS UNITARIO
ITEM
VIGAS CANALES. D=1.20 MS. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
ALQUILER FORMALETA MES
SECCION ANDAMIO
VIBRADOR A GASOLINA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.70

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
M2
DIA
DIA

CANTIDAD
1.03
8.26
2.00
2.00
0.40
2.00
2.00
0.20
0.70

4.2.3
und
M3

VALOR UNI.
$7,142.86
subtotal

VALOR PARCIAL
$7,142.86
$7,142.86

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$85.00
$70.00
$25,000.00

VALOR PARCIAL
$226,600.00
$11,233.60
$900.00
$2,706.00
$1,460.00
$3,000.00
$170.00
$14.00
$17,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.70
0.70

$263,583.60

VALOR UNI.
$73,738.57
$42,925.71

VALOR PARCIAL
$73,738.57
$42,925.71

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$116,664.29
387,391
$77,478.15
$77,478.15

20.0%

COSTO TOTAL UNITARIO

$464,869

ANALISIS UNITARIO
ITEM
VIGAS PREFABRICADAS. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1.00

UNIDAD
M3

CANTIDAD
1.03

4.2.4
und
M3

VALOR UNI.
$5,000.00
subtotal

VALOR PARCIAL
$5,000.00
$5,000.00

VALOR UNI.
$220,000.00

VALOR PARCIAL
$226,600.00

REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
VIBRADOR A GASOLINA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

ML
UNIDAD
UNIDAD
GL
UNIDAD

TARIFA DIA
51,617.00
30,048.00

4.00
2.00
2.00
0.40
0.70

RENDIM.
1.00
1.00

$1,360.00
$450.00
$1,353.00
$3,650.00
$25,000.00
subtotal

$5,440.00
$900.00
$2,706.00
$1,460.00
$17,500.00
$254,606.00

VALOR UNI.
$51,617.00
$30,048.00

VALOR PARCIAL
$51,617.00
$30,048.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$81,665.00
341,271
$68,254.20
$68,254.20

20.0%

COSTO TOTAL UNITARIO

$409,525

ANALISIS UNITARIO
ITEM
ENTREPISO BLOQUE DE ESCORIA. C. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
BLOQUE DE ESCORIA
VIBRADOR A GASOLINA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

4.3.1
und
M2

TARIFA DIA
5,000.00

RENDIM.
4.50

VALOR UNI.
$1,111.11
subtotal

VALOR PARCIAL
$1,111.11
$1,111.11

UNIDAD
M3
UNIDAD
UNIDAD

CANTIDAD
0.12
7.00
0.10

VALOR UNI.
$220,000.00
$450.00
$25,000.00
subtotal

VALOR PARCIAL
$26,400.00
$3,150.00
$2,500.00
$32,050.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.50
4.50

VALOR UNI.
$11,470.44
$6,677.33

VALOR PARCIAL
$11,470.44
$6,677.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,147.78
51,309
$10,261.78
$10,261.78

20.0%

COSTO TOTAL UNITARIO

$61,571

ANALISIS UNITARIO
ITEM
LAMINA COLABORANTE 0.10 CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
VIBRADOR A GASOLINA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
6.00
0.18

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
UNIDAD

CANTIDAD
0.11
2.00
1.00
1.00
0.20
0.10

4.3.2
und
M2

VALOR UNI.
$833.33
$388.89
subtotal

VALOR PARCIAL
$833.33
$388.89
$1,222.22

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$25,000.00

VALOR PARCIAL
$24,200.00
$2,720.00
$450.00
$1,353.00
$730.00
$2,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$31,953.00

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
46,786
$9,357.21
$9,357.21

20.0%

COSTO TOTAL UNITARIO

$56,143

ANALISIS UNITARIO
ITEM
LOSA ALIGERADA CASETON DE 0.30. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
CONTRATO CASETON
FORMALETA ENTREPISO
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

4.3.3
und
M2

TARIFA DIA
5,000.00
70.00

RENDIM.
3.52
0.18

VALOR UNI.
$1,420.45
$388.89
subtotal

VALOR PARCIAL
$1,420.45
$388.89
$1,809.34

UNIDAD
M3
UNIDAD
ML
M2

CANTIDAD
0.170
0.10
1.00
1.00

VALOR UNI.
$220,000.00
$25,000.00
$9,900.00
$85.00
subtotal

VALOR PARCIAL
$37,400.00
$2,500.00
$9,900.00
$85.00
$49,885.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.52
3.52

VALOR UNI.
$14,663.92
$8,536.36

VALOR PARCIAL
$14,663.92
$8,536.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$23,200.28
74,895
$14,978.93
$14,978.93

20.0%

COSTO TOTAL UNITARIO

$89,874

ANALISIS UNITARIO
ITEM
LOSA ALIGERADA CASETON DE 0.35. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
CONTRATO CASETON
FORMALETA ENTREPISO MES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
3.20
0.18

UNIDAD
M3
UNIDAD
ML
M2

CANTIDAD
0.190
0.10
1.00
1.00

VALOR UNI.
$1,562.50
$388.89
subtotal

VALOR PARCIAL
$1,562.50
$388.89
$1,951.39

VALOR UNI.
$220,000.00
$25,000.00
$9,900.00
$85.00

VALOR PARCIAL
$41,800.00
$2,500.00
$9,900.00
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
51,617.00

RENDIM.
3.20

4.3.4
und
M2

VALOR UNI.
$16,130.31

$54,285.00
VALOR PARCIAL
$16,130.31

Ayudante ( incluye 100% de prestaciones)

30,048.00

3.20

$9,390.00

$9,390.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$25,520.31
81,757
$16,351.34
$16,351.34

20.0%

COSTO TOTAL UNITARIO

$98,108

ANALISIS UNITARIO
ITEM
LOSA ALIGERADA CASETON DE 0.40. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
CONTRATO CASETON
FORMALETA ENTREPISO MES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
2.80
0.50

UNIDAD
M3
UNIDAD
ML
M2

CANTIDAD
0.210
0.10
1.00
1.00

4.3.5
und
M2

VALOR UNI.
$1,785.71
$140.00
subtotal

VALOR PARCIAL
$1,785.71
$140.00
$1,925.71

VALOR UNI.
$220,000.00
$25,000.00
$9,900.00
$85.00

VALOR PARCIAL
$46,200.00
$2,500.00
$9,900.00
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.80
2.80

$58,685.00

VALOR UNI.
$18,434.64
$10,731.43

VALOR PARCIAL
$18,434.64
$10,731.43

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$29,166.07
89,777
$17,955.36
$17,955.36

20.0%

COSTO TOTAL UNITARIO

$107,732

ANALISIS UNITARIO
ITEM
LOSA ALIGERADA CASETON DE 0.45. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
CONTRATO CASETON
FORMALETA ENTREPISO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
2.20
0.50

UNIDAD
M3
UNIDAD
ML
M2

CANTIDAD
0.230
0.10
1.00
1.00

VALOR UNI.
$2,272.73
$140.00
subtotal

VALOR PARCIAL
$2,272.73
$140.00
$2,412.73

VALOR UNI.
$220,000.00
$25,000.00
$9,900.00
$85.00

VALOR PARCIAL
$50,600.00
$2,500.00
$9,900.00
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.20
2.20

4.3.6
und
M2

VALOR UNI.
$23,462.27
$13,658.18
subtotal

$63,085.00
VALOR PARCIAL
$23,462.27
$13,658.18
$37,120.45

Total Costo Directo


A.I.U.
Total Costo Indirecto

102,618
$20,523.64
$20,523.64

20.0%

COSTO TOTAL UNITARIO

$123,142

ANALISIS UNITARIO
ITEM
LOSA ALIGERADA CASETON DE 0.50. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
CONTRATO CASETON
FORMALETA ENTREPISO MES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
1.90
0.18

UNIDAD
M3
UNIDAD
ML
M2

CANTIDAD
0.245
0.10
1.00
1.00

4.3.7
und
M2

VALOR UNI.
$2,631.58
$388.89
subtotal

VALOR PARCIAL
$2,631.58
$388.89
$3,020.47

VALOR UNI.
$220,000.00
$25,000.00
$9,900.00
$85.00

VALOR PARCIAL
$53,900.00
$2,500.00
$9,900.00
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.90
1.90

$66,385.00

VALOR UNI.
$27,166.84
$15,814.74

VALOR PARCIAL
$27,166.84
$15,814.74

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$42,981.58
112,387
$22,477.41
$22,477.41

20.0%

COSTO TOTAL UNITARIO

$134,864

ANALISIS UNITARIO
ITEM
LOSA CONCRETO CON PREPLANA. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
LOSA CONCRETO PREPLANA 3.000 PSI
FORMALETA ENTREPISO MES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
5.80
0.36

UNIDAD
M2
M2

CANTIDAD
1.100
1.00

4.3.8
und
M2

VALOR UNI.
$862.07
$194.44
subtotal

VALOR PARCIAL
$862.07
$194.44
$1,056.51

VALOR UNI.
$24,360.00
$85.00

VALOR PARCIAL
$26,796.00
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.80
5.80

$26,881.00

VALOR UNI.
$8,899.48
$5,180.69
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$8,899.48
$5,180.69
$14,080.17

20.0%

42,018
$8,403.54
$8,403.54

COSTO TOTAL UNITARIO

$50,421

ANALISIS UNITARIO
ITEM
LOSA MACIZA DE 0.10. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
FORMALETA ENTREPISO MES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
8.00
0.18

UNIDAD
M3
DIA
M2

CANTIDAD
0.110
0.10
1.00

4.3.9
und
M2

VALOR UNI.
$625.00
$388.89
subtotal

VALOR PARCIAL
$625.00
$388.89
$1,013.89

VALOR UNI.
$220,000.00
$25,000.00
$85.00

VALOR PARCIAL
$24,200.00
$2,500.00
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$26,785.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
38,007
$7,601.40
$7,601.40

20.0%

COSTO TOTAL UNITARIO

$45,608

ANALISIS UNITARIO
ITEM
LOSA MACIZA DE 0.12. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
FORMALETA ENTREPISO MES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
6.50
0.36

UNIDAD
M3
DIA
M2

CANTIDAD
0.130
0.10
1.00

4.3.10
und
M2

VALOR UNI.
$769.23
$194.44
subtotal

VALOR PARCIAL
$769.23
$194.44
$963.68

VALOR UNI.
$220,000.00
$25,000.00
$85.00

VALOR PARCIAL
$28,600.00
$2,500.00
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
6.50

$31,185.00

VALOR UNI.
$7,941.08
$4,622.77

VALOR PARCIAL
$7,941.08
$4,622.77

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,563.85
44,713
$8,942.50
$8,942.50

20.0%

COSTO TOTAL UNITARIO

$53,655

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

4.3.11
und

LOSA MACIZA DE 0.15. CONC. 3000 PSI


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
FORMALETA ENTREPISO MES

M2
TARIFA DIA
5,000.00
70.00

RENDIM.
5.40
0.36

UNIDAD
M3
DIA
M2

CANTIDAD
0.170
0.10
1.00

VALOR UNI.
$925.93
$194.44
subtotal

VALOR PARCIAL
$925.93
$194.44
$1,120.37

VALOR UNI.
$220,000.00
$25,000.00
$85.00

VALOR PARCIAL
$37,400.00
$2,500.00
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.40
5.40

$39,985.00

VALOR UNI.
$9,558.70
$5,564.44

VALOR PARCIAL
$9,558.70
$5,564.44

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$15,123.15
56,229
$11,245.70
$11,245.70

20.0%

COSTO TOTAL UNITARIO

$67,474

ANALISIS UNITARIO
No. ITEM
UNIDAD:

4.4.1
und
M3

ITEM
ESCALERAS EN CONCRETO. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
0.37

VALOR UNI.
$13,513.51
subtotal

VALOR PARCIAL
$13,513.51
$13,513.51

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
SECCION ANDAMIO
MORDAZA METALICA ($127/DIA JUEGO)
VIBRADOR A GASOLINA
FORMALETA ENTREPISOS
PARAL TELESCOPICO
GEOTEXTIL

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
DIA
DIA/JUEGO
DIA
DIA
DIA
GL

CANTIDAD
1.10
8.26
6.00
5.00
0.40
2.00
0.20
0.20
2.80
2.90
2.90
0.22

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$70.00
$120.00
$25,000.00
$85.00
$70.00
$2,100.00
subtotal

VALOR PARCIAL
$242,000.00
$11,233.60
$2,700.00
$6,765.00
$1,460.00
$3,000.00
$14.00
$24.00
$70,000.00
$246.50
$203.00
$462.00
$338,108.10

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.37
0.37

VALOR UNI.
$139,505.41
$81,210.81

VALOR PARCIAL
$139,505.41
$81,210.81

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO
ANALISIS UNITARIO

$220,716.22

20.0%

572,338
$114,467.57
$114,467.57
$686,805

No. ITEM
UNIDAD:

ITEM
TANQUE ELEVADO. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
0.34

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
FORMALETA ENTREPISO MES
SECCION ANDAMIO
MORDAZA METALICA ($127/DIA JUEGO)
VIBRADOR A GASOLINA

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
M2
DIA
DIA/JUEGO
DIA

CANTIDAD
1.10
4.00
2.00
5.00
0.40
2.00
2.00
0.20
0.20
2.80

4.4.2
und
M3

VALOR UNI.
$14,705.88
subtotal

VALOR PARCIAL
$14,705.88
$14,705.88

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$85.00
$70.00
$120.00
$25,000.00

VALOR PARCIAL
$242,000.00
$5,440.00
$900.00
$6,765.00
$1,460.00
$3,000.00
$170.00
$14.00
$24.00
$70,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.34
0.34

$329,773.00

VALOR UNI.
$151,814.71
$88,376.47

VALOR PARCIAL
$151,814.71
$88,376.47

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$240,191.18
584,670
$116,934.01
$116,934.01

20.0%

COSTO TOTAL UNITARIO

$-467,736

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
TANQUE SUBTERRANEO. CONC. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
0.48

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
FORMALETA ENTREPISO MES
SECCION ANDAMIO
MORDAZA METALICA ($127/DIA JUEGO)
VIBRADOR A GASOLINA

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
M2
DIA
DIA/JUEGO
DIA

CANTIDAD
1.19
4.00
2.00
5.00
0.40
2.00
2.00
0.20
0.20
2.80

VALOR UNI.
$10,416.67
subtotal

VALOR PARCIAL
$10,416.67
$10,416.67

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,650.00
$1,500.00
$85.00
$70.00
$120.00
$25,000.00

VALOR PARCIAL
$261,800.00
$5,440.00
$900.00
$6,765.00
$1,460.00
$3,000.00
$170.00
$14.00
$24.00
$70,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.48
0.48

4.4.3
und
M3

VALOR UNI.
$107,535.42
$62,600.00
subtotal

Total Costo Directo

$349,573.00
VALOR PARCIAL
$107,535.42
$62,600.00
$170,135.42
530,125

A.I.U.
Total Costo Indirecto

20.0%

$106,025.02
$106,025.02

COSTO TOTAL UNITARIO

$636,150

ANALISIS UNITARIO
No. ITEM
UNIDAD:

4.5.1
und
TN

ITEM
ACERO DE REFUERZO 37000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
0.30

VALOR UNI.
$16,666.67
subtotal

VALOR PARCIAL
$16,666.67
$16,666.67

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
ACERO FIGURADO 37000 PSI
SEGUETA NICHOLSON

UNIDAD
KG
KG
UNIDAD

CANTIDAD
0.02
1,050.00
30.00

VALOR UNI.
$2,000.00
$1,780.00
$3,200.00
subtotal

VALOR PARCIAL
$40.00
$1,869,000.00
$96,000.00
$1,965,040.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.30
0.30

VALOR UNI.
$172,056.67
$100,160.00

VALOR PARCIAL
$172,056.67
$100,160.00

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$272,216.67
2,253,923
$450,784.67
$450,784.67

20.0%

COSTO TOTAL UNITARIO

$2,704,708

ANALISIS UNITARIO
ITEM
ACERO DE REFUERZO 60000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.30

4.5.2
und
TN

VALOR UNI.
$16,666.67
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ACERO FIGURADO 60000 PSI 1/2"
ALAMBRE NEGRO No. 18
SEGUETA NICHOLSON

UNIDAD
KG
KG
UNIDAD

CANTIDAD
1,050.00
30.00
30.00

$16,666.67

VALOR UNI.
$1,780.00
$2,000.00
$3,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.30
0.30

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,869,000.00
$60,000.00
$96,000.00

$2,025,000.00

VALOR UNI.
$172,056.67
$100,160.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$16,666.67

VALOR PARCIAL
$172,056.67
$100,160.00
$272,216.67

20.0%

2,313,883
$462,776.67
$462,776.67
$2,776,660

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
GRAFIL DE 6 MM
I.EQUIPO
DESCRIPCION

TARIFA DIA

RENDIM.

4.5.3
und
KG

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
$0.00
$0.00

20.0%

COSTO TOTAL UNITARIO

$0

ANALISIS UNITARIO
ITEM
MALLAS ELECTROSOLDADAS
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

4.5.4
und
KG

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MALLA ELECTROSOLDADA

UNIDAD
UNIDAD

CANTIDAD
0.02

$0.00

VALOR UNI.
$58,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
110.00
110.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,170.00

$1,170.00

VALOR UNI.
$469.25
$273.16

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL

VALOR PARCIAL
$469.25
$273.16
$742.41

20.0%

1,912
$382.48
$382.48
$2,295

ANALISIS UNITARIO
ITEM
BLOQUE ESTRUCTURAL DE 12 x 19 x 39
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.00

5.1.1
und
M2

VALOR UNI.
$714.29

VALOR PARCIAL
$714.29

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
BLOQUE CONCRETO 12 X 19 X 39

UNIDAD
M3
UN

CANTIDAD
0.01
12.50

$714.29

VALOR UNI.
$166,200.00
$1,230.00

VALOR PARCIAL
$1,662.00
$15,375.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$17,037.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
29,418
$5,883.54
$5,883.54

20.0%

COSTO TOTAL UNITARIO

$35,301

ANALISIS UNITARIO
ITEM
BLOQUE ESTRUCTURAL DE 14 x 19 x 39
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.00

5.1.2
und
M2

VALOR UNI.
$714.29
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
BLOQUE CONCRETO 14 X 19 X 39

UNIDAD
M3
UN

CANTIDAD
0.01
12.50

$714.29

VALOR UNI.
$166,200.00
$1,230.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,662.00
$15,375.00

$17,037.00

VALOR UNI.
$7,373.86
$4,292.57

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$714.29

VALOR PARCIAL
$7,373.86
$4,292.57
$11,666.43

20.0%

29,418
$5,883.54
$5,883.54
$35,301

ANALISIS UNITARIO
ITEM
BLOQUE ESTRUCTURAL TIPO PIEDRA DE 0.16
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.00

5.1.3
und
M2

VALOR UNI.
$714.29

VALOR PARCIAL
$714.29

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
BLOQUE 14 X 19 X 39

UNIDAD
M3
UN

CANTIDAD
0.01
12.50

$714.29

VALOR UNI.
$166,200.00
$1,230.00

VALOR PARCIAL
$1,662.00
$15,375.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$17,037.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
29,418
$5,883.54
$5,883.54

20.0%

COSTO TOTAL UNITARIO

$35,301

ANALISIS UNITARIO
ITEM
CORTE LADRILLO
I.EQUIPO
DESCRIPCION
ALQUILER CORTADORA CON OPERARIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

5.2.1
und
UN

TARIFA DIA
20,000.00

RENDIM.
400.00

VALOR UNI.
$50.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
50
$10.00
$10.00

20.0%

COSTO TOTAL UNITARIO

$60

ANALISIS UNITARIO
ITEM
MUROS LAD. PORTANTE PRENSADO DE 0.15
I.EQUIPO

No. ITEM
UNIDAD:

5.2.2
und
M2

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
11.00

VALOR UNI.
$454.55

VALOR PARCIAL
$454.55

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
LADRILLO PORTANTE SANTA FE

UNIDAD
M3
UN

CANTIDAD
0.03
55.00

$454.55

VALOR UNI.
$166,200.00
$850.00

VALOR PARCIAL
$4,986.00
$46,750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
11.00
11.00

$51,736.00

VALOR UNI.
$4,692.45
$2,731.64

VALOR PARCIAL
$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
59,615
$11,922.93
$11,922.93

20.0%

COSTO TOTAL UNITARIO

$71,538

ANALISIS UNITARIO
ITEM
MUROS LAD. PORTANTE PRENSADO DE 0.25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

5.2.3
und
M2

VALOR UNI.
$625.00

VALOR PARCIAL
$625.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
LADRILLO PORTANTE PRENSADO

UNIDAD
M3
UN

CANTIDAD
0.07
118.00

$625.00

VALOR UNI.
$166,200.00
$550.00

VALOR PARCIAL
$11,634.00
$64,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$76,534.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
87,367
$17,473.43
$17,473.43

20.0%

COSTO TOTAL UNITARIO

$104,841

ANALISIS UNITARIO
ITEM
MUROS LAD. TOLETE FINO PERFORADO DE 0.12
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

5.2.4
und
M2
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

8.00

$625.00

$625.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
LADRILLO TOLETE FINO LIVIANO

UNIDAD
M3
UN

CANTIDAD
0.03
59.00

$625.00

VALOR UNI.
$166,200.00
$480.00

VALOR PARCIAL
$4,986.00
$28,320.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$33,306.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
44,139
$8,827.83
$8,827.83

20.0%

COSTO TOTAL UNITARIO

$52,967

ANALISIS UNITARIO
ITEM
MUROS LAD. TOLETE FINO PERFORADO DE 0.25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

5.2.5
und
M2

VALOR UNI.
$1,000.00

VALOR PARCIAL
$1,000.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
LADRILLO TOLETE FINO LIVIANO

UNIDAD
M3
UN

CANTIDAD
0.07
118.00

$1,000.00

VALOR UNI.
$166,200.00
$480.00

VALOR PARCIAL
$11,634.00
$56,640.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$68,274.00

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
85,607
$17,121.40
$17,121.40

20.0%

COSTO TOTAL UNITARIO

$102,728

ANALISIS UNITARIO
ITEM
MUROS LADRILLO HUECO # 4 DE 0.09
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
15.00

VALOR UNI.
$333.33

5.2.6
und
M2
VALOR PARCIAL
$333.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BLOQUE No 4
MORTERO 1 : 4

UNIDAD
UN
M3

CANTIDAD
13.30
0.06

$333.33

VALOR UNI.
$450.00
$166,200.00

VALOR PARCIAL
$5,985.00
$9,972.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$15,957.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
21,735
$4,346.93
$4,346.93

20.0%

COSTO TOTAL UNITARIO

$26,082

ANALISIS UNITARIO
ITEM
MUROS LADRILLO HUECO # 5 DE 0.115
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
15.00

5.2.7
und
M2

VALOR UNI.
$333.33

VALOR PARCIAL
$333.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BLOQUE No 5
MORTERO 1 : 4

UNIDAD
UN
M3

CANTIDAD
13.30
0.01

$333.33

VALOR UNI.
$450.00
$166,200.00

VALOR PARCIAL
$5,985.00
$1,662.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$7,647.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
13,425
$2,684.93
$2,684.93

20.0%

COSTO TOTAL UNITARIO

$16,110

ANALISIS UNITARIO
ITEM
MUROS LADRILLO HUECO # 6 DE 0.23
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.00

VALOR UNI.
$714.29

5.2.8
und
M2
VALOR PARCIAL
$714.29

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BLOQUE No 6
MORTERO 1 : 4

UNIDAD
UN
M3

CANTIDAD
22.00
0.04

$714.29

VALOR UNI.
$476.00
$166,200.00

VALOR PARCIAL
$10,472.00
$6,648.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$17,120.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
29,501
$5,900.14
$5,900.14

20.0%

COSTO TOTAL UNITARIO

$35,401

ANALISIS UNITARIO
ITEM
MUROS LADRILLO PRENSADO DE 0.06. V0C
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.30

5.2.9
und
M2

VALOR UNI.
$537.63

VALOR PARCIAL
$537.63

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
LADRILLO PRENSADO SANTA FE

UNIDAD
M3
UN

CANTIDAD
0.02
30.60

$537.63

VALOR UNI.
$166,200.00
$550.00

VALOR PARCIAL
$3,324.00
$16,830.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.30
9.30

$20,154.00

VALOR UNI.
$5,548.83
$3,230.97

VALOR PARCIAL
$5,548.83
$3,230.97

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,779.80
29,471
$5,894.29
$5,894.29

20.0%

COSTO TOTAL UNITARIO

$35,366

ANALISIS UNITARIO
ITEM
MUROS LADRILLO PRENSADO DE 0.12. V2C
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
11.00

VALOR UNI.
$454.55
subtotal

5.2.10
und
M2
VALOR PARCIAL
$454.55
$454.55

II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
LADRILLO PRENSADO SANTA FE

UNIDAD
M3
UN

CANTIDAD
0.03
55.00

VALOR UNI.
$166,200.00
$550.00

VALOR PARCIAL
$4,986.00
$30,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
11.00
11.00

$35,236.00

VALOR UNI.
$4,692.45
$2,731.64

VALOR PARCIAL
$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
43,115
$8,622.93
$8,622.93

20.0%

COSTO TOTAL UNITARIO

$51,738

ANALISIS UNITARIO
ITEM
MUROS LADRILLO PRENSADO DE 0.25. V2C
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

5.2.11
und
M2

VALOR UNI.
$833.33

VALOR PARCIAL
$833.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
LADRILLO PRENSADO SANTA FE

UNIDAD
M3
UN

CANTIDAD
0.03
118.00

$833.33

VALOR UNI.
$166,200.00
$550.00

VALOR PARCIAL
$4,986.00
$64,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$69,886.00

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
84,330
$16,866.03
$16,866.03

20.0%

COSTO TOTAL UNITARIO

$101,196

ANALISIS UNITARIO
ITEM
MUROS LADRILLO TOLETE COMUN DE 0.07
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.50

VALOR UNI.
$526.32
subtotal

II.MATERIALES DE OBRA

5.2.12
und
M2
VALOR PARCIAL
$526.32
$526.32

DESCRIPCION
MORTERO 1 : 4
LADRILLO TOLETE RECOCIDO

UNIDAD
M3
UN

CANTIDAD
0.02
30.60

VALOR UNI.
$166,200.00
$455.00

VALOR PARCIAL
$2,825.40
$13,923.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.50

$16,748.40

VALOR UNI.
$5,433.37
$3,162.95

VALOR PARCIAL
$5,433.37
$3,162.95

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,596.32
25,871
$5,174.21
$5,174.21

20.0%

COSTO TOTAL UNITARIO

$31,045

ANALISIS UNITARIO
ITEM
MUROS LADRILLO TOLETE COMUN DE 0.12
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.60

5.2.13
und
M2

VALOR UNI.
$471.70

VALOR PARCIAL
$471.70

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 4
LADRILLO TOLETE RECOCIDO

UNIDAD
M3
UN

CANTIDAD
0.06
55.00

$471.70

VALOR UNI.
$166,200.00
$455.00

VALOR PARCIAL
$9,972.00
$25,025.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.60
10.60

$34,997.00

VALOR UNI.
$4,869.53
$2,834.72

VALOR PARCIAL
$4,869.53
$2,834.72

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,704.25
43,173
$8,634.59
$8,634.59

20.0%

COSTO TOTAL UNITARIO

$51,808

ANALISIS UNITARIO
ITEM
MUROS LADRILLO TOLETE COMUN DE 0.25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

5.2.14
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

MORTERO 1 : 4
LADRILLO TOLETE RECOCIDO

M3
UN

0.09
118.00

$166,200.00
$455.00

$14,958.00
$53,690.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$68,648.00

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal

A.I.U.
Total Costo Indirecto

$13,610.83
82,309
$16,461.77
$16,461.77

20.0%

COSTO TOTAL UNITARIO

$98,771

ANALISIS UNITARIO
ITEM
SOBRECIMIENTO LADRILLO TOLETE 12 x 25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.00

5.2.15
und
ML

VALOR UNI.
$714.29

VALOR PARCIAL
$714.29

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO TOLETE RECOCIDO
SIKA - 1 IMPERMEABILIZANTE INTEGRAL
AGUA
ARENA LAVADA DE PEA

UNIDAD
KG
UN
KG
M3
M3

CANTIDAD
17.77
24.21
0.35
0.07
0.04

$714.29

VALOR UNI.
$400.00
$455.00
$3,600.00
$8,000.00
$25,000.00

VALOR PARCIAL
$7,108.00
$11,015.55
$1,260.00
$560.00
$1,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$20,943.55

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
33,324
$6,664.85
$6,664.85

20.0%

COSTO TOTAL UNITARIO

$39,989

ANALISIS UNITARIO
ITEM
SOBRECIMIENTO LADRILLO TOLETE 25 x 25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.12

VALOR UNI.
$702.25
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

5.2.16
und
ML
VALOR PARCIAL
$702.25
$702.25
VALOR PARCIAL

CEMENTO GRIS
LADRILLO TOLETE RECOCIDO
SIKA - 1 IMPERMEABILIZANTE INTEGRAL
AGUA
ARENA DE PEA

KG
UN
KG
M3
M3

17.77
24.21
0.53
0.07
0.04

$400.00
$455.00
$3,600.00
$8,000.00
$30,000.00

$7,108.00
$11,015.55
$1,908.00
$560.00
$1,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.12
7.12

$21,791.55

VALOR UNI.
$7,249.58
$4,220.22

VALOR PARCIAL
$7,249.58
$4,220.22

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,469.80
33,964
$6,792.72
$6,792.72

20.0%

COSTO TOTAL UNITARIO

$40,756

ANALISIS UNITARIO
ITEM
ALFAJIAS LADRILLO PRENSADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.80

5.3.1
und
ML

VALOR UNI.
$568.18

VALOR PARCIAL
$568.18

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LADRILLO PRENSADO SANTA FE
CEMENTO GRIS
ARENA DE PEA
AGUA

UNIDAD
UN
KG
M3
M3

CANTIDAD
12.87
2.39
0.01
0.01

$568.18

VALOR UNI.
$550.00
$400.00
$30,000.00
$8,000.00

VALOR PARCIAL
$7,078.50
$956.00
$300.00
$80.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.80
8.80

$8,414.50

VALOR UNI.
$5,865.57
$3,414.55

VALOR PARCIAL
$5,865.57
$3,414.55

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,280.11
18,263
$3,652.56
$3,652.56

20.0%

COSTO TOTAL UNITARIO

$21,915

ANALISIS UNITARIO
ITEM
ALFAJIAS LADRILLO TOLETE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.50

VALOR UNI.
$476.19
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

5.3.2
und
ML
VALOR PARCIAL
$476.19
$476.19
VALOR PARCIAL

LADRILLO TOLETE RECOCIDO


CEMENTO GRIS
ARENA DE PEA
SIKA-1 IMPERMEABILIZANTE INTEGRAL
AGUA

UN
KG
M3
KG
M3

14.00
2.39
0.01
0.09
0.02

$455.00
$400.00
$30,000.00
$3,600.00
$8,000.00

$6,370.00
$956.00
$300.00
$324.00
$160.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.50
10.50

$8,110.00

VALOR UNI.
$4,915.90
$2,861.71

VALOR PARCIAL
$4,915.90
$2,861.71

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,777.62
16,364
$3,272.76
$3,272.76

20.0%

COSTO TOTAL UNITARIO

$19,637

ANALISIS UNITARIO
ITEM
BORDILLO ZOCALO LADRILLO PRENSADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
LADRILLO PRENSADO 2 CARAS VISTAS
MORTERO 1:4 ARENA DE PEA
ARENA DE PEA
CEMENTO GRIS

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.72

UNIDAD
UNIDAD
M3
M3
KG

CANTIDAD
16.00
0.01
0.02
1.75

5.3.3
und
ML

VALOR UNI.
$466.42
subtotal

VALOR PARCIAL
$466.42
$466.42

VALOR UNI.
$455.00
$166,200.00
$30,000.00
$400.00

VALOR PARCIAL
$7,280.00
$1,662.00
$600.00
$700.00
$0.00
$10,242.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.72
10.72

VALOR UNI.
$4,815.02
$2,802.99

VALOR PARCIAL
$4,815.02
$2,802.99

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,618.00
18,326
$3,665.28
$3,665.28

20.0%

COSTO TOTAL UNITARIO

$21,992

ANALISIS UNITARIO
ITEM
DINTEL LADRILLO HUECO # 4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
17.00

VALOR UNI.
$294.12
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BLOQUE No. 4

UNIDAD
UN

CANTIDAD
3.60

VALOR UNI.
$450.00

5.3.4
und
ML
VALOR PARCIAL
$294.12
$294.12
VALOR PARCIAL
$1,620.00

AGUA
ARENA LAVADA DE RIO
CEMENTO GRIS
ACERO FIGURADO 60000 PSI DE 1/2"

M3
M3
KG
KG

0.00
0.02
3.15
1.41

$8,000.00
$58,000.00
$400.00
$1,780.00

$24.00
$1,160.00
$1,260.00
$2,509.80

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

$6,573.80

VALOR UNI.
$3,036.29
$1,767.53

VALOR PARCIAL
$3,036.29
$1,767.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,803.82
11,672
$2,334.35
$2,334.35

20.0%

COSTO TOTAL UNITARIO

$14,006

ANALISIS UNITARIO
ITEM
DINTEL LADRILLO HUECO # 5
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
17.00

5.3.5
und
ML

VALOR UNI.
$294.12

VALOR PARCIAL
$294.12

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BLOQUE No 5
AGUA
ARENA LAVADA DE RIO
CEMENTO GRIS
ACERO FIGURADO 60000 PSI DE 1/2"

UNIDAD
UN
M3
M3
KG
KG

CANTIDAD
3.60
0.00
0.02
3.15
1.41

$294.12

VALOR UNI.
$450.00
$8,000.00
$58,000.00
$400.00
$1,780.00

VALOR PARCIAL
$1,620.00
$24.00
$1,160.00
$1,260.00
$2,509.80

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

$6,573.80

VALOR UNI.
$3,036.29
$1,767.53

VALOR PARCIAL
$3,036.29
$1,767.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,803.82
11,672
$2,334.35
$2,334.35

20.0%

COSTO TOTAL UNITARIO

$14,006

ANALISIS UNITARIO
ITEM
DINTEL LADRILLO HUECO # 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
17.00

VALOR UNI.
$294.12
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BLOQUE No 6
AGUA

UNIDAD
UN
M3

CANTIDAD
3.60
0.00

VALOR UNI.
$476.00
$8,000.00

5.3.6
und
ML
VALOR PARCIAL
$294.12
$294.12
VALOR PARCIAL
$1,713.60
$24.00

ARENA LAVADA DE RIO


CEMENTO GRIS
ACERO FIGURADO 60000 PSI DE 1/2"

M3
KG
KG

0.02
4.15
1.41

$58,000.00
$400.00
$1,780.00

$1,160.00
$1,660.00
$2,509.80

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

$7,067.40

VALOR UNI.
$3,036.29
$1,767.53

VALOR PARCIAL
$3,036.29
$1,767.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,803.82
12,165
$2,433.07
$2,433.07

20.0%

COSTO TOTAL UNITARIO

$14,598

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
ENCHAPES LADRILLO PRENSADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
CORTADORA LADRILLO

TARIFA DIA
5,000.00
20,000.00

RENDIM.
7.00
20.00

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO PRENSADO SANTA FE
DISCO DE DIAMANTE
AGUA
ARENA DE PEA

UNIDAD
KG
UN
UN
M3
M3

CANTIDAD
8.05
31.00
0.01
0.01
0.04

5.3.7
und
M2

VALOR UNI.
$714.29
$1,000.00
subtotal

VALOR PARCIAL
$714.29
$1,000.00
$1,714.29

VALOR UNI.
$400.00
$550.00
$250,000.00
$8,000.00
$30,000.00

VALOR PARCIAL
$3,220.00
$17,050.00
$2,500.00
$40.00
$1,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$24,010.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
37,391
$7,478.14
$7,478.14

20.0%

COSTO TOTAL UNITARIO

$44,869

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
ENCHAPES LADRILLO TOLETE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
CORTADORA LADRILLO

5,000.00
20,000.00

RENDIM.
7.00
20.00

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO TOLETE PRENSADO
DISCO DE DIAMANTE

UNIDAD
KG
UN
UN

CANTIDAD
8.05
31.00
0.01

5.3.8
und
M2

VALOR UNI.
$714.29
$1,000.00
subtotal

VALOR PARCIAL
$714.29
$1,000.00
$1,714.29

VALOR UNI.
$400.00
$550.00
$250,000.00

VALOR PARCIAL
$3,220.00
$17,050.00
$2,500.00

AGUA
ARENA DE PEA

M3
M3

0.01
0.04

$8,000.00
$30,000.00

$40.00
$1,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$24,010.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
37,391
$7,478.14
$7,478.14

20.0%

COSTO TOTAL UNITARIO

$44,869

ANALISIS UNITARIO
ITEM
REMATES LADRILLO PORTANTE PRENSADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.20

5.3.9
und
ML

VALOR UNI.
$543.48

VALOR PARCIAL
$543.48

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO PORTANTE PRENSADO
ARENA DE PEA
AGUA

UNIDAD
KG
UN
M3
M3

CANTIDAD
2.81
16.00
0.01
0.00

$543.48

VALOR UNI.
$400.00
$850.00
$30,000.00
$8,000.00

VALOR PARCIAL
$1,124.00
$13,600.00
$300.00
$12.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.20
9.20

$15,036.00

VALOR UNI.
$5,610.54
$3,266.09

VALOR PARCIAL
$5,610.54
$3,266.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,876.63
24,456
$4,891.22
$4,891.22

20.0%

COSTO TOTAL UNITARIO

$29,347

ANALISIS UNITARIO
ITEM
REMATES LADRILLO PRENSADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.20

VALOR UNI.
$543.48
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO PRENSADO SANTA FE
ARENA DE PEA
AGUA

UNIDAD
KG
UN
M3
M3

CANTIDAD
2.81
11.20
0.01
0.00

VALOR UNI.
$400.00
$550.00
$30,000.00
$8,000.00

5.3.10
und
ML
VALOR PARCIAL
$543.48
$543.48
VALOR PARCIAL
$1,124.00
$6,160.00
$300.00
$12.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.20
9.20

$7,596.00

VALOR UNI.
$5,610.54
$3,266.09

VALOR PARCIAL
$5,610.54
$3,266.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,876.63
17,016
$3,403.22
$3,403.22

20.0%

COSTO TOTAL UNITARIO

$20,419

ANALISIS UNITARIO
ITEM
REMATES LADRILLO TOLETE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.20

5.3.11
und
ML

VALOR UNI.
$543.48

VALOR PARCIAL
$543.48

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO TOLETE
ARENA DE PEA
AGUA

UNIDAD
KG
UN
M3
M3

CANTIDAD
2.81
11.20
0.01
0.00

$543.48

VALOR UNI.
$400.00
$455.00
$30,000.00
$8,000.00

VALOR PARCIAL
$1,124.00
$5,096.00
$300.00
$12.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.20
9.20

$6,532.00

VALOR UNI.
$5,610.54
$3,266.09

VALOR PARCIAL
$5,610.54
$3,266.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,876.63
15,952
$3,190.42
$3,190.42

20.0%

COSTO TOTAL UNITARIO

$19,143

ANALISIS UNITARIO
ITEM
ANCLAJE EPOXICO CONCRETO 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.00

VALOR UNI.
$1,250.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ANCLAJE HKB II 58" 434 HILTI

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$2,870.00

5.4.1
und
UN
VALOR PARCIAL
$1,250.00
$1,250.00
VALOR PARCIAL
$2,870.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
4.00

$2,870.00

VALOR UNI.
$7,512.00

VALOR PARCIAL
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,512.00
11,632
$2,326.40
$2,326.40

20.0%

COSTO TOTAL UNITARIO

$13,958

ANALISIS UNITARIO
ITEM
ANCLAJE EPOXICO CONCRETO 3/8"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.00

5.4.2
und
UN

VALOR UNI.
$1,250.00

VALOR PARCIAL
$1,250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ANCLAJE HKB II 58" 434 HILTI

UNIDAD
UN

CANTIDAD
1.00

$1,250.00

VALOR UNI.
$2,870.00

VALOR PARCIAL
$2,870.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
4.00

$2,870.00

VALOR UNI.
$7,512.00

VALOR PARCIAL
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,512.00
11,632
$2,326.40
$2,326.40

20.0%

COSTO TOTAL UNITARIO

$13,958

ANALISIS UNITARIO
ITEM
GROUTING - MORTERO DE RELLENO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.80

VALOR UNI.
$6,250.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO GRAVA FINA -2000 PSI

UNIDAD
M3

CANTIDAD
1.03

VALOR UNI.
$250,444.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.80
0.80

VALOR UNI.
$64,521.25
$37,560.00

5.4.3
und
M3
VALOR PARCIAL
$6,250.00
$6,250.00
VALOR PARCIAL
$257,957.32

$257,957.32
VALOR PARCIAL
$64,521.25
$37,560.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$102,081.25
366,289
$73,257.71
$73,257.71

20.0%

COSTO TOTAL UNITARIO

$439,546

ANALISIS UNITARIO
ITEM
JUNTA DILATACION ICOPOR 2 CM. H = 0.50
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
96.00

5.4.4
und
ML

VALOR UNI.
$52.08

VALOR PARCIAL
$52.08

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ICOPOR LAMINA DE 2 cm

UNIDAD
UN

CANTIDAD
0.52

$52.08

VALOR UNI.
$14,000.00

VALOR PARCIAL
$7,210.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
96.00
96.00

$7,210.00

VALOR UNI.
$537.68
$313.00

VALOR PARCIAL
$537.68
$313.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$850.68
8,113
$1,622.55
$1,622.55

20.0%

COSTO TOTAL UNITARIO

$9,735

ANALISIS UNITARIO
ITEM
ACERO DE REFUERZO 37000 PSI
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

5.5.1
und
KG
VALOR PARCIAL

$0.00
VALOR PARCIAL

$0.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
$0.00
$0.00

20.0%

COSTO TOTAL UNITARIO

$0

ANALISIS UNITARIO
ITEM
ACERO DE REFUERZO 60000 PSI
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

5.5.2
und
KG

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
$0.00
$0.00

20.0%

COSTO TOTAL UNITARIO

$0

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
GRAFIL DE 6 MM
I.EQUIPO
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal

5.5.3
und
KG
VALOR PARCIAL

$0.00
VALOR PARCIAL

$0.00
VALOR PARCIAL

$0.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

$0.00
$0.00

20.0%

COSTO TOTAL UNITARIO

$0

ANALISIS UNITARIO
ITEM
MALLAS ELECTROSOLDADAS
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

5.5.4
und
KG

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
$0.00
$0.00

20.0%

COSTO TOTAL UNITARIO

$0

ANALISIS UNITARIO
ITEM
BORDILLO PARA ASEOS. H = 0.40 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
BLOQUE No 4
MORTERO 1:4
ARENA DE PEA
CEMENTO GRIS

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.72

UNIDAD
UNIDAD
M3
M3
KG

CANTIDAD
8.50
0.02
0.02
1.75

5.6.1
und
ML

VALOR UNI.
$466.42
subtotal

VALOR PARCIAL
$466.42
$466.42

VALOR UNI.
$450.00
$166,200.00
$30,000.00
$400.00

VALOR PARCIAL
$3,825.00
$3,324.00
$600.00
$700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.72
10.72

$8,449.00

VALOR UNI.
$4,815.02
$2,802.99
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$4,815.02
$2,802.99
$7,618.00

20.0%

16,533
$3,306.68

Total Costo Indirecto

$3,306.68

COSTO TOTAL UNITARIO

$19,840

ANALISIS UNITARIO
ITEM
BORDILLO PARA DUCHAS. H = 0.20 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
BLOQUE No 4
MORTERO 1:4 ARENA DE PEA
ARENA DE PEA
CEMENTO GRIS

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

UNIDAD
UNIDAD
M3
M3
KG

CANTIDAD
5.00
0.02
0.02
1.75

5.6.2
und
ML

VALOR UNI.
$625.00
subtotal

VALOR PARCIAL
$625.00
$625.00

VALOR UNI.
$450.00
$166,200.00
$30,000.00
$400.00

VALOR PARCIAL
$2,250.00
$3,324.00
$600.00
$700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$6,874.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
17,707
$3,541.43
$3,541.43

20.0%

COSTO TOTAL UNITARIO

$21,249

ANALISIS UNITARIO
ITEM
CHAZOS PARA CARPINTERIA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
55.00

5.6.3
und
UN

VALOR UNI.
$90.91
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
CHAZOS DE MADERA 10 X 10
ARENA DE PEA

UNIDAD
KG
UN
M3

CANTIDAD
0.10
1.03
0.01

$90.91

VALOR UNI.
$400.00
$150.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
55.00
55.00

VALOR PARCIAL
$40.00
$154.50
$300.00

$494.50

VALOR UNI.
$938.49
$546.33
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$90.91

VALOR PARCIAL
$938.49
$546.33
$1,484.82

20.0%

2,070
$414.05
$414.05

COSTO TOTAL UNITARIO

$2,484

ANALISIS UNITARIO
ITEM
INSTALACION CARPINTERIA METALICA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

5.6.4
und
M2

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$555.56

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
9.00
9.00

$0.00

VALOR UNI.
$7,456.00
$4,006.22

VALOR PARCIAL
$7,456.00
$4,006.22

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,462.22
12,018
$2,403.56
$2,403.56

20.0%

COSTO TOTAL UNITARIO

$14,421

ANALISIS UNITARIO
ITEM
INSTALACION DE DIVISIONES MODULARES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

5.6.5
und
M2

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$555.56

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
9.00
9.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL

$0.00

VALOR UNI.
$7,456.00
$4,006.22

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$555.56

VALOR PARCIAL
$7,456.00
$4,006.22
$11,462.22

20.0%

12,018
$2,403.56
$2,403.56
$14,421

ANALISIS UNITARIO
ITEM
ALFAJIA CONCRETO PREF. DE 0.15
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.50

6.1.1
und
ML

VALOR UNI.
$476.19

VALOR PARCIAL
$476.19

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
ARENA DE PEA
CEMENTO GRIS
TABLA CHAPA ORDINARIO
ACERO FIGURADO 60000 PSI DE 1/2"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
M3
M3
KG
ML
KG

CANTIDAD
0.02
0.02
0.01
0.71
0.18
0.73

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.50
10.50

$476.19

VALOR UNI.
$2,000.00
$256,000.00
$30,000.00
$400.00
$1,716.00
$1,780.00
subtotal

VALOR PARCIAL
$40.00
$5,120.00
$300.00
$284.00
$308.88
$1,299.40
$7,352.28

VALOR UNI.
$4,915.90
$2,861.71

VALOR PARCIAL
$4,915.90
$2,861.71

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,777.62
15,606
$3,121.22
$3,121.22

20.0%

COSTO TOTAL UNITARIO

$18,727

ANALISIS UNITARIO
ITEM
ALFAJIA CONCRETO PREF. DE 0.25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

6.1.2
und
ML

VALOR UNI.
$1,000.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
ARENA DE PEA
CEMENTO GRIS
TABLA CHAPA ORDINARIO
ACERO FIGURADO 60000 PSI DE 1/2"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
M3
M3
KG
ML
KG

CANTIDAD
0.03
0.02
0.01
1.19
0.18
1.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

VALOR PARCIAL
$1,000.00
$1,000.00

VALOR UNI.
$2,000.00
$256,000.00
$30,000.00
$400.00
$1,716.00
$1,780.00
subtotal

VALOR PARCIAL
$60.00
$5,120.00
$300.00
$476.00
$308.88
$1,780.00
$8,044.88

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

$16,333.00

20.0%

25,378
$5,075.58
$5,075.58
$30,453

ANALISIS UNITARIO
ITEM
ALFAJIA CONCRETO PREF. DE 0.30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.50

6.1.3
und
ML

VALOR UNI.
$1,111.11

VALOR PARCIAL
$1,111.11

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
ARENA DE PEA
CEMENTO GRIS
TABLA CHAPA ORDINARIO
ACERO FIGURADO 60000 PSI DE 1/2"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
M3
M3
KG
ML
KG

CANTIDAD
0.04
0.02
0.01
1.42
0.18
1.46

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.50
4.50

$1,111.11

VALOR UNI.
$2,000.00
$256,000.00
$30,000.00
$400.00
$1,716.00
$1,780.00
subtotal

VALOR PARCIAL
$80.00
$5,120.00
$300.00
$568.00
$308.88
$2,598.80
$8,975.68

VALOR UNI.
$11,470.44
$6,677.33

VALOR PARCIAL
$11,470.44
$6,677.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,147.78
28,235
$5,646.91
$5,646.91

20.0%

COSTO TOTAL UNITARIO

$33,881

ANALISIS UNITARIO
ITEM
DINTEL PREFABRICADO CONCRETO 10 x 20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

6.1.4
und
ML

VALOR UNI.
$625.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
VARA DE CLAVO
TABLA BURRA ORDINARIO
ACERO FIGURADO 60000 PSI DE 1/2"

UNIDAD
KG
M3
ML
ML
KG

CANTIDAD
0.11
0.03
0.01
0.15
2.90

$625.00

VALOR UNI.
$2,000.00
$256,000.00
$850.00
$1,353.00
$1,780.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$220.00
$7,680.00
$8.50
$202.95
$5,162.00
$13,273.45

VALOR UNI.
$6,452.13
$3,756.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$625.00

VALOR PARCIAL
$6,452.13
$3,756.00
$10,208.13

20.0%

24,107
$4,821.32
$4,821.32
$28,928

ITEM
DINTEL PREFABRICADO CONCRETO 15 x 20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

6.1.5
und
ML

VALOR UNI.
$625.00

VALOR PARCIAL
$625.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
VARA DE CLAVO
TABLA BURRA ORDINARIO
ACERO FIGURADO 60000 PSI DE 1/2"

UNIDAD
KG
M3
ML
ML
KG

CANTIDAD
0.11
0.03
0.01
0.15
2.90

$625.00

VALOR UNI.
$2,000.00
$256,000.00
$850.00
$1,353.00
$1,780.00

VALOR PARCIAL
$220.00
$7,680.00
$8.50
$202.95
$5,162.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$13,273.45

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
24,107
$4,821.32
$4,821.32

20.0%

COSTO TOTAL UNITARIO

$28,928

ANALISIS UNITARIO
ITEM
DINTEL PREFABRICADO CONCRETO 15 x 30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

6.1.6
und
ML

VALOR UNI.
$625.00

VALOR PARCIAL
$625.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
VARA DE CLAVO
TABLA BURRA ORDINARIO
ACERO FIGURADO 60000 PSI DE 1/2"

UNIDAD
KG
M3
ML
ML
KG

CANTIDAD
0.20
0.04
0.01
0.15
3.50

$625.00

VALOR UNI.
$2,000.00
$256,000.00
$850.00
$1,353.00
$1,780.00

VALOR PARCIAL
$400.00
$10,240.00
$8.50
$202.95
$6,230.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$17,081.45

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
27,915
$5,582.92
$5,582.92

20.0%

COSTO TOTAL UNITARIO

$33,497

ANALISIS UNITARIO
No. ITEM

6.1.7

ITEM
DINTEL PREFABRICADO CONCRETO 20 x 20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

und
ML

VALOR UNI.
$625.00

VALOR PARCIAL
$625.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
VARA DE CLAVO
TABLA BURRA ORDINARIO
ACERO FIGURADO 60000 PSI DE 1/2"

UNIDAD
KG
M3
ML
ML
KG

CANTIDAD
0.20
0.04
0.01
0.15
3.50

$625.00

VALOR UNI.
$2,000.00
$256,000.00
$850.00
$1,353.00
$1,780.00

VALOR PARCIAL
$400.00
$10,240.00
$8.50
$202.95
$6,230.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$17,081.45

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
27,915
$5,582.92
$5,582.92

20.0%

COSTO TOTAL UNITARIO

$33,497

ANALISIS UNITARIO
ITEM
DINTEL PREFABRICADO CONCRETO 25 x 30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.50

6.1.8
und
ML

VALOR UNI.
$1,428.57

VALOR PARCIAL
$1,428.57

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
VARA DE CLAVO
TABLA BURRA ORDINARIO
ACERO FIGURADO 60000 PSI DE 1/2"

UNIDAD
KG
M3
ML
ML
KG

CANTIDAD
0.35
0.07
0.02
0.30
7.00

$1,428.57

VALOR UNI.
$2,000.00
$256,000.00
$850.00
$1,353.00
$1,780.00

VALOR PARCIAL
$700.00
$17,920.00
$17.00
$405.90
$12,460.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.50
3.50

$31,502.90

VALOR UNI.
$14,747.71
$8,585.14

VALOR PARCIAL
$14,747.71
$8,585.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$23,332.86
56,264
$11,252.87
$11,252.87

20.0%

COSTO TOTAL UNITARIO

$67,517

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

6.1.9
und

PANELES PREFABRICADOS DE 0.07


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

M2
TARIFA DIA
5,000.00

RENDIM.
8.00

II.MATERIALES DE OBRA
DESCRIPCION
PANELES PREFABRICADOS DE 0.07

UNIDAD
M2

CANTIDAD
1.00

VALOR UNI.
$625.00
subtotal

VALOR PARCIAL
$625.00
$625.00

VALOR UNI.
$18,000.00

VALOR PARCIAL
$18,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$18,000.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
28,833
$5,766.63
$5,766.63

20.0%

COSTO TOTAL UNITARIO

$34,600

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PASOS PREFABRICADOS ESCALERA DE 0.30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
4.50

II.MATERIALES DE OBRA
DESCRIPCION
PASOS PREFABRICADOS ESCALERA DE 0.30

UNIDAD
ML

CANTIDAD
1.00

6.1.10
und
ML

VALOR UNI.
$1,111.11
subtotal

VALOR PARCIAL
$1,111.11
$1,111.11

VALOR UNI.
$14,000.00

VALOR PARCIAL
$14,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.50
4.50

$14,000.00

VALOR UNI.
$11,470.44
$6,677.33

VALOR PARCIAL
$11,470.44
$6,677.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,147.78
33,259
$6,651.78
$6,651.78

20.0%

COSTO TOTAL UNITARIO

$39,911

ANALISIS UNITARIO
ITEM
PREFABRICADO ARENERA. ROMPEOLAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
GRAVILLA DE RIO
ARENA LAVADA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

UNIDAD
KG
M3
M3
M3

CANTIDAD
7.00
0.00
0.05
0.03

6.1.11
und
ML

VALOR UNI.
$1,000.00
subtotal

VALOR PARCIAL
$1,000.00
$1,000.00

VALOR UNI.
$400.00
$8,000.00
$58,000.00
$30,000.00

VALOR PARCIAL
$2,800.00
$25.44
$2,900.00
$900.00

DILATACION EN BRONCE PC09


DURMIENTE ORD

ML
ML

1.50
1.00

$4,200.00
$450.00

$6,300.00
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$13,375.44

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
30,708
$6,141.69
$6,141.69

20.0%

COSTO TOTAL UNITARIO

$36,850

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
TOPES CONCRETO PARQUEADERO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
TOPES CONCRETO PARQUEADERO
*.15*.17

DE

6.1.12
und
UN

TARIFA DIA
5,000.00

RENDIM.
10.24

VALOR UNI.
$488.28
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$488.28
$488.28
VALOR PARCIAL

1.80
UNIDAD

1.00

$48,720.00

$48,720.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.24
10.24

$48,720.00

VALOR UNI.
$5,040.72
$2,934.38

VALOR PARCIAL
$5,040.72
$2,934.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,975.10
57,183
$11,436.68
$11,436.68

20.0%

COSTO TOTAL UNITARIO

$68,620

ANALISIS UNITARIO
ITEM
DIVISIONES PBAOS EN LOSETAS DE CONCRETO E= 6 cm.
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
II.MATERIALES DE OBRA
DESCRIPCION
DIVISIONES
PBAOS
EN
CONCRETO E= 6 cm.

UNIDAD
LOSETAS

No. ITEM
UNIDAD:

RENDIM.
13.36

VALOR UNI.
$374.25
subtotal

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$374.25
$374.25
VALOR PARCIAL

DE
M2

1.00

$24,000.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

6.1.13
und
M2

TARIFA DIA
51,617.00
30,048.00

RENDIM.
13.36
13.36

VALOR UNI.
$3,863.55
$2,249.10

$24,000.00
$24,000.00
VALOR PARCIAL
$3,863.55
$2,249.10

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,112.65
30,487
$6,097.38
$6,097.38

20.0%

COSTO TOTAL UNITARIO

$36,584

ANALISIS UNITARIO
ITEM
BANCAS EN CONCRETO DE 0.60
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION
BANCAS EN CONCRETO DE 0.60 CON ESPALDAR
DE 1.80 *0.6 DE ANCHO

No. ITEM
UNIDAD:

6.2.1
und
und

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
5.50
3.60
48.00

VALOR UNI.
$909.09
$37,500.00
$4,791.67
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

UNIDAD

0.60

VALOR PARCIAL
$909.09
$37,500.00
$4,791.67
$43,200.76
VALOR PARCIAL

$76,560.00

$45,936.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.50
5.50

$45,936.00

VALOR UNI.
$9,384.91
$5,463.27

VALOR PARCIAL
$9,384.91
$5,463.27

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$14,848.18
103,985
$20,796.99
$20,796.99

20.0%

COSTO TOTAL UNITARIO

$124,782

ANALISIS UNITARIO
ITEM
CINTAS DE AMARRE CUBIERTAS DE 15 x 10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ALQUILER FORMALETA
SECCION ANDAMIO
VIBRADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

6.2.2
und
ML

TARIFA DIA
5,000.00
85.00
70.00
25,000.00

RENDIM.
10.00
1.00
0.10
12.48

VALOR UNI.
$500.00
$85.00
$700.00
$2,003.21
subtotal

VALOR PARCIAL
$500.00
$85.00
$700.00
$2,003.21
$3,288.21

UNIDAD
M3
ML
ML
GL
LB

CANTIDAD
0.02
3.00
0.66
0.10
0.60

VALOR UNI.
$267,000.00
$450.00
$1,353.00
$3,500.00
$1,500.00
subtotal

VALOR PARCIAL
$5,340.00
$1,350.00
$892.98
$350.00
$900.00
$8,832.98

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal

$8,166.50

Total Costo Directo


A.I.U.
Total Costo Indirecto

20,288
$4,057.54
$4,057.54

20.0%

COSTO TOTAL UNITARIO

$24,345

ANALISIS UNITARIO
ITEM
CINTAS DE AMARRE CUBIERTAS DE 25 x 10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
ALQUILER FORMALETA
VIBRADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

6.2.3
und
ML

TARIFA DIA
5,000.00
70.00
85.00
25,000.00

RENDIM.
9.00
0.50
0.80
12.00

VALOR UNI.
$555.56
$140.00
$106.25
$2,083.33
subtotal

VALOR PARCIAL
$555.56
$140.00
$106.25
$2,083.33
$2,885.14

UNIDAD
M3
ML
ML
GLN
LB

CANTIDAD
0.03
3.00
0.66
0.10
0.60

VALOR UNI.
$220,000.00
$450.00
$1,353.00
$3,500.00
$1,500.00
subtotal

VALOR PARCIAL
$6,600.00
$1,350.00
$892.98
$350.00
$900.00
$10,092.98

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
22,052
$4,410.40
$4,410.40

20.0%

COSTO TOTAL UNITARIO

$26,462

ANALISIS UNITARIO
ITEM
COLUMNETAS CUBIERTAS DE 15 x 12
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
PARAL TELESCOPICO
SECCION ANDAMIO
MORDAZA METALICA ($127/DIA JUEGO)
VIBRADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00
70.00
120.00
25,000.00

RENDIM.
2.00
0.08
0.17
0.08
11.50

UNIDAD
M3
ML
ML
ML
GL
LB

CANTIDAD
0.02
0.90
0.45
0.45
0.10
0.30

VALOR UNI.
$2,500.00
$840.00
$420.00
$1,440.00
$2,173.91
subtotal

VALOR PARCIAL
$2,500.00
$840.00
$420.00
$1,440.00
$2,173.91
$7,373.91

VALOR UNI.
$267,000.00
$1,360.00
$450.00
$1,353.00
$3,500.00
$1,500.00

VALOR PARCIAL
$5,340.00
$1,224.00
$202.50
$608.85
$350.00
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
51,617.00

RENDIM.
2.00

6.2.4
und
ML

VALOR UNI.
$25,808.50

$8,175.35
VALOR PARCIAL
$25,808.50

Ayudante ( incluye 100% de prestaciones)

30,048.00

2.00

$15,024.00

$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
56,382
$11,276.35
$11,276.35

20.0%

COSTO TOTAL UNITARIO

$67,658

ANALISIS UNITARIO
ITEM
MESONES EN CONCRETO DE 0.40
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
FORMALETA
II.MATERIALES DE OBRA
DESCRIPCION
TABLA CHAPA
PUNTILLA C/C2"
CONCRETO 3000 PSI
ACERO DE REFUERZO 1/2" 60000 PSI
ALAMBRE NEGRO No. 18
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

6.2.5
und
ML

TARIFA DIA
5,000.00
85.00

RENDIM.
4.00
0.24

VALOR UNI.
$1,250.00
$354.17
subtotal

VALOR PARCIAL
$1,250.00
$354.17
$1,604.17

UNIDAD
ML
LB
M3
KG
KG

CANTIDAD
1.00
2.00
0.05
10.00
0.30

VALOR UNI.
$1,716.00
$1,500.00
$267,000.00
$1,780.00
$2,000.00
subtotal

VALOR PARCIAL
$1,716.00
$3,000.00
$13,350.00
$17,800.00
$600.00
$36,466.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
58,486
$11,697.28
$11,697.28

20.0%

COSTO TOTAL UNITARIO

$70,184

ANALISIS UNITARIO
ITEM
MESONES EN CONCRETO DE 0.60
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
FORMALETA
II.MATERIALES DE OBRA
DESCRIPCION
TABLA CHAPA
PUNTILLA C/C2"
CONCRETO 3000 PSI
ACERO DE REFUERZO
ALAMBRE NEGRO no 18
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

6.2.6
und
ML

TARIFA DIA
5,000.00
85.00

RENDIM.
3.50
0.24

VALOR UNI.
$1,428.57
$354.17
subtotal

VALOR PARCIAL
$1,428.57
$354.17
$1,782.74

UNIDAD
ML
LB
M3
KG
KG

CANTIDAD
1.00
2.00
0.07
11.50
0.30

VALOR UNI.
$1,716.00
$1,500.00
$267,000.00
$1,780.00
$2,000.00
subtotal

VALOR PARCIAL
$1,716.00
$3,000.00
$18,690.00
$20,470.00
$600.00
$44,476.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.50
3.50

VALOR UNI.
$14,747.71
$8,585.14

VALOR PARCIAL
$14,747.71
$8,585.14

subtotal

$23,332.86

Total Costo Directo


A.I.U.
Total Costo Indirecto

69,592
$13,918.32
$13,918.32

20.0%

COSTO TOTAL UNITARIO

$83,510

ANALISIS UNITARIO
ITEM
ACOMETIDA GALV. 1/2" 5 MT
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.10

7.1.1
und
UN

VALOR UNI.
$2,380.95

VALOR PARCIAL
$2,380.95

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REGISTRO TOYA DE 1/2"
CHEQUE RED WHITE 1 -1/2 "
TUBO GALVANIZADO DE 1/2 "
CODO GALVANIZADO DE 1/2 "

UNIDAD
UN
UN
ML
UN

CANTIDAD
1.05
1.05
5.15
2.05

$2,380.95

VALOR UNI.
$21,300.00
$35,970.00
$4,500.00
$1,300.00

VALOR PARCIAL
$22,365.00
$37,768.50
$23,175.00
$2,665.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.10
2.00

$85,973.50

VALOR UNI.
$28,266.67
$16,524.00

VALOR PARCIAL
$28,266.67
$16,524.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$44,790.67
133,145
$26,629.02
$26,629.02

20.0%

COSTO TOTAL UNITARIO

$159,774

ANALISIS UNITARIO
ITEM
ACOMETIDA PVC 1/2" 5 MT
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.80

VALOR UNI.
$1,785.71
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
REGISTRO TOYA DE 1/2"
VALVULA DE CIOMPUERTA DE 1/2"
CHEQUE RED WHITE 1 -1/2 "
TUBO PRESION RDE 9 PVC 1 / 2"
CODO DE 90 PRESION PVC 1/2 "
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
GL
GL
UN
UN
UN
ML
UN

CANTIDAD
0.05
0.03
1.05
1.05
1.05
5.25
2.10

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.00
2.00

7.1.2
und
UN
VALOR PARCIAL
$1,785.71
$1,785.71

VALOR UNI.
$46,120.00
$25,788.00
$21,300.00
$15,900.00
$35,970.00
$1,788.00
$360.00
subtotal

VALOR PARCIAL
$2,306.00
$773.64
$22,365.00
$16,695.00
$37,768.50
$9,387.00
$756.00
$90,051.14

VALOR UNI.
$29,680.00
$16,524.00

VALOR PARCIAL
$29,680.00
$16,524.00

subtotal

$46,204.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

138,041
$27,608.17
$27,608.17

20.0%

COSTO TOTAL UNITARIO

$165,649

ANALISIS UNITARIO
ITEM
ACOMETIDA PVC 3/4" 5 MT
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.80

7.1.3
und
ML

VALOR UNI.
$1,785.71

VALOR PARCIAL
$1,785.71

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO PRESION RDE 11 PVC 3 / 4"
CODO DE 90 PRESION PVC 3/ 4 "
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
GL
GL
ML
UN

CANTIDAD
0.01
0.01
1.05
2.05

TARIFA DIA
59,360.00
33,048.00

RENDIM.
50.00
50.00

$1,785.71

VALOR UNI.
$46,120.00
$25,788.00
$2,255.00
$686.00
subtotal

VALOR PARCIAL
$415.08
$257.88
$2,367.75
$1,406.30
$4,447.01

VALOR UNI.
$1,187.20
$660.96

VALOR PARCIAL
$1,187.20
$660.96

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,848.16
8,081
$1,616.18
$1,616.18

20.0%

COSTO TOTAL UNITARIO

$9,697

ANALISIS UNITARIO
ITEM
CONEXIN COMPLETA TANQUE ELEVADO EN PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.82

7.2.1
und
UN

VALOR UNI.
$6,097.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
REGISTRO TOYA DE 2"
TUBO PRESION RDE 13,5 PVC 1"
TUBO PRESION RDE 21 PVC 2"
CODO DE 90 PRESION PVC 1"
CODO DE 90 PRESION PVC 2 "
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
GL
GL
UN
ML
ML
UN
UN

CANTIDAD
0.05
0.02
1.00
1.05
1.05
2.10
2.10

TARIFA DIA
59,360.00
33,048.00

RENDIM.
0.82
0.82

VALOR PARCIAL
$6,097.56
$6,097.56

VALOR UNI.
$46,120.00
$25,788.00
$97,000.00
$3,300.00
$11,858.00
$1,344.00
$5,530.00
subtotal

VALOR PARCIAL
$2,306.00
$515.76
$97,000.00
$3,465.00
$12,450.90
$2,822.40
$11,613.00
$130,173.06

VALOR UNI.
$72,390.24
$40,302.44

VALOR PARCIAL
$72,390.24
$40,302.44

subtotal
Total Costo Directo
A.I.U.

$112,692.68

20.0%

248,963
$49,792.66

Total Costo Indirecto

$49,792.66

COSTO TOTAL UNITARIO

$298,756

ANALISIS UNITARIO
ITEM
CONEX.TANQUE ELEVADO GALV
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
0.42

7.2.2
und
UN

VALOR UNI.
$11,904.76

VALOR PARCIAL
$11,904.76

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REGISTRO TOYA DE 2"
TUBO GALVANIZADO 1"
TUBO GALVANIZADO 2"
CODO GALVANIZADO 1"
CODO GALVANIZADO 2"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UN
ML
ML
UN
UN

CANTIDAD
1.00
1.05
1.05
2.10
2.10

TARIFA DIA
59,360.00
33,048.00

RENDIM.
0.42
0.42

$11,904.76

VALOR UNI.
$97,000.00
$7,500.00
$13,700.00
$2,500.00
$5,500.00
subtotal

VALOR PARCIAL
$97,000.00
$7,875.00
$14,385.00
$5,250.00
$11,550.00
$136,060.00

VALOR UNI.
$141,333.33
$78,685.71

VALOR PARCIAL
$141,333.33
$78,685.71

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$220,019.05
367,984
$73,596.76
$73,596.76

20.0%

COSTO TOTAL UNITARIO

$441,581

ANALISIS UNITARIO
ITEM
FLOTADOR MECANICO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

7.2.3
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
FLOTADOR METALICO DE 2"
SUB-CONTRATO HIDRAULICO Y SANITARIO

UNIDAD
UN
%

CANTIDAD
1.00
38.00

$50.00

VALOR UNI.
$134,000.00
$127,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA

RENDIM.

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$134,000.00
$48,260.00

$182,260.00

VALOR UNI.

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL

$0.00

20.0%

182,310
$36,462.00
$36,462.00
$218,772

ANALISIS UNITARIO
ITEM
ACCESORIOS PVC-P DE 1"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

7.4.1
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CODO DE 90 PRESION PVC 1"
TEE PRESION PVC 1"

UNIDAD
UN
UN

CANTIDAD
0.70
0.70

$100.00

VALOR UNI.
$1,344.00
$1,513.00

VALOR PARCIAL
$940.80
$1,059.10

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
50.00
50.00

$1,999.90

VALOR UNI.
$1,187.20
$660.96

VALOR PARCIAL
$1,187.20
$660.96

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,848.16
3,948
$789.61
$789.61

20.0%

COSTO TOTAL UNITARIO

$4,738

ANALISIS UNITARIO
ITEM
ACCESORIOS PVC-P DE 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

7.4.2
und
UN

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CODO DE 90 PRESION PVC 1/ 2"
TEE PRESION PVC 1 / 2"

UNIDAD
UN
UN

CANTIDAD
0.70
0.70

$100.00

VALOR UNI.
$360.00
$411.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
50.00
50.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$252.00
$287.70

$539.70

VALOR UNI.
$1,187.20
$660.96

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$100.00

VALOR PARCIAL
$1,187.20
$660.96
$1,848.16

20.0%

2,488
$497.57
$497.57
$2,985

ANALISIS UNITARIO
ITEM
ACCESORIOS PVC-P DE 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

7.4.3
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CODO DE 90 PRESION PVC 3/4"
TEE PRESION PVC 3/4"

UNIDAD
UN
UN

CANTIDAD
0.70
0.70

$100.00

VALOR UNI.
$686.00
$324.00

VALOR PARCIAL
$480.20
$226.80

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
50.00
50.00

$707.00

VALOR UNI.
$1,187.20
$660.96

VALOR PARCIAL
$1,187.20
$660.96

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,848.16
2,655
$531.03
$531.03

20.0%

COSTO TOTAL UNITARIO

$3,186

ANALISIS UNITARIO
ITEM
ACCESORIOS PVC-P DE 1 1/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
28.00

7.4.4
und
UN

VALOR UNI.
$178.57
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CODO DE 90 PRESION PVC 1 1/4"
TEE PRESION PVC 1 1/4"

UNIDAD
UN
UN

CANTIDAD
0.70
0.70

$178.57

VALOR UNI.
$2,225.00
$4,164.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
28.00
28.00

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$1,557.50
$2,914.80

$4,472.30

VALOR UNI.
$2,120.00
$1,180.29

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$178.57

VALOR PARCIAL
$2,120.00
$1,180.29
$3,300.29

20.0%

7,951
$1,590.23
$1,590.23
$9,541

ITEM
RED COBRE
I.EQUIPO

No. ITEM
UNIDAD:

7.4.5
und
ML

1/2"

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
40.00

VALOR UNI.
$125.00

VALOR PARCIAL
$125.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO PARA COBRE
TUBO COBRE TIPO L 1 / 2"
CODO DE 45 COBRE C X C 1 / 2"

UNIDAD
ML
ML
UN

CANTIDAD
0.01
1.05
0.50

$125.00

VALOR UNI.
$18,000.00
$37,000.00
$1,800.00

VALOR PARCIAL
$180.00
$38,850.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
40.00
40.00

$39,930.00

VALOR UNI.
$1,484.00
$826.20

VALOR PARCIAL
$1,484.00
$826.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,310.20
42,365
$8,473.04
$8,473.04

20.0%

COSTO TOTAL UNITARIO

$50,838

ANALISIS UNITARIO
ITEM
RED COBRE
I.EQUIPO

No. ITEM
UNIDAD:

7.4.6
und
ML

3/4"

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
40.00

VALOR UNI.
$125.00

VALOR PARCIAL
$125.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO PARA COBRE
TUBO COBRE TIPO L 3 / 4"
CODO DE 45 COBRE C X C 3 / 4"

UNIDAD
ML
ML
UN

CANTIDAD
0.01
1.05
0.50

$125.00

VALOR UNI.
$18,000.00
$35,000.00
$1,300.00

VALOR PARCIAL
$180.00
$36,750.00
$650.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
40.00
40.00

$37,580.00

VALOR UNI.
$1,484.00
$826.20

VALOR PARCIAL
$1,484.00
$826.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,310.20
40,015
$8,003.04
$8,003.04

20.0%

COSTO TOTAL UNITARIO

$48,018

ANALISIS UNITARIO
ITEM
RED SUMINISTRO CPVC 1/2"

No. ITEM
UNIDAD:

7.4.7
und
ML

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
23.00

VALOR UNI.
$217.39

VALOR PARCIAL
$217.39

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA CPVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO CPVC 1 / 2"
CODO CPVC 1 / 2"

UNIDAD
GL
GL
ML
UN

CANTIDAD
0.01
0.02
1.05
0.50

$217.39

VALOR UNI.
$49,500.00
$25,788.00
$5,643.00
$1,007.00

VALOR PARCIAL
$495.00
$515.76
$5,925.15
$503.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
23.00
23.00

$7,439.41

VALOR UNI.
$2,580.87
$1,436.87

VALOR PARCIAL
$2,580.87
$1,436.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,017.74
11,675
$2,334.91
$2,334.91

20.0%

COSTO TOTAL UNITARIO

$14,009

ANALISIS UNITARIO
ITEM
RED SUMINISTRO CPVC 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
23.00

7.4.8
und
ML

VALOR UNI.
$217.39

VALOR PARCIAL
$217.39

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA CPVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO CPVC 3 / 4"
CODO CPVC 3 / 4"

UNIDAD
GL
GL
ML
UN

CANTIDAD
0.01
0.02
1.05
0.50

$217.39

VALOR UNI.
$49,500.00
$25,788.00
$9,275.00
$1,821.00

VALOR PARCIAL
$495.00
$515.76
$9,738.75
$910.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
23.00
23.00

$11,660.01

VALOR UNI.
$2,580.87
$1,436.87

VALOR PARCIAL
$2,580.87
$1,436.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,017.74
15,895
$3,179.03
$3,179.03

20.0%

COSTO TOTAL UNITARIO

$19,074

ANALISIS UNITARIO
ITEM
RED SUMINISTRO GALV. 1"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
16.00

VALOR UNI.
$312.50

7.4.9
und
ML
VALOR PARCIAL
$312.50

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO GALVANIZADO 1"
CODO GALVANIZADO DE 1"

UNIDAD
ML
UN

CANTIDAD
1.05
0.50

$312.50

VALOR UNI.
$7,500.00
$2,500.00

VALOR PARCIAL
$7,875.00
$1,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$9,125.00

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
15,213
$3,042.60
$3,042.60

20.0%

COSTO TOTAL UNITARIO

$18,256

ANALISIS UNITARIO
ITEM
RED SUMINISTRO GALV. 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

7.4.10
und
ML

VALOR UNI.
$625.00

VALOR PARCIAL
$625.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO GALVANIZADO 2"
CODO GALVANIZADO DE 2"

UNIDAD
ML
UN

CANTIDAD
1.05
0.50

$625.00

VALOR UNI.
$13,700.00
$5,500.00

VALOR PARCIAL
$14,385.00
$2,750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$17,135.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
29,311
$5,862.20
$5,862.20

20.0%

COSTO TOTAL UNITARIO

$35,173

ANALISIS UNITARIO
ITEM
RED SUMINISTRO GALV. 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
16.00

VALOR UNI.
$312.50
subtotal

II.MATERIALES DE OBRA

7.4.11
und
ML
VALOR PARCIAL
$312.50
$312.50

DESCRIPCION
TUBO GALVANIZADO 1 / 2"
CODO GALVANIZADO DE 1 / 2"

UNIDAD
ML
UN

CANTIDAD
1.05
0.50

VALOR UNI.
$4,500.00
$1,300.00

VALOR PARCIAL
$4,725.00
$650.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$5,375.00

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
11,463
$2,292.60
$2,292.60

20.0%

COSTO TOTAL UNITARIO

$13,756

ANALISIS UNITARIO
ITEM
RED SUMINISTRO GALV. 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
16.00

7.4.12
und
ML

VALOR UNI.
$312.50

VALOR PARCIAL
$312.50

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO GALVANIZADO 3 / 4"
CODO GALVANIZADO DE 3 / 4"

UNIDAD
ML
UN

CANTIDAD
1.05
0.50

$312.50

VALOR UNI.
$5,750.00
$5,500.00

VALOR PARCIAL
$6,037.50
$2,750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$8,787.50

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
14,876
$2,975.10
$2,975.10

20.0%

COSTO TOTAL UNITARIO

$17,851

ANALISIS UNITARIO
ITEM
RED SUMINISTRO GALV.1 1/2
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.00

VALOR UNI.
$625.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO GALVANIZADO 1-1 / 2"
CODO GALVANIZADO DE 1 -1 / 2"

UNIDAD
ML
UN

CANTIDAD
1.05
0.50

VALOR UNI.
$11,000.00
$3,800.00

7.4.13
und
ML
VALOR PARCIAL
$625.00
$625.00
VALOR PARCIAL
$11,550.00
$1,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$13,450.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
25,626
$5,125.20
$5,125.20

20.0%

COSTO TOTAL UNITARIO

$30,751

ANALISIS UNITARIO
ITEM
RED SUMINISTRO PVC 1"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
23.50

7.4.14
und
ML

VALOR UNI.
$212.77

VALOR PARCIAL
$212.77

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO PRESION RDE 13,5 PVC 1"
CODO DE 90 PRESION PVC 1"

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
GL
GL
ML
UN

CANTIDAD
0.01
0.02
1.05
0.50

TARIFA DIA
59,360.00
33,048.00

RENDIM.
23.50
23.50

$212.77

VALOR UNI.
$46,120.00
$25,788.00
$3,300.00
$1,344.00
subtotal

VALOR PARCIAL
$461.20
$515.76
$3,465.00
$672.00
$5,113.96

VALOR UNI.
$2,525.96
$1,406.30

VALOR PARCIAL
$2,525.96
$1,406.30

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,932.26
9,259
$1,851.80
$1,851.80

20.0%

COSTO TOTAL UNITARIO

$11,111

ANALISIS UNITARIO
ITEM
RED SUMINISTRO PVC 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
18.50

VALOR UNI.
$270.27
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO PRESION RDE 21 PVC 2"
CODO DE 90 PRESION PVC 2"

UNIDAD
GL
GL
ML
UN

CANTIDAD
0.02
0.03
1.05
0.50

VALOR UNI.
$46,120.00
$25,788.00
$11,858.00
$7,902.00

7.4.15
und
ML
VALOR PARCIAL
$270.27
$270.27
VALOR PARCIAL
$922.40
$644.70
$12,450.90
$3,951.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
18.50
18.50

$17,969.00

VALOR UNI.
$3,208.65
$1,786.38

VALOR PARCIAL
$3,208.65
$1,786.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,995.03
23,234
$4,646.86
$4,646.86

20.0%

COSTO TOTAL UNITARIO

$27,881

ANALISIS UNITARIO
ITEM
RED SUMINISTRO PVC 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
23.50

7.4.16
und
ML

VALOR UNI.
$212.77

VALOR PARCIAL
$212.77

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO PRESION RDE 9 PVC 1 / 2"
CODO DE 90 PRESION PVC 1 / 2"

UNIDAD
GL
GL
ML
UN

CANTIDAD
0.01
0.02
1.05
0.50

$212.77

VALOR UNI.
$46,120.00
$25,788.00
$1,788.00
$360.00

VALOR PARCIAL
$461.20
$515.76
$1,877.40
$180.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
23.50
23.50

$3,034.36

VALOR UNI.
$2,525.96
$1,406.30

VALOR PARCIAL
$2,525.96
$1,406.30

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,932.26
7,179
$1,435.88
$1,435.88

20.0%

COSTO TOTAL UNITARIO

$8,615

ANALISIS UNITARIO
ITEM
RED SUMINISTRO PVC 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
23.50

VALOR UNI.
$212.77
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO PRESION RDE 11 PVC 3 / 4"
CODO DE 90 PRESION PVC 3 / 4"

UNIDAD
GL
GL
ML
UN

CANTIDAD
0.01
0.02
1.05
0.50

VALOR UNI.
$46,120.00
$25,788.00
$2,255.00
$686.00
subtotal

III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

7.4.17
und
UN
VALOR PARCIAL
$212.77
$212.77
VALOR PARCIAL
$461.20
$515.76
$2,367.75
$343.00
$3,687.71
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

59,360.00
33,048.00

23.50
23.50

$2,525.96
$1,406.30

$2,525.96
$1,406.30

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,932.26
7,833
$1,566.55
$1,566.55

20.0%

COSTO TOTAL UNITARIO

$9,399

ANALISIS UNITARIO
ITEM
RED SUMINISTRO PVC 1 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
20.00

7.4.18
und
ML

VALOR UNI.
$250.00

VALOR PARCIAL
$250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO PRESION RDE 21 PVC 1 1 / 2"
CODO DE 90 PRESION PVC 1 1 / 2"

UNIDAD
GL
GL
ML
UN

CANTIDAD
0.03
0.02
1.55
0.50

$250.00

VALOR UNI.
$46,120.00
$25,788.00
$5,415.00
$4,157.00

VALOR PARCIAL
$1,153.00
$515.76
$8,393.25
$2,078.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.00
15.00

$12,140.51

VALOR UNI.
$3,957.33
$2,203.20

VALOR PARCIAL
$3,957.33
$2,203.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,160.53
18,551
$3,710.21
$3,710.21

20.0%

COSTO TOTAL UNITARIO

$22,261

ANALISIS UNITARIO
ITEM
REGISTRO P/D RED WITHE 1"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
26.00

VALOR UNI.
$192.31
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
REGISTRO RED WHITE DE 1"
UNIVERSAL GALVANIZADA 1"

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

VALOR UNI.
$50,700.00
$8,033.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
26.00
26.00

VALOR UNI.
$2,283.08
$1,271.08

7.4.19
und
UN
VALOR PARCIAL
$192.31
$192.31
VALOR PARCIAL
$50,700.00
$8,033.00

$58,733.00
VALOR PARCIAL
$2,283.08
$1,271.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,554.15
62,479
$12,495.89
$12,495.89

20.0%

COSTO TOTAL UNITARIO

$74,975

ANALISIS UNITARIO
ITEM
REGISTRO P/D RED WITHE 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
26.00

7.4.20
und
UN

VALOR UNI.
$192.31

VALOR PARCIAL
$192.31

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REGISTRO RED WHITE DE 1 / 2"
UNIVERSAL GALVANIZADA 1 / 2"

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

$192.31

VALOR UNI.
$28,500.00
$4,500.00

VALOR PARCIAL
$28,500.00
$4,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
26.00
26.00

$33,000.00

VALOR UNI.
$2,283.08
$1,271.08

VALOR PARCIAL
$2,283.08
$1,271.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,554.15
36,746
$7,349.29
$7,349.29

20.0%

COSTO TOTAL UNITARIO

$44,096

ANALISIS UNITARIO
ITEM
REGISTRO P/D RED WITHE 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
26.00

VALOR UNI.
$192.31
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
REGISTRO RED WHITE DE 3 / 4"
UNIVERSAL GALVANIZADA 3 / 4"

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

VALOR UNI.
$30,000.00
$5,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
26.00
26.00

VALOR UNI.
$2,283.08
$1,271.08
subtotal

Total Costo Directo

7.4.21
und
UN
VALOR PARCIAL
$192.31
$192.31
VALOR PARCIAL
$30,000.00
$5,500.00

$35,500.00
VALOR PARCIAL
$2,283.08
$1,271.08
$3,554.15
39,246

A.I.U.
Total Costo Indirecto

20.0%

$7,849.29
$7,849.29

COSTO TOTAL UNITARIO

$47,096

ANALISIS UNITARIO
ITEM
REGISTRO DE BOLA 200 Lb. - 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
26.00

7.4.22
und
UN

VALOR UNI.
$192.31

VALOR PARCIAL
$192.31

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VALVULA DE BOLA 200 Lb - 1 / 2"
UNIVERSAL GALVANIZADA 1 / 2"

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

$192.31

VALOR UNI.
$4,500.00
$4,500.00

VALOR PARCIAL
$4,500.00
$4,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
26.00
26.00

$9,000.00

VALOR UNI.
$2,283.08
$1,271.08

VALOR PARCIAL
$2,283.08
$1,271.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,554.15
12,746
$2,549.29
$2,549.29

20.0%

COSTO TOTAL UNITARIO

$15,296

ANALISIS UNITARIO
ITEM
CHEQUE P/D RED WITHE 1"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
18.00

7.4.23
und
UN

VALOR UNI.
$277.78
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CHEQUE RED WHITE 1"
UNIVERSAL GALVANIZADA 1"

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

$277.78

VALOR UNI.
$50,700.00
$8,033.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
18.00
18.00

VALOR PARCIAL
$50,700.00
$8,033.00

$58,733.00

VALOR UNI.
$3,297.78
$1,836.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$277.78

VALOR PARCIAL
$3,297.78
$1,836.00
$5,133.78

20.0%

64,145
$12,828.91
$12,828.91

COSTO TOTAL UNITARIO

$76,973

ANALISIS UNITARIO
ITEM
TUBERIA PVC-P RDE 9 DE 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
22.00

7.4.24
und
ML

VALOR UNI.
$227.27

VALOR PARCIAL
$227.27

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC -P RDE 9 DE 1 / 2 "
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
CODO DE 90 PRESION PVC-P 1 / 2"

UNIDAD
ML
GL
GL
UN

CANTIDAD
1.05
0.01
0.01
1.00

$227.27

VALOR UNI.
$1,788.00
$46,120.00
$25,788.00
$360.00

VALOR PARCIAL
$1,877.40
$230.60
$257.88
$360.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
22.00
22.00

$2,725.88

VALOR UNI.
$2,698.18
$1,502.18

VALOR PARCIAL
$2,698.18
$1,502.18

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,200.36
7,154
$1,430.70
$1,430.70

20.0%

COSTO TOTAL UNITARIO

$8,584

ANALISIS UNITARIO
ITEM
TUBERIA PVC-P RDE 11 DE 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
20.00

7.4.25
und
ML

VALOR UNI.
$250.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC -P RDE 11 DE 3 / 4 "
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
CODO DE 90 PRESION PVC-P 3 / 4"

UNIDAD
ML
GL
GL
UN

CANTIDAD
1.05
0.01
0.01
1.00

$250.00

VALOR UNI.
$2,255.00
$46,120.00
$25,788.00
$686.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
20.00
20.00

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$2,367.75
$230.60
$257.88
$686.00
$3,542.23

VALOR UNI.
$2,968.00
$1,652.40

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$250.00

VALOR PARCIAL
$2,968.00
$1,652.40
$4,620.40

20.0%

8,413
$1,682.53
$1,682.53
$10,095

ITEM
TUBERIA PVC-P RDE 13.5 DE 1"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
22.00

7.4.26
und
ML

VALOR UNI.
$227.27

VALOR PARCIAL
$227.27

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC -P RDE 21 DE 1 "
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS
CODO DE 90 PRESION PVC-P 1"

UNIDAD
ML
GL
GL
UN

CANTIDAD
1.05
0.01
0.01
1.00

$227.27

VALOR UNI.
$7,500.00
$46,120.00
$25,788.00
$1,344.00

VALOR PARCIAL
$7,875.00
$230.60
$257.88
$1,344.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
22.00
22.00

$9,707.48

VALOR UNI.
$2,698.18
$1,502.18

VALOR PARCIAL
$2,698.18
$1,502.18

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,200.36
14,135
$2,827.02
$2,827.02

20.0%

COSTO TOTAL UNITARIO

$16,962

ANALISIS UNITARIO
ITEM
TUBERIA PVC-P RDE 21 DE 1 1/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
18.00

7.4.27
und
ML

VALOR UNI.
$277.78

VALOR PARCIAL
$277.78

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC -P RDE 21 DE 1 - 1 /4 "
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS
CODO DE 90 PRESION PVC-P 1 1/4"

UNIDAD
ML
GL
GL
UN

CANTIDAD
1.05
0.01
0.01
1.00

$277.78

VALOR UNI.
$4,150.00
$46,120.00
$25,788.00
$2,225.00

VALOR PARCIAL
$4,357.50
$230.60
$257.88
$2,225.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
18.00
18.00

$7,070.98

VALOR UNI.
$3,297.78
$1,836.00

VALOR PARCIAL
$3,297.78
$1,836.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,133.78
12,483
$2,496.51
$2,496.51

20.0%

COSTO TOTAL UNITARIO

$14,979

ANALISIS UNITARIO
ITEM
TUBERIA PVC-P RDE 21 DE 1 1/2"

No. ITEM
UNIDAD:

7.4.28
und
ML

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
22.00

VALOR UNI.
$227.27

VALOR PARCIAL
$227.27

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC -P RDE 21 DE 1 - 1 / 2 "
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS
CODO DE 90 PRESION PVC-P 1 1 / 2"

UNIDAD
ML
GL
GL
UN

CANTIDAD
1.05
0.01
0.01
1.00

$227.27

VALOR UNI.
$6,500.00
$46,120.00
$25,788.00
$4,157.00

VALOR PARCIAL
$6,825.00
$230.60
$257.88
$4,157.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
22.00
22.00

$11,470.48

VALOR UNI.
$2,698.18
$1,502.18

VALOR PARCIAL
$2,698.18
$1,502.18

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,200.36
15,898
$3,179.62
$3,179.62

20.0%

COSTO TOTAL UNITARIO

$19,078

ANALISIS UNITARIO
ITEM
TUBERIA PVC-P RDE 21 DE 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
20.00

7.4.29
und
ML

VALOR UNI.
$250.00

VALOR PARCIAL
$250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC -P RDE 21 DE 2 "
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS
CODO DE 90 PRESION PVC-P 2"

UNIDAD
ML
GL
GL
UN

CANTIDAD
1.05
0.01
0.01
1.00

$250.00

VALOR UNI.
$11,858.00
$46,120.00
$25,788.00
$5,530.00

VALOR PARCIAL
$12,450.90
$230.60
$257.88
$5,530.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
20.00
20.00

$18,469.38

VALOR UNI.
$2,968.00
$1,652.40

VALOR PARCIAL
$2,968.00
$1,652.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,620.40
23,340
$4,667.96
$4,667.96

20.0%

COSTO TOTAL UNITARIO

$28,008

ANALISIS UNITARIO
ITEM
SUM. E INSTALACIN MOTOBOMBA MANUAL CON ENCENDIDO AUTOMTICO
I.EQUIPO
DESCRIPCION
TARIFA DIA
RENDIM.
HERRAMIENTA MENOR
5,000.00
0.42

No. ITEM
UNIDAD:

VALOR UNI.
$11,904.76

7.4.30
und
UN
VALOR PARCIAL
$11,904.76

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MOTO BOMBA MANUAL

UNIDAD
UNIDAD

CANTIDAD
1.00

$11,904.76

VALOR UNI.
$350,000.00

VALOR PARCIAL
$350,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
33,048.00
59,360.00

RENDIM.
0.42
0.42

$350,000.00

VALOR UNI.
$78,685.71
$141,333.33
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$78,685.71
$141,333.33
$220,019.05
581,924
$116,384.76
$116,384.76

20.0%

COSTO TOTAL UNITARIO

$698,309

ANALISIS UNITARIO
ITEM
REGISTRO P/D RED WITHE SIMILAR 1 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
26.00

7.4.31
und
UN

VALOR UNI.
$192.31

VALOR PARCIAL
$192.31

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REGISTRO RED WHITE DE 1 - 1 / 2"
UNIVERSAL GALVANIZADA 1 1 / 2"

UNIDAD
UN
UN

CANTIDAD
1.05
1.00

$192.31

VALOR UNI.
$47,200.00
$11,000.00

VALOR PARCIAL
$49,560.00
$11,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
26.00
26.00

$60,560.00

VALOR UNI.
$2,283.08
$1,271.08

VALOR PARCIAL
$2,283.08
$1,271.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,554.15
64,306
$12,861.29
$12,861.29

20.0%

COSTO TOTAL UNITARIO

$77,168

ANALISIS UNITARIO
ITEM
REGISTRO P/D RED WITHE SIMILAR 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
26.00

VALOR UNI.
$192.31
subtotal

II.MATERIALES DE OBRA

7.4.32
und
UN
VALOR PARCIAL
$192.31
$192.31

DESCRIPCION
REGISTRO RED WHITE DE 2"
UNIVERSAL GALVANIZADA 2"

UNIDAD
UN
UN

CANTIDAD
1.05
1.00

VALOR UNI.
$95,800.00
$16,000.00

VALOR PARCIAL
$100,590.00
$16,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
26.00
26.00

$116,590.00

VALOR UNI.
$2,283.08
$1,271.08

VALOR PARCIAL
$2,283.08
$1,271.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,554.15
120,336
$24,067.29
$24,067.29

20.0%

COSTO TOTAL UNITARIO

$144,404

ANALISIS UNITARIO
ITEM
ACCESORIOS PVC-P DE 1 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
22.00

7.4.33
und
UN

VALOR UNI.
$227.27

VALOR PARCIAL
$227.27

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CODO DE 90 PRESION PVC 1 1/ 2"
TEE PRESION PVC 1 1/ 2"

UNIDAD
UN
UN

CANTIDAD
0.70
0.70

$227.27

VALOR UNI.
$4,157.00
$6,343.00

VALOR PARCIAL
$2,909.90
$4,440.10

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
22.00
22.00

$7,350.00

VALOR UNI.
$2,698.18
$1,502.18

VALOR PARCIAL
$2,698.18
$1,502.18

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,200.36
11,778
$2,355.53
$2,355.53

20.0%

COSTO TOTAL UNITARIO

$14,133

ANALISIS UNITARIO
ITEM
ACCESORIOS PVC-P DE 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
22.00

VALOR UNI.
$227.27
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CODO DE 90 PRESION PVC 2"
TEE PRESION PVC 2"

UNIDAD
UN
UN

CANTIDAD
0.70
0.70

VALOR UNI.
$7,902.00
$8,706.00

7.4.34
und
UN
VALOR PARCIAL
$227.27
$227.27
VALOR PARCIAL
$5,531.40
$6,094.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
26.00
26.00

$11,625.60

VALOR UNI.
$2,283.08
$1,271.08

VALOR PARCIAL
$2,283.08
$1,271.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,554.15
15,407
$3,081.41
$3,081.41

20.0%

COSTO TOTAL UNITARIO

$18,488

ANALISIS UNITARIO
ITEM
TUBERIA H.G. DE 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
8.50

7.4.35
und
ML

VALOR UNI.
$588.24

VALOR PARCIAL
$588.24

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO H.G DE 2"
SELLADOR
CINTA TEFLON

UNIDAD
ML
GL
RL

CANTIDAD
1.05
0.02
1.05

$588.24

VALOR UNI.
$13,700.00
$45,000.00
$1,300.00

VALOR PARCIAL
$14,385.00
$900.00
$1,365.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.50
8.50

$16,650.00

VALOR UNI.
$6,983.53
$3,888.00

VALOR PARCIAL
$6,983.53
$3,888.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,871.53
28,110
$5,621.95
$5,621.95

20.0%

COSTO TOTAL UNITARIO

$33,732

ANALISIS UNITARIO
ITEM
ACCESORIOS H.G. DE 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

#REF!
TARIFA DIA
5,000.00

RENDIM.
8.50

VALOR UNI.
$588.24
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CODO H,G, 2"
TEE H.G. 2"

7.4.36
und

UNIDAD
UN
UN

CANTIDAD
0.70
0.70

VALOR UNI.
$5,500.00
$6,500.00

VALOR PARCIAL
$588.24
$588.24
VALOR PARCIAL
$3,850.00
$4,550.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.50
8.50

$8,400.00

VALOR UNI.
$6,983.53
$3,888.00

VALOR PARCIAL
$6,983.53
$3,888.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,871.53
19,860
$3,971.95
$3,971.95

20.0%

COSTO TOTAL UNITARIO

$23,832

ANALISIS UNITARIO
ITEM
FLOTADOR MECNICO PTANQUE SANIT.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

7.4.37
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
FLOTADOR METALICO 2"
SUB-CONTRATO HIDRAULICO Y SANITARIO

UNIDAD
UN
%

CANTIDAD
1.00
38.00

$50.00

VALOR UNI.
$134,000.00
$127,000.00

VALOR PARCIAL
$134,000.00
$48,260.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA

RENDIM.

$182,260.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
182,310
$36,462.00
$36,462.00

20.0%

COSTO TOTAL UNITARIO

$218,772

ANALISIS UNITARIO
ITEM
CHEQUE P/D RED WITHE 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
24.00

VALOR UNI.
$208.33
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CHEQUE RED WHITE 3 / 4"
UNIVERSAL GALVANIZADA 3 / 4"

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

VALOR UNI.
$35,100.00
$5,500.00

7.4.38
und
UN
VALOR PARCIAL
$208.33
$208.33
VALOR PARCIAL
$35,100.00
$5,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
24.00
24.00

$40,600.00

VALOR UNI.
$2,473.33
$1,377.00

VALOR PARCIAL
$2,473.33
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,850.33
44,659
$8,931.73
$8,931.73

20.0%

COSTO TOTAL UNITARIO

$53,590

ANALISIS UNITARIO
ITEM
PUNTO SUMINISTRO GALV
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.50

7.6.1
und
UN

VALOR UNI.
$1,111.11

VALOR PARCIAL
$1,111.11

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REGISTRO RED WHITE 3 / 4"
TUBO GALVANIZADO 1 / 2"
TUBO GALVANIZADO 3 / 4"
TUBO GALVANIZADO 1"
TUBO GALVANIZADO 1- 1 / 2"
CODO GALVANIZADO 1 / 2"
CODO GALVANIZADO 3 / 4"
CODO GALVANIZADO 1"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UN
UN
UN
UN
UN
UN
UN
UN

CANTIDAD
0.50
2.62
0.58
0.49
0.43
2.46
1.07
1.51

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.50
4.50

$1,111.11

VALOR UNI.
$30,000.00
$4,500.00
$5,750.00
$7,500.00
$11,000.00
$1,300.00
$5,500.00
$2,500.00
subtotal

VALOR PARCIAL
$15,000.00
$11,790.00
$3,335.00
$3,675.00
$4,730.00
$3,198.00
$5,885.00
$3,775.00
$51,388.00

VALOR UNI.
$13,191.11
$7,344.00

VALOR PARCIAL
$13,191.11
$7,344.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,535.11
73,034
$14,606.84
$14,606.84

20.0%

COSTO TOTAL UNITARIO

$87,641

ANALISIS UNITARIO
ITEM
PUNTO AGUA CALIENTE CPVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.60

VALOR UNI.
$1,086.96
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO CPVC 1 / 2"
TUBO CPVC 3 / 4"
CODO 90 CPVC 1 / 2"
CODO 90 CPVC 3 / 4"
SOLDADURA CPVC LIQUIDA 1/4

UNIDAD
UN
UN
UN
UN
GL

CANTIDAD
2.63
1.25
2.21
2.13
0.03

VALOR UNI.
$5,643.00
$9,275.00
$1,007.00
$1,821.00
$49,500.00

7.6.2
und
UN
VALOR PARCIAL
$1,086.96
$1,086.96
VALOR PARCIAL
$14,841.09
$11,593.75
$2,225.47
$3,878.73
$1,485.00

LIMPIADOR REMOVEDOR 760 GRMS


III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

GL

TARIFA DIA
59,360.00
33,048.00

0.02

RENDIM.
4.60
4.60

$25,788.00
subtotal

$515.76
$34,539.80

VALOR UNI.
$12,904.35
$7,184.35

VALOR PARCIAL
$12,904.35
$7,184.35

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,088.70
55,715
$11,143.09
$11,143.09

20.0%

COSTO TOTAL UNITARIO

$66,859

ANALISIS UNITARIO
ITEM
PUNTO AGUA FRIA PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

7.6.3
und
UN

VALOR UNI.
$1,000.00

VALOR PARCIAL
$1,000.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS
REGISTRO RED WHITE 3 / 4"
TUBO PVC PRESION 1 / 2" RDE 9
TUBO PRESION PVC 3 / 4" RDE 11
TUBO PRESION PVC 1" RDE 13,5
TUBO PVC PRESION 1 -1 / 2" RDE 21
CODO DE 90 PRESION PVC 1 / 2"
CODO DE 90 PRESION PVC 3 / 4"
CODO DE 90 PRESION PVC 1"
CODO DE 90 PVC PRESION 1 -1 / 2"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
GL
GL
UN
UN
UN
UN
UN
UN
UN
UN
UN

CANTIDAD
0.02
0.02
0.50
2.62
0.58
0.49
0.43
2.46
1.07
0.77
0.74

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.00
5.00

$1,000.00

VALOR UNI.
$46,120.00
$25,788.00
$30,000.00
$1,788.00
$2,255.00
$3,300.00
$5,415.00
$360.00
$686.00
$1,344.00
$4,157.00
subtotal

VALOR PARCIAL
$922.40
$515.76
$15,000.00
$4,684.56
$1,307.90
$1,617.00
$2,328.45
$885.60
$734.02
$1,034.88
$3,076.18
$32,106.75

VALOR UNI.
$11,872.00
$6,609.60

VALOR PARCIAL
$11,872.00
$6,609.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,481.60
51,588
$10,317.67
$10,317.67

20.0%

COSTO TOTAL UNITARIO

$61,906

ANALISIS UNITARIO
ITEM
PUNTO DESAGUE PVC 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

VALOR UNI.
$1,000.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
GL

CANTIDAD
0.01

VALOR UNI.
$46,120.00

7.7.1
und
UN
VALOR PARCIAL
$1,000.00
$1,000.00
VALOR PARCIAL
$461.20

LIMPIADOR REMOVEDOR 760 GRMS


TUBO PVC SANITARIO DE 2"
CODO 90 PVC SANITARIO DE 2" C X C
TEE PVC SANITARIA DE 2"

GL
ML
UN
UN

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

0.02
1.63
1.37
1.37

RENDIM.
5.00
5.00

$25,788.00
$6,900.00
$1,908.00
$6,900.00
subtotal

$515.76
$11,247.00
$2,613.96
$9,453.00
$24,290.92

VALOR UNI.
$11,872.00
$6,609.60

VALOR PARCIAL
$11,872.00
$6,609.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,481.60
43,773
$8,754.50
$8,754.50

20.0%

COSTO TOTAL UNITARIO

$52,527

ANALISIS UNITARIO
ITEM
PUNTO DESAGUE PVC 3";4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.00

7.7.2
und
UN

VALOR UNI.
$1,250.00

VALOR PARCIAL
$1,250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS
TUBO PVC SANITARIO DE 3"
TUBO PVC SANITARIO DE 4"
CODO 90 PVC SANITARIO DE 3" C X C
CODO 90 PVC SANITARIO DE 4" C X C

UNIDAD
GL
GL
ML
ML
UN
UN

CANTIDAD
0.08
0.06
0.91
0.26
2.63
1.37

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.00
4.00

$1,250.00

VALOR UNI.
$46,120.00
$25,788.00
$11,968.00
$16,678.00
$4,144.00
$7,803.00
subtotal

VALOR PARCIAL
$3,459.00
$1,547.28
$10,890.88
$4,336.28
$10,898.72
$10,690.11
$41,822.27

VALOR UNI.
$14,840.00
$8,262.00

VALOR PARCIAL
$14,840.00
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$23,102.00
66,174
$13,234.85
$13,234.85

20.0%

COSTO TOTAL UNITARIO

$79,409

ANALISIS UNITARIO
ITEM
ACCESORIOS PVC-S DE 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
17.00

VALOR UNI.
$294.12
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CODO 90 PVC SANITARIO DE 2" C X C
TEE PVC SANITARIA DE 2"
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
GL

CANTIDAD
0.50
0.70
0.00

VALOR UNI.
$1,908.00
$6,900.00
$46,120.00

7.8.1
und
ML
VALOR PARCIAL
$294.12
$294.12
VALOR PARCIAL
$954.00
$4,830.00
$46.12

LIMPIADOR REMOVEDOR 760 GRMS

GL

0.00

$25,788.00

$25.79

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
17.00
17.00

$5,855.91

VALOR UNI.
$3,491.76
$1,944.00

VALOR PARCIAL
$3,491.76
$1,944.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,435.76
11,586
$2,317.16
$2,317.16

20.0%

COSTO TOTAL UNITARIO

$13,903

ANALISIS UNITARIO
ITEM
BAJANTE A.LL.
I.EQUIPO

No. ITEM
UNIDAD:

7.8.2
und
ML

PVC 3"

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
20.00

VALOR UNI.
$250.00

VALOR PARCIAL
$250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC A. LL DE 3"
CODO 90 PVC SANITARIO DE 3" C X C
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
UN
UN
UN

CANTIDAD
1.05
0.06
0.01
0.01

$250.00

VALOR UNI.
$6,813.00
$4,144.00
$46,120.00
$25,788.00

VALOR PARCIAL
$7,153.65
$248.64
$599.56
$257.88

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
20.00
20.00

$8,259.73

VALOR UNI.
$2,968.00
$1,652.40

VALOR PARCIAL
$2,968.00
$1,652.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,620.40
13,130
$2,626.03
$2,626.03

20.0%

COSTO TOTAL UNITARIO

$15,756

ANALISIS UNITARIO
ITEM
BAJANTE A.LL.
I.EQUIPO

No. ITEM
UNIDAD:
PVC 4"

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
13.90

VALOR UNI.
$359.71
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC A. LL DE 4"
CODO 90 PVC SANITARIO DE 4" C X C
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
UN
GL
GL

CANTIDAD
1.05
0.06
0.01
0.01

VALOR UNI.
$11,747.00
$7,803.00
$46,120.00
$25,788.00

7.8.3
und
ML
VALOR PARCIAL
$359.71
$359.71
VALOR PARCIAL
$12,334.35
$468.18
$599.56
$257.88

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
13.90
13.90

$13,659.97

VALOR UNI.
$4,270.50
$2,377.55

VALOR PARCIAL
$4,270.50
$2,377.55

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,648.06
20,668
$4,133.55
$4,133.55

20.0%

COSTO TOTAL UNITARIO

$24,801

ANALISIS UNITARIO
ITEM
BAJANTE A.N.
I.EQUIPO

No. ITEM
UNIDAD:

7.8.4
und
ML

PVC 3"

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
16.00

VALOR UNI.
$312.50

VALOR PARCIAL
$312.50

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC SANITARIO DE 3"
CODO 90 PVC SANITARIO DE 3" C X C
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
UN
GL
GL

CANTIDAD
1.05
0.06
0.02
0.01

$312.50

VALOR UNI.
$11,968.00
$4,144.00
$46,120.00
$25,788.00

VALOR PARCIAL
$12,566.40
$248.64
$922.40
$385.53

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$14,122.97

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
20,211
$4,042.19
$4,042.19

20.0%

COSTO TOTAL UNITARIO

$24,253

ANALISIS UNITARIO
ITEM
BAJANTE A.N.
I.EQUIPO

No. ITEM
UNIDAD:
PVC 4"

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
12.00

VALOR UNI.
$416.67
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC SANITARIO DE 4"
CODO 90 PVC SANITARIO DE 4" C X C
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
UN
GL
GL

CANTIDAD
1.05
0.06
0.03
0.02

VALOR UNI.
$16,678.00
$7,803.00
$46,120.00
$25,788.00
subtotal

III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

7.8.5
und
ML
VALOR PARCIAL
$416.67
$416.67
VALOR PARCIAL
$17,511.90
$468.18
$1,153.00
$515.76
$19,648.84
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

59,360.00
33,048.00

12.00
12.00

$4,946.67
$2,754.00

$4,946.67
$2,754.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,700.67
27,766
$5,553.23
$5,553.23

20.0%

COSTO TOTAL UNITARIO

$33,319

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
BAJANTE A.N.
I.EQUIPO

7.8.6
und
ML

PVC 6"

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC SANITARIO DE 6"
CODO 90 PVC SANITARIO DE 6" C X C
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
UN
GL
GL

CANTIDAD
1.05
0.06
0.04
0.03

$555.56

VALOR UNI.
$35,319.00
$63,133.00
$46,120.00
$25,788.00

VALOR PARCIAL
$37,084.95
$3,787.98
$1,729.50
$773.64

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
9.00
9.00

$43,376.07

VALOR UNI.
$6,595.56
$3,672.00

VALOR PARCIAL
$6,595.56
$3,672.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,267.56
54,199
$10,839.84
$10,839.84

20.0%

COSTO TOTAL UNITARIO

$65,039

ANALISIS UNITARIO
ITEM
REVENTILACION
I.EQUIPO

No. ITEM
UNIDAD:
PVC 3"

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
15.50

VALOR UNI.
$322.58
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC SANITARIO DE 3"
CODO 90 PVC SANITARIO DE 3" C X C
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
UN
GL
GL

CANTIDAD
1.05
0.33
0.00
0.00

VALOR UNI.
$11,968.00
$4,144.00
$46,120.00
$25,788.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.50
15.50

VALOR UNI.
$3,829.68
$2,132.13

7.8.7
und
ML
VALOR PARCIAL
$322.58
$322.58
VALOR PARCIAL
$12,566.40
$1,367.52
$46.12
$25.79
$14,005.83
VALOR PARCIAL
$3,829.68
$2,132.13

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,961.81
20,290
$4,058.04
$4,058.04

20.0%

COSTO TOTAL UNITARIO

$24,348

ANALISIS UNITARIO
ITEM
VENTILACION Y REVENTILACION
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

7.8.8
und
ML

PVC 2"
TARIFA DIA
5,000.00

RENDIM.
15.50

VALOR UNI.
$322.58

VALOR PARCIAL
$322.58

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC SANITARIO DE 2"
CODO 90 PVC SANITARIO DE 2" C X C
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
UN
GL
GL

CANTIDAD
1.05
0.33
0.00
0.00

$322.58

VALOR UNI.
$6,900.00
$1,908.00
$46,120.00
$25,788.00

VALOR PARCIAL
$7,245.00
$629.64
$46.12
$25.79

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.50
15.50

$7,946.55

VALOR UNI.
$3,829.68
$2,132.13

VALOR PARCIAL
$3,829.68
$2,132.13

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,961.81
14,231
$2,846.19
$2,846.19

20.0%

COSTO TOTAL UNITARIO

$17,077

ANALISIS UNITARIO
ITEM
VENTILACION Y REVENTILACION
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:
PVC 4"
TARIFA DIA
5,000.00

RENDIM.
15.50

VALOR UNI.
$322.58
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC SANITARIO DE 4"
CODO 90 PVC SANITARIO DE 4" C X C
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
UN
GL
GL

CANTIDAD
1.05
0.33
0.00
0.00

VALOR UNI.
$16,678.00
$7,803.00
$46,120.00
$25,788.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.50
15.50

VALOR UNI.
$3,829.68
$2,132.13
subtotal

Total Costo Directo

7.8.9
und
ML
VALOR PARCIAL
$322.58
$322.58
VALOR PARCIAL
$17,511.90
$2,574.99
$46.12
$25.79
$20,158.80
VALOR PARCIAL
$3,829.68
$2,132.13
$5,961.81
26,443

A.I.U.
Total Costo Indirecto

20.0%

$5,288.64
$5,288.64

COSTO TOTAL UNITARIO

$31,732

ANALISIS UNITARIO
ITEM
TUBERIA PVC-L 2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
15.50

7.9.1
und
ML

VALOR UNI.
$322.58

VALOR PARCIAL
$322.58

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC L DE 2"
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
GL
GL

CANTIDAD
1.05
0.01
0.02

$322.58

VALOR UNI.
$3,700.00
$46,120.00
$25,788.00

VALOR PARCIAL
$3,885.00
$461.20
$515.76

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.50
15.50

$4,861.96

VALOR UNI.
$3,829.68
$2,132.13

VALOR PARCIAL
$3,829.68
$2,132.13

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,961.81
11,146
$2,229.27
$2,229.27

20.0%

COSTO TOTAL UNITARIO

$13,376

ANALISIS UNITARIO
ITEM
TUBERIA PVC-L 4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
14.00

7.9.2
und
ML

VALOR UNI.
$357.14
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC L DE 4"
SOLDADURA PVC LIQUIDA 1/4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
GL
GL

CANTIDAD
1.05
0.00
0.00

$357.14

VALOR UNI.
$11,747.00
$46,120.00
$25,788.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
14.00
14.00

VALOR PARCIAL
$12,334.35
$46.12
$25.79

$12,406.26

VALOR UNI.
$4,240.00
$2,360.57
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$357.14

VALOR PARCIAL
$4,240.00
$2,360.57
$6,600.57

20.0%

19,364
$3,872.79

Total Costo Indirecto

$3,872.79

COSTO TOTAL UNITARIO

$23,237

ANALISIS UNITARIO
ITEM
INST. APARATO SANITARIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
14.00

7.10.1
und
UN

VALOR UNI.
$357.14

VALOR PARCIAL
$357.14

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO BLANCO

UNIDAD
KG

CANTIDAD
0.50

$357.14

VALOR UNI.
$800.00

VALOR PARCIAL
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
14.00
14.00

$400.00

VALOR UNI.
$4,240.00
$2,360.57

VALOR PARCIAL
$4,240.00
$2,360.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,600.57
7,358
$1,471.54
$1,471.54

20.0%

COSTO TOTAL UNITARIO

$8,829

ANALISIS UNITARIO
ITEM
INST. BOMBAS
I.EQUIPO

No. ITEM
UNIDAD:

7.12.1
und
UN

AGUA

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
0.13

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL

$0.00

VALOR UNI.
$254,215.38

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$254,215.38
$254,215.38

20.0%

254,265
$50,853.08
$50,853.08
$305,118

ANALISIS UNITARIO
ITEM
INST.EQUIP.HIDRONEUMATICO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

7.12.2
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
33,048.00
59,360.00

RENDIM.
0.20
0.20

$0.00

VALOR UNI.
$165,240.00
$296,800.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$165,240.00
$296,800.00
$462,040.00
462,090
$92,418.00
$92,418.00

20.0%

COSTO TOTAL UNITARIO

$554,508

ANALISIS UNITARIO
ITEM
SALIDA + INT.AVE 601 PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.20

8.1.1
und
UN

VALOR UNI.
$961.54

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
INTERRUPTOR SENCILLO
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
1.00
6.00
3.00
2.00
1.00
0.01
0.01

$961.54

VALOR UNI.
$15.00
$150.00
$35,772.00
$3,600.00
$11,788.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.10

VALOR PARCIAL
$15.00
$300.00
$2,861.76
$3,600.00
$70,728.00
$4,980.00
$564.00
$600.00
$257.88
$461.20

$ 84,353

VALOR UNI.
$11,415.38
$6,480.00
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$961.54

VALOR PARCIAL
$11,415.38
$6,480.00
$17,895.38

20.0%

$ 103,210
$ 20,642

Total Costo Indirecto

$ 20,642

COSTO TOTAL UNITARIO

$123,852

ANALISIS UNITARIO
ITEM
SALIDA + INT.LUM 10C PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.20

8.1.2
und
UN

VALOR UNI.
$961.54

VALOR PARCIAL
$961.54

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
INTERRUPTOR SENCILLO
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
1.00
6.00
3.00
2.00
1.00
0.01
0.01

$961.54

VALOR UNI.
$15.00
$150.00
$35,772.00
$3,600.00
$395.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

VALOR PARCIAL
$15.00
$300.00
$2,861.76
$3,600.00
$2,370.00
$4,980.00
$564.00
$600.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.10

$16,009.84

VALOR UNI.
$11,415.38
$6,480.00

VALOR PARCIAL
$11,415.38
$6,480.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,895.38
34,867
$6,973.35
$6,973.35

20.0%

COSTO TOTAL UNITARIO

$41,840

ANALISIS UNITARIO
ITEM
SALIDA BOMBA TRIF. CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.20

VALOR UNI.
$961.54

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 3X5 cm
SALIDA PARA CORDON
ALAMBRE COBRE THW 10 AWG
TUBO CONDUIT GRIS 3/4
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA CUADRADA 10X10X10
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

UNIDAD
UN
UN
ML
ML
UN
UN

CANTIDAD
1.00
1.00
24.00
8.00
2.00
1.00

TARIFA DIA
59,360.00

RENDIM.
5.20

8.1.3
und
UN
VALOR PARCIAL
$961.54

$961.54

VALOR UNI.
$1,500.00
$2,800.00
$1,205.00
$8,500.00
$350.00
$1,200.00
subtotal

VALOR PARCIAL
$1,500.00
$2,800.00
$28,920.00
$68,000.00
$700.00
$1,200.00
$103,120.00

VALOR UNI.
$11,415.38

VALOR PARCIAL
$11,415.38

Ayudante ( incluye 100% de prestaciones)

33,048.00

5.10

$6,480.00

$6,480.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,895.38
121,977
$24,395.38
$24,395.38

20.0%

COSTO TOTAL UNITARIO

$146,372

ANALISIS UNITARIO
ITEM
SALIDA BOMBA TRIF. PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.00

8.1.4
und
UN

VALOR UNI.
$1,000.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 3X5 cm
ALAMBRE COBRE DESNUDO AWG 14
SALIDA PARA CORDON
ALAMBRE COBRE THW 10 AWG
TUBO CONDUIT PVC-3/4
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA CUADRADA 10X10X10

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UN
KG
KG
UN
ML
ML
UN
UN
UN

CANTIDAD
2.00
1.00
0.17
1.00
18.00
6.00
0.01
0.01
2.00

VALOR UNI.
$1,500.00
$35,772.00
$2,800.00
$1,205.00
$1,700.00
$25,788.00
$46,120.00
$350.00
$1,200.00

VALOR PARCIAL
$1,000.00
$0.00
$1,000.00
VALOR PARCIAL
$3,000.00
$35,772.00
$476.00
$1,205.00
$30,600.00
$154,728.00
$461.20
$3.50
$2,400.00

subtotal
TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.00
5.00

$228,645.70

VALOR UNI.
$11,872.00
$6,609.60

VALOR PARCIAL
$11,872.00
$6,609.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,481.60
248,127
$49,625.46
$49,625.46

20.0%

COSTO TOTAL UNITARIO

$297,753

ANALISIS UNITARIO
ITEM
SALIDA BOTON TIMBRE CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.55

VALOR UNI.
$1,408.45
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
Cndt PVC TUBO PLACA 3 M 1/2"
CAJA GVNZD 5800
JUEGO BOQUILLAS 1/2"
c&a ALAMBRE ATT 2*22
AVE 605 BOTON TIMBRE

UNIDAD
ML
UN
JG
ML
UN

CANTIDAD
7.35
2.10
2.10
7.75
1.05

VALOR UNI.
$1,660.00
$400.00
$130.00
$189.00
$2,230.00

8.1.5
und
UN
VALOR PARCIAL
$1,408.45
$1,408.45
VALOR PARCIAL
$12,201.00
$840.00
$273.00
$1,464.75
$2,341.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.55
3.55

$17,120.25

VALOR UNI.
$16,721.13
$9,309.30

VALOR PARCIAL
$16,721.13
$9,309.30

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,030.42
44,559
$8,911.82
$8,911.82

20.0%

COSTO TOTAL UNITARIO

$53,471

ANALISIS UNITARIO
ITEM
SALIDA BOTON TIMBRE PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 14 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.20

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.13
9.00
4.50
2.00
1.00
0.01
0.01

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

8.1.6
und
UN

VALOR UNI.
$961.54
subtotal

VALOR PARCIAL
$961.54
$0.00
$961.54

VALOR UNI.
$15.00
$150.00
$35,772.00
$282.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00
subtotal

VALOR PARCIAL
$15.00
$300.00
$4,650.36
$2,538.00
$7,470.00
$564.00
$600.00
$257.88
$461.20
$16,856.44

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
35,589
$7,117.75
$7,117.75

20.0%

COSTO TOTAL UNITARIO

$42,706

ANALISIS UNITARIO
ITEM
SALIDA CAMARA TV
CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.00

VALOR UNI.
$500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SALIDA PARA CORDON
ADAPTADOR TERMINAL CONDUIT 3/4
TUBO CONDUIT GRIS 1/2
CAJA SENCILLA CONDUIT

UNIDAD
UN
UN
ML
UN

CANTIDAD
1.00
2.00
27.00
1.00

VALOR UNI.
$2,800.00
$350.00
$7,000.00
$600.00

8.1.7
und
UN
VALOR PARCIAL
$500.00
$0.00
$500.00
VALOR PARCIAL
$2,800.00
$700.00
$189,000.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
10.00
10.00

$193,100.00

VALOR UNI.
$5,936.00
$3,304.80

VALOR PARCIAL
$5,936.00
$3,304.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,240.80
202,841
$40,568.16
$40,568.16

20.0%

COSTO TOTAL UNITARIO

$243,409

ANALISIS UNITARIO
ITEM
SALIDA CAMARA TV
PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

II.MATERIALES DE OBRA
DESCRIPCION
SALIDA PARA CORDON
ADAPTADOR TERMINAL CONDUIT 3/4
TUVO CONDUIT PVC 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.00

UNIDAD
UN
UN
ML
UN
UN
UN

CANTIDAD
1.00
2.00
24.00
1.00
0.01
0.01

TARIFA DIA
59,360.00
33,048.00

RENDIM.
10.00
10.00

8.1.8
und
UN

VALOR UNI.
$500.00
subtotal

VALOR PARCIAL
$500.00
$0.00
$500.00

VALOR UNI.
$2,800.00
$350.00
$1,660.00
$600.00
$25,788.00
$46,120.00
subtotal

VALOR PARCIAL
$2,800.00
$700.00
$39,840.00
$600.00
$257.88
$461.20
$44,659.08

VALOR UNI.
$5,936.00
$3,304.80

VALOR PARCIAL
$5,936.00
$3,304.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,240.80
54,400
$10,879.98
$10,879.98

20.0%

COSTO TOTAL UNITARIO

$65,280

ANALISIS UNITARIO
ITEM
SALIDA CAMPANA TIMBRE CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
5.20

VALOR UNI.
$961.54
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 3X5 cm
ALAMBRE COBRE THW 14 AWG
TUVO CONDUIT GRIS 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT

UNIDAD
UN
ML
ML
UN
UN

CANTIDAD
0.10
4.00
2.00
2.00
1.00

VALOR UNI.
$1,500.00
$282.00
$7,000.00
$282.00
$600.00

8.1.9
und
UN
VALOR PARCIAL
$961.54
$0.00
$961.54
VALOR PARCIAL
$150.00
$1,128.00
$14,000.00
$564.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$16,442.00

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
35,174
$7,034.86
$7,034.86

20.0%

COSTO TOTAL UNITARIO

$42,209

ANALISIS UNITARIO
ITEM
SALIDA CAMPANA TIMBRE PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.10
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 14 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.06
2.00
2.00
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$282.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$2,146.32
$564.00
$3,320.00
$564.00
$600.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$8,228.40

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
26,049
$5,209.83
$5,209.83

20.0%

COSTO TOTAL UNITARIO

$31,259

ANALISIS UNITARIO
ITEM
SALIDA CANTONERA
CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SALIDA PARA CORDON

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$2,800.00

8.1.11
und
UN
VALOR PARCIAL
$100.00
$0.00
$100.00
VALOR PARCIAL
$2,800.00

PLACA IDENTIFICACION 3X5 cm


ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT GRIS 1/2
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA SENCILLA CONDUIT

UN
ML
ML
UN
UN

0.10
18.00
9.00
3.00
1.00

$1,500.00
$395.00
$7,000.00
$350.00
$600.00

$150.00
$7,110.00
$63,000.00
$1,050.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$74,710.00

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
92,581
$18,516.15
$18,516.15

20.0%

COSTO TOTAL UNITARIO

$111,097

ANALISIS UNITARIO
ITEM
SALIDA CANTONERA
PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.12
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
PLACA IDENTIFICACION 3X5 cm
SALIDA PARA CORDON

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.17
12.00
6.00
3.00
1.00
0.01
0.01
0.10
1.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00
$1,500.00
$2,800.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$6,081.24
$4,740.00
$9,960.00
$846.00
$600.00
$257.88
$461.20
$150.00
$2,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$26,211.32

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
44,032
$8,806.42
$8,806.42

20.0%

COSTO TOTAL UNITARIO

$52,839

ANALISIS UNITARIO
ITEM
SALIDA CUATRO VIAS

No. ITEM
UNIDAD:
PVC

8.1.13
und
UN

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
3.00
0.13
18.00
4.50
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$1,200.00
$25,788.00
$46,120.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$450.00
$4,650.36
$7,110.00
$7,470.00
$564.00
$1,200.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$22,178.44

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
39,999
$7,999.84
$7,999.84

20.0%

COSTO TOTAL UNITARIO

$47,999

ANALISIS UNITARIO
ITEM
SALIDA DOBLE
I.EQUIPO

No. ITEM
UNIDAD:
PVC

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

VALOR UNI.
$11,415.38
$6,355.38
subtotal

8.1.14
und
UN
VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$600.00
$257.88
$461.20

$12,409.84
VALOR PARCIAL
$11,415.38
$6,355.38
$17,770.77

Total Costo Directo


A.I.U.
Total Costo Indirecto

30,231
$6,046.12
$6,046.12

20.0%

COSTO TOTAL UNITARIO

$36,277

ANALISIS UNITARIO
ITEM
SALIDA DOBLE CONM. PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.15
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
3.00
0.13
18.00
4.50
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$450.00
$4,650.36
$7,110.00
$7,470.00
$564.00
$600.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$21,578.44

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
39,399
$7,879.84
$7,879.84

20.0%

COSTO TOTAL UNITARIO

$47,279

ANALISIS UNITARIO
ITEM
SALIDA FLOTADOR
CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO CONDUIT GRIS 3/4
PLACA IDENTIFICACION 3X5 cm
ALAMBRE COBRE THW 12 AWG
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA SENCILLA CONDUIT

UNIDAD
UN
UN
ML
UN
UN

CANTIDAD
18.00
0.10
36.00
2.00
1.00

VALOR UNI.
$8,500.00
$1,500.00
$395.00
$350.00
$600.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
59,360.00

RENDIM.
5.20

VALOR UNI.
$11,415.38

8.1.16
und
UN
VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$153,000.00
$150.00
$14,220.00
$700.00
$600.00
$168,670.00
VALOR PARCIAL
$11,415.38

Ayudante ( incluye 100% de prestaciones)

33,048.00

5.20

$6,355.38

$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
186,491
$37,298.15
$37,298.15

20.0%

COSTO TOTAL UNITARIO

$223,789

ANALISIS UNITARIO
ITEM
SALIDA FLOTADOR
PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

II.MATERIALES DE OBRA
DESCRIPCION
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

UNIDAD
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
2.00
0.34
24.00
12.00
2.00
1.00
0.01
0.01

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

8.1.17
und
UN

VALOR UNI.
$50.00
subtotal

VALOR PARCIAL
$50.00
$0.00
$50.00

VALOR UNI.
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00
subtotal

VALOR PARCIAL
$300.00
$12,162.48
$9,480.00
$19,920.00
$564.00
$600.00
$257.88
$461.20
$43,745.56

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
61,566
$12,313.27
$12,313.27

20.0%

COSTO TOTAL UNITARIO

$73,880

ANALISIS UNITARIO
ITEM
SALIDA FOTOCELDA
PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.17
12.00
6.00
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

8.1.18
und
UN
VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$6,081.24
$4,740.00
$9,960.00
$564.00
$600.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$22,979.32

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
40,800
$8,160.02
$8,160.02

20.0%

COSTO TOTAL UNITARIO

$48,960

ANALISIS UNITARIO
ITEM
SALIDA LAMPARA MURO PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.19
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE THW 14 AWG
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA OCTOGONAL CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
ML
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.80
4.50
9.00
4.50
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$400.00
$25,788.00
$46,120.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$420.00
$160,974.00
$3,555.00
$7,470.00
$564.00
$400.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$174,117.08

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
191,938
$38,387.57
$38,387.57

20.0%

COSTO TOTAL UNITARIO

$230,325

ANALISIS UNITARIO
ITEM
SALIDA LAMPARA PISO PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$15.00

8.1.20
und
UN
VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00

CONECTOR RESORTE ROJO


ALAMBRE COBRE THW 14 AWG
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA OCTOGONAL CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UN
ML
ML
ML
UN
UN
UN
UN

2.00
9.00
18.00
9.00
2.00
1.00
0.01
0.01

$150.00
$282.00
$395.00
$1,660.00
$282.00
$400.00
$25,788.00
$46,120.00

$300.00
$2,538.00
$7,110.00
$14,940.00
$564.00
$400.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$26,586.08

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
44,407
$8,881.37
$8,881.37

20.0%

COSTO TOTAL UNITARIO

$53,288

ANALISIS UNITARIO
ITEM
SALIDA LAMPARA TECHO PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.21
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE THW 14 AWG
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA OCTAGONAL CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
ML
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
4.50
9.00
4.50
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$282.00
$395.00
$1,660.00
$282.00
$400.00
$25,788.00
$46,120.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$1,269.00
$3,555.00
$7,470.00
$564.00
$400.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.20
5.20

$14,292.08

VALOR UNI.
$11,415.38
$6,355.38

VALOR PARCIAL
$11,415.38
$6,355.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,770.77
32,113
$6,422.57
$6,422.57

20.0%

COSTO TOTAL UNITARIO

$38,535

ANALISIS UNITARIO
ITEM
SALIDA LAMPARA+ROSETA PVC
I.EQUIPO

No. ITEM
UNIDAD:

8.1.22
und
UN

DESCRIPCION
HERRAMIENTA MENOR

II.MATERIALES DE OBRA
DESCRIPCION
JUEGO DE BOQUILLAS DE 1/2"
c&a ALAMBRE N 14 DESNUDO
AVE 611 INTERRUPTOR DOBLE
ALAMBRE COBRE THW 14 AWG
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
AVE 666 TOMA DOBLE AMERICANA
CAJA GALVANIZADA 5800
ROSETA (PLAFON)
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
5,000.00

RENDIM.
50.00

UNIDAD
JG
ML
UN
ML
ML
ML
UN
UN
UN

CANTIDAD
2.24
3.36
0.84
2.69
5.38
3.36
0.53
1.12
0.53

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

VALOR UNI.
$100.00
subtotal

VALOR PARCIAL
$100.00
$0.00
$100.00

VALOR UNI.
$130.00
$188.00
$2,890.00
$282.00
$395.00
$1,660.00
$2,100.00
$400.00
$820.00
subtotal

VALOR PARCIAL
$291.20
$631.68
$2,427.60
$758.58
$2,125.10
$5,577.60
$1,113.00
$448.00
$434.60
$13,807.36

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
40,310
$8,061.93
$8,061.93

20.0%

COSTO TOTAL UNITARIO

$48,372

ANALISIS UNITARIO
ITEM
SALIDA MOTOR PUERTA CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.23
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SALIDA PARA CORDON
PLACA IDENTIFICACION 3X5 cm
ALAMBRE COBRE THW 10 AWG
TUBO CONDUIT GRIS 3/4
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA SENCILLA CONDUIT

UNIDAD
UN
UN
ML
ML
UN
UN

CANTIDAD
1.00
0.10
48.00
24.00
2.00
1.00

VALOR UNI.
$2,800.00
$1,500.00
$1,205.00
$8,500.00
$350.00
$600.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$2,800.00
$150.00
$57,840.00
$204,000.00
$700.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$266,090.00

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
292,542
$58,508.46
$58,508.46

20.0%

COSTO TOTAL UNITARIO

$351,051

ANALISIS UNITARIO
No. ITEM

8.1.24

ITEM
SALIDA MOTOR PUERTA PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE DESNUDO AWG 14
TORNILLO LAMINA DIAM 3/8
ALAMBRE COBRE THW 10 AWG
TUBO CONDUIT PVC 3/4
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
SALIDA PARA CORDON
PLACA IDENTIFICACION 3X5 cm
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

UNIDAD
KG
UN
ML
ML
UN
UN
UN
UN
UN
UN

CANTIDAD
0.34
1.00
36.00
12.00
2.00
1.00
0.01
0.01
1.00
0.10

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

und
UN

VALOR UNI.
$50.00
subtotal

VALOR PARCIAL
$50.00
$0.00
$50.00

VALOR UNI.
$35,772.00
$15.00
$1,205.00
$1,700.00
$350.00
$600.00
$25,788.00
$46,120.00
$2,800.00
$1,500.00
subtotal

VALOR PARCIAL
$12,162.48
$15.00
$43,380.00
$20,400.00
$700.00
$600.00
$257.88
$461.20
$2,800.00
$150.00
$80,926.56

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
107,379
$21,475.77
$21,475.77

20.0%

COSTO TOTAL UNITARIO

$128,855

ANALISIS UNITARIO
ITEM
SALIDA P/TEMPORIZADOR PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

8.1.25
und
UN

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.13
9.00
4.50
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$1,200.00
$25,788.00
$46,120.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

VALOR PARCIAL
$15.00
$300.00
$4,650.36
$3,555.00
$7,470.00
$564.00
$1,200.00
$257.88
$461.20
$18,473.44

VALOR UNI.
$16,960.00
$9,442.29
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$555.56
$0.00
$555.56

VALOR PARCIAL
$16,960.00
$9,442.29
$26,402.29

20.0%

45,431
$9,086.26

Total Costo Indirecto

$9,086.26

COSTO TOTAL UNITARIO

$54,518

ANALISIS UNITARIO
ITEM
SALIDA PARA CONTACTOR PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.26
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA GALVANIZADA 5800

UNIDAD
UN
UN
KG
ML
ML
UN
UN

CANTIDAD
1.00
2.00
0.17
12.00
6.00
2.00
1.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$400.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$6,081.24
$4,740.00
$9,960.00
$564.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$22,060.24

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
48,513
$9,702.51
$9,702.51

20.0%

COSTO TOTAL UNITARIO

$58,215

ANALISIS UNITARIO
ITEM
SALIDA PUNTO ALARMA CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SALIDA PARA CORDON
TUBO CONDUIT GRIS 1/2
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA SENCILLA CONDUIT

UNIDAD
UN
ML
UN
UN

CANTIDAD
1.00
9.00
2.00
1.00

VALOR UNI.
$2,800.00
$7,000.00
$350.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

VALOR UNI.
$16,960.00
$9,442.29
subtotal

Total Costo Directo

8.1.27
und
UN
VALOR PARCIAL
$100.00
$0.00
$100.00
VALOR PARCIAL
$2,800.00
$63,000.00
$700.00
$600.00

$67,100.00
VALOR PARCIAL
$16,960.00
$9,442.29
$26,402.29
93,602

A.I.U.
Total Costo Indirecto

20.0%

$18,720.46
$18,720.46

COSTO TOTAL UNITARIO

$112,323

ANALISIS UNITARIO
ITEM
SALIDA PUNTO ALARMA PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.28
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SALIDA PARA CORDON
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
ML
UN
UN
UN
UN

CANTIDAD
1.00
9.00
2.00
1.00
0.01
0.01

VALOR UNI.
$2,800.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

VALOR PARCIAL
$50.00
$0.00
$50.00
VALOR PARCIAL
$2,800.00
$14,940.00
$564.00
$600.00
$257.88
$461.20

subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$19,623.08

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
46,075
$9,215.07
$9,215.07

20.0%

COSTO TOTAL UNITARIO

$55,290

ANALISIS UNITARIO
ITEM
SALIDA PVC+TOMA DBL. AVE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
TOMA DOBLE AMERICANA

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01
1.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$1,200.00
$25,788.00
$46,120.00
$3,200.00
subtotal

8.1.29
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$1,200.00
$257.88
$461.20
$3,200.00
$16,209.84

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
42,662
$8,532.43
$8,532.43

20.0%

COSTO TOTAL UNITARIO

$51,195

ANALISIS UNITARIO
ITEM
SALIDA PVC+TOMA DBL. DEKO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.30
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA 4X4MET DEKO AK 2V
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
TOMA CORRIENTE DOBLE

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01
1.00

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$3,200.00
$25,788.00
$46,120.00
$3,600.00

VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$3,200.00
$257.88
$461.20
$3,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$18,609.84

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
45,062
$9,012.43
$9,012.43

20.0%

COSTO TOTAL UNITARIO

$54,075

ANALISIS UNITARIO
ITEM
SALIDA PVC+TOMA PISO AVE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14

UNIDAD
UN
UN
KG

CANTIDAD
1.00
2.00
0.08

VALOR UNI.
$15.00
$150.00
$35,772.00

8.1.31
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$2,861.76

ALAMBRE COBRE THW 12 AWG


TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
INTERRUPTOR SENCILLO

ML
ML
UN
UN
UN
UN
UN

6.00
3.00
2.00
1.00
0.01
0.01
1.00

$395.00
$1,660.00
$282.00
$3,200.00
$25,788.00
$46,120.00
$3,600.00

$2,370.00
$4,980.00
$564.00
$3,200.00
$257.88
$461.20
$3,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$18,609.84

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
45,062
$9,012.43
$9,012.43

20.0%

COSTO TOTAL UNITARIO

$54,075

ANALISIS UNITARIO
ITEM
SALIDA PVC+TOMA SNC. AVE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.32
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
TOMA SENCILLA AMERICANA

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01
1.00

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$3,200.00
$25,788.00
$46,120.00
$3,200.00

VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$3,200.00
$257.88
$461.20
$3,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$18,209.84

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
44,662
$8,932.43
$8,932.43

20.0%

COSTO TOTAL UNITARIO

$53,595

ANALISIS UNITARIO
ITEM
SALIDA PVC+TOMA TRIF. AVE
I.EQUIPO

No. ITEM
UNIDAD:

8.1.33
und
UN

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
TOMA TRIFASICA

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01
1.00

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$3,200.00
$25,788.00
$46,120.00
$4,800.00

VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$3,200.00
$257.88
$461.20
$4,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$19,809.84

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
46,262
$9,252.43
$9,252.43

20.0%

COSTO TOTAL UNITARIO

$55,515

ANALISIS UNITARIO
ITEM
SALIDA PVC+TOMA TRIF.AVE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.34
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
TOMA TRIFASICA

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01
1.00

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$3,200.00
$25,788.00
$46,120.00
$4,800.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$3,200.00
$257.88
$461.20
$4,800.00
$19,809.84

VALOR UNI.
$16,960.00
$9,442.29
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$50.00

VALOR PARCIAL
$16,960.00
$9,442.29
$26,402.29

20.0%

46,262
$9,252.43

Total Costo Indirecto

$9,252.43

COSTO TOTAL UNITARIO

$55,515

ANALISIS UNITARIO
ITEM
SALIDA PVC+TOMA+INT. AVE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.35
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
INTER-SENC- INTR CONMUTABLE

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.13
6.00
4.50
2.00
1.00
0.01
0.01
1.00

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$3,200.00
$25,788.00
$46,120.00
$3,500.00

VALOR PARCIAL
$15.00
$300.00
$4,650.36
$2,370.00
$7,470.00
$564.00
$3,200.00
$257.88
$461.20
$3,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$22,788.44

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
49,241
$9,848.15
$9,848.15

20.0%

COSTO TOTAL UNITARIO

$59,089

ANALISIS UNITARIO
ITEM
SALIDA SENCILLA
PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

subtotal
III.MANO DE OBRA

8.1.36
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$600.00
$257.88
$461.20

$12,409.84

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
38,862
$7,772.43
$7,772.43

20.0%

COSTO TOTAL UNITARIO

$46,635

ANALISIS UNITARIO
ITEM
SALIDA SENCILLA CONM. PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.37
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA SENCILLA CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.13
13.50
4.50
2.00
1.00
0.01
0.01

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$600.00
$25,788.00
$46,120.00

VALOR PARCIAL
$15.00
$300.00
$4,650.36
$5,332.50
$7,470.00
$564.00
$600.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$19,650.94

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
46,103
$9,220.65
$9,220.65

20.0%

COSTO TOTAL UNITARIO

$55,324

ANALISIS UNITARIO
ITEM
SALIDA SENCILLA+CONM. PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
JUEGO BOQUILLAS 1/2"
c&a ALAMBRE TW 12
c&a ALAMBRE TW 14
c&a ALAMBRE N 14 DESNUDO

UNIDAD
JG
ML
ML
ML

CANTIDAD
3.15
4.41
13.23
18.00

VALOR UNI.
$130.00
$395.00
$282.00
$188.00

8.1.38
und
UN
VALOR PARCIAL
$100.00
$100.00
VALOR PARCIAL
$409.50
$1,741.95
$3,730.86
$3,384.00

TUBO CONDUIT PVC 1/2


AVE 611 INTERRUPTOR DOBLE
CAJA GALVANIZADA 5800
AVE 030 ROSETA

ML
UN
UN
UN

4.50
0.84
1.47
1.05

$1,660.00
$2,890.00
$400.00
$820.00

$7,470.00
$2,427.60
$588.00
$861.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$20,612.91

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
47,115
$9,423.04
$9,423.04

20.0%

COSTO TOTAL UNITARIO

$56,538

ANALISIS UNITARIO
ITEM
SALIDA SONIDO
I.EQUIPO

No. ITEM
UNIDAD:

8.1.39
und
UN

CN

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SALIDA PARA CORDON
TUBO CONDUIT GRIS 1/2
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA GALVANIZADA 5800

UNIDAD
UN
ML
UN
UN

CANTIDAD
0.01
9.00
2.00
1.00

$50.00

VALOR UNI.
$2,800.00
$7,000.00
$350.00
$400.00

VALOR PARCIAL
$28.00
$63,000.00
$700.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
9.00
9.00

$64,128.00

VALOR UNI.
$6,595.56
$3,672.00

VALOR PARCIAL
$6,595.56
$3,672.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,267.56
74,446
$14,889.11
$14,889.11

20.0%

COSTO TOTAL UNITARIO

$89,335

ANALISIS UNITARIO
ITEM
SALIDA SONIDO
I.EQUIPO

No. ITEM
UNIDAD:
PVC

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SALIDA PARA CORDON
TUBO CONDUIT PVC 1/2

UNIDAD
UN
ML

CANTIDAD
0.01
9.00

VALOR UNI.
$2,800.00
$1,660.00

8.1.40
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$28.00
$14,940.00

ADAPTADOR TERMINAL CONDUIT 1/2


CAJA GALVANIZADA 5800
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UN
UN
UN
UN

TARIFA DIA
59,360.00
33,048.00

2.00
1.00
0.01
0.01

RENDIM.
11.00
11.00

$282.00
$400.00
$25,788.00
$46,120.00
subtotal

$564.00
$400.00
$257.88
$461.20
$16,651.08

VALOR UNI.
$5,396.36
$3,004.36

VALOR PARCIAL
$5,396.36
$3,004.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,400.73
25,102
$5,020.36
$5,020.36

20.0%

COSTO TOTAL UNITARIO

$30,122

ANALISIS UNITARIO
ITEM
SALIDA TOMA BIF. 20 A PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.41
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA GALAVANIZADA 5800
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
3.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$400.00
$25,788.00
$46,120.00

VALOR PARCIAL
$15.00
$450.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$400.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$12,359.84

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
38,812
$7,762.43
$7,762.43

20.0%

COSTO TOTAL UNITARIO

$46,575

ANALISIS UNITARIO
ITEM
SALIDA TOMA MURO+INT. PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

8.1.42
und
UN
VALOR PARCIAL
$50.00
$50.00

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA GALVANIZADA 5800
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.13
6.00
4.50
2.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$400.00
$25,788.00
$46,120.00

VALOR PARCIAL
$15.00
$300.00
$4,650.36
$2,370.00
$7,470.00
$564.00
$400.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$16,488.44

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
42,941
$8,588.15
$8,588.15

20.0%

COSTO TOTAL UNITARIO

$51,529

ANALISIS UNITARIO
ITEM
SALIDA TOMA SNC. 20 A PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.43
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA GALVANIZADA 5800
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$400.00
$25,788.00
$46,120.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$400.00
$257.88
$461.20

$12,209.84

VALOR UNI.
$16,960.00
$9,442.29

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$16,960.00
$9,442.29
$26,402.29

20.0%

38,662
$7,732.43
$7,732.43
$46,395

ITEM
SALIDA TOMA SNC. MURO CN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.44
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT GRIS 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA GALVANIZADA 5800

UNIDAD
ML
ML
UN
UN

CANTIDAD
5.00
4.50
2.00
1.00

$50.00

VALOR UNI.
$395.00
$7,000.00
$282.00
$400.00

VALOR PARCIAL
$1,975.00
$31,500.00
$564.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$34,439.00

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
60,891
$12,178.26
$12,178.26

20.0%

COSTO TOTAL UNITARIO

$73,070

ANALISIS UNITARIO
ITEM
SALIDA TOMA SNC. P.T. PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.45
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
1.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$1,200.00
$25,788.00
$46,120.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

VALOR PARCIAL
$15.00
$150.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$1,200.00
$257.88
$461.20

$12,859.84

VALOR UNI.
$16,960.00
$9,442.29
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$50.00

VALOR PARCIAL
$16,960.00
$9,442.29
$26,402.29

20.0%

39,312
$7,862.43

Total Costo Indirecto

$7,862.43

COSTO TOTAL UNITARIO

$47,175

ANALISIS UNITARIO
ITEM
SALIDA TOMA SNC. PISO PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.46
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
3.00
2.00
1.00
0.01
0.01

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$1,200.00
$25,788.00
$46,120.00

VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$4,980.00
$564.00
$1,200.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$13,009.84

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
39,462
$7,892.43
$7,892.43

20.0%

COSTO TOTAL UNITARIO

$47,355

ANALISIS UNITARIO
ITEM
SALIDA TOMA SNC.MURO PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 12 AWG
TUBO CONDUIT PVC 1/2
ADAPTADOR TERMINAL CONDUIT 1/2
CAJA DOBLE CONDUIT
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.08
6.00
4.50
3.00
1.00
0.01
0.01

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$1,200.00
$25,788.00
$46,120.00

subtotal
III.MANO DE OBRA

8.1.47
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$15.00
$300.00
$2,861.76
$2,370.00
$7,470.00
$846.00
$1,200.00
$257.88
$461.20

$15,781.84

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
42,234
$8,446.83
$8,446.83

20.0%

COSTO TOTAL UNITARIO

$50,681

ANALISIS UNITARIO
ITEM
SALIDA TOMA TRIF.50 A PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.1.48
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO LAMINA DIAM 3/8
CONECTOR RESORTE ROJO
ALAMBRE COBRE DESNUDO AWG 14
ALAMBRE COBRE THW 10 AWG
TUBO CONDUIT PVC 3/4
ADAPTADOR TERMINAL CONDUIT 3/4
CAJA GALVANIZADA 5800
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
KG
ML
ML
UN
UN
UN
UN

CANTIDAD
1.00
2.00
0.13
13.50
4.50
1.00
1.00
0.01
0.01

$50.00

VALOR UNI.
$15.00
$150.00
$35,772.00
$395.00
$1,660.00
$282.00
$400.00
$25,788.00
$46,120.00

VALOR PARCIAL
$15.00
$300.00
$4,650.36
$5,332.50
$7,470.00
$282.00
$400.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.50
3.50

$19,168.94

VALOR UNI.
$16,960.00
$9,442.29

VALOR PARCIAL
$16,960.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$26,402.29
45,621
$9,124.25
$9,124.25

20.0%

COSTO TOTAL UNITARIO

$54,745

ANALISIS UNITARIO
ITEM
SALIDA TRIPLE
I.EQUIPO

No. ITEM
UNIDAD:
PVC

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO CONDUIT PVC 1"
JUEGO BOQUILLAS DE 1/2"
JUEGO BOQUILLAS DE 1"
ALAMBRE COBRE DESNUDO AWG 14

UNIDAD
ML
JG
JG
ML

CANTIDAD
2.52
1.05
1.05
5.25

VALOR UNI.
$3,012.00
$130.00
$310.00
$188.00

8.1.49
und
UN
VALOR PARCIAL
$100.00
$100.00
VALOR PARCIAL
$7,590.24
$136.50
$325.50
$987.00

ALAMBRE TW 12 AWG
TUBO CONDUIT PVC 1/2
ALAMBRE TW 10 AWG
CAJA GALVANIZADA 5800
AVE 020T3 TOMA TRIPOLAR 20 AMP

ML
ML
ML
UN
UN

13.13
2.73
8.40
1.00
1.05

$395.00
$1,660.00
$619.00
$400.00
$2,110.00

$5,186.35
$4,531.80
$5,199.60
$400.00
$2,215.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.00
2.00

$26,572.49

VALOR UNI.
$29,680.00
$16,524.00

VALOR PARCIAL
$29,680.00
$16,524.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$46,204.00
72,876
$14,575.30
$14,575.30

20.0%

COSTO TOTAL UNITARIO

$87,452

ANALISIS UNITARIO
ITEM
BANDEJA TIPO ESCALERA 30 x 80
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.2.1
und
ML

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ACCESORIO T
ANCLAJE AUTOPERFORANTE 1/2"
BANDEJA PORTACABLE
SOPORTE PARA BANDEJA

UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD

CANTIDAD
0.15
2.12
1.32
0.53

$100.00

VALOR UNI.
$11,024.00
$21,780.00
$10,309.00
$27,580.00

VALOR PARCIAL
$1,653.60
$46,173.60
$13,607.88
$14,617.40

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
11.00
11.00

$76,052.48

VALOR UNI.
$5,396.36
$3,004.36

VALOR PARCIAL
$5,396.36
$3,004.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,400.73
84,553
$16,910.64
$16,910.64

20.0%

COSTO TOTAL UNITARIO

$101,464

ANALISIS UNITARIO
ITEM
CANALETA METALICA 10 x 4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
HERRAMIENTA ELECTRICAS
II.MATERIALES DE OBRA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
5,000.00

RENDIM.
3.60
20.00

VALOR UNI.
$1,388.89
$250.00
subtotal

8.2.2
und
ML
VALOR PARCIAL
$1,388.89
$250.00
$1,638.89

DESCRIPCION
CHAZO PARA TORNILLO 1/8 X 1-1/4
TORNILLO GOLOSO 1/8 X 1-1/4
TAPA TROQUELADA METALICA 2 ORIFICIOS
CANALETA METALICA CON DIVISION 10

UNIDAD
UN
UN
UN
UN

CANTIDAD
3.00
3.00
1.00
1.00

VALOR UNI.
$250.00
$48.00
$2,000.00
$18,000.00

VALOR PARCIAL
$750.00
$144.00
$2,000.00
$18,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
11.00
11.00

$20,894.00

VALOR UNI.
$4,692.45
$2,731.64

VALOR PARCIAL
$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
29,957
$5,991.40
$5,991.40

20.0%

COSTO TOTAL UNITARIO

$35,948

ANALISIS UNITARIO
ITEM
CANALETA METALICA 10 x 4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

II.MATERIALES DE OBRA
DESCRIPCION
CHAZO PARA TORNILLO 1/8 X 1-1/4
TORNILLO GOLOSO 1/8 X 1-1/4
TAPA TROQUELADA METALICA 2 ORIFICIOS
CANALETA METALICA CON DIVISION 10

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
5,000.00

RENDIM.
3.60
20.00

UNIDAD
UN
UN
UN
UN

CANTIDAD
3.00
3.00
1.00
1.00

8.2.3
und
ML

VALOR UNI.
$1,388.89
$250.00
subtotal

VALOR PARCIAL
$1,388.89
$250.00
$1,638.89

VALOR UNI.
$250.00
$48.00
$2,000.00
$18,000.00

VALOR PARCIAL
$750.00
$144.00
$2,000.00
$18,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
11.00
11.00

$20,894.00

VALOR UNI.
$4,692.45
$2,731.64

VALOR PARCIAL
$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
29,957
$5,991.40
$5,991.40

20.0%

COSTO TOTAL UNITARIO

$35,948

ANALISIS UNITARIO
ITEM
CANALETA PLASTICA 10 x 4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

VALOR UNI.
$2,500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

8.2.4
und
ML
VALOR PARCIAL
$2,500.00
$2,500.00
VALOR PARCIAL

CLAVOALTA VELOCIDAD 1/4 X 2


ACCESORIOS PARA CANALETA PLASTICA
CANALETA PLASTICA PANDUIT 10

UN
UN
UN

3.00
0.15
1.00

$190.00
$93,000.00
$2,000.00

$570.00
$13,950.00
$2,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
11.00
11.00

$16,520.00

VALOR UNI.
$4,692.45
$2,731.64

VALOR PARCIAL
$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
26,444
$5,288.82
$5,288.82

20.0%

COSTO TOTAL UNITARIO

$31,733

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM

8.2.6
und
ML

DUCTOS VERTICALES 30 x 8

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
HERRAMIENTAS ELECTRICAS
II.MATERIALES DE OBRA
DESCRIPCION
ANCLAJE AUTOPERFORANTE 1/2"
DUCTO METALICO SIN DIVISION .30
SOPORTE PARA BANDEJA PORTACABLES

TARIFA DIA
5,000.00
5,000.00

RENDIM.
2.50
1.50

UNIDAD
UNIDAD
UNIDAD
UNIDAD

CANTIDAD
4.00
1.20
0.60

VALOR UNI.
$2,000.00
$3,333.33
subtotal

VALOR PARCIAL
$2,000.00
$3,333.33
$5,333.33

VALOR UNI.
$11,024.00
$22,400.00
$10,309.00

VALOR PARCIAL
$44,096.00
$26,880.00
$6,185.40

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
11.00
11.00

$77,161.40

VALOR UNI.
$5,396.36
$3,004.36

VALOR PARCIAL
$5,396.36
$3,004.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,400.73
90,895
$18,179.09
$18,179.09

20.0%

COSTO TOTAL UNITARIO

$109,075

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
z

8.3.1
und
ML

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL

CABLE COBRE THW 10 AWG


CABLE COBRE THW 12 AWG
TUBO CONDUIT PVC 1"
SUB-CONTRATO ELECTRICO

ML
ML
ML
%

3.00
1.00
1.00
38.00

$619.00
$395.00
$3,012.00
$0.00

$1,857.00
$395.00
$3,012.00
$0.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.50
2.50

$5,264.00

VALOR UNI.
$23,744.00
$13,219.20

VALOR PARCIAL
$23,744.00
$13,219.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$36,963.20
42,783
$8,556.55
$8,556.55

20.0%

COSTO TOTAL UNITARIO

$51,339

ANALISIS UNITARIO
ITEM
ACOMETIDA PARCIAL BIFSICA - 2#8 + 1#10 + 1#12
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

8.3.2
und
ML

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ADAPTADOR TERMINAL CONDUIT 1"
ALAMBRE COBRE DESNUDO AWG 12
ALAMBRE COBRE THW 10 AWG
ALAMBRE COBRE THW 12 AWG
ALAMBRE COBRE THW 8 AWG
LIMPIADOR REM. PVC 760 GR.
SOLDADURA PVC LIQUIDA 1/4
TUBO CONDUIT PVC 1"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UNIDAD
KG
ML
ML
ML
UNIDAD
UNIDAD
ML

CANTIDAD
0.33
0.04
1.00
1.00
2.00
0.01
0.01
1.00

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$555.56

VALOR UNI.
$659.00
$2,900.00
$1,205.00
$395.00
$2,420.00
$25,788.00
$46,120.00
$3,162.00
subtotal

VALOR PARCIAL
$217.47
$116.00
$1,205.00
$395.00
$4,840.00
$257.88
$461.20
$3,162.00
$7,492.55

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
19,599
$3,919.82
$3,919.82

20.0%

COSTO TOTAL UNITARIO

$23,519

ANALISIS UNITARIO
ITEM
ACOMETIDA PARCIAL TRIFSICA - 3#8 + 1#10 + 1#12
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00

No. ITEM
UNIDAD:

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA

8.3.3
und
ML
VALOR PARCIAL
$555.56
$555.56

DESCRIPCION
ADAPTADOR TERMINAL CONDUIT 1"
ALAMBRE COBRE DESNUDO AWG 12
ALAMBRE COBRE THW 10 AWG
ALAMBRE COBRE THW 12 AWG
ALAMBRE COBRE THW 8 AWG
LIMPIADOR REM. PVC 760 GR.
SOLDADURA PVC LIQUIDA 1/4
TUBO CONDUIT PVC 1"
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UNIDAD
KG
ML
ML
ML
UNIDAD
UNIDAD
ML

CANTIDAD
0.33
0.04
1.00
1.00
3.00
0.01
0.01
1.00

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

VALOR UNI.
$659.00
$11,788.00
$1,205.00
$395.00
$2,400.00
$25,788.00
$46,120.00
$3,162.00
subtotal

VALOR PARCIAL
$217.47
$471.52
$1,205.00
$395.00
$7,200.00
$257.88
$461.20
$3,162.00
$12,681.08

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
24,788
$4,957.53
$4,957.53

20.0%

COSTO TOTAL UNITARIO

$29,745

ANALISIS UNITARIO
ITEM
ALAMBRE Cu No.10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.4
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE THW 10 AWG

UNIDAD
ML

CANTIDAD
1.00

$50.00

VALOR UNI.
$1,205.00

VALOR PARCIAL
$1,205.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$1,205.00

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,680.15
2,935
$587.03
$587.03

20.0%

COSTO TOTAL UNITARIO

$3,522

ANALISIS UNITARIO
ITEM
ALAMBRE Cu DESNUDO No. 8
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

8.3.5
und
ML
VALOR PARCIAL
$50.00
$50.00

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE DESNUDO 8 AWG

UNIDAD
KG

CANTIDAD

VALOR UNI.

0.11

VALOR PARCIAL

$36,100.00

$3,971.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$3,971.00

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal

$1,680.15

Total Costo Directo


A.I.U.
Total Costo Indirecto

5,701
$1,140.23
$1,140.23

20.0%

COSTO TOTAL UNITARIO

$6,841

ANALISIS UNITARIO
ITEM
ALAMBRE Cu DESNUDO No.10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.6
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE DESNUDO 10 AWG

UNIDAD
KG

CANTIDAD

$50.00

VALOR UNI.

0.07

VALOR PARCIAL

$2,900.00

$203.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$203.00

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,680.15
1,933
$386.63
$386.63

20.0%

COSTO TOTAL UNITARIO

$2,320

ANALISIS UNITARIO
ITEM
ALAMBRE Cu DESNUDO No.12
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA

8.3.7
und
ML
VALOR PARCIAL
$50.00
$50.00

DESCRIPCION
ALAMBRE COBRE DESNUDO 12 AWG

UNIDAD
KG

CANTIDAD

VALOR UNI.

0.04

VALOR PARCIAL

$11,788.00

$471.52

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$471.52

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal

$1,680.15

Total Costo Directo


A.I.U.
Total Costo Indirecto

2,202
$440.33
$440.33

20.0%

COSTO TOTAL UNITARIO

$2,642

ANALISIS UNITARIO
ITEM
CABLE Cu
I.EQUIPO

No. ITEM
UNIDAD:

8.3.8
und
ML

No. 2 AWG

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 2 AWG

UNIDAD
ML

CANTIDAD

$50.00

VALOR UNI.

1.00

VALOR PARCIAL

$8,100.00

$8,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$8,100.00

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,680.15
9,830
$1,966.03
$1,966.03

20.0%

COSTO TOTAL UNITARIO

$11,796

ANALISIS UNITARIO
ITEM
CABLE Cu
I.EQUIPO

No. ITEM
UNIDAD:
No. 4 AWG

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

8.3.9
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

CABLE COBRE THW 4 AWG

ML

1.00

$5,100.00

$5,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$5,100.00

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal

$1,680.15

Total Costo Directo


A.I.U.
Total Costo Indirecto

6,830
$1,366.03
$1,366.03

20.0%

COSTO TOTAL UNITARIO

$8,196

ANALISIS UNITARIO
ITEM
CABLE Cu
I.EQUIPO

No. ITEM
UNIDAD:

8.3.10
und
ML

No. 6 AWG

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 6 AWG

UNIDAD
ML

CANTIDAD

$50.00

VALOR UNI.

1.00

VALOR PARCIAL

$3,450.00

$3,450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$3,450.00

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,680.15
5,180
$1,036.03
$1,036.03

20.0%

COSTO TOTAL UNITARIO

$6,216

ANALISIS UNITARIO
ITEM
CABLE Cu No. 8 AWG
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

8.3.11
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

CABLE COBRE THW 8 AWG

ML

1.00

$2,420.00

$2,420.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$2,420.00

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,680.15
4,150
$830.03
$830.03

20.0%

COSTO TOTAL UNITARIO

$4,980

ANALISIS UNITARIO
ITEM
RED B.T.
I.EQUIPO

No. ITEM
UNIDAD:

8.3.12
und
ML

7x4/0 AWG

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 4/ 0 AWG

UNIDAD
ML

CANTIDAD

$50.00

VALOR UNI.

7.00

VALOR PARCIAL

$29,800.00

$208,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
7.00
7.00

$208,600.00

VALOR UNI.
$8,480.00
$9,442.29

VALOR PARCIAL
$8,480.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,922.29
226,572
$45,314.46
$45,314.46

20.0%

COSTO TOTAL UNITARIO

$271,887

ANALISIS UNITARIO
ITEM
RED B.T.
I.EQUIPO

No. ITEM
UNIDAD:
7x400 MCM

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 400 Kcmil

UNIDAD
ML

CANTIDAD
7.00

VALOR UNI.
$87,100.00

8.3.13
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$609,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
7.00
7.00

$609,700.00

VALOR UNI.
$8,480.00
$9,442.29

VALOR PARCIAL
$8,480.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,922.29
627,672
$125,534.46
$125,534.46

20.0%

COSTO TOTAL UNITARIO

$753,207

ANALISIS UNITARIO
ITEM
RED B.T.
I.EQUIPO

No. ITEM
UNIDAD:

8.3.14
und
ML

11x300 MCM

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 300 Kcmil

UNIDAD
ML

CANTIDAD

$555.56

VALOR UNI.

11.00

VALOR PARCIAL

$65,650.00

$722,150.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
7.00
7.00

$722,150.00

VALOR UNI.
$8,480.00
$9,442.29

VALOR PARCIAL
$8,480.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,922.29
740,628
$148,125.57
$148,125.57

20.0%

COSTO TOTAL UNITARIO

$888,753

ANALISIS UNITARIO
ITEM
RED B.T. 2 (7x300 MCM)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 300 Kcmil

UNIDAD
ML

CANTIDAD
14.00

VALOR UNI.
$65,650.00

8.3.15
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$919,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
7.00
7.00

$919,100.00

VALOR UNI.
$8,480.00
$9,442.29

VALOR PARCIAL
$8,480.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,922.29
937,072
$187,414.46
$187,414.46

20.0%

COSTO TOTAL UNITARIO

$1,124,487

ANALISIS UNITARIO
ITEM
RED B.T. 2 (7x4/0 AWG)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.16
und
Ml

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 4/0 AWG

UNIDAD
ML

CANTIDAD

$50.00

VALOR UNI.

14.00

VALOR PARCIAL

$29,800.00

$417,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
7.00
7.00

$417,200.00

VALOR UNI.
$8,480.00
$9,442.29

VALOR PARCIAL
$8,480.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,922.29
435,172
$87,034.46
$87,034.46

20.0%

COSTO TOTAL UNITARIO

$522,207

ANALISIS UNITARIO
ITEM
RED B.T. 2 (7x400 MCM)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 400 Kcmil

UNIDAD
ML

CANTIDAD
14.00

VALOR UNI.
$87,100.00

8.3.17
und
Ml
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,219,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
7.00
7.00

$1,219,400.00

VALOR UNI.
$8,480.00
$9,442.29

VALOR PARCIAL
$8,480.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,922.29
1,237,372
$247,474.46
$247,474.46

20.0%

COSTO TOTAL UNITARIO

$1,484,847

ANALISIS UNITARIO
ITEM
RED B.T. 2 (7x500 MCM)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.18
und
Ml

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 500 Kcmil

UNIDAD
ML

CANTIDAD

$50.00

VALOR UNI.

14.00

VALOR PARCIAL

$113,815.00

$1,593,410.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
7.00
7.00

$1,593,410.00

VALOR UNI.
$8,480.00
$9,442.29

VALOR PARCIAL
$8,480.00
$9,442.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,922.29
1,611,382
$322,276.46
$322,276.46

20.0%

COSTO TOTAL UNITARIO

$1,933,659

ANALISIS UNITARIO
ITEM
RED B.T.3x1/0 +1x2 AWG
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 2 AWG
CABLE COBRE THW 1/0 AWG

UNIDAD
ML
ML

CANTIDAD
1.00
3.00

VALOR UNI.
$8,100.00
$22,069.00

8.3.19
und
ML
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL
$8,100.00
$66,207.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
22.00
22.00

$74,307.00

VALOR UNI.
$2,698.18
$3,004.36

VALOR PARCIAL
$2,698.18
$3,004.36

subtotal

$5,702.55

Total Costo Directo


A.I.U.
Total Costo Indirecto

80,565
$16,113.02
$16,113.02

20.0%

COSTO TOTAL UNITARIO

$96,678

ANALISIS UNITARIO
ITEM
RED B.T.3x2 +1x4 AWG
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.20
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 4 AWG
CABLE COBRE THW 2 AWG

UNIDAD
ML
ML

CANTIDAD

$50.00

VALOR UNI.

1.00
3.00

VALOR PARCIAL

$5,100.00
$8,100.00

$5,100.00
$24,300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
22.00
22.00

$29,400.00

VALOR UNI.
$2,698.18
$3,004.36

VALOR PARCIAL
$2,698.18
$3,004.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,702.55
35,153
$7,030.51
$7,030.51

20.0%

COSTO TOTAL UNITARIO

$42,183

ANALISIS UNITARIO
ITEM
RED B.T.3x2/0 +1x1/0 AWG
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 1/0 AWG
CABLE COBRE THW 2/0 AWG

UNIDAD
ML
ML

CANTIDAD
1.00
3.00

VALOR UNI.
$22,069.00
$2,300.00

8.3.21
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$22,069.00
$6,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
22.00
22.00

$28,969.00

VALOR UNI.
$2,698.18
$3,004.36

VALOR PARCIAL
$2,698.18
$3,004.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,702.55
34,722
$6,944.31
$6,944.31

20.0%

COSTO TOTAL UNITARIO

$41,666

ANALISIS UNITARIO
ITEM
RED B.T.3x350 +1x250 MCM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.22
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 250 Kcmil
CABLE COBRE THW 350 Kcmil

UNIDAD
ML
ML

CANTIDAD

$50.00

VALOR UNI.

1.00
3.00

VALOR PARCIAL

$54,850.00
$76,420.00

$54,850.00
$229,260.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
22.00
22.00

$284,110.00

VALOR UNI.
$2,698.18
$3,004.36

VALOR PARCIAL
$2,698.18
$3,004.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,702.55
289,863
$57,972.51
$57,972.51

20.0%

COSTO TOTAL UNITARIO

$347,835

ANALISIS UNITARIO
ITEM
RED B.T.3x4/0 +1x2/0 AWG
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 2/0 AWG
CABLE COBRE THW 4/0 AWG

UNIDAD
ML
ML

CANTIDAD
1.00
3.00

VALOR UNI.
$2,300.00
$29,800.00

subtotal

8.3.23
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$2,300.00
$89,400.00

$91,700.00

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
22.00
22.00

VALOR UNI.
$2,698.18
$3,004.36

VALOR PARCIAL
$2,698.18
$3,004.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,702.55
97,453
$19,490.51
$19,490.51

20.0%

COSTO TOTAL UNITARIO

$116,943

ANALISIS UNITARIO
ITEM
RED B.T.3x400 +1x300 MCM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.24
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 300 Kcmil
CABLE COBRE THW 400 Kcmil

UNIDAD
ML
ML

CANTIDAD
1.00
3.00

$50.00

VALOR UNI.
$65,650.00
$87,100.00

VALOR PARCIAL
$65,650.00
$261,300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
66,096.00

RENDIM.
22.00
22.00

$326,950.00

VALOR UNI.
$2,698.18
$3,004.36

VALOR PARCIAL
$2,698.18
$3,004.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,702.55
332,703
$66,540.51
$66,540.51

20.0%

COSTO TOTAL UNITARIO

$399,243

ANALISIS UNITARIO
ITEM
TUBERIA CN
I.EQUIPO

No. ITEM
UNIDAD:
1" INCRUST

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ADAPTADOR TERMINAL CONDUIT 1
TUBO CONDUIT GRIS 1

UNIDAD
UN
ML

CANTIDAD
0.33
1.00

VALOR UNI.
$659.00
$11,500.00

subtotal
III.MANO DE OBRA

8.3.25
und
ML
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL
$217.47
$11,500.00

$11,717.47

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
17.00
17.00

VALOR UNI.
$3,491.76
$1,944.00

VALOR PARCIAL
$3,491.76
$1,944.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,435.76
17,709
$3,541.76
$3,541.76

20.0%

COSTO TOTAL UNITARIO

$21,251

ANALISIS UNITARIO
ITEM
TUBERIA CN
I.EQUIPO

No. ITEM
UNIDAD:

8.3.26
und
ML

1" SUSPEND

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUERCA ACERO 1/4
GRAPA GALVANIZADA TUBO 1
ADAPTADOR TERMINAL CONDUIT 1
TUBO CONDUIT GRIS 1
PERNO 1/2 ALT.VEL 1 3/4
CARGA FULMINANTE MEDIA 330
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UN
UN
UN
ML
UN
UN

CANTIDAD
2.00
1.00
0.33
1.00
2.00
2.00

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$50.00

VALOR UNI.
$20.00
$3,500.00
$659.00
$11,500.00
$250.00
$300.00
subtotal

VALOR PARCIAL
$40.00
$3,500.00
$217.47
$11,500.00
$500.00
$600.00
$16,357.47

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
22,183
$4,436.59
$4,436.59

20.0%

COSTO TOTAL UNITARIO

$26,620

ANALISIS UNITARIO
ITEM
TUBERIA CN 1 1/2 INCRUST
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ADAPTADOR TERMINAL CONDUIT 1 1/2
TUBO CONDUIT GALVANIZADO 1 1/2

UNIDAD
UN
ML

CANTIDAD
0.33
1.00

VALOR UNI.
$1,980.00
$12,120.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

8.3.27
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$653.40
$12,120.00

$12,773.40
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

59,360.00
33,048.00

14.00
14.00

$4,240.00
$2,360.57

$4,240.00
$2,360.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,600.57
19,424
$3,884.79
$3,884.79

20.0%

COSTO TOTAL UNITARIO

$23,309

ANALISIS UNITARIO
ITEM
TUBERIA CN 1 1/2 SUSPEND
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.28
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUERCA ACERO 1/4
GRAPA GALVANIZADA TUBO 1
ADAPTADOR TERMINAL CONDUIT 1 1/2
TUBO CONDUIT GALVANIZADO 1 1/2
PERNO 1/2 ALT.VEL 1 3/4
CARGA FULMINANTE MEDIA 330
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UN
UN
UN
ML
UN
UN

CANTIDAD
2.00
1.00
0.33
1.00
2.00
2.00

TARIFA DIA
59,360.00
33,048.00

RENDIM.
12.50
12.50

$50.00

VALOR UNI.
$20.00
$3,500.00
$1,980.00
$12,120.00
$250.00
$300.00
subtotal

VALOR PARCIAL
$40.00
$3,500.00
$653.40
$12,120.00
$500.00
$600.00
$17,413.40

VALOR UNI.
$4,748.80
$2,643.84

VALOR PARCIAL
$4,748.80
$2,643.84

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,392.64
24,856
$4,971.21
$4,971.21

20.0%

COSTO TOTAL UNITARIO

$29,827

ANALISIS UNITARIO
ITEM
TUBERIA PVC
I.EQUIPO

No. ITEM
UNIDAD:
1" INCRUST

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO CONDUIT PVC 1
ADAPTADOR TERMINAL CONDUIT 1
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
ML
UN
UN
UN

CANTIDAD
1.00
0.33
0.01
0.01

VALOR UNI.
$5,500.00
$659.00
$25,788.00
$46,120.00

subtotal

8.3.29
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$5,500.00
$217.47
$257.88
$461.20

$6,436.55

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
24.00
24.00

VALOR UNI.
$2,473.33
$1,377.00

VALOR PARCIAL
$2,473.33
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,850.33
10,337
$2,067.38
$2,067.38

20.0%

COSTO TOTAL UNITARIO

$12,404

ANALISIS UNITARIO
ITEM
TUBERIA PVC
I.EQUIPO

No. ITEM
UNIDAD:

8.3.30
und
ML

1" SUSPEND

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUERCA ACERO 1/4
GRAPA GALVANIZADA TUBO 1
ADAPTADOR TERMINAL CONDUIT 1
TUBO CONDUIT PVC 1
PERNO 1/2 ALT.VEL 1 3/4
CARGA FULMINANTE MEDIA 330
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
UN
ML
UN
UN
UN
UN

CANTIDAD
2.00
1.00
0.33
1.00
2.00
2.00
0.01
0.01

$50.00

VALOR UNI.
$20.00
$3,500.00
$659.00
$3,162.00
$250.00
$300.00
$25,788.00
$46,120.00

VALOR PARCIAL
$40.00
$3,500.00
$217.47
$3,162.00
$500.00
$600.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
24.00
24.00

$8,738.55

VALOR UNI.
$2,473.33
$1,377.00

VALOR PARCIAL
$2,473.33
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,850.33
12,639
$2,527.78
$2,527.78

20.0%

COSTO TOTAL UNITARIO

$15,167

ANALISIS UNITARIO
ITEM
TUBERIA PVC 1 1/2 INCRUST
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBO CONDUIT PVC 1 1/2
ADAPTADOR TERMINAL CONDUIT 1 1/2
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
ML
UN
UN
UN

CANTIDAD
1.00
0.33
0.01
0.01

VALOR UNI.
$6,230.00
$1,980.00
$25,788.00
$46,120.00

8.3.31
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$6,230.00
$653.40
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
18.00
18.00

$7,602.48

VALOR UNI.
$3,297.78
$1,836.00

VALOR PARCIAL
$3,297.78
$1,836.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,133.78
12,786
$2,557.25
$2,557.25

20.0%

COSTO TOTAL UNITARIO

$15,344

ANALISIS UNITARIO
ITEM
TUBERIA PVC 1 1/2 SUSPEND
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.32
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUERCA ACERO 1/4
GRAPA GALVANIZADA TUBO 1
ADAPTADOR TERMINAL CONDUIT 1 1/2
TUBO CONDUIT PVC 1 1/2
PERNO 1/2 ALT.VEL 1 3/4
CARGA FULMINANTE MEDIA 330
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
UN
UN
UN
ML
UN
UN
UN
UN

CANTIDAD
2.00
1.00
0.33
1.00
2.00
2.00
0.01
0.01

$50.00

VALOR UNI.
$20.00
$3,500.00
$1,980.00
$6,230.00
$250.00
$300.00
$25,788.00
$46,120.00

VALOR PARCIAL
$40.00
$3,500.00
$653.40
$6,230.00
$500.00
$600.00
$257.88
$461.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
18.00
18.00

$12,242.48

VALOR UNI.
$3,297.78
$1,836.00

VALOR PARCIAL
$3,297.78
$1,836.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,133.78
17,426
$3,485.25
$3,485.25

20.0%

COSTO TOTAL UNITARIO

$20,912

ANALISIS UNITARIO
ITEM
TUBO CN 1 1/2"+3#6 + # 8
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE THW 8 AWG
CABLE COBRE THW 6 AWG
ADAPTADOR TERMINAL CONDUIT 1 1/2

UNIDAD
ML
ML
UN

CANTIDAD
1.00
3.00
0.33

VALOR UNI.
$48,000.00
$3,450.00
$1,980.00

8.3.33
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$48,000.00
$10,350.00
$653.40

TUBO AGUAS NEGRAS 1 1/2

ML

1.00

$6,500.00

$6,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
7.20
7.00

$65,503.40

VALOR UNI.
$8,244.44
$4,721.14

VALOR PARCIAL
$8,244.44
$4,721.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,965.59
78,519
$15,703.80
$15,703.80

20.0%

COSTO TOTAL UNITARIO

$94,223

ANALISIS UNITARIO
ITEM
TUBO CN 1"
I.EQUIPO

No. ITEM
UNIDAD:

8.3.34
und
ML

+3#8 + #10

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE THW 8 AWG
ALAMBRE COBRE THW 10 AWG
ADAPTADOR TERMINAL CONDUIT 1
TUBO CONDUIT GRIS 1

UNIDAD
ML
ML
UN
ML

CANTIDAD
3.00
1.00
0.33
1.00

$50.00

VALOR UNI.
$48,000.00
$1,205.00
$659.00
$11,500.00

VALOR PARCIAL
$144,000.00
$1,205.00
$217.47
$11,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
7.20
7.00

$156,922.47

VALOR UNI.
$8,244.44
$4,721.14

VALOR PARCIAL
$8,244.44
$4,721.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,965.59
169,938
$33,987.61
$33,987.61

20.0%

COSTO TOTAL UNITARIO

$203,926

ANALISIS UNITARIO
ITEM
TUBO PVC 1 1/2+3#6+#8+#10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE DESNUDO AWG 10
ALAMBRE COBRE THW 8 AWG
CABLE COBRE THW 6 AWG
TUBO CONDUIT PVC 1 1/2

UNIDAD
KG
ML
UN
ML

CANTIDAD
0.07
1.00
3.00
1.00

VALOR UNI.
$2,900.00
$48,000.00
$3,450.00
$6,230.00

8.3.35
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$203.00
$48,000.00
$10,350.00
$6,230.00

ADAPTADOR TERMINAL CONDUIT 1 1/2


LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UN
UN
UN

TARIFA DIA
59,360.00
33,048.00

0.33
0.01
0.01

RENDIM.
9.00
9.00

$282.00
$25,788.00
$46,120.00
subtotal

$93.06
$257.88
$461.20
$65,595.14

VALOR UNI.
$6,595.56
$3,672.00

VALOR PARCIAL
$6,595.56
$3,672.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,267.56
75,913
$15,182.54
$15,182.54

20.0%

COSTO TOTAL UNITARIO

$91,095

ANALISIS UNITARIO
ITEM
TUBO PVC 1" 3#8+#10+#12
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.3.36
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE COBRE DESNUDO AWG 12
ALAMBRE COBRE THW 8 AWG
CABLE COBRE THW 10 AWG
TUBO CONDUIT PVC 1
ADAPTADOR TERMINAL CONDUIT 1
LIMPIADOR REM PVC 760 gr
SOLDADURA PVC LIQUIDA 1/4

UNIDAD
KG
ML
UN
ML
UN
UN
UN

CANTIDAD
0.04
3.00
1.00
1.00
0.33
0.01
0.01

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
9.00
9.00

$50.00

VALOR UNI.
$11,788.00
$48,000.00
$22,069.00
$3,162.00
$659.00
$25,788.00
$46,120.00
subtotal

VALOR PARCIAL
$471.52
$144,000.00
$22,069.00
$3,162.00
$217.47
$257.88
$461.20
$170,639.07

VALOR UNI.
$6,595.56
$3,672.00

VALOR PARCIAL
$6,595.56
$3,672.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,267.56
180,957
$36,191.33
$36,191.33

20.0%

COSTO TOTAL UNITARIO

$217,148

ANALISIS UNITARIO
ITEM
BREAKERS 2 X 30 AMPERIOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BREAKERS 2000 BIPOLAR HQP 30A

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$23,000.00

8.4.1
und
UN
VALOR PARCIAL
$100.00
$100.00
VALOR PARCIAL
$23,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
33,048.00
59,360.00

RENDIM.
8.00
8.00

$23,000.00

VALOR UNI.
$4,131.00
$7,420.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$4,131.00
$7,420.00
$11,551.00
34,651
$6,930.20
$6,930.20

20.0%

COSTO TOTAL UNITARIO

$41,581

ANALISIS UNITARIO
ITEM
CAJA MONOFASICA 6 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.2
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 2X 1 cms
CAJA MONOFASICA 6 CIRCUITOS

UNIDAD
UN
UN

CANTIDAD
6.00
1.00

$100.00

VALOR UNI.
$200.00
$32,880.00

VALOR PARCIAL
$1,200.00
$32,880.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.00
3.00

$34,080.00

VALOR UNI.
$19,786.67
$11,016.00

VALOR PARCIAL
$19,786.67
$11,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$30,802.67
64,983
$12,996.53
$12,996.53

20.0%

COSTO TOTAL UNITARIO

$77,979

ANALISIS UNITARIO
ITEM
CAJA MONOFASICA 12 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 2X 1 cms
CAJA MONOFASICA 12 CIRCUITOS

UNIDAD
UN
UN

CANTIDAD
12.00
1.00

VALOR UNI.
$200.00
$37,800.00

8.4.3
und
UN
VALOR PARCIAL
$100.00
$100.00
VALOR PARCIAL
$2,400.00
$37,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.45
1.48

$40,200.00

VALOR UNI.
$40,937.93
$22,329.73

VALOR PARCIAL
$40,937.93
$22,329.73

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$63,267.66
103,568
$20,713.53
$20,713.53

20.0%

COSTO TOTAL UNITARIO

$124,281

ANALISIS UNITARIO
ITEM
CAJA PARA 1 MEDIDOR
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.4
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CAJA PARA UN MEDIDOR

UNIDAD
UN

CANTIDAD
1.00

$100.00

VALOR UNI.
$28,750.00

VALOR PARCIAL
$28,750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.10
2.10

$28,750.00

VALOR UNI.
$28,266.67
$15,737.14

VALOR PARCIAL
$28,266.67
$15,737.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$44,003.81
72,854
$14,570.76
$14,570.76

20.0%

COSTO TOTAL UNITARIO

$87,425

ANALISIS UNITARIO
ITEM
CAJA PARA 4 MEDIDORES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CAJA PARA CUATRO CONTADORES
INTERRUPTOR NO AUTOMATICO TRIPOLAR 10100A

UNIDAD
UN
UN

CANTIDAD
1.00
4.00

8.4.5
und
UN
VALOR PARCIAL
$100.00
$100.00

VALOR UNI.
$17,250.00

VALOR PARCIAL
$17,250.00

$24,000.00

$96,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.02
1.02

$113,250.00

VALOR UNI.
$58,196.08
$32,400.00

VALOR PARCIAL
$58,196.08
$32,400.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$90,596.08
203,946
$40,789.22
$40,789.22

20.0%

COSTO TOTAL UNITARIO

$244,735

ANALISIS UNITARIO
ITEM
CAJA TRIFASICA
I.EQUIPO

No. ITEM
UNIDAD:

8.4.6
und
UN

6 CIRC.

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

PLACA IDENTIFICACION 2X 1 cms


CAJA TRIFASICA 6 CIRCUITOS

UN
UN

CANTIDAD

$100.00

VALOR UNI.

6.00
1.00

VALOR PARCIAL

$200.00
$115,000.00

$1,200.00
$115,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.50
1.50

$116,200.00

VALOR UNI.
$39,573.33
$22,032.00

VALOR PARCIAL
$39,573.33
$22,032.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$61,605.33
177,905
$35,581.07
$35,581.07

20.0%

COSTO TOTAL UNITARIO

$213,486

ANALISIS UNITARIO
ITEM
CAJA TRIFASICA 12 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

PLACA IDENTIFICACION 2X 1 cms


CAJATRIFASICA 12 CIRCUITOS

UN
UN

CANTIDAD
12.00
1.00

VALOR UNI.
$200.00
$185,000.00

8.4.7
und
UN
VALOR PARCIAL
$100.00
$100.00
VALOR PARCIAL
$2,400.00
$185,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.45
1.45

$187,400.00

VALOR UNI.
$40,937.93
$22,791.72

VALOR PARCIAL
$40,937.93
$22,791.72

subtotal

$63,729.66

Total Costo Directo


A.I.U.
Total Costo Indirecto

251,230
$50,245.93
$50,245.93

20.0%

COSTO TOTAL UNITARIO

$301,476

ANALISIS UNITARIO
ITEM
INT.AUT.ENCH.1 x 30 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.4.8
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS ENCHUFABLE UNIPOLAR 30 A

UNIDAD
UN

CANTIDAD

$50.00

VALOR UNI.

1.00

VALOR PARCIAL

$7,000.00

$7,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
22.00

$7,000.00

VALOR UNI.
$1,502.18

VALOR PARCIAL
$1,502.18

subtotal

$1,502.18

Total Costo Directo


A.I.U.
Total Costo Indirecto

8,552
$1,710.44
$1,710.44

20.0%

COSTO TOTAL UNITARIO

$10,263

ANALISIS UNITARIO
ITEM
INT.AUT.ENCH.1 x 50 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS ENCHUFABLE UNIPOLAR 50 A

UNIDAD

UN

CANTIDAD

1.00

8.4.9
und
UN
VALOR PARCIAL
$50.00
$50.00

VALOR UNI.

$9,600.00

VALOR PARCIAL

$9,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
24.00

$9,600.00

VALOR UNI.
$1,252.00

VALOR PARCIAL
$1,252.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,252.00
10,902
$2,180.40
$2,180.40

20.0%

COSTO TOTAL UNITARIO

$13,082

ANALISIS UNITARIO
ITEM
INT.AUT.ENCH.2 x 30 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.4.10
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS ENCHUFABLE BIPOLAR 30 A

UNIDAD

UN

CANTIDAD

$50.00

VALOR UNI.

1.00

VALOR PARCIAL

$25,900.00

$25,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
24.00

$25,900.00

VALOR UNI.
$1,377.00

VALOR PARCIAL
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,377.00
27,327
$5,465.40
$5,465.40

20.0%

COSTO TOTAL UNITARIO

$32,792

ANALISIS UNITARIO
ITEM
INT.AUT.ENCH.2 x 50 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS ENCHUFABLE BIPOLAR 50 A

UNIDAD

UN

CANTIDAD

1.00

VALOR UNI.

$31,500.00

subtotal

8.4.11
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

$31,500.00

$31,500.00

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
24.00

VALOR UNI.
$1,377.00

VALOR PARCIAL
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,377.00
32,927
$6,585.40
$6,585.40

20.0%

COSTO TOTAL UNITARIO

$39,512

ANALISIS UNITARIO
ITEM
INT.AUT.ENCH.2 x 100 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.4.12
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS ENCHUFABLE BIPOLAR 100 A

UNIDAD

UN

CANTIDAD

$50.00

VALOR UNI.

1.00

VALOR PARCIAL

$60,000.00

$60,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
24.00

$60,000.00

VALOR UNI.
$1,377.00

VALOR PARCIAL
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,377.00
61,427
$12,285.40
$12,285.40

20.0%

COSTO TOTAL UNITARIO

$73,712

ANALISIS UNITARIO
ITEM
INT.AUT.ENCH.3 x 30 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS ENCHUFABLE TRIPOLAR 30 A

UNIDAD

UN

CANTIDAD

1.00

VALOR UNI.

$44,600.00

subtotal
III.MANO DE OBRA

8.4.13
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

$44,600.00

$44,600.00

DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
24.00

VALOR UNI.
$1,377.00

VALOR PARCIAL
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,377.00
46,027
$9,205.40
$9,205.40

20.0%

COSTO TOTAL UNITARIO

$55,232

ANALISIS UNITARIO
ITEM
INT.AUT.ENCH.3 x 50 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.4.14
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS ENCHUFABLE TRIPOLAR 50 A

UNIDAD

UN

CANTIDAD

$50.00

VALOR UNI.

1.00

VALOR PARCIAL

$64,000.00

$64,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
20.00

$64,000.00

VALOR UNI.
$1,652.40

VALOR PARCIAL
$1,652.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,652.40
65,702
$13,140.48
$13,140.48

20.0%

COSTO TOTAL UNITARIO

$78,843

ANALISIS UNITARIO
ITEM
INT.AUT.ENCH.3 x 100 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS ENCHUFABLE TRIPOLAR 100
A

UNIDAD

UN

CANTIDAD

1.00

VALOR UNI.

$78,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

8.4.15
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

$78,100.00

$78,100.00
VALOR PARCIAL

Ayudante ( incluye 100% de prestaciones)

33,048.00

20.00

$1,652.40

$1,652.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,652.40
79,802
$15,960.48
$15,960.48

20.0%

COSTO TOTAL UNITARIO

$95,763

ANALISIS UNITARIO
ITEM
INT.AUT.IND. 3 x 30 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.16
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS INDUSTRIAL FD 30 A

UNIDAD
UN

CANTIDAD

$100.00

VALOR UNI.

1.00

VALOR PARCIAL

$33,000.00

$33,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
16.00

$33,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
35,166
$7,033.10
$7,033.10

20.0%

COSTO TOTAL UNITARIO

$42,199

ANALISIS UNITARIO
ITEM
INT.AUT.IND. 3 x 50 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS INDUSTRIAL TRIPOLAR FD 50
A

UNIDAD

UN

CANTIDAD

1.00

VALOR UNI.

$64,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
16.00

VALOR UNI.
$2,065.50

8.4.17
und
UN
VALOR PARCIAL
$100.00
$100.00
VALOR PARCIAL

$64,000.00

$64,000.00
VALOR PARCIAL
$2,065.50

subtotal

$2,065.50

Total Costo Directo


A.I.U.
Total Costo Indirecto

66,166
$13,233.10
$13,233.10

20.0%

COSTO TOTAL UNITARIO

$79,399

ANALISIS UNITARIO
ITEM
INT.AUT.IND. 3 x 100 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.18
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS INDUSTRIAL TRIPOLAR FD 100
A

UNIDAD

UN

CANTIDAD

$100.00

VALOR UNI.

1.00

VALOR PARCIAL

$56,000.00

$56,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
16.00

$56,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal

$2,065.50

Total Costo Directo


A.I.U.
Total Costo Indirecto

58,166
$11,633.10
$11,633.10

20.0%

COSTO TOTAL UNITARIO

$69,799

ANALISIS UNITARIO
ITEM
INT.AUT.IND. 3 x 150 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS INDUSTRIAL TRIPOLAR FD 150
A

UNIDAD

UN

CANTIDAD

$9,550.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
16.00

VALOR UNI.
$2,065.50
subtotal

VALOR PARCIAL
$100.00
$100.00

VALOR UNI.

1.00

8.4.19
und
UN

VALOR PARCIAL

$9,550.00

$9,550.00
VALOR PARCIAL
$2,065.50
$2,065.50

Total Costo Directo


A.I.U.
Total Costo Indirecto

11,716
$2,343.10
$2,343.10

20.0%

COSTO TOTAL UNITARIO

$14,059

ANALISIS UNITARIO
ITEM
INT.AUT.IND. 3 x 300 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.20
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS INDUSTRIAL TRIP

UNIDAD
UN

CANTIDAD

$100.00

VALOR UNI.

1.00

VALOR PARCIAL

$26,000.00

$26,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
16.00

$26,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
28,166
$5,633.10
$5,633.10

20.0%

COSTO TOTAL UNITARIO

$33,799

ANALISIS UNITARIO
ITEM
INT.AUT.IND. 3 x 600 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.21
und
UN

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS INDUSTRIAL TRIPOLAR

UNIDAD
UN

CANTIDAD

$100.00

VALOR UNI.

1.00

$26,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
16.00

VALOR PARCIAL
$26,000.00

$26,000.00

VALOR UNI.
$2,065.50
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$100.00

VALOR PARCIAL
$2,065.50
$2,065.50

20.0%

28,166
$5,633.10

Total Costo Indirecto

$5,633.10

COSTO TOTAL UNITARIO

$33,799

ANALISIS UNITARIO
ITEM
INT.AUT.IND. 3 x 1200 A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

8.4.22
und
UN

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITOS INDUSTRIAL 600-1200 A

UNIDAD
UN

CANTIDAD

$555.56

VALOR UNI.

1.00

VALOR PARCIAL

$78,100.00

$78,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
16.00

$78,100.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
80,721
$16,144.21
$16,144.21

20.0%

COSTO TOTAL UNITARIO

$96,865

ANALISIS UNITARIO
ITEM
TABLERO ESP.TOT. 12 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.23
und
UN

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 2X 1 cms
TABLERO PARA TOTALIZADOR 12 CIRCUITOS

UNIDAD
UN
UN

CANTIDAD

$100.00

VALOR UNI.

12.00
1.00

$200.00
$360,350.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.50
1.40

VALOR PARCIAL
$2,400.00
$360,350.00

$362,750.00

VALOR UNI.
$39,573.33
$23,605.71
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$100.00

VALOR PARCIAL
$39,573.33
$23,605.71
$63,179.05

20.0%

426,029
$85,205.81
$85,205.81

COSTO TOTAL UNITARIO

$511,235

ANALISIS UNITARIO
ITEM
TABLERO ESP.TOT. 18 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.24
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 2X 1 cms
TABLERO PARA TOTALIZADOR 18 CIRCUITOS

UNIDAD
UN
UN

CANTIDAD

$100.00

VALOR UNI.

18.00
1.00

VALOR PARCIAL

$200.00
$446,368.00

$3,600.00
$446,368.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.50
1.40

$449,968.00

VALOR UNI.
$39,573.33
$23,605.71

VALOR PARCIAL
$39,573.33
$23,605.71

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$63,179.05
513,247
$102,649.41
$102,649.41

20.0%

COSTO TOTAL UNITARIO

$615,896

ANALISIS UNITARIO
ITEM
TABLERO ESP.TOT. 24 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.25
und
UN

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 2X 1 cms
TABLERO PARA TOTALIZADOR 24 CIRCUITOS

UNIDAD
UN
UN

CANTIDAD

$100.00

VALOR UNI.

24.00
1.00

$200.00
$427,300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.50
1.40

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$4,800.00
$427,300.00

$432,100.00

VALOR UNI.
$39,573.33
$23,605.71

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$100.00

VALOR PARCIAL
$39,573.33
$23,605.71
$63,179.05

20.0%

495,379
$99,075.81
$99,075.81
$594,455

ANALISIS UNITARIO
ITEM
TABLERO P/LLAVE 12 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.26
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 2X 1 cms
TABLERO PARA LLAVE 12 CIRCUITOS

UNIDAD
UN
UN

CANTIDAD

$100.00

VALOR UNI.

12.00
1.00

VALOR PARCIAL

$200.00
$185,000.00

$2,400.00
$185,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.00
2.00

$187,400.00

VALOR UNI.
$29,680.00
$16,524.00

VALOR PARCIAL
$29,680.00
$16,524.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$46,204.00
233,704
$46,740.80
$46,740.80

20.0%

COSTO TOTAL UNITARIO

$280,445

ANALISIS UNITARIO
ITEM
TABLERO P/LLAVE 24 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.27
und
UN

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 2X 1 cms
TABLERO PARA LLAVE 24 CIRCUITOS

UNIDAD
UN
UN

CANTIDAD

$100.00

VALOR UNI.

24.00
1.00

$200.00
$290,820.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.50
1.40

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$4,800.00
$290,820.00

$295,620.00

VALOR UNI.
$39,573.33
$23,605.71

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$100.00

VALOR PARCIAL
$39,573.33
$23,605.71
$63,179.05

20.0%

358,899
$71,779.81
$71,779.81
$430,679

ANALISIS UNITARIO
ITEM
TABLERO P/LLAVE 36 CIRC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.4.28
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PLACA IDENTIFICACION 2X 1 cms
TABLERO PARA LLAVE 36 CIRCUITOS

UNIDAD
UN
UN

CANTIDAD

$100.00

VALOR UNI.

36.00
1.00

VALOR PARCIAL

$200.00
$335,000.00

$7,200.00
$335,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
0.99
0.99

$342,200.00

VALOR UNI.
$59,959.60
$33,381.82

VALOR PARCIAL
$59,959.60
$33,381.82

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$93,341.41
435,641
$87,128.28
$87,128.28

20.0%

COSTO TOTAL UNITARIO

$522,770

ANALISIS UNITARIO
ITEM
CAJA DE PASO RECTANGULAR
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.5.1
und
UN

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO COCIDO CLARO
GRAVILLA DE RIO
ARENA DE PEA
MARCO Y TAPA CAJA
PLACA IDENTIFICACION 8 X 5 cms

UNIDAD
KG
UN
M3
M3
UN
UN

CANTIDAD
200.00
166.00
0.04
0.10
1.00
1.00

$100.00

VALOR UNI.
$400.00
$560.00
$58,000.00
$30,000.00
$24,000.00
$4,800.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.70
0.60

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$80,000.00
$92,960.00
$2,320.00
$3,000.00
$24,000.00
$4,800.00
$207,080.00

VALOR UNI.
$73,738.57
$50,080.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$100.00

VALOR PARCIAL
$73,738.57
$50,080.00
$123,818.57

20.0%

330,999
$66,199.71
$66,199.71
$397,198

ANALISIS UNITARIO
ITEM
CAMARA ETB
I.EQUIPO

No. ITEM
UNIDAD:

8.5.2
und
UN

TIPO 13

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
EXCAVACION MANUAL
ANDEN EN CONCRETO e / 0,08
ARO PARA TAPA TELEFONOS
CONSOLA PARA CAMARA ,80
PLACA BASE CONCRETO 0,15
BLOQUE PARA CAMARA TELEFONICA
SUMINISTRO PERNO PARA CONSOLA
ARMADA FUNDIDA/ DESMONTE BOVEDA C A
COLOCACION CONS CAMARA DE INSPECCION
SUMINISTRO PELDAO PARA CONS CAJA INSP
MURO EN BLOQUE CONCRETO PARA CAMARA T

UNIDAD
M3
M2
UN
UN
M2
UN
UN
M2
UN
UN

ROTURA EN CONCRETO CAMARA ETB

M2
M3

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

CANTIDAD
10.01
1.36
1.00
4.00
3.58
114.00
12.00
3.46
4.00
12.00
14.39
0.54

RENDIM.
0.20
0.20

$100.00

VALOR UNI.
$24,000.00
$55,000.00
$20,000.00
$15,000.00
$52,000.00
$3,364.00
$2,675.00
$71,874.00
$9,818.00
$5,900.00

VALOR PARCIAL
$240,240.00
$74,800.00
$20,000.00
$60,000.00
$186,160.00
$383,496.00
$32,100.00
$248,684.04
$39,272.00
$70,800.00

$6,000.00
$28,515.00
subtotal

$86,340.00
$15,398.10
$1,457,290.14

VALOR UNI.
$258,085.00
$150,240.00

VALOR PARCIAL
$258,085.00
$150,240.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$408,325.00
1,865,715
$373,143.03
$373,143.03

20.0%

COSTO TOTAL UNITARIO

$2,238,858

ANALISIS UNITARIO
ITEM
CAMARA ETB
I.EQUIPO

No. ITEM
UNIDAD:
TIPO 14

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
EXCAVACION MANUAL
ANDEN EN CONCRETO e / 0,08
ARO PARA TAPA TELEFONOS
CONSOLA PARA CAMARA ,80
PLACA BASE CONCRETO 0,15
BLOQUE PARA CAMARA TELEFONICA
SUMINISTRO PERNO PARA CONSOLA
ARMADA FUNDIDA/ DESMONTE BOVEDA C A
COLOCACION CONS CAMARA DE INSPECCION
SUMINISTRO PELDAO PARA CONS CAJA INSP
MURO EN BLOQUE CONCRETO PARA CAMARA T
ROTURA EN CONCRETO CAMARA ETB
RELLENO DE EXCAVACION

UNIDAD
M3
M2
UN
UN
M2
UN
UN
M2
UN
UN
M2
M3
M3

CANTIDAD
13.77
1.74
1.00
4.00
6.04
132.00
12.00
5.92
4.00
12.00
16.66
0.68
2.12

8.5.3
und
UN
VALOR PARCIAL
$100.00
$100.00

VALOR UNI.
$55,000.00
$20,000.00
$15,000.00
$52,000.00
$3,364.00
$2,675.00
$71,874.00
$9,818.00
$5,900.00
$6,000.00

VALOR PARCIAL
$757,350.00
$34,800.00
$15,000.00
$208,000.00
$20,318.56
$353,100.00
$862,488.00
$58,122.56
$23,600.00
$72,000.00

$28,515.00
$6,200.00
$3,550.00
subtotal

$475,059.90
$4,216.00
$2,884,055.02

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.12
0.12

VALOR UNI.
$430,141.67
$250,400.00

VALOR PARCIAL
$430,141.67
$250,400.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$680,541.67
3,564,697
$712,939.34
$712,939.34

20.0%

COSTO TOTAL UNITARIO

$4,277,636

ANALISIS UNITARIO
ITEM
CAMARA ETB
I.EQUIPO

No. ITEM
UNIDAD:

8.5.4
und
UN

TIPO 18

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
EXCAVACION MANUAL
ANDEN EN CONCRETO e / 0,08
ARO PARA TAPA TELEFONOS
CONSOLA PARA CAMARA ,80
PLACA BASE CONCRETO 0,15
BLOQUE PARA CAMARA TELEFONICA
SUMINISTRO PERNO PARA CONSOLA
ARMADA FUNDIDA/ DESMONTE BOVEDA C A
COLOCACION CONS CAMARA DE INSPECCION
SUMINISTRO PELDAO PARA CONS CAJA INSP
MURO EN BLOQUE CONCRETO PARA CAMARA T

UNIDAD
M3
M2
UN
UN
M2
UN
UN
M2
UN
UN

ROTURA EN CONCRETO CAMARA ETB


RELLENO DE EXCAVACION

M2
M3
M3

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

CANTIDAD
11.73
1.54
1.00
4.00
4.23
120.00
12.00
4.11
4.00
12.00
15.15
0.54
2.12

RENDIM.
0.15
0.15

$100.00

VALOR UNI.
$55,000.00
$20,000.00
$15,000.00
$52,000.00
$3,364.00
$2,675.00
$71,874.00
$9,818.00
$5,900.00
$6,000.00

VALOR PARCIAL
$645,150.00
$30,800.00
$15,000.00
$208,000.00
$14,229.72
$321,000.00
$862,488.00
$40,351.98
$23,600.00
$72,000.00

$28,515.00
$6,200.00
$3,550.00
subtotal

$432,002.25
$3,348.00
$7,526.00
$2,675,495.95

VALOR UNI.
$344,113.33
$200,320.00

VALOR PARCIAL
$344,113.33
$200,320.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$544,433.33
3,220,029
$644,005.86
$644,005.86

20.0%

COSTO TOTAL UNITARIO

$3,864,035

ANALISIS UNITARIO
ITEM
CANALIZACION TELEFON.SUBT. 2 x 4" PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

8.5.5
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

DUCTO ELECTRONICO LIVIANO 4


UNION CONDUIT PVC 4
ARENA DE PEA
RECEBO COMUN

ML
UN
M3
M3

2.00
0.50
0.09
0.04

$10,450.00
$7,169.00
$30,000.00
$25,000.00

$20,900.00
$3,584.50
$2,700.00
$1,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)Electrico
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
51,617.00
30,048.00
59,360.00
33,048.00

RENDIM.
3.60
3.60
4.00
4.00

$28,184.50

VALOR UNI.
$14,338.06
$8,346.67
$14,840.00
$8,262.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$14,338.06
$8,346.67
$14,840.00
$8,262.00
$45,786.72
74,021
$14,804.24
$14,804.24

20.0%

COSTO TOTAL UNITARIO

$88,825

ANALISIS UNITARIO
ITEM
CANALIZACION TELEFONICA SUBT. 2 x 4" AC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.5.6
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
UNION A.C CONICA 4
DUCTO DOBLE PARED 4
ADAPTADOR TERMINAL CAMPANA
ARENA DE PEA
RECEBO COMUN

UNIDAD
UN
ML
UN
M3
M3

CANTIDAD
0.50
2.00
0.14
0.09
0.04

$50.00

VALOR UNI.
$2,500.00
$14,100.00
$850.00
$30,000.00
$25,000.00

VALOR PARCIAL
$1,250.00
$28,200.00
$119.00
$2,700.00
$1,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)Electrico
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
51,617.00
30,048.00
59,360.00
33,048.00

RENDIM.
3.50
3.50
3.50
3.50

$33,269.00

VALOR UNI.
$14,747.71
$8,585.14
$16,960.00
$9,442.29
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$14,747.71
$8,585.14
$16,960.00
$9,442.29
$49,735.14
83,054
$16,610.83
$16,610.83

20.0%

COSTO TOTAL UNITARIO

$99,665

ANALISIS UNITARIO
ITEM
CABLE 1# 10 + 2#12 AWG/THW I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1.55

VALOR UNI.
$3,225.81
subtotal

II.MATERIALES DE OBRA

8.7.1
und
ML
VALOR PARCIAL
$3,225.81
$3,225.81

DESCRIPCION
CABLE COBRE THW 12 AWG
CABLE COBRE THW 10 AWG
ALAMBRE DESNUDO No 10 AWG

UNIDAD
ML
ML
ML

CANTIDAD
2.04
1.02
1.03

VALOR UNI.
$2,538.00
$12,760.00
$2,900.00

VALOR PARCIAL
$5,177.52
$13,015.20
$2,987.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
72,264.00
39,064.00

RENDIM.
80.00
80.00

$21,179.72

VALOR UNI.
$903.30
$488.30

VALOR PARCIAL
$903.30
$488.30

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,391.60
25,797
$5,159.43
$5,159.43

20.0%

COSTO TOTAL UNITARIO

$30,957

ANALISIS UNITARIO
ITEM
CABLE 1#10 + 2# 2 + 1#10T AWG/THW
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.7.2
und
ML

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE THW 2 AWG
CABLE COBRE THW 10 AWG
ALAMBRE DESNUDO No 10 AWG

UNIDAD
ML
ML
ML

CANTIDAD
2.04
1.02
1.03

$100.00

VALOR UNI.
$8,100.00
$2,538.00
$2,900.00

VALOR PARCIAL
$16,524.00
$2,588.76
$2,987.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
72,264.00
39,064.00

RENDIM.
80.00
80.00

$22,099.76

VALOR UNI.
$903.30
$488.30

VALOR PARCIAL
$903.30
$488.30

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,391.60
23,591
$4,718.27
$4,718.27

20.0%

COSTO TOTAL UNITARIO

$28,310

ANALISIS UNITARIO
ITEM
CABLE UTP CAT 5 TENDIDO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
19.00

VALOR UNI.
$263.16
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

8.7.3
und
ML
VALOR PARCIAL
$263.16
$263.16
VALOR PARCIAL

CABLE UTP CATEGORIA 5/4 PARES BELDE


AMARRE PLASTICO COLRING 4,6MM

ML
UN

1.02
1.25

$780.00
$380.00

$795.60
$475.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
72,264.00
39,064.00

RENDIM.
140.00
140.00

$1,270.60

VALOR UNI.
$516.17
$279.03

VALOR PARCIAL
$516.17
$279.03

subtotal

$795.20

Total Costo Directo


A.I.U.
Total Costo Indirecto

2,329
$465.79
$465.79

20.0%

COSTO TOTAL UNITARIO

$2,795

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
LINE CORD 1m
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
11.00

8.7.4
und
ML

VALOR UNI.
$454.55

VALOR PARCIAL
$454.55

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LINE CORD CAT 5 24 AWG

UNIDAD
UN

CANTIDAD

$454.55

VALOR UNI.

1.25

VALOR PARCIAL

$7,500.00

$9,375.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
72,264.00
39,064.00

RENDIM.
280.00
280.00

$9,375.00

VALOR UNI.
$258.09
$139.51

VALOR PARCIAL
$258.09
$139.51

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$397.60
10,227
$2,045.43
$2,045.43

20.0%

COSTO TOTAL UNITARIO

$12,273

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PATCH CORD 2 m
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

8.7.5
und
ML
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL

PATCH CORD CAT 5 24

UN

1.25

$9,200.00

$11,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
72,264.00
39,064.00

RENDIM.
290.00
290.00

$11,500.00

VALOR UNI.
$249.19
$134.70

VALOR PARCIAL
$249.19
$134.70

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$383.89
12,439
$2,487.89
$2,487.89

20.0%

COSTO TOTAL UNITARIO

$14,927

ANALISIS UNITARIO
ITEM
SALIDA DE VOZ Y DATOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1.85

8.7.6
und
UN

VALOR UNI.
$2,702.70

VALOR PARCIAL
$2,702.70

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TOMA JACK RJ 45- 110 JACK CAT 5e AMP
WALL PLATE AJUSTE SENCILLO
LIBRO ETIQUET. 190 DATOS
TOMA RJ 45 - 110 JACK SNAP

UNIDAD
UN
UN
UN
UN

CANTIDAD
1.03
1.03
0.01

$2,702.70

VALOR UNI.
$15,000.00
$4,500.00
$26,250.00
$10,000.00

VALOR PARCIAL
$15,450.00
$4,635.00
$262.50
$0.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
72,264.00
39,064.00

RENDIM.
13.00
13.00

$20,347.50

VALOR UNI.
$5,558.77
$3,004.92

VALOR PARCIAL
$5,558.77
$3,004.92

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,563.69
31,614
$6,322.78
$6,322.78

20.0%

COSTO TOTAL UNITARIO

$37,937

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
SALIDA ELECTECTRICA CORR. REGULADA

8.7.7
und
UN

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
1.70

VALOR UNI.
$2,941.18
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
LIBRO ETIQUET. 190 DATOS

UNIDAD
UN

CANTIDAD
0.01

VALOR UNI.
$26,250.00

VALOR PARCIAL
$2,941.18
$2,941.18
VALOR PARCIAL
$262.50

TOMA CORRIENTE DE POLO AISLADO

UN

1.00

$7,500.00

$7,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
72,264.00
39,064.00

RENDIM.
13.00
13.00

$7,762.50

VALOR UNI.
$5,558.77
$3,004.92

VALOR PARCIAL
$5,558.77
$3,004.92

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,563.69
19,267
$3,853.47
$3,853.47

20.0%

COSTO TOTAL UNITARIO

$23,121

ANALISIS UNITARIO
ITEM
TIERRA ARMARIO MEDIDORES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.8.1
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE COBRE DESNUDO AWG No 4
VARILLA CW 5/8 X 2,40

UNIDAD
ML
UN

CANTIDAD
3.00
1.00

$50.00

VALOR UNI.
$5,597.00
$8,000.00

VALOR PARCIAL
$16,791.00
$8,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.00
4.00

$24,791.00

VALOR UNI.
$14,840.00
$8,262.00

VALOR PARCIAL
$14,840.00
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$23,102.00
47,943
$9,588.60
$9,588.60

20.0%

COSTO TOTAL UNITARIO

$57,532

ANALISIS UNITARIO
ITEM
TIERRA CAJA MEDIDORES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABLE DESNUDO AWG No 2
VARILLA CW 5/8 X 2,40

UNIDAD
ML
UN

CANTIDAD
3.00
1.00

VALOR UNI.
$6,126.00
$8,000.00

8.8.2
und
UN
VALOR PARCIAL
$100.00
$100.00
VALOR PARCIAL
$18,378.00
$8,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.00
4.00

$26,378.00

VALOR UNI.
$14,840.00
$8,262.00

VALOR PARCIAL
$14,840.00
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$23,102.00
49,580
$9,916.00
$9,916.00

20.0%

COSTO TOTAL UNITARIO

$59,496

ANALISIS UNITARIO
ITEM
TIERRA TABLERO GRAL.DIST.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.8.3
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE DESNUDO AWG 1 / 0
VARILLA CW 3/4 X 2,40

UNIDAD
ML
UN

CANTIDAD

$50.00

VALOR UNI.

2.00
1.00

VALOR PARCIAL

$24,331.00
$30,000.00

$48,662.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.10
2.00

$78,662.00

VALOR UNI.
$28,266.67
$16,524.00

VALOR PARCIAL
$28,266.67
$16,524.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$44,790.67
123,503
$24,700.53
$24,700.53

20.0%

COSTO TOTAL UNITARIO

$148,203

ANALISIS UNITARIO
ITEM
PARARRAYOS
I.EQUIPO

No. ITEM
UNIDAD:
9 KV - 10KV

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO DE ACERO 7 X 5/8
SILLA CRUCETA TIPO ICEL
TORNILLO CERRAJE 5/8 X 1 1/2
CRUCETA MADERA INMUNIZADA 2,5 m

UNIDAD
UN
UN
UN
UN

CANTIDAD
4.00
2.00
2.00
2.00

VALOR UNI.
$1,920.00
$2,800.00
$1,100.00
$37,000.00

8.9.1
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$7,680.00
$5,600.00
$2,200.00
$74,000.00

DIAGONAL MADERA INMUNIZADA


COLLARIN DOS SALIDAS 4,5
PARARRAYO OXIDO ZINC BTA
PLATINA DIAGONALES 1,1 cm
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UN
UN
UN
UN

TARIFA DIA
59,360.00
33,048.00

4.00
1.00
3.00
2.00

RENDIM.
4.00
4.00

$5,500.00
$6,000.00
$130,000.00
$5,000.00
subtotal

$22,000.00
$6,000.00
$390,000.00
$10,000.00
$517,480.00

VALOR UNI.
$14,840.00
$8,262.00

VALOR PARCIAL
$14,840.00
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$23,102.00
540,632
$108,126.40
$108,126.40

20.0%

COSTO TOTAL UNITARIO

$648,758

ANALISIS UNITARIO
ITEM
CANALIZACION ELECTRICA SUBT. 2 x 4" AC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.10.1
und
ML

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
UNION A.C CONICA 4
DUCTO ELECTRONICO PESADO 4
ADAPTADOR TERMINAL CAMPANA 4
ARENA DE PEA
RECEBO COMUN

UNIDAD
UN
ML
UN
M3
M3

CANTIDAD
0.50
2.00
0.14
0.09
0.04

$100.00

VALOR UNI.
$2,500.00
$14,000.00
$850.00
$30,000.00
$25,000.00

VALOR PARCIAL
$1,250.00
$28,000.00
$119.00
$2,700.00
$1,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones) Electrico
Ayudante ( incluye 100% de prestaciones) Electrico
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00
51,617.00
30,048.00

RENDIM.
3.50
3.50
3.20
3.20

$33,069.00

VALOR UNI.
$16,960.00
$9,442.29
$16,130.31
$9,390.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$16,960.00
$9,442.29
$16,130.31
$9,390.00
$51,922.60
85,092
$17,018.32
$17,018.32

20.0%

COSTO TOTAL UNITARIO

$102,110

ANALISIS UNITARIO
ITEM
CANALIZACION ELECTRICA SUBT. 2 x 4" PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
DUCTO DOBLE PARED 4
UNION PVC SANITARIA 4

UNIDAD
ML
UN

CANTIDAD
2.00
0.50

VALOR UNI.
$14,100.00
$80,000.00

8.10.2
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$28,200.00
$40,000.00

ARENA DE PEA
RECEBO COMUN

M3
M3

0.09
0.04

$30,000.00
$25,000.00

$2,700.00
$1,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones) Electrico
Ayudante ( incluye 100% de prestaciones) Electrico

TARIFA DIA
51,617.00
30,048.00
59,360.00
33,048.00

RENDIM.
3.50
3.50
3.50
3.50

$71,900.00

VALOR UNI.
$14,747.71
$8,585.14
$16,960.00
$9,442.29
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$14,747.71
$8,585.14
$16,960.00
$9,442.29
$49,735.14
121,685
$24,337.03
$24,337.03

20.0%

COSTO TOTAL UNITARIO

$146,022

ANALISIS UNITARIO
ITEM
CANALIZACION ELECTRICA SUBT. 4 x 4" AC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.10.3
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
UNION A.C CONICA 4
DUCTO ELECTRONICO PESADO 4
ADAPTADOR TERMINAL CAMPANA 4
ARENA DE PEA
RECEBO COMUN

UNIDAD
UN
ML
UN
M3
M3

CANTIDAD
1.00
4.00
0.28
0.09
0.04

$50.00

VALOR UNI.
$2,500.00
$14,000.00
$850.00
$30,000.00
$25,000.00

VALOR PARCIAL
$2,500.00
$56,000.00
$238.00
$2,700.00
$1,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.80
2.80

$62,438.00

VALOR UNI.
$21,200.00
$11,802.86

VALOR PARCIAL
$21,200.00
$11,802.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$33,002.86
95,491
$19,098.17
$19,098.17

20.0%

COSTO TOTAL UNITARIO

$114,589

ANALISIS UNITARIO
ITEM
CANALIZACION ELECTRICA SUBT. 4 x 4" PVC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
DUCTO DOBLE PARED 4
UNION PVC SANITARIA 4

UNIDAD
ML
UN

CANTIDAD
4.00
1.00

VALOR UNI.
$14,100.00
$80,000.00

8.10.4
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$56,400.00
$80,000.00

ARENA DE PEA
RECEBO COMUN

M3
M3

0.09
0.04

$30,000.00
$25,000.00

$2,700.00
$1,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.80
2.80

$140,100.00

VALOR UNI.
$21,200.00
$11,802.86

VALOR PARCIAL
$21,200.00
$11,802.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$33,002.86
173,153
$34,630.57
$34,630.57

20.0%

COSTO TOTAL UNITARIO

$207,783

ANALISIS UNITARIO
ITEM
CAMARA INSP DOBLE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

8.11.1
und
UN

VALOR UNI.
$100.00

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TAPA PARA CAMARA AP DOBLE
MORTERO ARENA LAVADA 1 ,2
CONCRETO 1. 2 , 4
MARCO PARA TAPA CAMARA DOBLE
TABLA CHAPA ORDINARIA
LADRILLO COCIDO CLARO
PAETE LISO MUROS 1,4
ACERO DE REFUERZO 37000 PSI FIG.
RELLENOS DE EXCAVACION
RELLENOS AGREGADO PETREO
LISTON ORDINARIO

UNIDAD
UN
M3
M3
UN
ML
UN
M2
KG
M3
M3
ML

CANTIDAD
3.00
0.18
0.30
1.00
8.40
135.00
2.58
20.00
1.12
0.16
8.40

$100.00

VALOR UNI.
$111,000.00
$212,700.00
$267,000.00
$7,900.00
$1,716.00
$560.00
$44,500.00
$1,750.00
$3,550.00
$2,500.00
$2,500.00

VALOR PARCIAL
$333,000.00
$38,286.00
$80,100.00
$7,900.00
$14,414.40
$75,600.00
$114,810.00
$35,000.00
$3,976.00
$400.00
$21,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.59
0.59

$724,486.40

VALOR UNI.
$87,486.44
$50,928.81

VALOR PARCIAL
$87,486.44
$50,928.81

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$138,415.25
863,002
$172,600.33
$172,600.33

20.0%

COSTO TOTAL UNITARIO

$1,035,602

ANALISIS UNITARIO
ITEM
CAMARA INSP VEHICULAR
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
$100.00

8.11.2
und
UN
VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TAPA PARA CAMARA AP
MORTERO ARENA LAVADA 1 :2
CONCRETO 1: 2 : 4
MARCO PARA TAPA CAMARA DOBLE
TABLA CHAPA ORDINARIA
LADRILLO COCIDO CLARO
PAETE LISO MUROS 1:4
ACERO DE REFUERZO 37000 PSI FIG.
RELLENOS DE EXCAVACION
RELLENOS AGREGADO PETREO
LISTON ORDINARIO

UNIDAD
UN
M3
M3
UN
ML
UN
M2
KG
M3
M3
ML

CANTIDAD
2.00
0.13
0.54
1.00
11.20
379.00
7.21
30.00
2.41
0.31
11.20

$100.00

VALOR UNI.
$111,000.00
$212,700.00
$267,000.00
$7,900.00
$4,060.00
$560.00
$44,500.00
$1,750.00
$3,550.00
$2,500.00
$2,500.00

VALOR PARCIAL
$222,000.00
$27,651.00
$144,180.00
$7,900.00
$45,472.00
$212,240.00
$320,845.00
$52,500.00
$8,555.50
$775.00
$28,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.17
0.17

$1,070,118.50

VALOR UNI.
$303,629.41
$176,752.94

VALOR PARCIAL
$303,629.41
$176,752.94

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$480,382.35
1,550,601
$310,120.17
$310,120.17

20.0%

COSTO TOTAL UNITARIO

$1,860,721

ANALISIS UNITARIO
ITEM
CAMARA INSPECCION SENC.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.11.3
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TAPA PARA CAMARA AP
MORTERO ARENA LAVADA 1 :2
CONCRETO 1: 2 : 4
MARCO PARA TAPA CAMARA AP
TABLA CHAPA ORDINARIA
LADRILLO COCIDO CLARO
PAETE LISO MUROS 1:4
ACERO DE REFUERZO 37000 PSI FIG.
RELLENOS DE EXCAVACION
RELLENOS AGREGADO PETREO
LISTON ORDINARIO

UNIDAD
UN
M3
M3
UN
ML
UN
M2
KG
M3
M3
ML

CANTIDAD
1.00
0.08
0.20
1.00
6.00
93.00
1.68
10.00
0.85
0.10
6.00

$50.00

VALOR UNI.
$4,300.00
$212,700.00
$220,000.00
$4,060.00
$1,716.00
$560.00
$44,500.00
$1,750.00
$3,550.00
$2,500.00
$2,500.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.79
0.79

VALOR PARCIAL
$4,300.00
$17,016.00
$44,000.00
$4,060.00
$10,296.00
$52,080.00
$74,760.00
$17,500.00
$3,017.50
$250.00
$15,000.00
$242,279.50

VALOR UNI.
$65,337.97
$38,035.44
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$65,337.97
$38,035.44
$103,373.42

20.0%

345,703
$69,140.58
$69,140.58

COSTO TOTAL UNITARIO

$414,844

ANALISIS UNITARIO
ITEM
MARCO P/TAPA CAMARA AP
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.11.4
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ANTICORROSIVO ROJO
ESMALTE SINTETICO PINTULUX
PLATINA HIERRO 2*1/2*1/4
SOLDADURA ELECTRICA 004-3/23"
TRANSPORTE CAMION
ANGULO HIERRO 2 1/2" X 3/16
SUBCONTRATO ORNAMENTACION

UNIDAD
GL
GL
ML
KG
VJ
ML
%

CANTIDAD
0.08
0.08
0.48
1.96
0.04
2.98
30.00

$50.00

VALOR UNI.
$30,000.00
$60,220.00
$2,700.00
$22,000.00
$70,000.00
$50,720.00
$0.00

VALOR PARCIAL
$2,400.00
$4,817.60
$1,296.00
$43,120.00
$2,800.00
$151,145.60
$0.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.60
3.60

$205,579.20

VALOR UNI.
$14,338.06
$8,346.67

VALOR PARCIAL
$14,338.06
$8,346.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,684.72
228,314
$45,662.78
$45,662.78

20.0%

COSTO TOTAL UNITARIO

$273,977

ANALISIS UNITARIO
ITEM
MARCO P/TAPA CAMARA DOBLE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
ANTICORROSIVO ROJO
ESMALTE SINTETICO PINTULUX
PLATINA HIERRO 2*1/2*1/4
SOLDADURA ELECTRICA 004-3/23"
TRANSPORTE CAMION
ANGULO HIERRO 2 1/2" X 3/16
SUBCONTRATO ELECTRICO
SUBCONTRATO ORNAMENTACION

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

8.11.5
und
UN

TARIFA DIA
5,000.00
70.00

RENDIM.
9.00
0.18

VALOR UNI.
$555.56
$388.89
subtotal

VALOR PARCIAL
$555.56
$388.89
$944.44

UNIDAD
GL
GL
ML
KG
VJ
ML
%
%

CANTIDAD
0.12
0.12
1.44
0.31
0.05
4.36
30.00
30.00

VALOR UNI.
$30,000.00
$60,220.00
$2,700.00
$22,000.00
$70,000.00
$50,720.00
$0.00
$38,000.00
subtotal

VALOR PARCIAL
$3,600.00
$7,226.40
$3,888.00
$6,820.00
$3,500.00
$221,139.20
$0.00
$11,400.00
$257,573.60

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.20
2.20

VALOR UNI.
$23,462.27
$13,658.18

VALOR PARCIAL
$23,462.27
$13,658.18

subtotal
Total Costo Directo

$37,120.45
295,638

A.I.U.
Total Costo Indirecto

20.0%

$59,127.70
$59,127.70

COSTO TOTAL UNITARIO

$354,766

ANALISIS UNITARIO
ITEM
TAPA P/CAMARA AP
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
ANTICORROSIVO ROJO
CONCRETO 3000 PSI
ESMALTE SINTETICO PINTULUX
HIERRO VARILLA 3/8" X 6M
PLACA IDENTIFICACION 8X5 CM
PLATINA HIERRO 2 X 1/2 X 1/4
TRANSPORTE CAMION
TUBO ESTRUCT. NEGRO 2
SUBCONTRATO DE ORNMENTACION
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

8.11.6
und
UN

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

VALOR PARCIAL
$555.56
$555.56

UNIDAD
GL
M3
GL
ML
UN
ML
VJ
ML
%

CANTIDAD
0.04
0.03
0.04
9.52
2.98
2.98
0.03
0.10
45.00

VALOR UNI.
$30,000.00
$220,000.00
$60,220.00
$2,100.00
$4,800.00
$4,300.00
$70,000.00
$7,930.00
$82,473.00
subtotal

VALOR PARCIAL
$1,200.00
$6,600.00
$2,408.80
$19,992.00
$14,304.00
$12,814.00
$2,100.00
$793.00
$37,112.85
$57,318.80

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.20
3.20

VALOR UNI.
$16,130.31
$9,390.00

VALOR PARCIAL
$16,130.31
$9,390.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$25,520.31
83,395
$16,678.93
$16,678.93

20.0%

COSTO TOTAL UNITARIO

$100,074

ANALISIS UNITARIO
ITEM
TAPA P/CAMARA AP DOBLE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

No. ITEM
UNIDAD:

8.11.7
und
UN

TARIFA DIA
5,000.00
70.00

RENDIM.
9.00
0.18

VALOR UNI.
$555.56
$388.89
subtotal

VALOR PARCIAL
$555.56
$388.89
$944.44

II.MATERIALES DE OBRA
DESCRIPCION
ANTICORROSIVO ROJO
CONCRETO 3000 PSI
ESMALTE SINTETICO PINTULUX
HIERRO VARILLA 3/8" X 6M
PLACA IDENTIFICACION 8X5 CM
PLATINA HIERRO 2 X 1/2 X 1/4
TRANSPORTE CAMION
TUBO ESTRUCT. NEGRO 1/2"
SUBCONTRATO DE ORNAMENTACION

UNIDAD
GL
M3
GL
ML
UN
ML
VJ
ML
%

CANTIDAD
0.03
0.02
0.03
9.52
1.00
2.34
0.02
0.10
45.00

VALOR UNI.
$30,000.00
$256,000.00
$30,000.00
$400.00
$4,800.00
$4,300.00
$70,000.00
$7,930.00
$54,262.00
subtotal

VALOR PARCIAL
$900.00
$5,120.00
$900.00
$3,808.00
$4,800.00
$10,062.00
$1,400.00
$793.00
$24,417.90
$52,200.90

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
73,562
$14,712.32
$14,712.32

20.0%

COSTO TOTAL UNITARIO

$88,274

ANALISIS UNITARIO
No. ITEM
UNIDAD:

8.12.1
und
UN

ITEM
POSTE CONCR. 6m 510 Kg
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

VALOR UNI.
$50.00
$18,666.67
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

POSTE CONCRETO LINEA 6m 510-kg

UN

1.00

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67
VALOR PARCIAL

$100,000.00

$100,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$100,000.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
169,163
$33,832.63
$33,832.63

20.0%

COSTO TOTAL UNITARIO

$202,996

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
POSTE CONCR. 8m 1050 Kg
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

VALOR UNI.
$50.00
$18,666.67
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

POSTE CONCRETO LINEA 8m 1050-kg

UN

1.00

$230,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

VALOR UNI.
$32,086.49
$18,360.00
subtotal

8.12.2
und
UN
VALOR PARCIAL
$50.00
$18,666.67
$18,716.67
VALOR PARCIAL
$230,000.00

$230,000.00
VALOR PARCIAL
$32,086.49
$18,360.00
$50,446.49

Total Costo Directo


A.I.U.
Total Costo Indirecto

299,163
$59,832.63
$59,832.63

20.0%

COSTO TOTAL UNITARIO

$358,996

ANALISIS UNITARIO
ITEM
POSTE CONCR. 10m 750 Kg
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE CONCRETO LINEA 10m 750-kg

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

UNIDAD
UN

CANTIDAD
1.00

8.12.3
und
UN

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$307,400.00

VALOR PARCIAL
$307,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$307,400.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
376,563
$75,312.63
$75,312.63

20.0%

COSTO TOTAL UNITARIO

$451,876

ANALISIS UNITARIO
ITEM
POSTE CONCR. 10m 1050 Kg
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE CONCRETO LINEA 10m 1050-kg

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

UNIDAD
UN

CANTIDAD
1.00

8.12.4
und
UN

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$398,000.00

VALOR PARCIAL
$398,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$398,000.00

VALOR UNI.
$32,086.49
$18,360.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$32,086.49
$18,360.00
$50,446.49

20.0%

467,163
$93,432.63
$93,432.63

COSTO TOTAL UNITARIO

$560,596

ANALISIS UNITARIO
ITEM
POSTE CONCR. 12m 510 Kg
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE CONCRETO LINEA 12m 510-kg

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

UNIDAD
UN

CANTIDAD
1.00

8.12.5
und
UN

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$400,000.00

VALOR PARCIAL
$400,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$400,000.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
469,163
$93,832.63
$93,832.63

20.0%

COSTO TOTAL UNITARIO

$562,996

ANALISIS UNITARIO
ITEM
POSTE CONCR. 12m 750 Kg
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE CONCRETO LINEA 12m 750-kg

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

UNIDAD
UN

CANTIDAD
1.00

8.12.6
und
UN

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$417,600.00

VALOR PARCIAL
$417,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$417,600.00

VALOR UNI.
$32,086.49
$18,360.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

VALOR PARCIAL
$32,086.49
$18,360.00
$50,446.49

20.0%

486,763
$97,352.63
$97,352.63
$584,116

ANALISIS UNITARIO
ITEM
POSTE CONCR. 14m 1050 Kg
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE CONCRETO LINEA 14m 1050-kg

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

UNIDAD
UN

CANTIDAD
1.00

8.12.7
und
UN

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$710,000.00

VALOR PARCIAL
$710,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$710,000.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
779,163
$155,832.63
$155,832.63

20.0%

COSTO TOTAL UNITARIO

$934,996

ANALISIS UNITARIO
ITEM
POSTE CONCR. 12M 1050 Kg
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE CONCRETO LINEA 12m 1050-kg

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

UNIDAD
UN

CANTIDAD
1.00

8.12.8
und
UN

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$533,600.00

VALOR PARCIAL
$533,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$533,600.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
602,763
$120,552.63
$120,552.63

20.0%

COSTO TOTAL UNITARIO

$723,316

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

8.12.9
und

POSTE CONCRETO 18m 1350Kg


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE CONCRETO REFORZADO 18m 1350-kg

UN
TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$1,400,000.00

VALOR PARCIAL
$1,400,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$1,400,000.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
1,469,163
$293,832.63
$293,832.63

20.0%

COSTO TOTAL UNITARIO

$1,762,996

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
POSTE MADERA 8m PESADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

II.MATERIALES DE OBRA
DESCRIPCION
POSTE MADERA INMUNIZADA 8 m

UNIDAD
UN

CANTIDAD
1.00

8.12.10
und
UN

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$125,000.00

VALOR PARCIAL
$125,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$125,000.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
194,163
$38,832.63
$38,832.63

20.0%

COSTO TOTAL UNITARIO

$232,996

ANALISIS UNITARIO
ITEM
POSTE MADERA 10m PESADO
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

8.12.11
und
UN
VALOR PARCIAL

HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE MADERA INMUNIZADA 10 m

5,000.00
280,000.00

UNIDAD
UN

100.00
15.00

CANTIDAD
1.00

$50.00
$18,666.67
subtotal

$50.00
$18,666.67
$18,716.67

VALOR UNI.
$180,000.00

VALOR PARCIAL
$180,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$180,000.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
249,163
$49,832.63
$49,832.63

20.0%

COSTO TOTAL UNITARIO

$298,996

ANALISIS UNITARIO
ITEM
POSTE MADERA 12m PESADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
GRUA EXTENSION PARA POSTES
II.MATERIALES DE OBRA
DESCRIPCION
POSTE MADERA INMUNIZADA 12 m

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
280,000.00

RENDIM.
100.00
15.00

UNIDAD
UN

CANTIDAD
1.00

8.12.12
und
UN

VALOR UNI.
$50.00
$18,666.67
subtotal

VALOR PARCIAL
$50.00
$18,666.67
$18,716.67

VALOR UNI.
$245,000.00

VALOR PARCIAL
$245,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
1.85
1.80

$245,000.00

VALOR UNI.
$32,086.49
$18,360.00

VALOR PARCIAL
$32,086.49
$18,360.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$50,446.49
314,163
$62,832.63
$62,832.63

20.0%

COSTO TOTAL UNITARIO

$376,996

ANALISIS UNITARIO
ITEM
RED AEREA 3 x 1; ACSR
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

8.13.1
und
ML
VALOR PARCIAL
$50.00
$50.00

II.MATERIALES DE OBRA
DESCRIPCION
CABLE ALUMINIO DESNUDO 1 AWG

UNIDAD
ML

CANTIDAD
3.00

VALOR UNI.
$5,500.00

VALOR PARCIAL
$16,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$16,500.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal

$11,551.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

28,101
$5,620.20
$5,620.20

20.0%

COSTO TOTAL UNITARIO

$33,721

ANALISIS UNITARIO
ITEM
RED AEREA 3 x 4; ACSR
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.13.2
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE ALUMINIO DESNUDO 4 AWG

UNIDAD
ML

CANTIDAD

$50.00

VALOR UNI.

3.00

VALOR PARCIAL

$2,450.00

$7,350.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$7,350.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
18,951
$3,790.20
$3,790.20

20.0%

COSTO TOTAL UNITARIO

$22,741

ANALISIS UNITARIO
ITEM
RED AEREA 3 x 2/0; ACSR
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

8.13.3
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

CABLE ALUMINIO DESNUDO AF 2 / 0

ML

3.00

$10,500.00

$31,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$31,500.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
43,101
$8,620.20
$8,620.20

20.0%

COSTO TOTAL UNITARIO

$51,721

ANALISIS UNITARIO
ITEM
RED AEREA 3 x 4/0; ACSR
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.13.4
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE ALUMINIO DESNUDO AF 4 / 0

UNIDAD
ML

CANTIDAD

$50.00

VALOR UNI.

3.00

VALOR PARCIAL

$11,800.00

$35,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$35,400.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
47,001
$9,400.20
$9,400.20

20.0%

COSTO TOTAL UNITARIO

$56,401

ANALISIS UNITARIO
ITEM
RED MEDIA TENSION TRIPLEX 2/0
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABLE TRIPLEX 15 KV 4 / 0

UNIDAD
ML

CANTIDAD
1.00

VALOR UNI.
$292,000.00

8.13.5
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$292,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.50
15.50

$292,000.00

VALOR UNI.
$3,829.68
$2,132.13

VALOR PARCIAL
$3,829.68
$2,132.13

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,961.81
298,012
$59,602.36
$59,602.36

20.0%

COSTO TOTAL UNITARIO

$357,614

ANALISIS UNITARIO
ITEM
RED MEDIATENSION TRIPLEX 4/0
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.13.6
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE TRIPLEX 15 KV 2 / 0

UNIDAD
ML

CANTIDAD
1.00

$50.00

VALOR UNI.
$215,000.00

VALOR PARCIAL
$215,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.50
15.50

$215,000.00

VALOR UNI.
$3,829.68
$2,132.13

VALOR PARCIAL
$3,829.68
$2,132.13

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,961.81
221,012
$44,202.36
$44,202.36

20.0%

COSTO TOTAL UNITARIO

$265,214

ANALISIS UNITARIO
ITEM
TERMINAL Cu TRIPLEX EXTERIOR 3/0
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TERMINAL PREMOL INT / 0 - 500

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$590,000.00

8.13.7
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$590,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.50
15.50

$590,000.00

VALOR UNI.
$3,829.68
$2,132.13

VALOR PARCIAL
$3,829.68
$2,132.13

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,961.81
596,012
$119,202.36
$119,202.36

20.0%

COSTO TOTAL UNITARIO

$715,214

ANALISIS UNITARIO
ITEM
TERMINAL Cu TRIPLEX INTERIOR 4/0
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.13.8
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TERMINAL PREMOL INT 4 -2 / 0

UNIDAD
UN

CANTIDAD

$50.00

VALOR UNI.

1.00

VALOR PARCIAL

$140,000.00

$140,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.50
15.50

$140,000.00

VALOR UNI.
$3,829.68
$2,132.13

VALOR PARCIAL
$3,829.68
$2,132.13

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,961.81
146,012
$29,202.36
$29,202.36

20.0%

COSTO TOTAL UNITARIO

$175,214

ANALISIS UNITARIO
ITEM
TIERRA PARARRAYOS /POSTE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VARILLA CW 5 / 8 X 2,40
ALAMBRE COBRE DESNUDO AWG 8
TUBO CONDUIT GRIS 1/2
CINTA BANDIT 1 / 2
HEBILLA 1 / 2

UNIDAD
UN
KG
ML
RL
UN

CANTIDAD
1.00
1.12
1.00
0.06
0.04

VALOR UNI.
$8,000.00
$36,100.00
$7,000.00
$40,000.00
$500.00
subtotal

III.MANO DE OBRA

8.14.1
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$8,000.00
$40,432.00
$7,000.00
$2,400.00
$20.00
$57,852.00

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.00
4.00

VALOR UNI.
$14,840.00
$8,262.00

VALOR PARCIAL
$14,840.00
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$23,102.00
81,004
$16,200.80
$16,200.80

20.0%

COSTO TOTAL UNITARIO

$97,205

ANALISIS UNITARIO
ITEM
REVISIN Y REPARACIN DE PUNTO ELCTRICO (INC. CAMBIO DE APARATOS)
I.EQUIPO
DESCRIPCION
TARIFA DIA
RENDIM.
HERRAMIENTA MENOR
5,000.00
9.00
ANDAMIO
70.00
0.18
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
CONCRETO 2500 PSI
ARENA DE PEA
CEMENTO GRIS
ESTERILLA DE GUADUA

UNIDAD
KG
M3
M3
KG
M2

CANTIDAD
0.02
0.05
0.05
2.20
1.00

No. ITEM
UNIDAD:

8.15.1
und
UN

VALOR UNI.
$555.56
$388.89
subtotal

VALOR PARCIAL
$555.56
$388.89
$944.44

VALOR UNI.
$2,000.00
$256,000.00
$30,000.00
$400.00
$4,100.00

VALOR PARCIAL
$40.00
$12,800.00
$1,500.00
$880.00
$4,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.10
5.10

$19,320.00

VALOR UNI.
$11,639.22
$6,480.00

VALOR PARCIAL
$11,639.22
$6,480.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,119.22
38,384
$7,676.73
$7,676.73

20.0%

COSTO TOTAL UNITARIO

$46,060

ANALISIS UNITARIO
ITEM
AISLADOR DE PIN ANSI 52-1
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
AISLADOR DE PIN ANSI 52 - 1
PORTA AISLADOR UN PUESTO

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

VALOR UNI.
$25,700.00
$2,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

8.16.1
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$25,700.00
$2,400.00

$28,100.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

59,360.00
33,048.00

48.00
48.00

$1,236.67
$688.50

$1,236.67
$688.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,925.17
30,075
$6,015.03
$6,015.03

20.0%

COSTO TOTAL UNITARIO

$36,090

ANALISIS UNITARIO
ITEM
AISLADOR DE PIN ANSI 55-1
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.2
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
AISLADOR DE PIN ANSI 55 - 2
PORTA AISLADOR UN PUESTO

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

$50.00

VALOR UNI.
$8,700.00
$2,400.00

VALOR PARCIAL
$8,700.00
$2,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
42.00
42.00

$11,100.00

VALOR UNI.
$1,413.33
$786.86

VALOR PARCIAL
$1,413.33
$786.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,200.19
13,350
$2,670.04
$2,670.04

20.0%

COSTO TOTAL UNITARIO

$16,020

ANALISIS UNITARIO
ITEM
AISLADOR SUSP.ANSI 52-1
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
AISLADOR SUSPENSION ANSI 52 - 1

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$20,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
59,360.00

RENDIM.
48.00

VALOR UNI.
$1,236.67

8.16.3
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$20,200.00

$20,200.00
VALOR PARCIAL
$1,236.67

Ayudante ( incluye 100% de prestaciones)

33,048.00

48.00

$688.50

$688.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,925.17
22,175
$4,435.03
$4,435.03

20.0%

COSTO TOTAL UNITARIO

$26,610

ANALISIS UNITARIO
ITEM
CERCO MADERA 2.2m VESTIDO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.4
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO ESPIGO 5 / 8 X 24"
CERCO MADERA INMUNIZADA 2,5 m

UNIDAD
UN
UN

CANTIDAD
4.00
2.00

$50.00

VALOR UNI.
$2,900.00
$69,000.00

VALOR PARCIAL
$11,600.00
$138,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$149,600.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
161,201
$32,240.20
$32,240.20

20.0%

COSTO TOTAL UNITARIO

$193,441

ANALISIS UNITARIO
ITEM
CONECTOR COMP.RAN.PARAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CONECTOR TUBULAR 4 / 0

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$4,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
48.00
48.00

VALOR UNI.
$1,236.67
$688.50

8.16.7
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$4,200.00

$4,200.00
VALOR PARCIAL
$1,236.67
$688.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,925.17
6,175
$1,235.03
$1,235.03

20.0%

COSTO TOTAL UNITARIO

$7,410

ANALISIS UNITARIO
ITEM
CONST.VERTICAL ANGULO <50
I.EQUIPO
DESCRIPCION
CAMPERO PASAJEROS
CAMION 3 TON REDES
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
AISLADOR SUSPENS ANSI 52- 1
RETENIDA PARA MEDIA TENS. CPS
PERNO DE OJO 5/8 X 5. 45
GRAPA DE SUSPENSION 6 - 2 / 0

No. ITEM
UNIDAD:

TARIFA DIA
108,000.00
180,000.00
5,000.00

RENDIM.
30.00
250.00
50.00

UNIDAD
UN
UN
UN
UN

CANTIDAD
6.00
1.00
3.00
3.00

8.16.8
und
UN

VALOR UNI.
$3,600.00
$720.00
$100.00
subtotal

VALOR PARCIAL
$3,600.00
$720.00
$100.00
$4,420.00

VALOR UNI.
$20,200.00
$90,000.00
$2,500.00
$8,000.00

VALOR PARCIAL
$121,200.00
$90,000.00
$7,500.00
$24,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
14.00
14.00

$242,700.00

VALOR UNI.
$4,240.00
$2,360.57

VALOR PARCIAL
$4,240.00
$2,360.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,600.57
253,721
$50,744.11
$50,744.11

20.0%

COSTO TOTAL UNITARIO

$304,465

ANALISIS UNITARIO
ITEM
CONST.VERTICAL ANGULO >50
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
AISLADOR SUSPENS ANSI 52- 1
RETENIDA PARA MEDIA TENS. CPS
ESTRIBO PARA MEDIA TENSION
GRAPA TERMINAL TIPO RECTO
GRAPA P / OPERAR EN CALIENTE
ABRAZADERA UNA SALIDA TIPO 2
PERNO DE OJO 5/8 X 2 54T - 2
TORNILLO CERRAJE 5/8 X 1 1/2
TUERCA OJO ALARGADO 5/8
III.MANO DE OBRA
DESCRIPCION

UNIDAD
UN
UN
UN
UN
UN
UN
UN
UN
UN

CANTIDAD
12.00
1.00
3.00
6.00
3.00
3.00
3.00
3.00
3.00

VALOR UNI.
$20,200.00
$90,000.00
$28,000.00
$16,850.00
$20,000.00
$150.00
$2,500.00
$1,100.00
$4,800.00
subtotal

TARIFA DIA

RENDIM.

VALOR UNI.

8.16.9
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$242,400.00
$90,000.00
$84,000.00
$101,100.00
$60,000.00
$450.00
$7,500.00
$3,300.00
$14,400.00
$603,150.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

59,360.00
33,048.00

7.30
7.30

$8,131.51
$4,527.12

$8,131.51
$4,527.12

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,658.63
615,859
$123,171.73
$123,171.73

20.0%

COSTO TOTAL UNITARIO

$739,030

ANALISIS UNITARIO
ITEM
CORTACIRCUITO CAUELA 100-15KV
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.10
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CORTA CIRCUITO ENCHUFABLE BIPOLAR 100A

UNIDAD
UN

CANTIDAD

$50.00

VALOR UNI.

1.00

VALOR PARCIAL

$60,000.00

$60,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
24.00
24.00

$60,000.00

VALOR UNI.
$2,473.33
$1,377.00

VALOR PARCIAL
$2,473.33
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,850.33
63,900
$12,780.07
$12,780.07

20.0%

COSTO TOTAL UNITARIO

$76,680

ANALISIS UNITARIO
ITEM
DERIVACION 90 C/RET INF
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ESTRUCTURA TANGENTE CPS
HERRAJE PARA ESTRUCTURA FINAL CPS
AISLADOR DE PIN ANSI 55- 1
RETENIDA PARA MEDIA TENS CPS
ESTRIBO PARA MEDIA TENSION
GRAPA P / OPERAR EN CALIENTE
III.MANO DE OBRA
DESCRIPCION

UNIDAD
UN
UN
JGO
UN
UN
UN

CANTIDAD
1.00
1.00
2.00
1.00
3.00
3.00

VALOR UNI.
$219,200.00
$468,000.00
$13,200.00
$90,000.00
$28,000.00
$20,000.00
subtotal

TARIFA DIA

RENDIM.

VALOR UNI.

8.16.11
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$219,200.00
$468,000.00
$26,400.00
$90,000.00
$84,000.00
$60,000.00
$947,600.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

59,360.00
33,048.00

20.00
20.00

$2,968.00
$1,652.40

$2,968.00
$1,652.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,620.40
952,270
$190,454.08
$190,454.08

20.0%

COSTO TOTAL UNITARIO

$1,142,724

ANALISIS UNITARIO
ANALISIS UNITARIO
ITEM
ESTRIBOS MEDIA TENSION
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.13
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CONECTOR TUBULAR 1 / 0
CABLE COBRE DESNUDO AWG 1 / 0

UNIDAD
UN
ML

CANTIDAD
2.00
0.50

$50.00

VALOR UNI.
$16,000.00
$24,331.00

VALOR PARCIAL
$32,000.00
$12,165.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
50.00
50.00

$44,165.50

VALOR UNI.
$1,187.20
$660.96

VALOR PARCIAL
$1,187.20
$660.96

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,848.16
46,064
$9,212.73
$9,212.73

20.0%

COSTO TOTAL UNITARIO

$55,276

ANALISIS UNITARIO
ITEM
ESTRUCTURA EN ANGULO CPS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
CAMPERO PASAJEROS
CAMION 3 TON REDES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
108,000.00
180,000.00

RENDIM.
100.00
16.00
130.00

VALOR UNI.
$50.00
$6,750.00
$1,384.62
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
AISLADOR DE PIN ANSI 55- 1
AISLADOR DE PIN ANSI 52- 1
RETENIDA PARA BAJA TENS
RETENIDA PARA MEDIA TENS CPS
DIAGONAL VARILLA 5/8 "CPS
ESPARRAGO 5/8" X 18

UNIDAD
HC
UN
UN
UN
UN
UN

CANTIDAD
6.00
6.00
1.00
1.00
4.00
4.00

VALOR UNI.
$13,200.00
$25,700.00
$585,500.00
$90,000.00
$5,300.00
$5,700.00

8.16.14
und
UN
VALOR PARCIAL
$50.00
$6,750.00
$1,384.62
$8,184.62
VALOR PARCIAL
$79,200.00
$154,200.00
$585,500.00
$90,000.00
$21,200.00
$22,800.00

ABRAZADERA 1 SALIDA TIPO 2


TORNILLO ACERO GALVANIZADO 8X 5/8"
PORTA AISLADOR UN PUESTO
CRUCETA MADERA INMUNIZADA 2,5 m
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UN
UN
UN
UN

TARIFA DIA
59,360.00
33,048.00

1.00
2.00
6.00
2.00

RENDIM.
7.00
7.00

$8,200.00
$3,900.00
$2,400.00
$37,000.00
subtotal

$8,200.00
$7,800.00
$14,400.00
$74,000.00
$1,057,300.00

VALOR UNI.
$8,480.00
$4,721.14

VALOR PARCIAL
$8,480.00
$4,721.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,201.14
1,078,686
$215,737.15
$215,737.15

20.0%

COSTO TOTAL UNITARIO

$1,294,423

ANALISIS UNITARIO
ITEM
ESTRUCTURA TANGENTE CPS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
CAMPERO PASAJEROS
CAMION 3 TON REDES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
108,000.00
180,000.00

RENDIM.
100.00
32.00
250.00

8.16.15
und
UN

VALOR UNI.
$50.00
$3,375.00
$720.00

VALOR PARCIAL
$50.00
$3,375.00
$720.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
AISLADOR DE PIN ANSI 55-1
AISLADOR DE PIN ANSI 55-2
AISLADOR DE PIN ANSI 52-1
DIAGONAL VARILLA 5/8" CPS
TORNILLO ACERO GALVANIZADO 5X5/8
TORNILLO ACERO GALVANIZADO 8X5/8
CRUCETA MADERA INMUNIZADA 2,5 m
ABRAZADERA EN U TIPO .1
HILO ALUMINIO 0,7X0,9
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
HC
UN
UN
UN
UN
UN
UN
UN
ml

CANTIDAD
3.00
3.00
3.00
2.00
2.00
1.00
1.00
1.00
8.00

TARIFA DIA
59,360.00
33,048.00

RENDIM.
14.00
14.00

$4,145.00

VALOR UNI.
$13,200.00
$8,700.00
$25,700.00
$5,300.00
$1,550.00
$3,900.00
$37,000.00
$8,200.00
$1,700.00
subtotal

VALOR PARCIAL
$39,600.00
$26,100.00
$77,100.00
$10,600.00
$3,100.00
$3,900.00
$37,000.00
$8,200.00
$13,600.00
$219,200.00

VALOR UNI.
$4,240.00
$2,360.57

VALOR PARCIAL
$4,240.00
$2,360.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,600.57
229,946
$45,989.11
$45,989.11

20.0%

COSTO TOTAL UNITARIO

$275,935

ANALISIS UNITARIO
ITEM
GRAPA TERMINAL TIPO RECTO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

8.16.17
und
UN
VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
GRAPA TERMINAL 2/0 A 4/0

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$16,000.00

VALOR PARCIAL
$16,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
80.00
80.00

$16,000.00

VALOR UNI.
$742.00
$413.10

VALOR PARCIAL
$742.00
$413.10

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,155.10
17,205
$3,441.02
$3,441.02

20.0%

COSTO TOTAL UNITARIO

$20,646

ANALISIS UNITARIO
ITEM
GRAPAS OPERAR EN CALIENTE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.18
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
GRAPA PARA OPERAR EN CALIENTE

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$20,000.00

VALOR PARCIAL
$20,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
48.00
48.00

$20,000.00

VALOR UNI.
$1,236.67
$688.50

VALOR PARCIAL
$1,236.67
$688.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,925.17
21,975
$4,395.03
$4,395.03

20.0%

COSTO TOTAL UNITARIO

$26,370

ANALISIS UNITARIO
ITEM
HERRAJE P/ESTR.FINAL CPS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
CAMPERO PASAJEROS
CAMION 3 TON REDES

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
108,000.00
180,000.00

RENDIM.
100.00
11.50
100.00

VALOR UNI.
$50.00
$9,391.30
$1,800.00

8.16.19
und
UN
VALOR PARCIAL
$50.00
$9,391.30
$1,800.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
DIAGONAL VARILLA 5/8 "CPS
ESPARRAGO 5/8" X 20
ABRAZADERA 1 SALIDA TIPO 2
TORNILLO ACERO GALVANIZADO 5X 5/8"
GRAPA TERMINAL 6-20 N. 1
CRUCETA MADERA INMUNIZADA 2,5 m
AISLADOR SUPENSION ANSI 52-1
AISLADOR DE PIN ANSI 52-1
PERNO DE OJO 5/8 X 5,45
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UN
UN
UN
UN
UN
UN
UN
UN
UN

CANTIDAD
4.00
2.00
2.00
4.00
3.00
2.00
6.00
6.00
3.00

TARIFA DIA
59,360.00
33,048.00

RENDIM.
5.00
5.50

$11,241.30

VALOR UNI.
$5,300.00
$5,700.00
$7,200.00
$1,550.00
$12,000.00
$37,000.00
$20,200.00
$25,700.00
$2,500.00
subtotal

VALOR PARCIAL
$21,200.00
$11,400.00
$14,400.00
$6,200.00
$36,000.00
$74,000.00
$121,200.00
$154,200.00
$7,500.00
$446,100.00

VALOR UNI.
$11,872.00
$6,008.73

VALOR PARCIAL
$11,872.00
$6,008.73

subtotal

$17,880.73

Total Costo Directo


A.I.U.
Total Costo Indirecto

475,222
$95,044.41
$95,044.41

20.0%

COSTO TOTAL UNITARIO

$570,266

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
HERRAJES ANG. 90 C/RETEN.
I.EQUIPO
DESCRIPCION

TARIFA DIA

CAMPERO PASAJEROS

108,000.00

RENDIM.

8.16.20
und
UN

VALOR UNI.

59.00

VALOR PARCIAL

$1,830.51

$1,830.51
$1,830.51

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
HERRAJE PARA ESTRUCUTRA FINAL CPS
RETENIDA PARA MEDIA TENS. CPS
ESTRIBO PARA MEDIA TENSION
GRAPA PARA OPERAR EN CALIENTE
TUERCA DE OJO ALARGADO
ABRAZADERA 2 SALIDA TIPO.3
TORNILLO CERRAJE 5/8 X 1 1/2
III.MANO DE OBRA
DESCRIPCION

UNIDAD
UN
UN
UN
UN
UN
UN
UN

TARIFA DIA

CANTIDAD
2.00
2.00
3.00
3.00
1.00
1.00
2.00

RENDIM.

VALOR UNI.

VALOR PARCIAL

$468,000.00
$90,000.00
$28,000.00
$20,000.00
$4,800.00
$9,280.00
$1,100.00
subtotal
VALOR UNI.

$936,000.00
$180,000.00
$84,000.00
$60,000.00
$4,800.00
$9,280.00
$2,200.00
$1,276,280.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
1,278,111
$255,622.10
$255,622.10

20.0%

COSTO TOTAL UNITARIO

$1,533,733

ANALISIS UNITARIO
ITEM
PARARRAYOS

No. ITEM
UNIDAD:
9 KV - 10KV

8.16.21
und
UN

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
50.00

VALOR UNI.
100

VALOR PARCIAL
$100.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

PARARRAYO OXIDO ZINC BTA


COLLARIN 2 SALIDAS 4-5"
CRUCETA MADERA INMUNIZADA 2,5M
DIAGONAL MADERA INMUNIZADA
PLATINA DIAGONALES 1,1 CM
SILLA CRUCETA TIPO ICEL
TORNILLO ACERO 7*5/8"
TORNILLO CERRAJE 5/8" X 1 1/2"

UN
UN
UN
UN
UN
UN
UN
UN

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

CANTIDAD
3.00
1.00
2.00
4.00
2.00
2.00
4.00
2.00

RENDIM.
4.00
4.00

$100.00

VALOR UNI.

VALOR PARCIAL

$130,000.00
$6,000.00
$37,000.00
$5,500.00
$5,000.00
$2,800.00
$1,920.00
$1,100.00
subtotal

$390,000.00
$6,000.00
$74,000.00
$22,000.00
$10,000.00
$5,600.00
$7,680.00
$2,200.00
$517,480.00

VALOR UNI.
$14,840.00
$8,262.00

VALOR PARCIAL
$14,840.00
$8,262.00

subtotal

$23,102.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

540,682
$108,136.40
$108,136.40

20.0%

COSTO TOTAL UNITARIO

$648,818

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
RETENIDA DOBLE SIMETRICA
I.EQUIPO
DESCRIPCION

TARIFA DIA

CAMPERO PASAJEROS
CAMION 3 TON REDES

108,000.00
180,000.00

RENDIM.

8.16.22
und
UN

VALOR UNI.

16.60
26.50

$6,506.02
$6,792.45

$6,506.02
$6,792.45
$13,298.48
VALOR PARCIAL
$468,000.00
$25,700.00
$84,000.00
$50,550.00
$14,400.00
$121,200.00
$111,000.00
$60,000.00
$934,850.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
HERRAJE PARA ESTRUCTURA FINAL CPS
AISLADOR DE PIN ANSI 52 -1
ESTRIBO PARA MEDIA TENSION
GRAPA TERMINAL TIPO RECTO
TUERCA DE OJO ALARGADO
AISLADOR SUSPENSION ANSI 52-1
AISLADOR SUSPENSION ANSI 52-1
GRAPA PARA OPERAR EN CALIENTE
III.MANO DE OBRA
DESCRIPCION

VALOR PARCIAL

UNIDAD
UN
HR
UN
HR
UN
HR
UN
UN

CANTIDAD
1.00
1.00
3.00
3.00
3.00
6.00
6.00
3.00

VALOR UNI.
$468,000.00
$25,700.00
$28,000.00
$16,850.00
$4,800.00
$20,200.00
$18,500.00
$20,000.00
subtotal

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

VALOR PARCIAL

$0.00

20.0%

948,148
$189,629.70
$189,629.70
$1,137,778

ANALISIS UNITARIO
ITEM
RETENIDA P/BAJA TENSION
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

8.16.23
und
UN

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
RETENIDA TERMINAL POSTE - VARIOS
CABLE ACERO GALVANIZADO 3/8
AISLADOR TENSOR ANSI 54-1

UNIDAD
UN
ML
UN

CANTIDAD
1.00
16.00
1.00

$0.00

VALOR UNI.
$546,437.00
$2,000.00
$7,700.00

VALOR PARCIAL
$546,437.00
$32,000.00
$7,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$586,137.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
586,137
$117,227.40
$117,227.40

20.0%

COSTO TOTAL UNITARIO

$703,364

ANALISIS UNITARIO
ITEM
RETENIDA P/MEDIA TENS.CPS
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

8.16.29
und
UN

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABLE ACERO GALVANIZADO 3/8
AISLADOR TENSOR ANSI 54-2
RETENIDA TERMINAL POSTE VARIOS

UNIDAD
ML
UN
M2

CANTIDAD
18.00
1.00
1.00

$0.00

VALOR UNI.
$2,000.00
$9,200.00
$45,850.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR PARCIAL
$36,000.00
$9,200.00
$45,850.00

$91,050.00

VALOR UNI.

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

VALOR PARCIAL

VALOR PARCIAL

$0.00

20.0%

91,050
$18,210.00
$18,210.00

COSTO TOTAL UNITARIO

$109,260

ANALISIS UNITARIO
ITEM
RETENIDA TERM. POSTE-VAR.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
CAMPERO PASAJEROS
VIBRO COMPACTADOR TIPO RANA
II.MATERIALES DE OBRA
DESCRIPCION
VIGUETA ANCLA DE RETENIDA
GUARDA CABO PARA CABLE 3/8
VARILLA ANCLAGE 3/4 X 2m
ABRAZADERA SIN SALIDA T-2
GRAPA PRENSORA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)Electrico
Ayudante ( incluye 100% de prestaciones)Electrico
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

8.16.30
und
UN

TARIFA DIA
5,000.00
108,000.00
35,000.00

RENDIM.
100.00
32.00
1.00

VALOR UNI.
$50.00
$3,375.00
$35,000.00
subtotal

VALOR PARCIAL
$50.00
$3,375.00
$35,000.00
$38,425.00

UNIDAD
UN
UN
UN
UN
UN

CANTIDAD
1.00
1.00
1.00
1.00
4.00

VALOR UNI.
$454,000.00
$400.00
$9,500.00
$5,800.00
$4,640.00
subtotal

VALOR PARCIAL
$454,000.00
$400.00
$9,500.00
$5,800.00
$18,560.00
$488,260.00

TARIFA DIA
59,360.00
33,048.00
51,617.00
30,048.00

RENDIM.
4.50
5.00
60.00
60.00

VALOR UNI.
$13,191.11
$6,609.60
$860.28
$500.80
subtotal

VALOR PARCIAL
$13,191.11
$6,609.60
$860.28
$500.80
$21,161.79

Total Costo Directo


A.I.U.
Total Costo Indirecto

547,847
$109,569.36
$109,569.36

20.0%

COSTO TOTAL UNITARIO

$657,416

ANALISIS UNITARIO
ITEM
TUBO GALV.3"+ACC./BAJADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.31
und
ML

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
UNION CONDUIT GALVANIZADA 3"
TUBO CONDUIT GALVANIZADA 3"
CURVA CONDUIT GALVANIZADA 3"
CINTA BANDIT 1/2"
HEBILLA 1/2"

UNIDAD
UN
ML
UN
RL
UN

CANTIDAD
0.33
1.00
1.00
0.09
0.04

$50.00

VALOR UNI.
$14,700.00
$76,800.00
$10,500.00
$40,000.00
$500.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
24.00
24.00

VALOR PARCIAL
$4,851.00
$76,800.00
$10,500.00
$3,600.00
$20.00
$95,771.00

VALOR UNI.
$2,473.33
$1,377.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$2,473.33
$1,377.00
$3,850.33

20.0%

99,671
$19,934.27
$19,934.27

COSTO TOTAL UNITARIO

$119,606

ANALISIS UNITARIO
ITEM
TUBO GALV.4"+ACC./BAJADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.32
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
UNION CONDUIT GALVANIZADA 4"
TUBO CONDUIT GALVANIZADA 4"
CURVA CONDUIT GALVANIZADA 4"
CINTA BANDIT 1/2"
HEBILLA 1/2"

UNIDAD
UN
ML
UN
RL
UN

CANTIDAD
0.33
1.00
1.00
0.09
0.04

$50.00

VALOR UNI.
$13,200.00
$65,000.00
$123,850.00
$40,000.00
$500.00

VALOR PARCIAL
$4,356.00
$65,000.00
$123,850.00
$3,600.00
$20.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.00
4.00

$196,826.00

VALOR UNI.
$14,840.00
$8,262.00

VALOR PARCIAL
$14,840.00
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$23,102.00
219,978
$43,995.60
$43,995.60

20.0%

COSTO TOTAL UNITARIO

$263,974

ANALISIS UNITARIO
ITEM
TUBO GALVANIZADO 3/4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.33
und
ML

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CINTA BANDIT 1/2
TUBO CONDUIT GALVANIZADA 3/4"

UNIDAD
RL
ML

CANTIDAD
0.09
1.00

$50.00

VALOR UNI.
$40,000.00
$4,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
24.00
24.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$3,600.00
$4,500.00

$8,100.00

VALOR UNI.
$2,473.33
$1,377.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$2,473.33
$1,377.00
$3,850.33

20.0%

12,000
$2,400.07
$2,400.07
$14,400

ANALISIS UNITARIO
ITEM
TUBO GALVANIZADO 1"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.34
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CINTA BANDIT 1/2"
TUBO CONDUIT GALVANIZADA 1"

UNIDAD
RL
ML

CANTIDAD
0.09
1.00

$50.00

VALOR UNI.
$40,000.00
$5,500.00

VALOR PARCIAL
$3,600.00
$5,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
25.00
25.00

$9,100.00

VALOR UNI.
$2,374.40
$1,321.92

VALOR PARCIAL
$2,374.40
$1,321.92

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,696.32
12,846
$2,569.26
$2,569.26

20.0%

COSTO TOTAL UNITARIO

$15,416

ANALISIS UNITARIO
ITEM
TUERCA DE OJO ALARGADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.35
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUERCA OJO ALARGADO 5 / 8"

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$4,800.00

VALOR PARCIAL
$4,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
45.00

$4,800.00

VALOR UNI.
$734.40

VALOR PARCIAL
$734.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$734.40
5,584
$1,116.88
$1,116.88

20.0%

COSTO TOTAL UNITARIO

$6,701

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

8.16.36
und

VESTIDA P/ESTR.TANG.CPS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UN
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
AISLADOR ESPIGO 34,5 ANSI 56-3
TORNILLO ACERO 7X5/8"
PORTA AISLADOR 1 PUESTO
SILLA CRUCETA TIPO ICEL
TORNILLO CERRAJE 5/8X1 1/2"
CRUCETA MADERA INMUNIZADA 2,5m
DIAGONAL MADERA INMUNIZADA
COLLARIN UNA SALIDA 5-6"
ABRAZADERA EN U TIPO -1
PLATINA DIAGONALES 1,1cm
HILO ALUMINIO 0,7X0,9

UNIDAD
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
ml

CANTIDAD
3.00
2.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
8.00

$50.00

VALOR UNI.
$50,000.00
$0.00
$2,400.00
$2,800.00
$1,100.00
$37,000.00
$5,500.00
$6,000.00
$8,200.00
$5,000.00
$1,700.00

VALOR PARCIAL
$150,000.00
$0.00
$7,200.00
$2,800.00
$1,100.00
$37,000.00
$5,500.00
$6,000.00
$8,200.00
$5,000.00
$13,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.70
2.70

$236,400.00

VALOR UNI.
$21,985.19
$12,240.00

VALOR PARCIAL
$21,985.19
$12,240.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$34,225.19
270,675
$54,135.04
$54,135.04

20.0%

COSTO TOTAL UNITARIO

$324,810

ANALISIS UNITARIO
ITEM
VIGA MADERA 205 M VESTIDA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.37
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO CERRAJE 5/8X1 1/2"
COLLARIN DOS SALIDAS 6-7"
TORNILLO ESPIGO 5/8X24"
VIGA MADERA INMUNIZADA 2,5m

UNIDAD
UN
UN
UN
UN

CANTIDAD
4.00
2.00
4.00
2.00

$50.00

VALOR UNI.
$1,100.00
$6,000.00
$2,900.00
$1,950.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

VALOR PARCIAL
$4,400.00
$12,000.00
$11,600.00
$3,900.00

$31,900.00

VALOR UNI.
$7,420.00
$4,131.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$7,420.00
$4,131.00
$11,551.00

20.0%

43,501
$8,700.20
$8,700.20

COSTO TOTAL UNITARIO

$52,201

ANALISIS UNITARIO
ITEM
VIGUETA ANCLA DE RETENIDA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.16.38
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 1:3:3
REPISA ORDINARIO 3 m
TABLA ORDINARIO BURRA 0,20
ACERO DE REFUERZO 37000 PSI 1/4"
ACERO DE REFUERZO 37000 PSI 3/8"
TABLA ORDINARIO BURRA 0,30
TABLA ORDINARIO BURRA 0,10
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
M3
ML
ML
KG
KG
ML
ML

CANTIDAD
0.01
2.10
2.50
0.60
1.23
2.50
2.50

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$50.00

VALOR UNI.
$1,780.00
$1,360.00
$1,353.00
$1,750.00
$75,000.00
$1,353.00
$1,353.00
subtotal

VALOR PARCIAL
$17.80
$2,856.00
$3,382.50
$1,050.00
$92,250.00
$3,382.50
$3,382.50
$106,321.30

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
111,816
$22,363.13
$22,363.13

20.0%

COSTO TOTAL UNITARIO

$134,179

ANALISIS UNITARIO
ITEM
BARRAJE PREM. 6 SALIDAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.17.1
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BARRAJE PREMOLDEADO B.T.600 v

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$235,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
10.00
10.00

VALOR PARCIAL
$235,600.00

$235,600.00

VALOR UNI.
$5,936.00
$3,304.80
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$5,936.00
$3,304.80
$9,240.80

20.0%

244,891
$48,978.16
$48,978.16

COSTO TOTAL UNITARIO

$293,869

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
BORNA 4/0
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

8.17.2
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BORNA TERMINAL 4/0 MCM

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$19,500.00

VALOR PARCIAL
$19,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
24.00
24.00

$19,500.00

VALOR UNI.
$2,473.33
$1,377.00

VALOR PARCIAL
$2,473.33
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,850.33
23,400
$4,680.07
$4,680.07

20.0%

COSTO TOTAL UNITARIO

$28,080

ANALISIS UNITARIO
ITEM
BOTON TIMBRE AVE 605
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.1
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BOTON TIMBRE AVE 605

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$2,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
13.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$2,000.00

$2,000.00

VALOR UNI.
$2,542.15

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$2,542.15
$2,542.15

20.0%

4,592
$918.43
$918.43
$5,511

ANALISIS UNITARIO
ITEM
BOTON TIMBRE DEKO 040BL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.2
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BOTON TIMBRE DEKO 040BL

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$10,000.00

VALOR PARCIAL
$10,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$10,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
12,116
$2,423.10
$2,423.10

20.0%

COSTO TOTAL UNITARIO

$14,539

ANALISIS UNITARIO
ITEM
BOTON TIMBRE LUM 040C
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.3
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BOTON TIMBRE

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$10,000.00

VALOR PARCIAL
$10,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$10,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
12,116
$2,423.10
$2,423.10

20.0%

COSTO TOTAL UNITARIO

$14,539

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

8.19.4
und

CAMPANA TIMBRE AVE 207


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UN
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ZUMBADOR 110VOLTS. AVE 207

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$5,600.00

VALOR PARCIAL
$5,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$5,600.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
7,716
$1,543.10
$1,543.10

20.0%

COSTO TOTAL UNITARIO

$9,259

ANALISIS UNITARIO
ITEM
CAMPANA TIMBRE AVE 607
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.5
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ZUMBADOR 110VOLTS.

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$3,950.00

VALOR PARCIAL
$3,950.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$3,950.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
6,066
$1,213.10
$1,213.10

20.0%

COSTO TOTAL UNITARIO

$7,279

ANALISIS UNITARIO
ITEM
CONM. SENCILLO DEKO 020B
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

8.19.6
und
UN
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

100.00

$50.00

$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR CONMUTABLE SENCILLO

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$5,200.00

VALOR PARCIAL
$5,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
15.00

$5,200.00

VALOR UNI.
$2,203.20

VALOR PARCIAL
$2,203.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,203.20
7,453
$1,490.64
$1,490.64

20.0%

COSTO TOTAL UNITARIO

$8,944

ANALISIS UNITARIO
ITEM
CONM. SENCILLO LUM 020C
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.7
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR CONMUTABLE SENCILLO

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$5,200.00

VALOR PARCIAL
$5,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
15.00

$5,200.00

VALOR UNI.
$2,203.20

VALOR PARCIAL
$2,203.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,203.20
7,453
$1,490.64
$1,490.64

20.0%

COSTO TOTAL UNITARIO

$8,944

ANALISIS UNITARIO
ITEM
CONM.SENCILLO AVE 602
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

8.19.8
und
UN
VALOR PARCIAL
$50.00
$50.00

II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR CONMUTABLE

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$5,200.00

VALOR PARCIAL
$5,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
15.00

$5,200.00

VALOR UNI.
$2,203.20

VALOR PARCIAL
$2,203.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,203.20
7,453
$1,490.64
$1,490.64

20.0%

COSTO TOTAL UNITARIO

$8,944

ANALISIS UNITARIO
ITEM
INT 4 VIAS DEKO 020BV
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.9
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CUATRO VIAS DEKO 020BV

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$13,000.00

VALOR PARCIAL
$13,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$13,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
15,116
$3,023.10
$3,023.10

20.0%

COSTO TOTAL UNITARIO

$18,139

ANALISIS UNITARIO
ITEM
INT. DOBLE AVE 611
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR DOBLE AVE 611

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$20,000.00

8.19.10
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$20,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$20,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
22,116
$4,423.10
$4,423.10

20.0%

COSTO TOTAL UNITARIO

$26,539

ANALISIS UNITARIO
ITEM
INT. DOBLE DEKO 101B
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.11
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR DOBLE DEKO 101B

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$20,000.00

VALOR PARCIAL
$20,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$20,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
22,116
$4,423.10
$4,423.10

20.0%

COSTO TOTAL UNITARIO

$26,539

ANALISIS UNITARIO
ITEM
INT. DOBLE LUM 101C
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR DOBLE LUM 101C

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$20,000.00

8.19.12
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$20,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$20,000.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
22,116
$4,423.10
$4,423.10

20.0%

COSTO TOTAL UNITARIO

$26,539

ANALISIS UNITARIO
ITEM
INT. 4 VIAS AVE 604
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.13
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR CUATRO VIAS

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$5,200.00

VALOR PARCIAL
$5,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$5,200.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
7,316
$1,463.10
$1,463.10

20.0%

COSTO TOTAL UNITARIO

$8,779

ANALISIS UNITARIO
ITEM
INT. TRIPLE AVE 633
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR TRIPLE AVE 633

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$8,200.00

subtotal

8.19.14
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$8,200.00

$8,200.00

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
10,316
$2,063.10
$2,063.10

20.0%

COSTO TOTAL UNITARIO

$12,379

ANALISIS UNITARIO
ITEM
INT. TRIPLE AVE 413 LP
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.15
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR TRIPLE AVE413 LP

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$8,200.00

VALOR PARCIAL
$8,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$8,200.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
10,316
$2,063.10
$2,063.10

20.0%

COSTO TOTAL UNITARIO

$12,379

ANALISIS UNITARIO
ITEM
INT. TRIPLE DEKO 111B
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR TRIPLE DEKO 111B

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$8,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

VALOR UNI.
$2,065.50

8.19.16
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$8,200.00

$8,200.00
VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
10,316
$2,063.10
$2,063.10

20.0%

COSTO TOTAL UNITARIO

$12,379

ANALISIS UNITARIO
ITEM
INT. TRIPLE LUM 111C
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.17
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR TRIPLE LUM 111C

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$8,200.00

VALOR PARCIAL
$8,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones) Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$8,200.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
10,316
$2,063.10
$2,063.10

20.0%

COSTO TOTAL UNITARIO

$12,379

ANALISIS UNITARIO
ITEM
INT.SENCILLO
I.EQUIPO

No. ITEM
UNIDAD:
LX010C

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR SENCILLO LX010C

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$2,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

VALOR UNI.
$2,065.50
subtotal

8.19.18
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$2,200.00

$2,200.00
VALOR PARCIAL
$2,065.50
$2,065.50

Total Costo Directo


A.I.U.
Total Costo Indirecto

4,316
$863.10
$863.10

20.0%

COSTO TOTAL UNITARIO

$5,179

ANALISIS UNITARIO
ITEM
INT.SENCILLO AVE 201
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.19
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR SENCILLO AVE 201

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$2,200.00

VALOR PARCIAL
$2,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

$2,200.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
4,316
$863.10
$863.10

20.0%

COSTO TOTAL UNITARIO

$5,179

ANALISIS UNITARIO
ITEM
INT.SENCILLO AVE 601
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.20
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR SENCILLO AVE 601

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$2,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)Electrico

TARIFA DIA
33,048.00

RENDIM.
16.00

VALOR PARCIAL
$2,200.00

$2,200.00

VALOR UNI.
$2,065.50
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$2,065.50
$2,065.50

20.0%

4,316
$863.10
$863.10

COSTO TOTAL UNITARIO

$5,179

ANALISIS UNITARIO
ITEM
INT.SENCILLO DEKO 010B
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

8.19.21
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INTERRUPTOR SENCILLO DEKO 010 B

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$2,200.00

VALOR PARCIAL
$2,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)ELECTRICO

TARIFA DIA
33,048.00

RENDIM.
16.00

$2,200.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
4,316
$863.10
$863.10

20.0%

COSTO TOTAL UNITARIO

$5,179

ANALISIS UNITARIO
ITEM
FILOS Y DILATACIONES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

9.1.1
und
ML

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
1.50
0.00
0.01

$50.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
40.00
40.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$600.00
$12.00
$300.00

$912.00

VALOR UNI.
$1,290.43
$751.20

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$1,290.43
$751.20
$2,041.63

20.0%

3,004
$600.73
$600.73
$3,604

ANALISIS UNITARIO
ITEM
PAETE IMPERMEAB. MUROS 1:3. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
TOXEMENT 1-A IMPERMEABILIZANTE INTEGRAL

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3
KG

CANTIDAD
14.30
0.01
0.03
0.70

9.1.2
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$3,600.00

VALOR PARCIAL
$5,720.00
$60.00
$900.00
$2,520.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.50
15.50

$9,200.00

VALOR UNI.
$3,330.13
$1,938.58

VALOR PARCIAL
$3,330.13
$1,938.58

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,268.71
14,883
$2,976.52
$2,976.52

20.0%

COSTO TOTAL UNITARIO

$17,859

ANALISIS UNITARIO
ITEM
PAETE IMPERMEAB. MUROS 1:4. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
TOXEMENT 1-A IMPERMEABILIZANTE INTEGRAL

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3
KG

CANTIDAD
7.60
0.01
0.03
0.70

9.1.3
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$3,600.00

VALOR PARCIAL
$3,040.00
$40.00
$900.00
$2,520.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.50
15.50

$6,500.00

VALOR UNI.
$3,330.13
$1,938.58
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

VALOR PARCIAL
$3,330.13
$1,938.58
$5,268.71

20.0%

12,183
$2,436.52
$2,436.52
$14,619

ANALISIS UNITARIO
ITEM
PAETE LISO CULATAS 1:3 . 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
16.30
0.01
0.03

9.1.4
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$6,520.00
$60.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$7,480.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
13,338
$2,667.64
$2,667.64

20.0%

COSTO TOTAL UNITARIO

$16,006

ANALISIS UNITARIO
ITEM
PAETE LISO CULATAS 1:4. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
14.13
0.01
0.03

9.1.5
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$5,652.00
$40.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$6,592.00

VALOR UNI.
$3,441.13
$2,003.20
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO
ANALISIS UNITARIO

VALOR PARCIAL
$3,441.13
$2,003.20
$5,444.33

20.0%

12,450
$2,490.04
$2,490.04
$14,940

ITEM
PAETE LISO CULATAS 1:5. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
15.12
0.01
0.03

9.1.6
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$6,048.00
$40.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$6,988.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
12,846
$2,569.24
$2,569.24

20.0%

COSTO TOTAL UNITARIO

$15,415

ANALISIS UNITARIO
ITEM
PAETE LISO CULATAS 1:6. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
10.20
0.01
0.03

9.1.7
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$4,080.00
$48.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$5,028.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
10,886
$2,177.24
$2,177.24

20.0%

COSTO TOTAL UNITARIO

$13,063

ANALISIS UNITARIO
No. ITEM

9.1.8

ITEM
PAETE LISO SOBRE MUROS 1:4. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
7.60
0.01
0.03

und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$3,040.00
$40.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.50
16.50

$3,980.00

VALOR UNI.
$3,128.30
$1,821.09

VALOR PARCIAL
$3,128.30
$1,821.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,949.39
9,343
$1,868.66
$1,868.66

20.0%

COSTO TOTAL UNITARIO

$11,212

ANALISIS UNITARIO
ITEM
PAETE LISO SOBRE MUROS 1:5. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
6.34
0.01
0.03

9.1.9
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$2,536.00
$40.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.50
16.50

$3,476.00

VALOR UNI.
$3,128.30
$1,821.09

VALOR PARCIAL
$3,128.30
$1,821.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,949.39
8,839
$1,767.86
$1,767.86

20.0%

COSTO TOTAL UNITARIO

$10,607

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

9.1.10
und

PAETE LISO SOBRE MUROS 1:6. 2 CM


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

M2
TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
5.48
0.00
0.03

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$2,192.00
$20.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.50
16.50

$3,112.00

VALOR UNI.
$3,128.30
$1,821.09

VALOR PARCIAL
$3,128.30
$1,821.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,949.39
8,475
$1,695.06
$1,695.06

20.0%

COSTO TOTAL UNITARIO

$10,170

ANALISIS UNITARIO
ITEM
PAETE LISO SOBRE MUROS 1:7. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
3.50
0.00
0.03

9.1.11
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$1,400.00
$20.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.50
16.50

$2,320.00

VALOR UNI.
$3,128.30
$1,821.09

VALOR PARCIAL
$3,128.30
$1,821.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,949.39
7,683
$1,536.66
$1,536.66

20.0%

COSTO TOTAL UNITARIO

$9,220

ANALISIS UNITARIO
ITEM
PAETE RUSTICO MUROS 1:5. 2 CM

No. ITEM
UNIDAD:

9.1.12
und
M2

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
6.52
0.00
0.03

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$2,608.00
$28.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
14.50
14.50

$3,536.00

VALOR UNI.
$3,559.79
$2,072.28

VALOR PARCIAL
$3,559.79
$2,072.28

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,632.07
9,582
$1,916.39
$1,916.39

20.0%

COSTO TOTAL UNITARIO

$11,498

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
RESANES GENERALES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
7.50
0.00
0.03

9.1.13
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$3,000.00
$28.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.50
16.50

$3,928.00

VALOR UNI.
$3,128.30
$1,821.09

VALOR PARCIAL
$3,128.30
$1,821.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,949.39
9,291
$1,858.26
$1,858.26

20.0%

COSTO TOTAL UNITARIO

$11,150

ANALISIS UNITARIO
ITEM
ENTRAMADO MADERA PARA CIELOS RASOS
I.EQUIPO

No. ITEM
UNIDAD:

9.2.1
und
M2

DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

II.MATERIALES DE OBRA
DESCRIPCION
REPISA ORDINARIO 3 m
TABLA BURRA ORDINARIO 0,10 m
PUNTILLA CON CABEZA 2 "

UNIDAD
ML
ML
LB

CANTIDAD
2.16
2.16
0.08

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$1,360.00
$1,353.00
$1,500.00

VALOR PARCIAL
$2,937.60
$2,922.48
$120.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
14.50
14.50

$5,980.08

VALOR UNI.
$3,559.79
$2,072.28

VALOR PARCIAL
$3,559.79
$2,072.28

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,632.07
12,026
$2,405.21
$2,405.21

20.0%

COSTO TOTAL UNITARIO

$14,431

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MALLA BAJO ENTRAMADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

II.MATERIALES DE OBRA
DESCRIPCION
MALLA CON VENA 0,60 X 2,00
PUNTILLA CON CABEZA 2 "

UNIDAD
UN
LB

CANTIDAD
0.73
0.08

9.2.2
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$1,500.00
$1,500.00

VALOR PARCIAL
$1,095.00
$120.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
19.00
19.00

$1,215.00

VALOR UNI.
$2,716.68
$1,581.47

VALOR PARCIAL
$2,716.68
$1,581.47

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,298.16
5,927
$1,185.41
$1,185.41

20.0%

COSTO TOTAL UNITARIO

$7,112

ANALISIS UNITARIO
ITEM
PAETE BAJO ALISTADO GUADUA. 3 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00

9.2.3
und
M2
VALOR PARCIAL
$25.00

ANDAMIO

70.00

0.18

$388.89

$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$2,740.00
$48.00
$900.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
6.85
0.01
0.03

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$3,688.00

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
13,176
$2,635.16
$2,635.16

20.0%

COSTO TOTAL UNITARIO

$15,811

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PAETE BAJO MALLA 1:4. 3 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
10.20
0.01
0.03

9.2.4
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$4,080.00
$40.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.50
12.50

$5,020.00

VALOR UNI.
$4,129.36
$2,403.84

VALOR PARCIAL
$4,129.36
$2,403.84

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,533.20
11,967
$2,393.42
$2,393.42

20.0%

COSTO TOTAL UNITARIO

$14,361

ANALISIS UNITARIO
ITEM
PAETE BAJO MALLA 1:4. 3 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

VALOR UNI.
$25.00
$388.89

9.2.5
und
M2
VALOR PARCIAL
$25.00
$388.89

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
10.20
0.01
0.03

$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$4,080.00
$40.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.50
12.50

$5,020.00

VALOR UNI.
$4,129.36
$2,403.84

VALOR PARCIAL
$4,129.36
$2,403.84

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,533.20
11,967
$2,393.42
$2,393.42

20.0%

COSTO TOTAL UNITARIO

$14,361

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PAETE BAJO MALLA 1:5. 3 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
8.45
0.01
0.03

9.2.6
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$3,380.00
$40.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.50
12.50

$4,320.00

VALOR UNI.
$4,129.36
$2,403.84

VALOR PARCIAL
$4,129.36
$2,403.84

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,533.20
11,267
$2,253.42
$2,253.42

20.0%

COSTO TOTAL UNITARIO

$13,521

ANALISIS UNITARIO
ITEM
PAETE BAJO MALLA 1:6. 3 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

VALOR UNI.
$25.00
$388.89
subtotal

9.2.7
und
M2
VALOR PARCIAL
$25.00
$388.89
$413.89

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
7.30
0.00
0.03

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$2,920.00
$32.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.50
12.50

$3,852.00

VALOR UNI.
$4,129.36
$2,403.84

VALOR PARCIAL
$4,129.36
$2,403.84

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,533.20
10,799
$2,159.82
$2,159.82

20.0%

COSTO TOTAL UNITARIO

$12,959

ANALISIS UNITARIO
ITEM
PAETE LISO BAJO PLACAS 1:4. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
7.60
0.01
0.02

9.2.8
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$3,040.00
$40.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.50
16.50

$3,680.00

VALOR UNI.
$3,128.30
$1,821.09

VALOR PARCIAL
$3,128.30
$1,821.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,949.39
9,043
$1,808.66
$1,808.66

20.0%

COSTO TOTAL UNITARIO

$10,852

ANALISIS UNITARIO
ITEM
PAETE LISO BAJO PLACAS 1:5. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

VALOR UNI.
$25.00
$388.89
subtotal

9.2.9
und
M2
VALOR PARCIAL
$25.00
$388.89
$413.89

DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
6.30
0.01
0.03

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$2,520.00
$40.00
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
16.50
16.50

$3,460.00

VALOR UNI.
$3,128.30
$1,821.09

VALOR PARCIAL
$3,128.30
$1,821.09

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,949.39
8,823
$1,764.66
$1,764.66

20.0%

COSTO TOTAL UNITARIO

$10,588

ANALISIS UNITARIO
ITEM
PAETE RUSTICO BAJO PLACAS 1:5. 2 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
200.00
0.18

UNIDAD
KG
M3
M3

CANTIDAD
7.20
0.01
0.04

9.2.10
und
M2

VALOR UNI.
$25.00
$388.89
subtotal

VALOR PARCIAL
$25.00
$388.89
$413.89

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$2,880.00
$64.00
$1,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.50
12.50

$4,144.00

VALOR UNI.
$4,129.36
$2,403.84

VALOR PARCIAL
$4,129.36
$2,403.84

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,533.20
11,091
$2,218.22
$2,218.22

20.0%

COSTO TOTAL UNITARIO

$13,309

ANALISIS UNITARIO
ITEM
ADOQUIN CONCRETO PEATONAL. 6 CMS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

10.2.1
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL

ADOQUIN CONCRETO 11X6X20


AGUA
ARENA LAVADA DE PEA

UN
M3
M3

50.00
0.00
0.02

$400.00
$8,000.00
$25,000.00

$20,000.00
$24.00
$500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$20,524.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
30,757
$6,151.43
$6,151.43

20.0%

COSTO TOTAL UNITARIO

$36,909

ANALISIS UNITARIO
ITEM
ADOQUIN CONCRETO VEHICULAR. 8 CMS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.2
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ADOQUIN CONCRETO 11X8X20
AGUA
ARENA LAVADA DE PEA

UNIDAD
UN
M3
M3

CANTIDAD
50.00
0.00
0.02

$25.00

VALOR UNI.
$400.00
$8,000.00
$25,000.00

VALOR PARCIAL
$20,000.00
$24.00
$500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$20,524.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
30,757
$6,151.43
$6,151.43

20.0%

COSTO TOTAL UNITARIO

$36,909

ANALISIS UNITARIO
ITEM
ADOQUIN DE GRES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
COLOR MINERAL
AGUA
ADOQUIN GRES 10 X 20 X 2,5

UNIDAD
KG
M3
M2

CANTIDAD
1.03
0.01
1.03

VALOR UNI.
$12,600.00
$8,000.00
$525.00

10.2.3
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$12,978.00
$40.00
$540.75

ARENA LAVADA DE PEA

M3

0.03

$25,000.00

$750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.50
7.50

$14,308.75

VALOR UNI.
$6,882.27
$4,006.40

VALOR PARCIAL
$6,882.27
$4,006.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,888.67
25,222
$5,044.48
$5,044.48

20.0%

COSTO TOTAL UNITARIO

$30,267

ANALISIS UNITARIO
ITEM
BALD. GRANITO BH-5 DE 33x33. MORT.1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.4
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
BALDOSA ALFA BH-5 33 X 33
CEMENTO BLANCO

UNIDAD
KG
M3
M3
M2
KG

CANTIDAD
6.27
0.00
0.02
1.03
1.03

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$29,116.00
$800.00

VALOR PARCIAL
$2,508.00
$24.00
$600.00
$29,989.48
$824.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.50
8.50

$33,945.48

VALOR UNI.
$6,072.59
$3,535.06

VALOR PARCIAL
$6,072.59
$3,535.06

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,607.65
43,578
$8,715.63
$8,715.63

20.0%

COSTO TOTAL UNITARIO

$52,294

ANALISIS UNITARIO
ITEM
BALDOSIN GRANITO L-1 33 x 33. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
BALDOSA ALFA L1 33 X 33

UNIDAD
KG
M3
M3
M2

CANTIDAD
6.27
0.00
0.02
1.03

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$26,000.00

10.2.5
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$2,508.00
$24.00
$600.00
$26,780.00

CEMENTO BLANCO

KG

1.03

$800.00

$824.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.50
8.50

$30,736.00

VALOR UNI.
$6,072.59
$3,535.06

VALOR PARCIAL
$6,072.59
$3,535.06

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,607.65
40,369
$8,073.73
$8,073.73

20.0%

COSTO TOTAL UNITARIO

$48,442

ANALISIS UNITARIO
ITEM
BALDOSIN GRANITO P-5 33 x 33. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.6
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
BALDOSA ALFA P - 5 33 X 33
CEMENTO BLANCO

UNIDAD
KG
M3
M3
M2
KG

CANTIDAD
6.27
0.00
0.02
1.03
1.03

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$26,000.00
$800.00

VALOR PARCIAL
$2,508.00
$24.00
$600.00
$26,780.00
$824.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.50
8.50

$30,736.00

VALOR UNI.
$6,072.59
$3,535.06

VALOR PARCIAL
$6,072.59
$3,535.06

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,607.65
40,369
$8,073.73
$8,073.73

20.0%

COSTO TOTAL UNITARIO

$48,442

ANALISIS UNITARIO
ITEM
CERAMICA 20 X 20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
CERAMICA CORONA 20 X 20
CEMENTO BLANCO

UNIDAD
KG
M3
M3
M2
KG

CANTIDAD
6.27
0.00
0.02
1.03
1.03

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$13,000.00
$800.00

10.2.7
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$2,508.00
$24.00
$600.00
$13,390.00
$824.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.50
8.50

$17,346.00

VALOR UNI.
$6,072.59
$3,535.06

VALOR PARCIAL
$6,072.59
$3,535.06

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,607.65
26,979
$5,395.73
$5,395.73

20.0%

COSTO TOTAL UNITARIO

$32,374

ANALISIS UNITARIO
ITEM
CERAMICA 33 X 33
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.8
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
CERAMICA CORONA 34 X 34
CEMENTO BLANCO

UNIDAD
KG
M3
M3
M2
KG

CANTIDAD
6.27
0.01
0.02
1.03
1.03

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$20,421.00
$800.00

VALOR PARCIAL
$2,508.00
$52.00
$600.00
$21,033.63
$824.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.50
8.50

$25,017.63

VALOR UNI.
$6,072.59
$3,535.06

VALOR PARCIAL
$6,072.59
$3,535.06

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,607.65
34,650
$6,930.06
$6,930.06

20.0%

COSTO TOTAL UNITARIO

$41,580

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
GRANITO PULIDO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
MARMOLINA
CEMENTO GRIS
COLOR MINERAL
AGUA
CEMENTO BLANCO
ARENA DE PEA

UNIDAD
BT
KG
KG
M3
KG
M3

CANTIDAD
0.50
18.70
0.33
0.01
21.00
0.09

VALOR UNI.
$9,500.00
$400.00
$12,600.00
$8,000.00
$800.00
$30,000.00

10.2.9
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$4,750.00
$7,480.00
$4,158.00
$64.00
$16,800.00
$2,700.00

DILATACION EN BRONCE PC 09
GRANITO TRAVERTINO
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

ML
BT

TARIFA DIA
51,617.00
30,048.00

1.38
0.75

RENDIM.
5.50
5.50

$4,200.00
$18,000.00
subtotal

$5,796.00
$13,500.00
$55,248.00

VALOR UNI.
$9,384.91
$5,463.27

VALOR PARCIAL
$9,384.91
$5,463.27

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$14,848.18
70,121
$14,024.24
$14,024.24

20.0%

COSTO TOTAL UNITARIO

$84,145

ANALISIS UNITARIO
ITEM
GRAVILLA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.10
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
GRAVILLA DE RIO
ARENA DE PEA
DILATACION EN BRONCE PC 09

UNIDAD
KG
M3
M3
M3
ML

CANTIDAD
6.98
0.03
0.02
0.03
0.80

$25.00

VALOR UNI.
$400.00
$8,000.00
$58,000.00
$30,000.00
$4,200.00

VALOR PARCIAL
$2,792.00
$200.00
$1,160.00
$900.00
$3,360.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.16
3.16

$8,412.00

VALOR UNI.
$16,334.49
$9,508.86

VALOR PARCIAL
$16,334.49
$9,508.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$25,843.35
34,280
$6,856.07
$6,856.07

20.0%

COSTO TOTAL UNITARIO

$41,136

ANALISIS UNITARIO
ITEM
LISTON M. H. AMARILLO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TIRAS ALISTADO 3X3X3
PUNTILLA CON CABEZA 2 "
LISTON M. H. AMARILLO

UNIDAD
ML
LB
M2

CANTIDAD
0.40
0.27
1.10

VALOR UNI.
$580.00
$1,500.00
$22,000.00

10.2.11
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$232.00
$405.00
$24,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
7.00

$24,837.00

VALOR UNI.
$7,941.08
$4,292.57

VALOR PARCIAL
$7,941.08
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,233.65
37,096
$7,419.13
$7,419.13

20.0%

COSTO TOTAL UNITARIO

$44,515

ANALISIS UNITARIO
ITEM
LISTON M. H. GUAYACAN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.12
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TIRAS ALISTADO 3X3X3
PUNTILLA CON CABEZA 2"
LISTON M. H. GUAYACAN
MALLA SIN VENA

UNIDAD
ML
LB
M2
UNIDAD

CANTIDAD
0.40
0.27
1.10
0.40

$25.00

VALOR UNI.
$580.00
$1,500.00
$24,200.00
$3,800.00

VALOR PARCIAL
$232.00
$405.00
$26,620.00
$1,520.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
7.00

$28,777.00

VALOR UNI.
$7,941.08
$4,292.57

VALOR PARCIAL
$7,941.08
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,233.65
41,036
$8,207.13
$8,207.13

20.0%

COSTO TOTAL UNITARIO

$49,243

ANALISIS UNITARIO
ITEM
LISTON M. H. ORDINARIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TIRAS ALISTADO 3X3X3
PUNTILLA CON CABEZA 2"
LISTON M. H. ORDINARIO

UNIDAD
ML
LB
M2

CANTIDAD
0.40
0.27
1.10

VALOR UNI.
$580.00
$1,500.00
$2,500.00

10.2.13
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$232.00
$405.00
$2,750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$3,387.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
15,078
$3,015.69
$3,015.69

20.0%

COSTO TOTAL UNITARIO

$18,094

ANALISIS UNITARIO
ITEM
LOSETAS DE CONCRETO DE 40 x 40 x 4.5
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

10.2.14
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
LOSETA PREFABRICADA A-40
MORTERO 1:3

UNIDAD
M3
M2
M3

CANTIDAD
0.04
1.00
0.01

$50.00

VALOR UNI.
$30,000.00
$21,500.00
$212,700.00

VALOR PARCIAL
$1,200.00
$21,500.00
$2,127.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$24,827.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
33,044
$6,608.70
$6,608.70

20.0%

COSTO TOTAL UNITARIO

$39,652

ANALISIS UNITARIO
ITEM
LOSETAS DE CONCRETO DE 50 x 50 x 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
LOSETA PREFABRICADA A-50
MORTERO 1:3

UNIDAD
M3
M2
M3

CANTIDAD
0.04
1.00
0.01

VALOR UNI.
$30,000.00
$21,500.00
$212,700.00

subtotal

10.2.15
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,200.00
$21,500.00
$2,127.00

$24,827.00

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
33,044
$6,608.70
$6,608.70

20.0%

COSTO TOTAL UNITARIO

$39,652

ANALISIS UNITARIO
ITEM
PARKET GUAYACAN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.16
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PARKET GUAYACAN

UNIDAD
M2

CANTIDAD
1.00

$25.00

VALOR UNI.
$65,000.00

VALOR PARCIAL
$65,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$65,000.00

VALOR UNI.

VALOR PARCIAL
$0.00
$0.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
65,025
$13,005.00
$13,005.00

20.0%

COSTO TOTAL UNITARIO

$78,030

ANALISIS UNITARIO
ITEM
PISOPACK COMERCIAL 2 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
INSTALACION PISO VINILO CON PEGANTE
PISO PAK RESIDENCIAL 2,00 mm

UNIDAD
M2
M2

CANTIDAD
1.00
1.00

VALOR UNI.
$1,000.00
$16,000.00

subtotal
III.MANO DE OBRA

10.2.17
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$1,000.00
$16,000.00

$17,000.00

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA

RENDIM.

VALOR UNI.
$0.00
$0.00

VALOR PARCIAL
$0.00
$0.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
17,025
$3,405.00
$3,405.00

20.0%

COSTO TOTAL UNITARIO

$20,430

ANALISIS UNITARIO
ITEM
PISOPACK RESIDENCIAL 1.6 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.18
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
INSTALACION PISO VINILO CON PEGANTE
PISO PAK RESIDENCIAL 1,60 mm

UNIDAD
M2
M2

CANTIDAD
1.00
1.00

$25.00

VALOR UNI.
$1,000.00
$14,500.00

VALOR PARCIAL
$1,000.00
$14,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$15,500.00

VALOR UNI.

VALOR PARCIAL
$0.00
$0.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
15,525
$3,105.00
$3,105.00

20.0%

COSTO TOTAL UNITARIO

$18,630

ANALISIS UNITARIO
ITEM
PISOPACK TRAFICO PESADO 3MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
INSTALACION PISO VINILO CON PEGANTE
PISO PAK RESIDENCIAL 3,0 mm

UNIDAD
M2
M2

CANTIDAD
1.00
1.00

VALOR UNI.
$1,000.00
$21,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

10.2.19
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$1,000.00
$21,500.00

$22,500.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

51,617.00
30,048.00

$0.00
$0.00
subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
22,525
$4,505.00
$4,505.00

20.0%

COSTO TOTAL UNITARIO

$27,030

ANALISIS UNITARIO
ITEM
PULIDA Y BRILLO GRANITO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.20
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PULIDA PISOS GRANITO

UNIDAD
M2

CANTIDAD
1.00

$25.00

VALOR UNI.
$37,500.00

VALOR PARCIAL
$37,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$37,500.00

VALOR UNI.

VALOR PARCIAL
$0.00
$0.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
37,525
$7,505.00
$7,505.00

20.0%

COSTO TOTAL UNITARIO

$45,030

ANALISIS UNITARIO
ITEM
PULIDA Y LACADA PISOS MADERA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BARNIZ VITRIFLEX
LACADA PISO MADERA

UNIDAD
GL
M2

CANTIDAD
0.10
1.00

VALOR UNI.
$65,000.00
$14,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
51,617.00

RENDIM.

VALOR UNI.

10.2.21
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$6,500.00
$14,000.00

$20,500.00
VALOR PARCIAL

Ayudante ( incluye 100% de prestaciones)

30,048.00
subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
20,525
$4,105.00
$4,105.00

20.0%

COSTO TOTAL UNITARIO

$24,630

ANALISIS UNITARIO
ITEM
TABLETA GRES DE 10 x 10. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.22
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
TABLETA CORRIENTE GRES 10 X 10

UNIDAD
KG
M3
M3
M2

CANTIDAD
6.85
0.00
0.02
1.03

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$9,123.00

VALOR PARCIAL
$2,740.00
$24.00
$600.00
$9,396.69

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.12
9.12

$12,760.69

VALOR UNI.
$5,659.76
$3,294.74

VALOR PARCIAL
$5,659.76
$3,294.74

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,954.50
21,740
$4,348.04
$4,348.04

20.0%

COSTO TOTAL UNITARIO

$26,088

ANALISIS UNITARIO
ITEM
TABLETA GRES LISO DE 33 x 33. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
TABLETA CORRIENTE GRES 33 X 33

UNIDAD
KG
M3
M3
M2

CANTIDAD
9.41
0.01
0.04
1.03

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$18,290.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.12
9.12

VALOR UNI.
$5,659.76
$3,294.74

10.2.23
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$3,764.00
$56.00
$1,200.00
$18,838.70

$23,858.70
VALOR PARCIAL
$5,659.76
$3,294.74

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,954.50
32,838
$6,567.64
$6,567.64

20.0%

COSTO TOTAL UNITARIO

$39,406

ANALISIS UNITARIO
ITEM
TABLON CUARTO 26. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.24
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
TABLON CUARTO

UNIDAD
KG
M3
M3
M2

CANTIDAD
9.41
0.01
0.04
1.03

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$12,500.00

VALOR PARCIAL
$3,764.00
$56.00
$1,200.00
$12,875.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.12
9.12

$17,895.00

VALOR UNI.
$5,659.76
$3,294.74

VALOR PARCIAL
$5,659.76
$3,294.74

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,954.50
26,874
$5,374.90
$5,374.90

20.0%

COSTO TOTAL UNITARIO

$32,249

ANALISIS UNITARIO
ITEM
VINISOL COMERCIAL 2 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VINISOL COMERCIAL 2 mm

UNIDAD
M2

CANTIDAD
1.03

VALOR UNI.
$19,115.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR UNI.

10.2.25
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$19,688.45

$19,688.45
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
19,713
$3,942.69
$3,942.69

20.0%

COSTO TOTAL UNITARIO

$23,656

ANALISIS UNITARIO
ITEM
VINISOL RESIDENCIAL 1.6 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.26
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VINISOL COMERCIAL 1,6 mm

UNIDAD
M2

CANTIDAD
1.03

$25.00

VALOR UNI.
$17,050.00

VALOR PARCIAL
$17,561.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$17,561.50

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
17,587
$3,517.30
$3,517.30

20.0%

COSTO TOTAL UNITARIO

$21,104

ANALISIS UNITARIO
ITEM
VINISOL TRAFICO PESADO 2 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VINISOL TRAFICO PESADO 2 mm

UNIDAD
M2

CANTIDAD
1.03

VALOR UNI.
$19,115.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR UNI.

subtotal

10.2.27
und
M2
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL
$19,688.45

$19,688.45
VALOR PARCIAL

$0.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

20,244
$4,048.80
$4,048.80

20.0%

COSTO TOTAL UNITARIO

$24,293

ANALISIS UNITARIO
ITEM
VINISOL TRAFICO PESADO 3 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.2.28
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VINISOL TRAFICO PESADO 3 mm

UNIDAD
M2

CANTIDAD
1.03

$25.00

VALOR UNI.
$21,200.00

VALOR PARCIAL
$21,836.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$21,836.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
21,861
$4,372.20
$4,372.20

20.0%

COSTO TOTAL UNITARIO

$26,233

ANALISIS UNITARIO
ITEM
ACABADO EN DURO-PISO PBAOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
AGUA
CEMENTO BLANCO
PEGACOR BLANCO
CERAMICA CORONA 34X34

UNIDAD
M3
KG
KG
M2

CANTIDAD
0.03
0.70
3.15
1.05

VALOR UNI.
$8,000.00
$800.00
$850.00
$20,421.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.00

VALOR UNI.
$5,433.37
$3,338.67
subtotal

10.2.29
und
M2
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL
$240.00
$560.00
$2,677.50
$21,442.05

$24,919.55
VALOR PARCIAL
$5,433.37
$3,338.67
$8,772.04

Total Costo Directo


A.I.U.
Total Costo Indirecto

34,247
$6,849.43
$6,849.43

20.0%

COSTO TOTAL UNITARIO

$41,097

ANALISIS UNITARIO
ITEM
AFINADO ENDUREC. H=0.05. MORT. 1:3
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.1.1
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
ROCKTOP ROJO

UNIDAD
KG
M3
M3
KG

CANTIDAD
19.00
0.01
0.05
3.50

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$2,200.00

VALOR PARCIAL
$7,600.00
$80.00
$1,500.00
$7,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
11.00
11.00

$16,880.00

VALOR UNI.
$4,692.45
$2,731.64

VALOR PARCIAL
$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
24,329
$4,865.82
$4,865.82

20.0%

COSTO TOTAL UNITARIO

$29,195

ANALISIS UNITARIO
ITEM
AFINADO IMPERM. PISOS. H = 0.03. M 1:3
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
SIKA - 1 IMPERMEABILIZANTE INTEGRAL

UNIDAD
KG
M3
M3
KG

CANTIDAD
19.00
0.01
0.05
1.18

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$3,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

VALOR UNI.
$3,036.29
$1,767.53
subtotal

Total Costo Directo

10.1.2
und
M2
VALOR PARCIAL
$25.00
$25.00
VALOR PARCIAL
$7,600.00
$80.00
$1,500.00
$4,248.00

$13,428.00
VALOR PARCIAL
$3,036.29
$1,767.53
$4,803.82
18,257

A.I.U.
Total Costo Indirecto

20.0%

$3,651.36
$3,651.36

COSTO TOTAL UNITARIO

$21,908

ANALISIS UNITARIO
ITEM
AFINADO PISOS VINISOL. H=0.04. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.1.3
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
SIKA IMPERMEABILIZANTE INTEGRAL

UNIDAD
KG
M3
M3
KG

CANTIDAD
19.00
0.01
0.05
1.18

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$3,600.00

VALOR PARCIAL
$7,600.00
$80.00
$1,500.00
$4,248.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
18.00
18.00

$13,428.00

VALOR UNI.
$2,867.61
$1,669.33

VALOR PARCIAL
$2,867.61
$1,669.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,536.94
17,990
$3,597.99
$3,597.99

20.0%

COSTO TOTAL UNITARIO

$21,588

ANALISIS UNITARIO
ITEM
AFINADO TERRAZAS. H = 0.08. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.1.4
und
M2

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
SIKA - 1 IMPERMEABILIZANTE INTEGRAL

UNIDAD
KG
M3
M3
KG

CANTIDAD
24.88
0.02
0.10
2.24

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$3,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
13.00
14.00

VALOR PARCIAL
$9,952.00
$120.00
$3,000.00
$8,064.00

$21,136.00

VALOR UNI.
$3,970.54
$2,146.29
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$25.00

VALOR PARCIAL
$3,970.54
$2,146.29
$6,116.82

20.0%

27,278
$5,455.56

Total Costo Indirecto

$5,455.56

COSTO TOTAL UNITARIO

$32,733

ANALISIS UNITARIO
ITEM
CEMENTO ESMALTADO. H=1.5. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.1.5
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
24.88
0.02
0.10

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$9,952.00
$120.00
$3,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$13,072.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
18,541
$3,708.27
$3,708.27

20.0%

COSTO TOTAL UNITARIO

$22,250

ANALISIS UNITARIO
ITEM
CONCRETO BASE MUEBLE. H = 0.10. 2500 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.1.6
und
M2

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TABLA CHAPA ORDNARIO
CONCRETO CORRIENTE 2500 PSI

UNIDAD
ML
M3

CANTIDAD
0.51
0.11

$25.00

VALOR UNI.
$1,716.00
$200,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

VALOR PARCIAL
$875.16
$22,000.00

$22,875.16

VALOR UNI.
$5,735.22
$3,338.67
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$25.00

VALOR PARCIAL
$5,735.22
$3,338.67
$9,073.89

20.0%

31,974
$6,394.81
$6,394.81

COSTO TOTAL UNITARIO

$38,369

ANALISIS UNITARIO
ITEM
CONCRETO ESCOBEADO. H = 0.10. 2500 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

10.1.7
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TABLA CHAPA ORDNARIO
CONCRETO CORRIENTE 2500 PSI

UNIDAD
ML
M3

CANTIDAD
1.02
0.11

$50.00

VALOR UNI.
$1,716.00
$200,000.00

VALOR PARCIAL
$1,750.32
$22,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$23,750.32

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
32,874
$6,574.84
$6,574.84

20.0%

COSTO TOTAL UNITARIO

$39,449

ANALISIS UNITARIO
ITEM
CONCRETO ESTAMPADO O IMPRESO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

10.1.8
und
M2

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TABLA CHAPA ORDNARIO
CONCRETO CORRIENTE 3000 PSI

UNIDAD
ML
M3

CANTIDAD
1.02
0.16

$50.00

VALOR UNI.
$1,716.00
$220,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

VALOR PARCIAL
$1,750.32
$35,200.00

$36,950.32

VALOR UNI.
$4,301.42
$2,504.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$4,301.42
$2,504.00
$6,805.42

20.0%

43,806
$8,761.15
$8,761.15

COSTO TOTAL UNITARIO

$52,567

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
POLISEC CAL. 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
200.00

10.1.9
und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
POLISEC CALIBRE 6

UNIDAD
M2

CANTIDAD
1.13

$25.00

VALOR UNI.
$570.00

VALOR PARCIAL
$644.10

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
60.00
60.00

$644.10

VALOR UNI.
$860.28
$500.80

VALOR PARCIAL
$860.28
$500.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,361.08
2,030
$406.04
$406.04

20.0%

COSTO TOTAL UNITARIO

$2,436

ANALISIS UNITARIO
ITEM
CENEFAS EN CONCRETO DE 0.30. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

10.5.1
und
ML

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 3000 PSI
TABLA BURRA 3M

UNIDAD
M3
ML

CANTIDAD
0.02
0.33

$555.56

VALOR UNI.
$220,000.00
$2,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$4,400.00
$792.00

$5,192.00

VALOR UNI.
$5,161.70
$3,004.80

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$555.56

VALOR PARCIAL
$5,161.70
$3,004.80
$8,166.50

20.0%

13,914
$2,782.81
$2,782.81
$16,697

ANALISIS UNITARIO
ITEM
CENEFAS EN GRANITO PULIDO DE 0.25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

10.5.2
und
ML

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO BLANCO
GRANITO TRAVERTINO PERUANO
MARMOLINA
PULIDA GRANITO

UNIDAD
KG
BT
BT
M2

CANTIDAD
5.00
0.08
0.12
0.50

$555.56

VALOR UNI.
$800.00
$18,000.00
$9,500.00
$37,500.00

VALOR PARCIAL
$4,000.00
$1,440.00
$1,140.00
$18,750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$25,330.00

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
39,496
$7,899.28
$7,899.28

20.0%

COSTO TOTAL UNITARIO

$47,396

ANALISIS UNITARIO
ITEM
DILATACIONES LADRILLO 0.25. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.5.3
und
ML

VALOR UNI.
$25.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
LADRILLO TOLETE COMUN

UNIDAD
KG
M3
M3
UN

CANTIDAD
3.32
0.01
0.02
15.84

$25.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$455.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,328.00
$80.00
$600.00
$7,207.20

$9,215.20

VALOR UNI.
$5,735.22
$3,338.67

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$25.00

VALOR PARCIAL
$5,735.22
$3,338.67
$9,073.89

20.0%

18,314
$3,662.82
$3,662.82
$21,977

ANALISIS UNITARIO
ITEM
PIRLAN DE ALUMINIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

10.5.4
und
ML

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO PARA MADERA 1 No 6
PIRLAN ALUMINIO DORADO

UNIDAD
UN
ML

CANTIDAD
3.09
0.17

$25.00

VALOR UNI.
$20.00
$2,600.00

VALOR PARCIAL
$61.80
$442.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
20.00

$503.80

VALOR UNI.
$1,502.40

VALOR PARCIAL
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,502.40
2,031
$406.24
$406.24

20.0%

COSTO TOTAL UNITARIO

$2,437

ANALISIS UNITARIO
ITEM
AFINADO ENDURECIDO PASOS ESCAL. M 1:3
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
AGUA
ARENA DE POZO
CEMENTO GRIS

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.30

UNIDAD
M3
M3
KG

CANTIDAD
0.01
0.01
3.00

10.4.1
und
ML

VALOR UNI.
$2,173.91
subtotal

VALOR PARCIAL
$2,173.91
$2,173.91

VALOR UNI.
$8,000.00
$35,000.00
$400.00

VALOR PARCIAL
$40.00
$350.00
$1,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$1,590.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
11,930
$2,386.08
$2,386.08

20.0%

COSTO TOTAL UNITARIO

$14,316

ANALISIS UNITARIO
ITEM
CONCRETO BASE GRADAS DE 0.30. 3000 PSI
I.EQUIPO

No. ITEM
UNIDAD:

10.4.2
und
ML

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
2.13

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3.000 PSI
TABLA CHAPA ORDINARIO 0,10
PUNTILLA 2 C/C

UNIDAD
M3
ML
LB

CANTIDAD
0.02
1.02
0.30

VALOR UNI.
$2,347.42
subtotal

VALOR PARCIAL
$2,347.42
$2,347.42

VALOR UNI.
$220,000.00
$1,716.00
$1,500.00

VALOR PARCIAL
$4,400.00
$1,750.32
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$6,600.32

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
17,114
$3,422.85
$3,422.85

20.0%

COSTO TOTAL UNITARIO

$20,537

ANALISIS UNITARIO
ITEM
GRADAS EN GRANITO PULIDO DE 0.30
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

10.4.3
und
ML

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CONTRATO GRANITO GRADA

UNIDAD
ML

CANTIDAD
1.00

$0.00

VALOR UNI.
$37,500.00

VALOR PARCIAL
$37,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$37,500.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
37,500
$7,500.00
$7,500.00

20.0%

COSTO TOTAL UNITARIO

$45,000

ANALISIS UNITARIO
ITEM
GRADAS EN GRAVILLA LAVADA DE 0.30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
GRAVILLA DE RIO
ARENA LAVADA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

UNIDAD
KG
M3
M3
M3

CANTIDAD
3.50
0.00
0.01
0.01

10.4.4
und
ML

VALOR UNI.
$833.33
subtotal

VALOR PARCIAL
$833.33
$833.33

VALOR UNI.
$400.00
$8,000.00
$58,000.00
$400.00

VALOR PARCIAL
$1,400.00
$12.72
$580.00
$4.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$1,996.72

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
19,163
$3,832.61
$3,832.61

20.0%

COSTO TOTAL UNITARIO

$22,996

ANALISIS UNITARIO
ITEM
GRADAS EN TABLETA GRES Y GRAVILLA 0.30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
TABLETA 10*10 GRES EGIPCIA
AGUA
ARENA LAVADA DE PEA
CEMENTO GRIS

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

UNIDAD
M2
M3
M3
KG

CANTIDAD
1.03
0.00
0.02
6.00

10.4.5
und
ML

VALOR UNI.
$833.33
subtotal

VALOR PARCIAL
$833.33
$833.33

VALOR UNI.
$10,120.00
$8,000.00
$25,000.00
$400.00

VALOR PARCIAL
$10,423.60
$22.80
$500.00
$2,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.50

$13,346.40

VALOR UNI.
$5,433.37
$3,162.95

VALOR PARCIAL
$5,433.37
$3,162.95

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,596.32
22,776
$4,555.21
$4,555.21

20.0%

COSTO TOTAL UNITARIO

$27,331

ANALISIS UNITARIO
ITEM
GRADAS LADRILLO DE 0.30. MORT. 1:5
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
LADRILLO REJILLA
MORTERO 1: 5 ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

UNIDAD
UNIDAD
M3

CANTIDAD
30.00
0.025

VALOR UNI.
$833.33
subtotal

VALOR PARCIAL
$833.33
$833.33

VALOR UNI.
$310.00
$145,000.00

VALOR PARCIAL
$9,300.00
$3,625.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.50

10.4.6
und
ML

VALOR UNI.
$5,433.37
$3,162.95

$12,925.00
VALOR PARCIAL
$5,433.37
$3,162.95

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,596.32
22,355
$4,470.93
$4,470.93

20.0%

COSTO TOTAL UNITARIO

$26,826

ANALISIS UNITARIO
ITEM
GRADAS TABLETA GRES 0.30. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
TABLETA EGIPCIA 10*10
MORTERO 1: 4 ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

UNIDAD
M2
M3

CANTIDAD
1.05
0.025

10.4.7
und
ML

VALOR UNI.
$555.56
subtotal

VALOR PARCIAL
$555.56
$555.56

VALOR UNI.
$10,120.00
$166,200.00

VALOR PARCIAL
$10,626.00
$4,155.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.50

$14,781.00

VALOR UNI.
$5,433.37
$3,162.95

VALOR PARCIAL
$5,433.37
$3,162.95

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,596.32
23,933
$4,786.57
$4,786.57

20.0%

COSTO TOTAL UNITARIO

$28,719

ANALISIS UNITARIO
ITEM
GUARDAESCOBA CEDRO 6 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
GUARDAESCOBA EN CEDRO 6 CM
CHAZO EN MADERA 0.04*.04

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
18.00

UNIDAD
ML
UN

CANTIDAD
1.03
2.00

10.3.1
und
ML

$1.00
VALOR UNI.
$277.78
subtotal

VALOR PARCIAL
$277.78
$277.78

VALOR UNI.
$6,500.00
$350.00

VALOR PARCIAL
$6,695.00
$700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

$7,395.00

VALOR UNI.
$1,720.57
$1,001.60
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,720.57
$1,001.60
$2,722.17

20.0%

10,395
$2,078.99
$2,078.99
$12,474

ANALISIS UNITARIO
ITEM
GUARDAESCOBA CEDRO 8 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
GUARDAESCOBA EN CEDRO 8 CM
CHAZO EN MADERA 0.04*.04

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

UNIDAD
ML
UN

CANTIDAD
1.03
2.00

10.3.2
und
ML

VALOR UNI.
$833.33
subtotal

VALOR PARCIAL
$833.33
$833.33

VALOR UNI.
$8,000.00
$350.00

VALOR PARCIAL
$8,240.00
$700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
30.00
30.00

$8,940.00

VALOR UNI.
$1,720.57
$1,001.60

VALOR PARCIAL
$1,720.57
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,722.17
12,496
$2,499.10
$2,499.10

20.0%

COSTO TOTAL UNITARIO

$14,995

ANALISIS UNITARIO
ITEM
GUARDAESCOBA EN CEMENTO. MORT. 1:4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1: 4 ARENA DE PEA
LISTON ORDINARIO 10x2.2x3

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
12.00

UNIDAD
M3
ML

CANTIDAD
0.0040
1.05

10.3.3
und
ML

VALOR UNI.
$416.67
subtotal

VALOR PARCIAL
$416.67
$416.67

VALOR UNI.
$166,200.00
$2,500.00

VALOR PARCIAL
$664.80
$2,625.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$3,289.80

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
9,151
$1,830.16
$1,830.16

20.0%

COSTO TOTAL UNITARIO

$10,981

ANALISIS UNITARIO
ITEM
GUARDAESCOBA EN GRANITO. H = 0.065
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

VALOR UNI.
$833.33
subtotal

10.3.4
und
ML
VALOR PARCIAL
$833.33
$833.33

II.MATERIALES DE OBRA
DESCRIPCION
MARMOLINA
PULIDA GRANITO
CEMENTO BLANCO
GRANITO TRAVERTINO PERUANO No 3

UNIDAD
BTO
M2
KG
BTO

CANTIDAD
0.10
0.40
4.00
0.06

VALOR UNI.
$9,500.00
$37,500.00
$800.00
$18,000.00

VALOR PARCIAL
$950.00
$15,000.00
$3,200.00
$1,080.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$20,230.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
32,730
$6,545.95
$6,545.95

20.0%

COSTO TOTAL UNITARIO

$39,276

ANALISIS UNITARIO
ITEM
GUARDAESCOBA EN GRAVILLA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
GRAVILLA DE RIO
ARENA LAVADA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

UNIDAD
KG
M3
M3
M3

CANTIDAD
0.70
0.00
0.01
0.01

10.3.5
und
ML

VALOR UNI.
$833.33
subtotal

VALOR PARCIAL
$833.33
$833.33

VALOR UNI.
$400.00
$8,000.00
$58,000.00
$25,000.00

VALOR PARCIAL
$280.00
$2.56
$580.00
$250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$1,112.56

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
12,154
$2,430.80
$2,430.80

20.0%

COSTO TOTAL UNITARIO

$14,585

ANALISIS UNITARIO
ITEM
GUARDAESCOBA EN PISOPACK
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
GUARDAESCOBA PISOPACK 6.8 CMS

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
36.00

UNIDAD
ML

CANTIDAD
1.05

10.3.6
und
ML

VALOR UNI.
$138.89
subtotal

VALOR PARCIAL
$138.89
$138.89

VALOR UNI.
$850.00

VALOR PARCIAL
$892.50

subtotal

$892.50

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
120.00
120.00

VALOR UNI.
$430.14
$250.40

VALOR PARCIAL
$430.14
$250.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$680.54
1,712
$342.39
$342.39

20.0%

COSTO TOTAL UNITARIO

$2,054

ANALISIS UNITARIO
ITEM
GUARDAESCOBA EN VINISOL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
GUARDAESCOBA VINISOL 6.8 CMS

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
36.00

UNIDAD
ML

CANTIDAD
1.03

10.3.7
und
ML

VALOR UNI.
$138.89
subtotal

VALOR PARCIAL
$138.89
$138.89

VALOR UNI.
$1,450.00

VALOR PARCIAL
$1,493.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
130.00
130.00

$1,493.50

VALOR UNI.
$397.05
$231.14

VALOR PARCIAL
$397.05
$231.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$628.19
2,261
$452.12
$452.12

20.0%

COSTO TOTAL UNITARIO

$2,713

ANALISIS UNITARIO
No. ITEM
UNIDAD:

10.3.8
und
ML

ITEM
GUARDAESCOBA VIROLA 6 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
12.00

VALOR UNI.
$416.67
subtotal

VALOR PARCIAL
$416.67
$416.67

II.MATERIALES DE OBRA
DESCRIPCION
TIRAS ALISTADO 3*3*5
GUARDAESCOBA VIROLA 6 CMS
CHAZO MADERA 10X10

UNIDAD
ML
ML
UNIDAD

CANTIDAD
0.15
1.05
2.00

VALOR UNI.
$580.00
$7,500.00
$150.00
subtotal

VALOR PARCIAL
$87.00
$7,875.00
$300.00
$8,262.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
38.00
38.00

VALOR UNI.
$1,358.34
$790.74

VALOR PARCIAL
$1,358.34
$790.74

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,149.08

20.0%

10,828
$2,165.55
$2,165.55

COSTO TOTAL UNITARIO

$12,993

ANALISIS UNITARIO
No. ITEM
UNIDAD:

10.3.9
und
ML

ITEM
GUARDAESCOBA VIROLA 8 CM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
12.00

VALOR UNI.
$416.67
subtotal

VALOR PARCIAL
$416.67
$416.67

II.MATERIALES DE OBRA
DESCRIPCION
TIRAS ALISTADO 3*3*5
GUARDAESCOBA VIROLA 8 CMS
CHAZO MADERA 10X10

UNIDAD
ML
ML
UNIDAD

CANTIDAD
0.15
1.05
2.00

VALOR UNI.
$580.00
$9,200.00
$150.00
subtotal

VALOR PARCIAL
$87.00
$9,660.00
$300.00
$10,047.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
37.00
37.00

VALOR UNI.
$1,395.05
$812.11

VALOR PARCIAL
$1,395.05
$812.11

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,207.16
12,671
$2,534.17
$2,534.17

20.0%

COSTO TOTAL UNITARIO

$15,205

ANALISIS UNITARIO
ITEM
GUARDAESCOBA ZOCALO DE GRANITO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO BLANCO
GRANITO TRAVERTINO PERUANO
MARMOLINA
PULIDA PISOS GRANITO
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

10.3.10
und
ML

TARIFA DIA
5,000.00

RENDIM.
4.00

VALOR UNI.
$1,250.00
subtotal

VALOR PARCIAL
$1,250.00
$1,250.00

UNIDAD
KG
BT
BT
M2

CANTIDAD
4.00
0.06
1.20
0.10

VALOR UNI.
$800.00
$18,000.00
$18,000.00
$37,500.00
subtotal

VALOR PARCIAL
$3,200.00
$1,080.00
$21,600.00
$3,750.00
$29,630.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
7.00

VALOR UNI.
$7,941.08
$4,292.57

VALOR PARCIAL
$7,941.08
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,233.65
43,114
$8,622.73
$8,622.73

20.0%

COSTO TOTAL UNITARIO

$51,736

ANALISIS UNITARIO
ITEM
GUARDAESCOBA ZOCALO DE GRES
I.EQUIPO

No. ITEM
UNIDAD:

10.3.11
und
ML

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
9.00

II.MATERIALES DE OBRA
DESCRIPCION
TABLETA EGIPCIA 10*10
MORTERO 1:4 ARENA DE PEA

UNIDAD
M2
M3

CANTIDAD
0.15
0.01

VALOR UNI.
$555.56
subtotal

VALOR PARCIAL
$555.56
$3,180.00

VALOR UNI.
$10,120.00
$166,200.00

VALOR PARCIAL
$1,518.00
$1,662.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$3,180.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
14,527
$2,905.30
$2,905.30

20.0%

COSTO TOTAL UNITARIO

$17,432

ANALISIS UNITARIO
ITEM
MEDIA CAA EN CEMENTO. MORT. 1:3
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1:3 ARENA LAVADA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

UNIDAD
M3

CANTIDAD
0.020

10.3.12
und
ML

VALOR UNI.
$555.56
subtotal

VALOR PARCIAL
$555.56
$555.56

VALOR UNI.
$212,700.00

VALOR PARCIAL
$4,254.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
20.00
20.00

$4,254.00

VALOR UNI.
$2,580.85
$1,502.40

VALOR PARCIAL
$2,580.85
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,083.25
8,893
$1,778.56
$1,778.56

20.0%

COSTO TOTAL UNITARIO

$10,671

ANALISIS UNITARIO
ITEM
MEDIA CAA EN GRANITO. H = 0.065
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
MARMOLINA
PULIDA Y BRILLADA PISOS GRANITO
CEMENTO BLANCO
GRANITO TRAVERTINO PERUANO No 3

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

UNIDAD
BTO
M2
KG
BTO

CANTIDAD
0.01
0.40
4.00
0.06

10.3.13
und
ML

VALOR UNI.
$833.33
subtotal

VALOR PARCIAL
$833.33
$833.33

VALOR UNI.
$9,500.00
$37,500.00
$800.00
$18,000.00

VALOR PARCIAL
$95.00
$15,000.00
$3,200.00
$1,080.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$19,375.00

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
33,819
$6,763.83
$6,763.83

20.0%

COSTO TOTAL UNITARIO

$40,583

ANALISIS UNITARIO
ITEM
MEDIA CAA EN GRAVILLA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
GRAVILLA DE RIO
ARENA LAVADA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

UNIDAD
KG
M3
M3
M3

CANTIDAD
0.70
0.00
0.02
0.01

10.3.14
und
ML

VALOR UNI.
$833.33
subtotal

VALOR PARCIAL
$833.33
$833.33

VALOR UNI.
$400.00
$8,000.00
$58,000.00
$25,000.00

VALOR PARCIAL
$280.00
$2.56
$1,160.00
$250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$1,692.56

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
12,734
$2,546.80
$2,546.80

20.0%

COSTO TOTAL UNITARIO

$15,281

ANALISIS UNITARIO
ITEM
BAJANTE LAMINA GALVANIZADA 12 x 6 C. 20
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 20
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.20
0.20
38.00

VALOR UNI.
$18,000.00
$30,000.00
$31,476.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

11.3.1
und
ML
VALOR PARCIAL

$0.00
VALOR PARCIAL
$3,600.00
$6,000.00
$11,960.88

$21,560.88
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
21,561
$4,312.18
$4,312.18

20.0%

COSTO TOTAL UNITARIO

$25,873

ANALISIS UNITARIO
ITEM
BAJANTE PVC DE 3"
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

11.3.2
und
ML

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO PVC A LLUVIAS 3 "
CODO BAJANTE 45
SOLDADURA PVC LIQUIDA 1/4
SUB-CONTRATO HIDRAULICO Y SANITARIO
SUB-CONTRATO ORNAMENTACION

UNIDAD
ML
UN
UN
%
%

CANTIDAD
1.05
0.06
0.08
38.00
38.00

$0.00

VALOR UNI.
$6,813.00
$4,500.00
$46,120.00
$28,994.00
$28,994.00

VALOR PARCIAL
$7,153.65
$270.00
$3,689.60
$11,017.72
$11,017.72

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$33,148.69

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
33,149
$6,629.74
$6,629.74

20.0%

COSTO TOTAL UNITARIO

$39,778

ANALISIS UNITARIO
ITEM
CABALLETE LISO 0.60 X 2.00 CAL. 26 AL.
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 26
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.30
1.03
38.00

VALOR UNI.
$18,000.00
$40,715.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

11.3.3
und
ML
VALOR PARCIAL

$0.00
VALOR PARCIAL
$5,400.00
$41,936.45
$11,400.00

$58,736.45
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
58,736
$11,747.29
$11,747.29

20.0%

COSTO TOTAL UNITARIO

$70,484

ANALISIS UNITARIO
ITEM
CANAL LAMINA GALVANIZADA 15 x 20. CAL 20
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

11.3.4
und
ML

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 22
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.30
0.40
38.00

$0.00

VALOR UNI.
$18,000.00
$28,500.00
$30,000.00

VALOR PARCIAL
$5,400.00
$11,400.00
$11,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$28,200.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
28,200
$5,640.00
$5,640.00

20.0%

COSTO TOTAL UNITARIO

$33,840

ANALISIS UNITARIO
ITEM
CANAL LAMINA GALVANIZADA 20 x 50. CAL 20
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 22
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.60
1.00
38.00

VALOR UNI.
$18,000.00
$30,000.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

11.3.5
und
ML
VALOR PARCIAL

$0.00
VALOR PARCIAL
$10,800.00
$30,000.00
$11,400.00

$52,200.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
52,200
$10,440.00
$10,440.00

20.0%

COSTO TOTAL UNITARIO

$62,640

ANALISIS UNITARIO
ITEM
CANAL LAMINA GALVANIZADA D=.75. CAL 20
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

11.3.6
und
ML

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 22
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.60
0.38
38.00

$0.00

VALOR UNI.
$18,000.00
$28,500.00
$42,000.00

VALOR PARCIAL
$10,800.00
$10,830.00
$15,960.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$37,590.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
37,590
$7,518.00
$7,518.00

20.0%

COSTO TOTAL UNITARIO

$45,108

ANALISIS UNITARIO
ITEM
CANAL LAMINA GALVANIZADA D=0.50. CAL 20
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 22
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.40
0.25
38.00

VALOR UNI.
$18,000.00
$28,500.00
$28,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal

11.3.7
und
ML
VALOR PARCIAL

$0.00
VALOR PARCIAL
$7,200.00
$7,125.00
$10,640.00

$24,965.00
VALOR PARCIAL

$0.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

24,965
$4,993.00
$4,993.00

20.0%

COSTO TOTAL UNITARIO

$29,958

ANALISIS UNITARIO
ITEM
CANAL LAMINA GALVANIZADA D=1.00. CAL. 20
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

11.3.8
und
ML

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 22
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.60
1.20
38.00

$0.00

VALOR UNI.
$18,000.00
$28,500.00
$45,000.00

VALOR PARCIAL
$10,800.00
$34,200.00
$17,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$62,100.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
62,100
$12,420.00
$12,420.00

20.0%

COSTO TOTAL UNITARIO

$74,520

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CANAL PVC DE 3"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TORNILLO PARA MADERA 1" No 6
CANAL REF. 3501002 BLANCO
TAPA EXTERNA BLANCO
UNION CANAL BLANCO
SOPORTE CANAL BLANCO
SUB-CONTRATO HIDRAULICO Y SANITARIO
III.MANO DE OBRA
DESCRIPCION

UNIDAD
UN
ML
UN
UN
UN
%

CANTIDAD
4.00
1.03
0.68
0.34
2.74
38.00

VALOR UNI.
$20.00
$4,500.00
$4,500.00
$5,500.00
$1,500.00
$29,000.00
subtotal

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal

11.3.9
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$80.00
$4,635.00
$3,060.00
$1,870.00
$4,110.00
$11,020.00
$24,775.00
VALOR PARCIAL

$0.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

24,825
$4,965.00
$4,965.00

20.0%

COSTO TOTAL UNITARIO

$29,790

ANALISIS UNITARIO
ITEM
FLANCHE LAMINA GALVANIZADA 0.10. CAL. 20
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

11.3.10
und
ML

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 22
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.20
0.20
80.00

$0.00

VALOR UNI.
$18,000.00
$28,500.00
$11,850.00

VALOR PARCIAL
$3,600.00
$5,700.00
$9,480.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$18,780.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
18,780
$3,756.00
$3,756.00

20.0%

COSTO TOTAL UNITARIO

$22,536

ANALISIS UNITARIO
ITEM
FLANCHE LAMINA GALVANIZADA 0.20. CAL 20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.3.11
und
ML

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 22

UNIDAD
UN
UN

CANTIDAD
0.30
0.40

$50.00

VALOR UNI.
$18,000.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
9.00

VALOR PARCIAL
$5,400.00
$12,000.00

$17,400.00

VALOR UNI.
$3,338.67
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$3,338.67
$3,338.67

20.0%

20,789
$4,157.73
$4,157.73

COSTO TOTAL UNITARIO

$24,946

ANALISIS UNITARIO
ITEM
FLANCHE LAMINA GALVANIZADA 0.30. CAL. 20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.3.12
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ESTAO P / COBRE
LAMINA GALVANIZADA CALIBRE 20
SUB CONTRATO INSTALACION

UNIDAD
UN
UN
%

CANTIDAD
0.40
0.60
38.00

$50.00

VALOR UNI.
$18,000.00
$30,000.00
$0.00

VALOR PARCIAL
$7,200.00
$18,000.00
$0.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
9.00

$25,200.00

VALOR UNI.
$3,338.67

VALOR PARCIAL
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,338.67
28,589
$5,717.73
$5,717.73

20.0%

COSTO TOTAL UNITARIO

$34,306

ANALISIS UNITARIO
ITEM
TRAGANTES DE 4"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.3.13
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
CUPULA TRAGANTE C 4 X 2
ARENA DE PEA

UNIDAD
KG
UN
M3

CANTIDAD
1.00
1.00
0.01

$50.00

VALOR UNI.
$400.00
$5,700.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
20.00
20.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$400.00
$5,700.00
$300.00

$6,400.00

VALOR UNI.
$2,580.85
$1,502.40

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$2,580.85
$1,502.40
$4,083.25

20.0%

10,533
$2,106.65
$2,106.65
$12,640

ANALISIS UNITARIO
ITEM
TRAGANTES DE 6"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.3.14
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
CUPULA TRAGANTE C 6 X 4
ARENA DE PEA

UNIDAD
KG
UN
M3

CANTIDAD
1.00
1.00
0.01

$50.00

VALOR UNI.
$400.00
$12,650.00
$30,000.00

VALOR PARCIAL
$400.00
$12,650.00
$300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
20.00
20.00

$13,350.00

VALOR UNI.
$2,580.85
$1,502.40

VALOR PARCIAL
$2,580.85
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,083.25
17,483
$3,496.65
$3,496.65

20.0%

COSTO TOTAL UNITARIO

$20,980

ANALISIS UNITARIO
ITEM
CABALLETE CANALETA 43
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.1
und
ML

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABALLETE CANALETA 43 ARTICULADO
GANCHO TEJA ETERNIT

UNIDAD
UN
UN

CANTIDAD
2.30
2.00

$50.00

VALOR UNI.
$23,600.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$54,280.00
$1,200.00

$55,480.00

VALOR UNI.
$5,161.70
$3,004.80

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$5,161.70
$3,004.80
$8,166.50

20.0%

63,697
$12,739.30
$12,739.30
$76,436

ANALISIS UNITARIO
ITEM
CABALLETE CANALETA 90
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.2
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CABALLETE CANALETA 90 ARTICULADO
TORNILLO DE FIJACION

UNIDAD
UN
UN

CANTIDAD
2.30
2.00

$50.00

VALOR UNI.
$23,600.00
$1,200.00

VALOR PARCIAL
$54,280.00
$2,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$56,680.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
64,897
$12,979.30
$12,979.30

20.0%

COSTO TOTAL UNITARIO

$77,876

ANALISIS UNITARIO
ITEM
CABALLETE TEJA ETERNIT ART. C90 SUP.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.3
und
ML

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CABALLETE TEJA ETERNIT
GANCHO TEJA ETERNIT

UNIDAD
UN
UN

CANTIDAD
1.15
2.00

$50.00

VALOR UNI.
$20,343.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$23,394.45
$1,200.00

$24,594.45

VALOR UNI.
$5,161.70
$3,004.80

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$5,161.70
$3,004.80
$8,166.50

20.0%

32,811
$6,562.19
$6,562.19
$39,373

ITEM
CANALETA 43 DE 3.50 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.4
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
IGAS GRIS MASILLA PLASTICA
CANALETA 43 ETERNIT X 350
TORNILLO PARA CANALETA 43

UNIDAD
KG
UN
UN

CANTIDAD
0.12
0.60
0.60

$50.00

VALOR UNI.
$9,650.00
$69,950.00
$1,200.00

VALOR PARCIAL
$1,158.00
$41,970.00
$720.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$43,848.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
52,065
$10,412.90
$10,412.90

20.0%

COSTO TOTAL UNITARIO

$62,477

ANALISIS UNITARIO
ITEM
CANALETA 43 DE 4.00 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.5
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
IGAS GRIS MASILLA PLASTICA
CANALETA 43 ETERNIT X 400
TORNILLO PARA CANALETA 43 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.12
0.60
0.60

$50.00

VALOR UNI.
$9,650.00
$82,590.00
$1,200.00

VALOR PARCIAL
$1,158.00
$49,554.00
$720.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$51,432.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
59,649
$11,929.70
$11,929.70

20.0%

COSTO TOTAL UNITARIO

$71,578

ANALISIS UNITARIO
No. ITEM

11.2.6

ITEM
CANALETA 43 DE 4.50 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
IGAS GRIS MASILLA PLASTICA
CANALETA 43 ETERNIT X 450
TORNILLO PARA CANALETA 43 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.12
0.48
0.48

$50.00

VALOR UNI.
$9,650.00
$87,200.00
$1,200.00

VALOR PARCIAL
$1,158.00
$41,856.00
$576.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$43,590.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
51,807
$10,361.30
$10,361.30

20.0%

COSTO TOTAL UNITARIO

$62,168

ANALISIS UNITARIO
ITEM
CANALETA 43 DE 5.00 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.7
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
IGAS GRIS MASILLA PLASTICA
CANALETA 43 ETERNIT X 500
TORNILLO PARA CANALETA 43 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.12
0.48
0.48

$50.00

VALOR UNI.
$9,650.00
$93,600.00
$1,200.00

VALOR PARCIAL
$1,158.00
$44,928.00
$576.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.20
10.20

$46,662.00

VALOR UNI.
$5,060.49
$2,945.88

VALOR PARCIAL
$5,060.49
$2,945.88

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,006.37
54,718
$10,943.67
$10,943.67

20.0%

COSTO TOTAL UNITARIO

$65,662

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

11.2.8
und

CANALETA 43 DE 5.50 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

M2
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
IGAS GRIS MASILLA PLASTICA
CANALETA 43 ETERNIT X 550
TORNILLO PARA CANALETA 43 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.12
0.39
0.39

$50.00

VALOR UNI.
$9,650.00
$101,530.00
$1,200.00

VALOR PARCIAL
$1,158.00
$39,596.70
$468.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$41,222.70

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
50,347
$10,069.32
$10,069.32

20.0%

COSTO TOTAL UNITARIO

$60,416

ANALISIS UNITARIO
ITEM
CANALETA 43 DE 6.00 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.9
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
IGAS GRIS MASILLA PLASTICA
CANALETA 43 ETERNIT X 600
TORNILLO PARA CANALETA 43 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.12
0.39
0.39

$50.00

VALOR UNI.
$9,650.00
$110,550.00
$1,200.00

VALOR PARCIAL
$1,158.00
$43,114.50
$468.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$44,740.50

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
53,864
$10,772.88
$10,772.88

20.0%

COSTO TOTAL UNITARIO

$64,637

ANALISIS UNITARIO
ITEM
CANALETA 90 ACRILICO 3 MM

No. ITEM
UNIDAD:

11.2.10
und
M2

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CANALETA 90 ACRILICO 3MM
TORNILLO PARA CANALETA 90 METAL

UNIDAD
UN
UN

CANTIDAD
0.39
0.48

$50.00

VALOR UNI.
$214,500.00
$1,200.00

VALOR PARCIAL
$83,655.00
$576.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$84,231.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
91,086
$18,217.28
$18,217.28

20.0%

COSTO TOTAL UNITARIO

$109,304

ANALISIS UNITARIO
ITEM
CANALETA 90 DE 3.75 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
12.00

11.2.11
und
M2

VALOR UNI.
$416.67

VALOR PARCIAL
$416.67

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MASIL GRIS FRIO
CANALETA 90 ETERNIT X 375
TORNILLO PARA CANALETA 90 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.17
0.26
0.26

$416.67

VALOR UNI.
$9,650.00
$80,800.00
$3,200.00

VALOR PARCIAL
$1,640.50
$21,008.00
$832.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$23,480.50

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
30,703
$6,140.52
$6,140.52

20.0%

COSTO TOTAL UNITARIO

$36,843

ANALISIS UNITARIO
ITEM
CANALETA 90 DE 4.50 MS
I.EQUIPO

No. ITEM
UNIDAD:

11.2.12
und
M2

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MASIL GRIS FRIO
CANALETA 90 ETERNIT X 450
TORNILLO PARA CANALETA 90 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.17
0.26
0.26

$50.00

VALOR UNI.
$9,650.00
$96,900.00
$3,200.00

VALOR PARCIAL
$1,640.50
$25,194.00
$832.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$27,666.50

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
34,522
$6,904.38
$6,904.38

20.0%

COSTO TOTAL UNITARIO

$41,426

ANALISIS UNITARIO
ITEM
CANALETA 90 DE 5.25 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.13
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MASIL GRIS FRIO
CANALETA 90 ETERNIT X 525
TORNILLO PARA CANALETA 90 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.17
0.20
0.40

$50.00

VALOR UNI.
$9,650.00
$120,150.00
$3,200.00

VALOR PARCIAL
$1,640.50
$24,030.00
$1,280.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$26,950.50

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
35,167
$7,033.40
$7,033.40

20.0%

COSTO TOTAL UNITARIO

$42,200

ANALISIS UNITARIO
ITEM
CANALETA 90 DE 6.00 MS
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

11.2.14
und
M2
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

100.00

$50.00

$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MASIL GRIS FRIO
CANALETA 90 ETERNIT X 600
TORNILLO PARA CANALETA90 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.17
0.20
0.40

$50.00

VALOR UNI.
$9,650.00
$129,500.00
$3,200.00

VALOR PARCIAL
$1,640.50
$25,900.00
$1,280.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.50

$28,820.50

VALOR UNI.
$5,433.37
$3,162.95

VALOR PARCIAL
$5,433.37
$3,162.95

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,596.32
37,467
$7,493.36
$7,493.36

20.0%

COSTO TOTAL UNITARIO

$44,960

ANALISIS UNITARIO
ITEM
CANALETA 90 DE 7.00 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.15
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MASIL GRIS FRIO
CANALETA 90 ETERNIT X 700
TORNILLO PARA CANALETA90 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.17
0.20
0.40

$50.00

VALOR UNI.
$9,650.00
$151,000.00
$3,200.00

VALOR PARCIAL
$1,640.50
$30,200.00
$1,280.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$33,120.50

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
41,337
$8,267.40
$8,267.40

20.0%

COSTO TOTAL UNITARIO

$49,604

ANALISIS UNITARIO
ITEM
CANALETA 90 DE 9.00 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

11.2.16
und
M2
VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MASIL GRIS FRIO
CANALETA 90 ETERNIT X 900
TORNILLO PARA CANALETA90 METAL

UNIDAD
KG
UN
UN

CANTIDAD
0.17
0.13
0.40

$50.00

VALOR UNI.
$9,650.00
$206,450.00
$3,200.00

VALOR PARCIAL
$1,640.50
$26,838.50
$1,280.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$29,759.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
37,976
$7,595.10
$7,595.10

20.0%

COSTO TOTAL UNITARIO

$45,571

ANALISIS UNITARIO
ITEM
CLARABOYA ETERNIT No 4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.17
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CLARABOYA ETERNIT No 4
GANCHO TEJA ETERNIT

UNIDAD
UN
UN

CANTIDAD
1.00
4.00

$50.00

VALOR UNI.
$28,470.00
$600.00

VALOR PARCIAL
$28,470.00
$2,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$30,870.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
41,128
$8,225.63
$8,225.63

20.0%

COSTO TOTAL UNITARIO

$49,354

ANALISIS UNITARIO
ITEM
CLARABOYA ETERNIT No 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

11.2.18
und
M2
VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CLARABOYA ETERNIT No 6
GANCHO TEJA ETERNIT

UNIDAD
UN
UN

CANTIDAD
1.00
4.00

$50.00

VALOR UNI.
$45,690.00
$600.00

VALOR PARCIAL
$45,690.00
$2,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$48,090.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
58,348
$11,669.63
$11,669.63

20.0%

COSTO TOTAL UNITARIO

$70,018

ANALISIS UNITARIO
ITEM
CUBIERTA ALUMINIO TIPO SANDWICH
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.19
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CUBIERTA EN ALUMINIO TIPO SANWICH

UNIDAD
M2

CANTIDAD
1.00

$50.00

VALOR UNI.
$44,400.00

VALOR PARCIAL
$44,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$44,400.00

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
60,783
$12,156.60
$12,156.60

20.0%

COSTO TOTAL UNITARIO

$72,940

ANALISIS UNITARIO
ITEM
DOMOS ACRILICOS 90 X 90
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA

11.2.20
und
UN
VALOR PARCIAL
$50.00
$50.00

DESCRIPCION
DOMO BURBUJA DE 90 X 90

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$77,500.00

VALOR PARCIAL
$77,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

$77,500.00

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
118,383
$23,676.50
$23,676.50

20.0%

$142,059
ANALISIS UNITARIO
ITEM
ENTRAMADO TEJA DE BARRO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.21
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PLANCHON ORDINARIO 3 m
REPISA ORDINARIO 3 m
PUNTILLA CON CABEZA DE 2"

UNIDAD
UNIDAD
ML
LB

CANTIDAD
0.87
1.03
0.30

$50.00

VALOR UNI.
$8,120.00
$1,360.00
$1,500.00

VALOR PARCIAL
$7,064.40
$1,400.80
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.50
4.50

$8,915.20

VALOR UNI.
$11,470.44
$6,677.33

VALOR PARCIAL
$11,470.44
$6,677.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$18,147.78
27,113
$5,422.60
$5,422.60

20.0%

COSTO TOTAL UNITARIO

$32,536

ANALISIS UNITARIO
ITEM
ENTRAMADO TEJA ONDULADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

11.2.22
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

PLANCHON ORDINARIO 3 m
REPISA ORDINARIO 3 m
PUNTILLA CON CABEZA DE 2"

UNIDAD
ML
LB

0.87
1.03
0.30

$8,120.00
$1,230.00
$1,500.00

$7,064.40
$1,266.90
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$8,781.30

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
19,039
$3,807.89
$3,807.89

20.0%

COSTO TOTAL UNITARIO

$22,847

ANALISIS UNITARIO
ITEM
INMUNIZANTE CUBIERTAS EN MADERA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.23
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BROCHA DE CERDA 4"
A.C.P.M.
GEOTEXTIL

UNIDAD
UN
GL
M2

CANTIDAD
0.02
0.21
1.05

$50.00

VALOR UNI.
$10,000.00
$3,650.00
$2,100.00

VALOR PARCIAL
$200.00
$766.50
$2,205.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
40.00
40.00

$3,171.50

VALOR UNI.
$1,290.43
$751.20

VALOR PARCIAL
$1,290.43
$751.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,041.63
5,263
$1,052.63
$1,052.63

20.0%

COSTO TOTAL UNITARIO

$6,316

ANALISIS UNITARIO
ITEM
MONTAJE/DESMONTE CANALETA 43
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

11.2.24
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$0.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
8,217
$1,643.30
$1,643.30

20.0%

COSTO TOTAL UNITARIO

$9,860

ANALISIS UNITARIO
ITEM
MONTAJE/DESMONTE CANALETA 90
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.25
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$0.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
8,217
$1,643.30
$1,643.30

20.0%

COSTO TOTAL UNITARIO

$9,860

ANALISIS UNITARIO
ITEM
MONTAJE/DESMONTE TEJA ACRILICA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

11.2.26
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$0.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
6,855
$1,371.08
$1,371.08

20.0%

COSTO TOTAL UNITARIO

$8,227

ANALISIS UNITARIO
ITEM
MONTAJE/DESMONTE TEJA ONDULADA A.C.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

11.2.27
und
M2

TARIFA DIA
5,000.00
70.00

RENDIM.
4.50
0.16

VALOR UNI.
$1,111.11
$437.50
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$1,111.11
$437.50
$1,548.61
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
4.50

$0.00

VALOR UNI.
$6,677.33

VALOR PARCIAL
$6,677.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,677.33
8,226
$1,645.19
$1,645.19

20.0%

COSTO TOTAL UNITARIO

$9,871

ANALISIS UNITARIO
ITEM
REUBICACION TEJA DE BARRO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

11.2.28
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

$0.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

51,617.00
30,048.00

6.70
6.70

$7,704.03
$4,484.78

$7,704.03
$4,484.78

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,188.81
12,239
$2,447.76
$2,447.76

20.0%

COSTO TOTAL UNITARIO

$14,687

ANALISIS UNITARIO
ITEM
REPOSICION TEJA DE BARRO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.29
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TEJA BARRO
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
M2
KG
M3
M3

CANTIDAD
1.03
9.67
0.01
0.05

$50.00

VALOR UNI.
$21,230.00
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$21,866.90
$3,868.00
$40.00
$1,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$27,274.90

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
35,491
$7,098.28
$7,098.28

20.0%

COSTO TOTAL UNITARIO

$42,590

ANALISIS UNITARIO
ITEM
MONTAJE/DESMONTE CERCHAS Y CORREAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SUB CONTRATO INSTALACION

UNIDAD
%

CANTIDAD
37.00

VALOR UNI.
$22,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

VALOR UNI.

11.2.30
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$8,140.00

$8,140.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
8,190
$1,638.00
$1,638.00

20.0%

COSTO TOTAL UNITARIO

$9,828

ANALISIS UNITARIO
ITEM
TAPA CIERRE CANALETA 43
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.31
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TAPA CIERRE CANALETA 43

UNIDAD
UN

CANTIDAD
1.03

$50.00

VALOR UNI.
$3,720.00

VALOR PARCIAL
$3,831.60

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$3,831.60

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
20,215
$4,042.92
$4,042.92

20.0%

COSTO TOTAL UNITARIO

$24,258

ANALISIS UNITARIO
ITEM
TAPA CIERRE CANALETA 90
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TAPA CIERRE CANALETA 90

UNIDAD
UN

CANTIDAD
1.03

VALOR UNI.
$10,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

VALOR UNI.
$12,904.25
$7,512.00

11.2.32
und
M2
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL
$10,403.00

$10,403.00
VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
31,375
$6,274.96
$6,274.96

20.0%

COSTO TOTAL UNITARIO

$37,650

ANALISIS UNITARIO
ITEM
TEJA CINDU CLIMATIZADA. ANCHO 0.79
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
TEJA CINDURIB .88 UTIL .78

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
4.00
0.18

UNIDAD
M2

CANTIDAD
1.05

11.2.33
und
M2

VALOR UNI.
$1,250.00
$166.67
subtotal

VALOR PARCIAL
$1,250.00
$166.67
$1,416.67

VALOR UNI.
$20,800.00

VALOR PARCIAL
$21,840.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$21,840.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
33,465
$6,692.96
$6,692.96

20.0%

COSTO TOTAL UNITARIO

$40,158

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
TEJA DE BARRO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
TEJA DE BARRO

UNIDAD
KG
M3
M3
M2

CANTIDAD
9.67
0.01
0.05
1.03

VALOR UNI.
$400.00
$8,000.00
$30,000.00
$21,230.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
6.50

VALOR UNI.
$7,941.08
$4,622.77
subtotal

11.2.34
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$3,868.00
$40.00
$1,500.00
$21,866.90

$27,274.90
VALOR PARCIAL
$7,941.08
$4,622.77
$12,563.85

Total Costo Directo


A.I.U.
Total Costo Indirecto

39,889
$7,977.75
$7,977.75

20.0%

COSTO TOTAL UNITARIO

$47,866

ANALISIS UNITARIO
ITEM
TEJA ONDULADA A.C. TIPO ETERNIT No 4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.35
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TEJA ONDULADA ETERNIT No 4
GANCHO TEJA ETERNIT

UNIDAD
M2
UN

CANTIDAD
1.06
2.60

$50.00

VALOR UNI.
$16,000.00
$600.00

VALOR PARCIAL
$16,960.00
$1,560.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
13.00
13.00

$18,520.00

VALOR UNI.
$3,970.54
$2,311.38

VALOR PARCIAL
$3,970.54
$2,311.38

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,281.92
24,852
$4,970.38
$4,970.38

20.0%

COSTO TOTAL UNITARIO

$29,822

ANALISIS UNITARIO
ITEM
TEJA ONDULADA A.C. TIPO ETERNIT No 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
14.00

VALOR UNI.
$357.14
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TEJA ONDULADA ETERNIT No 6
GANCHO TEJA ETERNIT

UNIDAD
M2
UN

CANTIDAD
0.67
1.30

VALOR UNI.
$23,000.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
14.00
14.00

VALOR UNI.
$3,686.93
$2,146.29
subtotal

11.2.36
und
M2
VALOR PARCIAL
$357.14
$357.14
VALOR PARCIAL
$15,410.00
$780.00

$16,190.00
VALOR PARCIAL
$3,686.93
$2,146.29
$5,833.21

Total Costo Directo


A.I.U.
Total Costo Indirecto

22,380
$4,476.07
$4,476.07

20.0%

COSTO TOTAL UNITARIO

$26,856

ANALISIS UNITARIO
ITEM
TEJA ONDULADA A.C. TIPO ETERNIT No 8
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.37
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TEJA ONDULADA ETERNIT No 8
GANCHO TEJA ETERNIT

UNIDAD
UN
UN

CANTIDAD
0.50
1.10

$50.00

VALOR UNI.
$32,000.00
$600.00

VALOR PARCIAL
$16,000.00
$660.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
14.00
14.00

$16,660.00

VALOR UNI.
$3,686.93
$2,146.29

VALOR PARCIAL
$3,686.93
$2,146.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,833.21
22,543
$4,508.64
$4,508.64

20.0%

COSTO TOTAL UNITARIO

$27,052

ANALISIS UNITARIO
ITEM
TEJA ONDULADA A.C. TIPO ETERNIT No 10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TEJA ONDULADA ETERNIT No 10
GANCHO TEJA ETERNIT

UNIDAD
UN
UN

CANTIDAD
0.45
1.10

VALOR UNI.
$40,000.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
14.00
14.00

VALOR UNI.
$3,686.93
$2,146.29
subtotal

Total Costo Directo

11.2.38
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$18,000.00
$660.00

$18,660.00
VALOR PARCIAL
$3,686.93
$2,146.29
$5,833.21
24,543

A.I.U.
Total Costo Indirecto

20.0%

$4,908.64
$4,908.64

COSTO TOTAL UNITARIO

$29,452

ANALISIS UNITARIO
ITEM
TEJA ACRLICA No 4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.39
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TEJA ACRILICA No 4
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.01
4.00

$50.00

VALOR UNI.
$23,085.00
$450.00

VALOR PARCIAL
$23,315.85
$1,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

$25,115.85

VALOR UNI.
$3,036.29
$1,767.53

VALOR PARCIAL
$3,036.29
$1,767.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,803.82
29,970
$5,993.93
$5,993.93

20.0%

COSTO TOTAL UNITARIO

$35,964

ANALISIS UNITARIO
ITEM
TEJA ACRLICA No 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.40
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TEJA ACRILICA No 6
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.01
4.00

$50.00

VALOR UNI.
$35,550.00
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

VALOR PARCIAL
$35,905.50
$1,800.00

$37,705.50

VALOR UNI.
$3,036.29
$1,767.53
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$50.00

VALOR PARCIAL
$3,036.29
$1,767.53
$4,803.82

20.0%

42,559
$8,511.86

Total Costo Indirecto

$8,511.86

COSTO TOTAL UNITARIO

$51,071

ANALISIS UNITARIO
ITEM
TEJA ACRLICA No 8
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.41
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TEJA ACRILICA No 8
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.01
4.00

$50.00

VALOR UNI.
$43,000.00
$450.00

VALOR PARCIAL
$43,430.00
$1,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

$45,230.00

VALOR UNI.
$3,036.29
$1,767.53

VALOR PARCIAL
$3,036.29
$1,767.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,803.82
50,084
$10,016.76
$10,016.76

20.0%

COSTO TOTAL UNITARIO

$60,101

ANALISIS UNITARIO
ITEM
TEJA ACRLICA No 10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.42
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TEJA ACRILICA No 10
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.01
4.00

$50.00

VALOR UNI.
$40,000.00
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

VALOR PARCIAL
$40,400.00
$1,800.00

$42,200.00

VALOR UNI.
$3,036.29
$1,767.53
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$3,036.29
$1,767.53
$4,803.82

20.0%

47,054
$9,410.76
$9,410.76

COSTO TOTAL UNITARIO

$56,465

ANALISIS UNITARIO
ITEM
TEJA PLSTICA TIPO AJOVER No 4
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

11.2.43
und
UN

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TEJA PLASTICA AJOVER No 4
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.01
4.00

$555.56

VALOR UNI.
$21,500.00
$450.00

VALOR PARCIAL
$21,715.00
$1,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$23,515.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
30,876
$6,175.19
$6,175.19

20.0%

COSTO TOTAL UNITARIO

$37,051

ANALISIS UNITARIO
ITEM
TEJA PLSTICA TIPO AJOVER No 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
12.00

11.2.44
und
UN

VALOR UNI.
$416.67
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TEJA PLASTICA AJOVER No 6
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.10
6.00

$416.67

VALOR UNI.
$32,200.00
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

VALOR PARCIAL
$35,420.00
$2,700.00

$38,120.00

VALOR UNI.
$4,301.42
$2,504.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$416.67

VALOR PARCIAL
$4,301.42
$2,504.00
$6,805.42

20.0%

45,342
$9,068.42
$9,068.42

COSTO TOTAL UNITARIO

$54,411

ANALISIS UNITARIO
ITEM
TEJA PLSTICA TIPO AJOVER No 8
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.45
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TEJA PLASTICA AJOVER No 8
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.10
6.00

$50.00

VALOR UNI.
$43,000.00
$450.00

VALOR PARCIAL
$47,300.00
$2,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$50,000.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
56,855
$11,371.08
$11,371.08

20.0%

COSTO TOTAL UNITARIO

$68,227

ANALISIS UNITARIO
ITEM
TEJA PLSTICA TIPO AJOVER No 10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
12.00

11.2.46
und
UN

VALOR UNI.
$416.67
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TEJA PLASTICA AJOVER No 10
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.10
6.00

$416.67

VALOR UNI.
$53,800.00
$450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$59,180.00
$2,700.00

$61,880.00

VALOR UNI.
$4,301.42
$2,504.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$416.67

VALOR PARCIAL
$4,301.42
$2,504.00
$6,805.42

20.0%

69,102
$13,820.42
$13,820.42
$82,923

ANALISIS UNITARIO
ITEM
TEJA VENTILACION No 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.2.47
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TEJA PLASTICA AJOVER No 6
AMARRE TEJA

UNIDAD
UN
UN

CANTIDAD
1.10
6.00

$50.00

VALOR UNI.
$32,200.00
$450.00

VALOR PARCIAL
$35,420.00
$2,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$38,120.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
44,975
$8,995.08
$8,995.08

20.0%

COSTO TOTAL UNITARIO

$53,971

ANALISIS UNITARIO
ITEM
CERCHA EN NGULO 1"x1"x1/8" - CELOSA 5/8" - H=35 cm.
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
ANDAMIO
70.00
II.MATERIALES DE OBRA
DESCRIPCION
CERCHA EN NGULO 1"x1"x1/8" - CELOSA 5/8" H=35 cm.

UNIDAD
ML

No. ITEM
UNIDAD:

11.2.48
und
ML

RENDIM.
2.00
0.18

VALOR UNI.
$2,500.00
$388.89
subtotal

CANTIDAD

VALOR UNI.

1.00

VALOR PARCIAL
$2,500.00
$166.67
$2,666.67
VALOR PARCIAL

$22,000.00

$22,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
8.00
8.00

$22,000.00

VALOR UNI.
$8,388.00
$4,507.00

VALOR PARCIAL
$8,388.00
$4,507.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,895.00
37,562
$7,512.33
$7,512.33

20.0%

COSTO TOTAL UNITARIO

$45,074

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

11.2.49
und

CORREAS 2 " ARRIBA 1 5/8" ABAJO - CELOSA 1 "


I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
ANDAMIO
70.00
II.MATERIALES DE OBRA
DESCRIPCION
CORREAS 2 " ARRIBA 1 5/8" ABAJO CELOSA 1 "

UNIDAD
ML

ML
RENDIM.
2.00
0.18

VALOR UNI.
$2,500.00
$388.89
subtotal

CANTIDAD

VALOR UNI.

1.00

VALOR PARCIAL
$2,500.00
$388.89
$2,888.89
VALOR PARCIAL

$21,500.00

$21,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
9.00
9.00

$21,500.00

VALOR UNI.
$7,456.00
$4,006.22

VALOR PARCIAL
$7,456.00
$4,006.22

subtotal

$11,462.22

Total Costo Directo


A.I.U.
Total Costo Indirecto

35,851
$7,170.22
$7,170.22

20.0%

COSTO TOTAL UNITARIO

$14,340

ANALISIS UNITARIO
ITEM
CORREAS PERFIL RECTG. 10x4 cm. C.R. CAL. 18 ANTICORR. - ESM.
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00
ANDAMIO
70.00
II.MATERIALES DE OBRA
DESCRIPCION
CORREAS PERFIL RECTG. 10x4 cm. C.R. CAL. 18
ANTICORR. - ESM.

UNIDAD
ML

No. ITEM
UNIDAD:

11.2.50
und
ML

RENDIM.
2.00
0.18

VALOR UNI.
$2,500.00
$388.89
subtotal

CANTIDAD

VALOR UNI.

1.00

VALOR PARCIAL
$2,500.00
$388.89
$2,888.89
VALOR PARCIAL

$8,500.00

$8,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
8.00
8.00

$8,500.00

VALOR UNI.
$8,388.00
$4,507.00

VALOR PARCIAL
$8,388.00
$4,507.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,895.00
24,284
$4,856.78
$4,856.78

20.0%

COSTO TOTAL UNITARIO

$29,141

ANALISIS UNITARIO
ITEM
TEJA THERMO ACUSTIC TIPO AJOVER
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
9.00
0.18

VALOR UNI.
$555.56
$388.89
subtotal

11.2.51
und
M2
VALOR PARCIAL
$555.56
$388.89
$944.44

DESCRIPCION
TEJA THERMO ACUSTIC TIPO AJOVER

UNIDAD
KG

CANTIDAD
1.05

VALOR UNI.
$34,100.00

VALOR PARCIAL
$35,805.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$35,805.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
44,916
$8,983.19
$8,983.19

20.0%

COSTO TOTAL UNITARIO

$53,899

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
DOMOS ACRILICOS SIN ESTRUCTURA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
DOMOS ACRILICOS BURBUJA 1-1*1.1 3 MM

TARIFA DIA
5,000.00
70.00

RENDIM.
2.00
0.18

UNIDAD
M2

CANTIDAD
1.00

11.2.52
und
M2

VALOR UNI.
$2,500.00
$388.89
subtotal

VALOR PARCIAL
$2,500.00
$388.89
$2,888.89

VALOR UNI.
$49,550.00

VALOR PARCIAL
$49,550.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$49,550.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
62,647
$12,529.40
$12,529.40

20.0%

COSTO TOTAL UNITARIO

$75,176

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
DOMOS ACRILICOS CON ESTRUCTURA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
DOMOS
ACRILICOS
1.1*1.1
ESTRUCTURA
ESTRUCTURA

3MM

TARIFA DIA
5,000.00
70.00

RENDIM.
2.00
0.18

VALOR UNI.
$2,500.00
$388.89
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$2,500.00
$388.89
$2,888.89
VALOR PARCIAL

CON
M2
KG

1.00
32.00

$49,550.00
$10,000.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

11.2.53
und
M2

TARIFA DIA
67,104.00

RENDIM.
8.00

VALOR UNI.
$8,388.00

$49,550.00
$320,000.00
$369,550.00
VALOR PARCIAL
$8,388.00

Ayudante ( incluye 100% de prestaciones)

36,056.00

8.00

$4,507.00

$4,507.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,895.00
385,334
$77,066.78
$77,066.78

20.0%

COSTO TOTAL UNITARIO

$462,401

ANALISIS UNITARIO
ITEM
AFINADO CBTAS PLANAS. MORT. 1:3 IMP.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.1.1
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MORTERO 1 : 3 IMP ARENA LAVADA

UNIDAD
M3

CANTIDAD
0.04

$50.00

VALOR UNI.
$215,000.00

VALOR PARCIAL
$7,525.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$7,525.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
15,742
$3,148.30
$3,148.30

20.0%

COSTO TOTAL UNITARIO

$18,890

ANALISIS UNITARIO
ITEM
IMPERM. CANALES MANTO ASF. Y FOIL ALUM.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PERMAGLASS 6 FIBERGLASS
ALUMOL RECUBRIMIENTO ALUMINIO
ASFALTO TIPO 190 / 220
SUBCONTRATO INSTALACION

UNIDAD
M2
KG
KG
%

CANTIDAD
3.55
0.24
2.08
45.00

VALOR UNI.
$2,750.00
$15,550.00
$950.00
$6,500.00

subtotal
III.MANO DE OBRA

11.1.2
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$9,762.50
$3,732.00
$1,976.00
$2,925.00

$18,395.50

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
18,446
$3,689.10
$3,689.10

20.0%

COSTO TOTAL UNITARIO

$22,135

ANALISIS UNITARIO
ITEM
IMPERMEABILIZACION CUBIERTA PERMA PLY - 3 CAPAS
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00

No. ITEM
UNIDAD:

RENDIM.
100.00

11.1.3
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERMAGLASS 6 FIBERGLASS
ALUMOL RECUBRIMIENTO ALUMINIO
ASFALTO TIPO 190 / 220
SUBCONTRATO INSTALACION

UNIDAD
M2
KG
KG
%

CANTIDAD
3.55
0.24
2.08
45.00

$50.00

VALOR UNI.
$2,750.00
$15,550.00
$950.00
$6,500.00

VALOR PARCIAL
$9,762.50
$3,732.00
$1,976.00
$2,925.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$18,395.50

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
18,446
$3,689.10
$3,689.10

20.0%

COSTO TOTAL UNITARIO

$22,135

ANALISIS UNITARIO
ITEM
MANTO ASFALTICO CON FOIL ALUMINIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PERMAGLASS 6 FIBERGLASS
ALUMOL RECUBRIMIENTO ALUMINIO
ASFALTO TIPO 190 / 220
SUBCONTRATO INSTALACION

UNIDAD
M2
KG
KG
%

CANTIDAD
3.55
0.24
2.08
45.00

VALOR UNI.
$2,750.00
$15,550.00
$950.00
$6,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

11.1.4
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$9,762.50
$3,732.00
$1,976.00
$2,925.00

$18,395.50
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

51,617.00
30,048.00
subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
18,446
$3,689.10
$3,689.10

20.0%

COSTO TOTAL UNITARIO

$22,135

ANALISIS UNITARIO
ITEM
MANTO ASFALTICO CON POLIETILENO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

11.1.5
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MANTO FIBERGLASS 600 XT
SUBCONTRATO INSTALACION

UNIDAD
M2
%

CANTIDAD
1.00
45.00

$50.00

VALOR UNI.
$7,300.00
$9,500.00

VALOR PARCIAL
$7,300.00
$4,275.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$11,575.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
11,625
$2,325.00
$2,325.00

20.0%

COSTO TOTAL UNITARIO

$13,950

ANALISIS UNITARIO
ITEM
MEDIA CAA MORTERO DE PENDIENTE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA

UNIDAD
KG
M3
M3

CANTIDAD
9.67
0.01
0.05

VALOR UNI.
$400.00
$8,000.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

VALOR UNI.
$5,161.70
$3,004.80

11.1.6
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$3,868.00
$40.00
$1,500.00

$5,408.00
VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
13,625
$2,724.90
$2,724.90

20.0%

COSTO TOTAL UNITARIO

$16,349

ANALISIS UNITARIO
ITEM
PINTURA BITUMINOSA SOBRE TELA ASFALT.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
PINTURA BITUMINOSA SOBRE TELA ASFALT. 2
MANOS

No. ITEM
UNIDAD:

11.1.7
und
M2

TARIFA DIA
5,000.00

RENDIM.
14.00

VALOR UNI.
$357.14
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

GL

0.074

VALOR PARCIAL
$357.14
$357.14
VALOR PARCIAL

$53,450.00

$3,955.30

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
17.00
17.00

$3,955.30

VALOR UNI.
$3,036.29
$1,767.53

VALOR PARCIAL
$3,036.29
$1,767.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,803.82
9,116
$1,823.25
$1,823.25

20.0%

COSTO TOTAL UNITARIO

$10,940

ANALISIS UNITARIO
ITEM
VENTANAS ALUM. CORREDIZAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VENTANA CORREDIZA 1,2 X 1,2
SUB CONTRATO INSTALACION

UNIDAD
M2
%

CANTIDAD
1.03
45.00

VALOR UNI.
$175,000.00
$22,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR UNI.

12.1.1
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$180,250.00
$9,900.00

$190,150.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
190,200
$38,040.00
$38,040.00

20.0%

COSTO TOTAL UNITARIO

$228,240

ANALISIS UNITARIO
ITEM
VENTANAS ALUMINIO FIJAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

12.1.2
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VENTANA ALUMINIO FIJA
SUB CONTRATO INSTALACION

UNIDAD
M2
%

CANTIDAD
1.00
45.00

$50.00

VALOR UNI.
$70,000.00
$22,000.00

VALOR PARCIAL
$70,000.00
$9,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$79,900.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
79,950
$15,990.00
$15,990.00

20.0%

COSTO TOTAL UNITARIO

$95,940

ANALISIS UNITARIO
ITEM
VENTANAS SERIE 3831 AL. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VENTANA ALUMINIO SERIE 3831 AL. C/1
SUB - CONTRATO INSTALACION

UNIDAD
M2
%

CANTIDAD
1.00
45.00

VALOR UNI.
$85,000.00
$22,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR UNI.

12.1.3
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$85,000.00
$9,900.00

$94,900.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
94,950
$18,990.00
$18,990.00

20.0%

COSTO TOTAL UNITARIO

$113,940

ANALISIS UNITARIO
ITEM
VENTANAS SERIE 3831/5020 AL. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

12.1.4
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VENTANA ALUMINIO
SUB - CONTRATO INSTALACION

UNIDAD
M2
%

CANTIDAD
1.00
45.00

$50.00

VALOR UNI.
$85,000.00
$22,000.00

VALOR PARCIAL
$85,000.00
$9,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$94,900.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
94,950
$18,990.00
$18,990.00

20.0%

COSTO TOTAL UNITARIO

$113,940

ANALISIS UNITARIO
ITEM
VENTANAS SERIE 5020 AL. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VENTANA ALUMINIO
SUB - CONTRATO INSTALACION

UNIDAD
M2
%

CANTIDAD
1.00
37.00

VALOR UNI.
$85,000.00
$22,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR UNI.

subtotal

12.1.5
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$85,000.00
$8,140.00

$93,140.00
VALOR PARCIAL

$0.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

93,190
$18,638.00
$18,638.00

20.0%

COSTO TOTAL UNITARIO

$111,828

ANALISIS UNITARIO
ITEM
VENTANAS SERIE 8025 AL. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

12.1.6
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VENTANA ALUMINIO
SUB - CONTRATO INSTALACION

UNIDAD
M2
%

CANTIDAD
1.00
45.00

$50.00

VALOR UNI.
$85,000.00
$22,000.00

VALOR PARCIAL
$85,000.00
$9,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$94,900.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
94,950
$18,990.00
$18,990.00

20.0%

COSTO TOTAL UNITARIO

$113,940

ANALISIS UNITARIO
ITEM
BARANDA Y PASAMANOS TUBO DE 1 1/2"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BARANDA Y PASMANOS TUBO 1 -1 / 2"
SUB - CONTRATO INSTALACION

UNIDAD
ML
%

CANTIDAD
1.03
45.00

VALOR UNI.
$9,280.00
$22,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR UNI.

subtotal

12.2.1
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$9,558.40
$9,900.00

$19,458.40
VALOR PARCIAL

$0.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

19,508
$3,901.68
$3,901.68

20.0%

COSTO TOTAL UNITARIO

$23,410

ANALISIS UNITARIO
ITEM
CAJAS CONTADORES AGUA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

12.2.2
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA ALUMINIO EXT. 2"
ANTICORROSIVO ROJO CLARO
SOLDADURA ELECTRICA 004-3/23"
SUB-CONTRATO ORNAMENTACION
LAMINA COLD ROLLED CAL. 16

UNIDAD
UN
GL
KG
%
UN

CANTIDAD
0.51
0.02
0.68
50.00
0.37

$50.00

VALOR UNI.
$750.00
$30,000.00
$4,200.00
$22,000.00
$29,500.00

VALOR PARCIAL
$382.50
$600.00
$2,856.00
$11,000.00
$10,915.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$25,753.50

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
25,804
$5,160.70
$5,160.70

20.0%

COSTO TOTAL UNITARIO

$30,964

ANALISIS UNITARIO
ITEM
ESCALERA DE GATO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.

VALOR UNI.

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ANTICORROSIVO ROJO CLARO
SOLDADURA ELECTRICA 004-3/23"
SUB-CONTRATO ORNAMENTACION
TUBO GALVANIZADO 1"

UNIDAD
GL
KG
%
ML

CANTIDAD
0.01
0.01
50.00
5.00

VALOR UNI.
$30,000.00
$4,200.00
$22,000.00
$7,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR UNI.

subtotal
Total Costo Directo

12.2.3
und
ML
VALOR PARCIAL

$0.00
VALOR PARCIAL
$300.00
$42.00
$11,000.00
$37,500.00

$48,842.00
VALOR PARCIAL

$0.00
48,842

A.I.U.
Total Costo Indirecto

20.0%

$9,768.40
$9,768.40

COSTO TOTAL UNITARIO

$58,610

ANALISIS UNITARIO
ITEM
INSTALACION CARPINTERIA METALICA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

12.2.4
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SUB-CONTRATO ORNAMENTACION

UNIDAD
%

CANTIDAD
50.00

$50.00

VALOR UNI.
$22,000.00

VALOR PARCIAL
$11,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$11,000.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
11,050
$2,210.00
$2,210.00

20.0%

COSTO TOTAL UNITARIO

$13,260

ANALISIS UNITARIO
ITEM
MARCOS PUERTAS LAMINA-.80
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

12.2.5
und
UN

VALOR UNI.
$5.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA COMUN 2 "
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
LAMINA COLD ROLLED CAL 18
SUB - CONTRATO ORNAMENTACION

UNIDAD
UN
KG
GL
UN
%

CANTIDAD
3.00
0.08
0.02
0.67
50.00

$5.00

VALOR UNI.
$500.00
$4,200.00
$30,000.00
$22,100.00
$22,000.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

VALOR PARCIAL
$1,500.00
$336.00
$600.00
$14,807.00
$11,000.00
$28,243.00

VALOR UNI.

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$5.00

VALOR PARCIAL

$0.00

20.0%

28,248
$5,649.60
$5,649.60

COSTO TOTAL UNITARIO

$33,898

ANALISIS UNITARIO
ITEM
MARCOS TAPAS C. INSPECC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

12.2.6
und
UN

VALOR UNI.
$5.00

VALOR PARCIAL
$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PLATINA DE 1 -1 /4 X 1 / 4
SOLDADURA ELECTRICA 004-3 / 23"
ANGULO EN HIERRO DE 2" X 1 / 4"
ACERO FIGURADO 37000 PSI 1/4"
SUB - CONTRATO ORNAMENTACION

UNIDAD
KG
KG
UN
KG
%

CANTIDAD
3.36
0.20
3.36
8.40
37.00

$5.00

VALOR UNI.
$9,600.00
$4,200.00
$32,000.00
$1,750.00
$22,000.00

VALOR PARCIAL
$32,256.00
$840.00
$107,520.00
$14,700.00
$8,140.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$163,456.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
163,461
$32,692.20
$32,692.20

20.0%

COSTO TOTAL UNITARIO

$196,153

ANALISIS UNITARIO
ITEM
PUERTA ENTAMBORADA LAMINA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

12.2.7
und
M2

VALOR UNI.
$5.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA ALUMINIO 3 "
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
LAMINA COLD ROLLED CAL 18
SUB - CONTRATO ORNAMENTACION

UNIDAD
UN
KG
GL
UN
%

CANTIDAD
3.00
0.97
0.05
1.50
37.00

$5.00

VALOR UNI.
$500.00
$4,200.00
$30,000.00
$22,100.00
$22,000.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,500.00
$4,074.00
$1,500.00
$33,150.00
$8,140.00
$48,364.00

VALOR UNI.

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$5.00

VALOR PARCIAL

$0.00

20.0%

48,369
$9,673.80
$9,673.80
$58,043

ANALISIS UNITARIO
ITEM
PUERTA SENCILLA LAMINA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

12.2.8
und
M2

VALOR UNI.
$5.00

VALOR PARCIAL
$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA ALUMINIO 3 "
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
LAMINA COLD ROLLED CAL 18
SUB - CONTRATO ORNAMENTACION

UNIDAD
UN
KG
GL
UN
%

CANTIDAD
3.00
0.97
0.05
1.50
37.00

$5.00

VALOR UNI.
$500.00
$4,200.00
$30,000.00
$22,100.00
$22,000.00

VALOR PARCIAL
$1,500.00
$4,074.00
$1,500.00
$33,150.00
$8,140.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$48,364.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
48,369
$9,673.80
$9,673.80

20.0%

COSTO TOTAL UNITARIO

$58,043

ANALISIS UNITARIO
ITEM
PUERTAS VENTANAS LAMINA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

12.2.9
und
M2

VALOR UNI.
$5.00

VALOR PARCIAL
$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA ALUMINIO EXT 3 "
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
LAMINA COLD ROLLED CAL 18
SUB - CONTRATO ORNAMENTACION
ANGULO EN HIERRO DE 3/4 X 1/8 "

UNIDAD
UN
KG
GL
UN
%
ML

CANTIDAD
1.75
0.16
0.23
0.55
37.00
1.05

$5.00

VALOR UNI.
$750.00
$4,200.00
$30,000.00
$22,100.00
$22,000.00
$32,000.00

VALOR PARCIAL
$1,312.50
$672.00
$6,900.00
$12,155.00
$8,140.00
$33,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$62,779.50

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
62,785
$12,556.90
$12,556.90

20.0%

COSTO TOTAL UNITARIO

$75,341

ANALISIS UNITARIO
No. ITEM

12.2.10

ITEM
REJA BANCARIA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

und
M2

VALOR UNI.
$5.00

VALOR PARCIAL
$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
SUB - CONTRATO ORNAMENTACION
VARILLA CUADRADA 9 mm

UNIDAD
KG
GL
%
UN

CANTIDAD
0.60
0.20
37.00
1.74

$5.00

VALOR UNI.
$4,200.00
$30,000.00
$22,000.00
$6,985.00

VALOR PARCIAL
$2,520.00
$6,000.00
$8,140.00
$12,153.90

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$28,813.90

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
28,819
$5,763.78
$5,763.78

20.0%

COSTO TOTAL UNITARIO

$34,583

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
REJAS LAMINA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
1,000.00

12.2.11
und
M2

VALOR UNI.
$5.00

VALOR PARCIAL
$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
SUB - CONTRATO ORNAMENTACION
TUBO MUEBLE CALIBRE 18 1"
LAMINA COLD ROLLED CAL 18

UNIDAD
KG
GL
%
ML
UN

CANTIDAD
0.46
0.02
37.00
7.35
0.21

$5.00

VALOR UNI.
$4,200.00
$30,000.00
$22,000.00
$2,274.00
$22,100.00

VALOR PARCIAL
$1,932.00
$600.00
$8,140.00
$16,713.90
$4,641.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$32,026.90

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
32,032
$6,406.38
$6,406.38

20.0%

COSTO TOTAL UNITARIO

$38,438

ANALISIS UNITARIO
ITEM
REJILLAS PISO 30 CM.

No. ITEM
UNIDAD:

12.2.12
und
ML

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
1,000.00

VALOR UNI.
$5.00

VALOR PARCIAL
$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
ACERO FIGURADO 60000 PSI 1"
SUB - CONTRATO ORNAMENTACION
ANGULO EN HIERRO DE 3/4 X 1/8 "

UNIDAD
KG
GL
KG
%
ML

CANTIDAD
1.00
0.01
10.44
37.00
4.10

$5.00

VALOR UNI.
$4,200.00
$30,000.00
$1,780.00
$22,000.00
$32,000.00

VALOR PARCIAL
$4,200.00
$300.00
$18,583.20
$8,140.00
$131,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$162,423.20

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
162,428
$32,485.64
$32,485.64

20.0%

COSTO TOTAL UNITARIO

$194,914

ANALISIS UNITARIO
ITEM
VENTANAS LAMINA C.R. CAL 18. C/ INST
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

12.2.13
und
M2

VALOR UNI.
$5.00

VALOR PARCIAL
$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA ALUMINIO EXT 2"
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
MANIJA PARA VENTANA
SUB - CONTRATO ORNAMENTACION
ANGULO EN HIERRO DE 3/4 X 1/8 "
LAMINA COLD ROLLED CAL 18
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

$5.00

UNIDAD
UN
KG
GL
UN
%
ML
UN

CANTIDAD
1.05
0.16
0.23
1.00
37.00
1.94
0.44

VALOR UNI.
$750.00
$4,200.00
$30,000.00
$33,000.00
$22,000.00
$32,000.00
$22,100.00
subtotal

TARIFA DIA
30,048.00

RENDIM.

VALOR UNI.

VALOR PARCIAL
$787.50
$672.00
$6,900.00
$33,000.00
$8,140.00
$62,080.00
$9,724.00
$121,303.50
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
121,309
$24,261.70
$24,261.70

20.0%

COSTO TOTAL UNITARIO

$145,570

ANALISIS UNITARIO
ITEM
VENTANA EN LMINA C.R. CAL. 20 TIPO PERSIANA PVENTILACIN
I.EQUIPO
DESCRIPCION
TARIFA DIA

No. ITEM
UNIDAD:

RENDIM.

VALOR UNI.

12.2.14
und
M2
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

1,000.00

$5.00

$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO
MANIJA PARA VENTANA
SUB - CONTRATO ORNAMENTACION
ANGULO EN HIERRO DE 3/4 X 1/8 "
LAMINA COLD ROLLED CAL 20
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

$5.00

UNIDAD
KG
GL
UN
%
ML
UN

CANTIDAD
0.93
0.23
1.00
37.00
2.50
0.90

VALOR UNI.
$4,200.00
$30,000.00
$33,000.00
$22,000.00
$32,000.00
$22,100.00
subtotal

TARIFA DIA
30,048.00

RENDIM.

VALOR UNI.

VALOR PARCIAL
$3,906.00
$6,900.00
$33,000.00
$8,140.00
$80,000.00
$19,890.00
$151,836.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
151,841
$30,368.20
$30,368.20

20.0%

COSTO TOTAL UNITARIO

$182,209

ANALISIS UNITARIO
ITEM
RECONSTRUCCIN DE REJAS DE PROTECCIN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

12.2.15
und
M2

VALOR UNI.
$5.00

VALOR PARCIAL
$5.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SUB - CONTRATO ORNAMENTACION

UNIDAD
%

CANTIDAD
37.00

$5.00

VALOR UNI.
$22,000.00

VALOR PARCIAL
$8,140.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$8,140.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
8,145
$1,629.00
$1,629.00

20.0%

COSTO TOTAL UNITARIO

$9,774

ANALISIS UNITARIO
ITEM
RECONSTRUCCIN DE VENTANAS EN LMINA C.R. CAL. 18
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00

No. ITEM
UNIDAD:

RENDIM.
1,000.00

VALOR UNI.
$5.00
subtotal

12.2.16
und
M2
VALOR PARCIAL
$5.00
$5.00

II.MATERIALES DE OBRA
DESCRIPCION
SUB - CONTRATO ORNAMENTACION

UNIDAD
%

CANTIDAD
37.00

VALOR UNI.
$22,000.00

VALOR PARCIAL
$8,140.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$8,140.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
8,145
$1,629.00
$1,629.00

20.0%

COSTO TOTAL UNITARIO

$9,774

ANALISIS UNITARIO
ITEM
HOJA PUERTA TRIPLEX 0.61
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.1.1
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
HOJA PUERTA TRIPLEX 0,61

UNIDAD
UNIDAD

CANTIDAD
1.00

$50.00

VALOR UNI.
$64,000.00

VALOR PARCIAL
$64,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
36,056.00
67,104.00

RENDIM.
12.00
12.00

$64,000.00

VALOR UNI.
$3,004.67
$5,592.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$3,004.67
$5,592.00
$8,596.67
72,647
$14,529.33
$14,529.33

20.0%

COSTO TOTAL UNITARIO

$87,176

ANALISIS UNITARIO
ITEM
HOJA PUERTA TRIPLEX 0.81
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
HOJA PUERTA TRIPLEX 0,81

UNIDAD
UNIDAD

CANTIDAD
1.00

VALOR UNI.
$72,100.00

13.1.2
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$72,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
36,056.00
67,104.00

RENDIM.
12.00
12.00

$72,100.00

VALOR UNI.
$3,004.67
$5,592.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$3,004.67
$5,592.00
$8,596.67
80,747
$16,149.33
$16,149.33

20.0%

COSTO TOTAL UNITARIO

$96,896

ANALISIS UNITARIO
ITEM
HOJA PUERTA TRIPLEX 1.01
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.1.3
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
HOJA PUERTA TRIPLEX 1,01

UNIDAD
UNIDAD

CANTIDAD
1.00

$50.00

VALOR UNI.
$49,900.00

VALOR PARCIAL
$49,900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
36,056.00
67,104.00

RENDIM.
12.00
12.00

$49,900.00

VALOR UNI.
$3,004.67
$5,592.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$3,004.67
$5,592.00
$8,596.67
58,547
$11,709.33
$11,709.33

20.0%

COSTO TOTAL UNITARIO

$70,256

ANALISIS UNITARIO
ITEM
HOJA PUERTA FORTEC 0.70
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PUERTA FORTEC RESIDENCIAL 0,71

UNIDAD
UNIDAD

CANTIDAD
1.00

VALOR UNI.
$43,550.00

13.1.4
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$43,550.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
36,056.00
67,104.00

RENDIM.
12.00
12.00

$43,550.00

VALOR UNI.
$3,004.67
$5,592.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$3,004.67
$5,592.00
$8,596.67
52,197
$10,439.33
$10,439.33

20.0%

COSTO TOTAL UNITARIO

$62,636

ANALISIS UNITARIO
ITEM
HOJA PUERTA FORTEC 1.00
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.1.5
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PUERTA FORTEC RESIDENCIAL 1,00

UNIDAD
UNIDAD

CANTIDAD
1.00

$50.00

VALOR UNI.
$51,250.00

VALOR PARCIAL
$51,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
36,056.00
67,104.00

RENDIM.
12.00
12.00

$51,250.00

VALOR UNI.
$3,004.67
$5,592.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$3,004.67
$5,592.00
$8,596.67
59,897
$11,979.33
$11,979.33

20.0%

COSTO TOTAL UNITARIO

$71,876

ANALISIS UNITARIO
ITEM
HOJA PUERTA FORTEC 1.50
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PUERTA FORTEC RESIDENCIAL 1,50

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$63,400.00

subtotal

13.1.6
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$63,400.00

$63,400.00

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

TARIFA DIA
36,056.00
67,104.00

RENDIM.
12.00
12.00

VALOR UNI.
$3,004.67
$5,592.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$3,004.67
$5,592.00
$8,596.67
72,047
$14,409.33
$14,409.33

20.0%

COSTO TOTAL UNITARIO

$86,456

ANALISIS UNITARIO
ITEM
PUERTA FLORMORADO (MARCO Y HOJA)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.1.7
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA COMUN 3"
CEDRO CAQUETA PIEZA
PEGANTE COLBON
PUNTILLA SIN CABEZA 1"
TRIPLEX ESTRUCTURAL 7mm
TORNILLO PARA MADERA 2" No.9
CEDRO MACHO PIEZA 3.0
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)
Oficial (incluye 100% de prestaciones)

$50.00

UNIDAD
UN
UN
KG
LB
UN
UN
UN

CANTIDAD
3.00
0.34
0.15
0.10
1.00
18.00
0.36

VALOR UNI.
$500.00
$35,000.00
$9,500.00
$1,500.00
$44,100.00
$60.00
$50,000.00
subtotal

VALOR PARCIAL
$1,500.00
$11,900.00
$1,425.00
$150.00
$44,100.00
$1,080.00
$18,000.00
$59,075.00

TARIFA DIA
36,056.00
67,104.00

RENDIM.
2.80
2.80

VALOR UNI.
$12,877.14
$23,965.71
subtotal

VALOR PARCIAL
$12,877.14
$23,965.71
$36,842.86

Total Costo Directo


A.I.U.
Total Costo Indirecto

95,968
$19,193.57
$19,193.57

20.0%

COSTO TOTAL UNITARIO

$115,161

ANALISIS UNITARIO
ITEM
PUERTAS DE 0.80 (MARCO Y HOJA)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA COMUN
CEDRO CAQUETA PIEZA
CEDRO MACHO PIEZA 3.0
PEGANTE COLBON
PUNTILLA SIN CABEZA 1"
TORNILLO PARA MADERA 2" No.9
TRIPLEX PIZANO 4mm
III.MANO DE OBRA

UNIDAD
UN
UN
UN
KL
LB
UN
UN

CANTIDAD
3.00
0.80
0.80
0.20
0.35
18.00
2.00

VALOR UNI.
$500.00
$35,000.00
$50,000.00
$9,500.00
$1,500.00
$60.00
$10,580.00
subtotal

13.1.8
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,500.00
$28,000.00
$40,000.00
$1,900.00
$525.00
$1,080.00
$21,160.00
$94,165.00

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
2.80
2.80

VALOR UNI.
$23,965.71
$12,877.14
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$23,965.71
$12,877.14
$36,842.86
131,058
$26,211.57
$26,211.57

20.0%

COSTO TOTAL UNITARIO

$157,269

ANALISIS UNITARIO
ITEM
PUERTAS DE 1.00 (MARCO Y HOJA)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.1.9
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BISAGRA COMUN
CEDRO CAQUETA PIEZA
CEDRO MACHO PIEZA 3.0
PEGANTE COLBON
PUNTILLA SIN CABEZA 1"
TORNILLO PARA MADERA 2" No.9
TRIPLEX PIZANO 4mm
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

$50.00

UNIDAD
UN
UN
UN
KL
LB
UN
UN

CANTIDAD
3.00
1.00
1.00
0.20
0.35
18.00
2.00

VALOR UNI.
$500.00
$35,000.00
$50,000.00
$9,500.00
$1,500.00
$60.00
$10,580.00
subtotal

VALOR PARCIAL
$1,500.00
$35,000.00
$50,000.00
$1,900.00
$525.00
$1,080.00
$21,160.00
$111,165.00

TARIFA DIA
67,104.00
36,056.00

RENDIM.
2.80
2.80

VALOR UNI.
$23,965.71
$12,877.14
subtotal

VALOR PARCIAL
$23,965.71
$12,877.14
$36,842.86

Total Costo Directo


A.I.U.
Total Costo Indirecto

148,058
$29,611.57
$29,611.57

20.0%

COSTO TOTAL UNITARIO

$177,669

ANALISIS UNITARIO
ITEM
ENCHAPES MUROS EN TRIPLEX
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TIRAS ALISTADO 3X3X3
PEGANTE BOXER
TRIPLEX PIZANO 4 mm

UNIDAD
ML
GL
M2

CANTIDAD
2.00
0.10
1.01

VALOR UNI.
$580.00
$10,580.00
$44,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
17.00
17.00

VALOR UNI.
$3,947.29
$2,120.94

13.3.1
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,160.00
$1,058.00
$44,541.00

$46,759.00
VALOR PARCIAL
$3,947.29
$2,120.94

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,068.24
52,877
$10,575.45
$10,575.45

20.0%

COSTO TOTAL UNITARIO

$63,453

ANALISIS UNITARIO
ITEM
ENCHAPES MUROS FLORMORADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.3.2
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PEGANTE BOXER
TRIPLEX ESTRUCTURAL PIZANO 7 mm
CHAZO EN MADERA 4 X 4

UNIDAD
GL
UN
UN

CANTIDAD
0.10
0.35
2.00

$50.00

VALOR UNI.
$33,000.00
$44,100.00
$350.00

VALOR PARCIAL
$3,300.00
$15,435.00
$700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
16.00
16.00

$19,435.00

VALOR UNI.
$4,194.00
$2,253.50

VALOR PARCIAL
$4,194.00
$2,253.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,447.50
25,933
$5,186.50
$5,186.50

20.0%

COSTO TOTAL UNITARIO

$31,119

ANALISIS UNITARIO
ITEM
PASAMANOS FLORM. 15x.02
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
MADERA FLOR MORADO PIEZA
PUNTILLA SIN CABEZA 1"
TORNILLO PARA MADERA 2" X No 9

UNIDAD
ML
LB
UN

CANTIDAD
0.17
0.25
2.00

VALOR UNI.
$18,000.00
$1,500.00
$60.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
8.00
8.00

VALOR UNI.
$8,388.00
$4,507.00
subtotal

13.3.3
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$3,060.00
$375.00
$120.00

$3,555.00
VALOR PARCIAL
$8,388.00
$4,507.00
$12,895.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

16,500
$3,300.00
$3,300.00

20.0%

COSTO TOTAL UNITARIO

$19,800

ANALISIS UNITARIO
ITEM
PIRLANES DE MADERA DE 0.10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.3.4
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEDRO CAQUETA PIEZA
PUNTILLA SIN CABEZA 1"
TORNILLO PARA MADERA 2" X No 9

UNIDAD
UN
LB
UN

CANTIDAD
0.09
0.25
2.00

$50.00

VALOR UNI.
$35,000.00
$1,500.00
$60.00

VALOR PARCIAL
$3,150.00
$375.00
$120.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
9.00
9.00

$3,645.00

VALOR UNI.
$7,456.00
$4,006.22

VALOR PARCIAL
$7,456.00
$4,006.22

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,462.22
15,157
$3,031.44
$3,031.44

20.0%

COSTO TOTAL UNITARIO

$18,189

ANALISIS UNITARIO
ITEM
PIRLANES DE MADERA DE 0.15
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.3.5
und
ML

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEDRO CAQUETA PIEZA
PUNTILLA SIN CABEZA 1"
TORNILLO PARA MADERA 2" X No 9

UNIDAD
UN
LB
UN

CANTIDAD
0.15
0.25
2.00

$50.00

VALOR UNI.
$35,000.00
$1,500.00
$60.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
9.00
9.00

VALOR PARCIAL
$5,250.00
$375.00
$120.00

$5,745.00

VALOR UNI.
$7,456.00
$4,006.22
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$7,456.00
$4,006.22
$11,462.22

20.0%

17,257
$3,451.44
$3,451.44

COSTO TOTAL UNITARIO

$20,709

ANALISIS UNITARIO
ITEM
PIRLANES DE MADERA DE 0.25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

13.3.6
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEDRO CAQUETA PIEZA
PUNTILLA SIN CABEZA 1"
TORNILLO PARA MADERA 2" X No 9

UNIDAD
UN
LB
UN

CANTIDAD
0.18
0.25
2.00

$50.00

VALOR UNI.
$35,000.00
$1,500.00
$60.00

VALOR PARCIAL
$6,300.00
$375.00
$120.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
9.00
9.00

$6,795.00

VALOR UNI.
$7,456.00
$4,006.22

VALOR PARCIAL
$7,456.00
$4,006.22

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,462.22
18,307
$3,661.44
$3,661.44

20.0%

COSTO TOTAL UNITARIO

$21,969

ANALISIS UNITARIO
ITEM
VENTANERIA EN MADERA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

13.3.7
und
M2

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEDRO CAQUETA PIEZA
PUNTILLA SIN CABEZA 1"
TORNILLO PARA MADERA 2" X No 9
BISAGRA COMUN 3"
PEGANTE COLBON
CHAZO EN MADERA 4 X 4
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UN
LB
UN
UN
KL
UN

CANTIDAD
0.46
0.25
6.00
1.00
0.13
2.00

TARIFA DIA
67,104.00
36,056.00

RENDIM.
3.40
3.50

VALOR PARCIAL
$555.56
$555.56

VALOR UNI.
$35,000.00
$1,500.00
$60.00
$500.00
$9,500.00
$350.00
subtotal

VALOR PARCIAL
$16,100.00
$375.00
$360.00
$500.00
$1,235.00
$700.00
$19,270.00

VALOR UNI.
$19,736.47
$10,301.71

VALOR PARCIAL
$19,736.47
$10,301.71

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

$30,038.18

20.0%

49,864
$9,972.75
$9,972.75
$59,836

ANALISIS UNITARIO
ITEM
ENCHAPE MESONES EN CERAMICA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

14.2.1
und
ML

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
Ceramica corona 20x20
Cemento gris
Cemento blanco
Win de aluminio

UNIDAD
M2
KG
KG
ML

CANTIDAD
0.80
0.40
1.03
1.20

$555.56

VALOR UNI.
$13,000.00
$400.00
$800.00
$9,500.00

VALOR PARCIAL
$10,400.00
$160.00
$824.00
$11,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
10.00

$22,784.00

VALOR UNI.
$5,735.22
$3,004.80

VALOR PARCIAL
$5,735.22
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,740.02
32,080
$6,415.92
$6,415.92

20.0%

COSTO TOTAL UNITARIO

$38,495

ANALISIS UNITARIO
ITEM
GRANITO PULIDO MESONES LABORATORIOS DE 0.60
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00

No. ITEM
UNIDAD:

RENDIM.
9.00

14.2.2
und
ML

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
Granito
Marmolina
Cemento blanco
Pulida granito

UNIDAD
BT
BT
KG
M2

CANTIDAD
0.80
0.60
15.00
0.80

$555.56

VALOR UNI.
$37,500.00
$18,000.00
$800.00
$37,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
6.50

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$30,000.00
$10,800.00
$12,000.00
$30,000.00

$82,800.00

VALOR UNI.
$7,941.08
$4,622.77

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$555.56

VALOR PARCIAL
$7,941.08
$4,622.77
$12,563.85

20.0%

95,919
$19,183.88
$19,183.88
$115,103

ITEM
GRANITO PULIDO MESONES LAVAMANOS DE 0.40
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

14.2.3
und
ML

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
Granito
Marmolina
Cemento blanco
Pulida granito

UNIDAD
BT
BT
KG
M2

CANTIDAD
0.40
0.50
12.00
0.40

$555.56

VALOR UNI.
$18,000.00
$9,500.00
$800.00
$37,500.00

VALOR PARCIAL
$7,200.00
$4,750.00
$9,600.00
$15,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
6.50

$36,550.00

VALOR UNI.
$7,941.08
$4,622.77

VALOR PARCIAL
$7,941.08
$4,622.77

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,563.85
49,669
$9,933.88
$9,933.88

20.0%

COSTO TOTAL UNITARIO

$59,603

ANALISIS UNITARIO
ITEM
GRANITO PULIDO MESONES LAVAMANOS DE 0.60
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

14.2.4
und
ML

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
Granito
Marmolina
Cemento blanco
Pulida granito

UNIDAD
BT
BT
KG
M2

CANTIDAD
0.40
0.50
12.00
0.40

$555.56

VALOR UNI.
$18,000.00
$9,500.00
$800.00
$37,500.00

VALOR PARCIAL
$7,200.00
$4,750.00
$9,600.00
$15,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
6.50

$36,550.00

VALOR UNI.
$7,941.08
$4,622.77

VALOR PARCIAL
$7,941.08
$4,622.77

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,563.85
49,669
$9,933.88
$9,933.88

20.0%

COSTO TOTAL UNITARIO

$59,603

ANALISIS UNITARIO
No. ITEM

14.1.1

ITEM
ENCHAPE CERAMICA 20 x 20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

und
M2

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
Ceramica corona 20x20
Cemento gris
Cemento blanco
Win de aluminio
Agua

UNIDAD
M2
KG
KG
ML
M3

CANTIDAD
1.03
0.40
1.03
1.20
0.03

$555.56

VALOR UNI.
$13,000.00
$400.00
$800.00
$9,500.00
$8,000.00

VALOR PARCIAL
$13,390.00
$160.00
$824.00
$11,400.00
$240.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.50

$26,014.00

VALOR UNI.
$5,433.37
$3,162.95

VALOR PARCIAL
$5,433.37
$3,162.95

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,596.32
35,166
$7,033.17
$7,033.17

20.0%

COSTO TOTAL UNITARIO

$42,199

ANALISIS UNITARIO
ITEM
ENCHAPE CERAMICA 30 x 30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

14.1.2
und
M2

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
Ceramica corona 30X30 BLANCO
Cemento gris
Cemento blanco
Agua

UNIDAD
M2
KG
KG
M3

CANTIDAD
1.03
0.40
1.03
0.03

$555.56

VALOR UNI.
$17,100.00
$400.00
$800.00
$8,000.00

VALOR PARCIAL
$17,613.00
$160.00
$824.00
$240.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.50

$18,837.00

VALOR UNI.
$5,433.37
$3,162.95

VALOR PARCIAL
$5,433.37
$3,162.95

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,596.32
27,989
$5,597.77
$5,597.77

20.0%

COSTO TOTAL UNITARIO

$33,587

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

14.1.3
und

ENCHAPE CRISTANAC
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

M2
TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MOSAICO VITREO
CEMENTO GRIS
CEMENTO BLANCO
AGUA
ARENA LAVADA DE PEA
COLOR MINERAL
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
M2
KG
KG
M3
M3
KG

CANTIDAD
1.03
0.40
1.03
0.03
0.01
0.10

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.50
9.50

$555.56

VALOR UNI.
$37,500.00
$400.00
$800.00
$8,000.00
$25,000.00
$12,600.00
subtotal

VALOR PARCIAL
$38,625.00
$160.00
$824.00
$240.00
$250.00
$1,260.00
$41,359.00

VALOR UNI.
$5,433.37
$3,162.95

VALOR PARCIAL
$5,433.37
$3,162.95

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,596.32
50,511
$10,102.17
$10,102.17

20.0%

COSTO TOTAL UNITARIO

$60,613

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
DUCHA CRISTANAC 1.20 x 0.90
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
1.00

II.MATERIALES DE OBRA
DESCRIPCION
MOSAICO VITREO
CEMENTO GRIS
CEMENTO BLANCO
AGUA
ARENA LAVADA DE PEA
COLOR MINERAL

UNIDAD
M2
KG
KG
M3
M3
KG

CANTIDAD
10.74
6.12
40.77
0.29
0.01
0.10

14.3.1
und
UN

VALOR UNI.
$5,000.00
subtotal

VALOR PARCIAL
$5,000.00
$5,000.00

VALOR UNI.
$69,200.00
$400.00
$800.00
$8,000.00
$25,000.00
$12,600.00

VALOR PARCIAL
$743,208.00
$2,448.00
$32,616.00
$2,320.00
$250.00
$1,260.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.60

$782,102.00

VALOR UNI.
$103,234.00
$50,080.00

VALOR PARCIAL
$103,234.00
$50,080.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$153,314.00
940,416
$188,083.20
$188,083.20

20.0%

COSTO TOTAL UNITARIO

$1,128,499

ANALISIS UNITARIO
ITEM
ENCHAPE BORDILLO ASEO. H = 0.40

No. ITEM
UNIDAD:

14.3.2
und
ML

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
9.00

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
CEMENTO BLANCO
CERAMIC A20*20 EGEO BLANCO

UNIDAD
KG
KG
M2

CANTIDAD
2.00
0.04
0.45

VALOR UNI.
$555.56
subtotal

VALOR PARCIAL
$555.56
$555.56

VALOR UNI.
$400.00
$800.00
$15,076.00

VALOR PARCIAL
$800.00
$32.00
$6,784.20

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$7,616.20

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
14,977
$2,995.43
$2,995.43

20.0%

COSTO TOTAL UNITARIO

$17,973

ANALISIS UNITARIO
ITEM
ENCHAPE BORDILLO DUCHA. H = 0.20
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
CEMENTO BLANCO
CERAMIC A20*20 EGEO BLANCO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

UNIDAD
KG
KG
M2

CANTIDAD
1.00
0.09
0.30

14.3.3
und
ML

VALOR UNI.
$555.56
subtotal

VALOR PARCIAL
$555.56
$555.56

VALOR UNI.
$400.00
$800.00
$15,076.00

VALOR PARCIAL
$400.00
$72.00
$4,522.80

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$4,994.80

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
12,356
$2,471.15
$2,471.15

20.0%

COSTO TOTAL UNITARIO

$14,827

ANALISIS UNITARIO
ITEM
GRANITO POCETA ASEO DE 0.55 x 0.90
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.00

UNIDAD
M3

CANTIDAD
0.03

14.3.4
und
UN

VALOR UNI.
$714.29
subtotal

VALOR PARCIAL
$714.29
$714.29

VALOR UNI.
$30,000.00

VALOR PARCIAL
$900.00

ARENA LAVADA DE RIO


BLOQUE No.4
CEMENTO GRIS
GRAVILLA DE RIO
WIN DE ALUMINIO
TABLA CHAPA ORDINARIO
GRANITO TRAVERTINO
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

M3
UNIDAD
KG
M3
ML
ML
BT

TARIFA DIA
51,617.00
30,048.00

0.02
10.00
18.50
0.03
1.82
0.55
0.80

RENDIM.
2.00
2.00

$58,000.00
$450.00
$400.00
$58,000.00
$1,500.00
$4,060.00
$18,000.00
subtotal

$1,160.00
$4,500.00
$7,400.00
$1,740.00
$2,730.00
$2,233.00
$14,400.00
$35,063.00

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
76,610
$15,321.96
$15,321.96

20.0%

COSTO TOTAL UNITARIO

$91,932

ANALISIS UNITARIO
ITEM
LAVADERO PORCELANA BLANCA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
CEMENTO BLANCO
CERAMIC A20*20 EGEO BLANCO
ARENA DE PEA
BLOQUE No.4
GRAVILLA DE RIO
WIN ALUMINIO 1/2X1/2"
TABLA CHAPA ORDINARIO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

UNIDAD
KG
KG
M2
M3
UNIDAD
M3
ML
ML

CANTIDAD
22.30
2.66
5.30
0.04
12.36
0.04
7.36
0.61

14.3.5
und
UN

VALOR UNI.
$555.56
subtotal

VALOR PARCIAL
$555.56
$555.56

VALOR UNI.
$400.00
$800.00
$15,076.00
$30,000.00
$450.00
$58,000.00
$1,500.00
$4,060.00

VALOR PARCIAL
$8,920.00
$2,128.00
$79,902.80
$1,200.00
$5,562.00
$2,320.00
$11,040.00
$2,476.60

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.45
0.45

$113,549.40

VALOR UNI.
$114,704.44
$66,773.33

VALOR PARCIAL
$114,704.44
$66,773.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$181,477.78
295,583
$59,116.55
$59,116.55

20.0%

COSTO TOTAL UNITARIO

$354,699

ANALISIS UNITARIO
ITEM
TUBO CORTINA DUCHA
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

14.3.6
und
ML
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

7.00

$714.29

$714.29
$714.29

VALOR UNI.
$2,000.00
$3,550.00
subtotal

VALOR PARCIAL
$4,000.00
$5,325.00
$9,325.00

VALOR UNI.
$3,162.95

VALOR PARCIAL
$3,162.95

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ESCUDO GOLPEADOR CERRADURA
TUBO CORTINA DUCHA
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

UNIDAD
UNIDAD
ML

CANTIDAD
2.00
1.50

TARIFA DIA
30,048.00

RENDIM.
9.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,162.95
13,202
$2,640.45
$2,640.45

20.0%

COSTO TOTAL UNITARIO

$15,843

ANALISIS UNITARIO
No. ITEM
UNIDAD:

14.3.7
und
ML

ITEM
WIN DE ALUMINIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
32.00

VALOR UNI.
$156.25
subtotal

VALOR PARCIAL
$156.25
$156.25

II.MATERIALES DE OBRA
DESCRIPCION
WIN ALUMINIO 1/2" X 1/2" X 1/16"
CEMENTO BLANCO

UNIDAD
ML
KG

CANTIDAD
1.05
0.20

VALOR UNI.
$9,500.00
$800.00
subtotal

VALOR PARCIAL
$9,975.00

VALOR UNI.
$4,292.57

VALOR PARCIAL
$4,292.57

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
7.00

$9,975.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,292.57
14,424
$2,884.76
$2,884.76

20.0%

COSTO TOTAL UNITARIO

$17,309

ANALISIS UNITARIO
ITEM
BALA FLUORESCENTE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BALA FLUORESCENTE D = 17,5 cm

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$67,500.00

subtotal

15.2.1
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$67,500.00

$67,500.00

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
3.00
2.90

VALOR UNI.
$19,786.67
$11,395.86

VALOR PARCIAL
$19,786.67
$11,395.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$31,182.53
98,733
$19,746.51
$19,746.51

20.0%

COSTO TOTAL UNITARIO

$118,479

ANALISIS UNITARIO
ITEM
BALA INCANDESCENTE 60 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.2.2
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BALA INCANDESCENTE DE 60 W

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$14,000.00

VALOR PARCIAL
$14,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
59,360.00

RENDIM.
4.00

$14,000.00

VALOR UNI.
$14,840.00

VALOR PARCIAL
$14,840.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$14,840.00
28,890
$5,778.00
$5,778.00

20.0%

COSTO TOTAL UNITARIO

$34,668

ANALISIS UNITARIO
ITEM
BALA INCANDESCENTE 150W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BALA INCANDESCENTE DE 150 W

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$14,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

15.2.3
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$14,000.00

$14,000.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)

59,360.00

4.00

$14,840.00

$14,840.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$14,840.00
28,890
$5,778.00
$5,778.00

20.0%

COSTO TOTAL UNITARIO

$34,668

ANALISIS UNITARIO
ITEM
LUMINARIA MERCURIO 125 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.3.1
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE DE COBRE THW 12 WG
BRAZO LUMINARIA 3/4
LUMINARIA MERCURIO PE- VP 125 W

UNIDAD
ML
UN
UN

CANTIDAD
4.00
1.00
1.00

$50.00

VALOR UNI.
$395.00
$15,000.00
$220,000.00

VALOR PARCIAL
$1,580.00
$15,000.00
$220,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
10.50
10.50

$236,580.00

VALOR UNI.
$5,653.33
$3,147.43

VALOR PARCIAL
$5,653.33
$3,147.43

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,800.76
245,431
$49,086.15
$49,086.15

20.0%

COSTO TOTAL UNITARIO

$294,517

ANALISIS UNITARIO
ITEM
LUMINARIA MERCURIO 250 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE DE COBRE THW 12 WG
BRAZO LUMINARIA 3/4
LUMINARIA MERCURIO PE- VP 250 W

UNIDAD
ML
UN
UN

CANTIDAD
4.00
1.00
1.00

VALOR UNI.
$395.00
$15,000.00
$115,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

VALOR UNI.
$7,420.00
$4,131.00

15.3.2
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,580.00
$15,000.00
$115,000.00

$131,580.00
VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
143,181
$28,636.20
$28,636.20

20.0%

COSTO TOTAL UNITARIO

$171,817

ANALISIS UNITARIO
ITEM
LUMINARIA MERCURIO 400 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.3.3
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE DE COBRE THW 12 WG
BRAZO LUMINARIA 3/4
LUMINARIA MERCURIO PE- VP 400 W

UNIDAD
ML
UN
UN

CANTIDAD
4.00
1.00
1.00

$50.00

VALOR UNI.
$395.00
$15,000.00
$298,000.00

VALOR PARCIAL
$1,580.00
$15,000.00
$298,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$314,580.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
326,181
$65,236.20
$65,236.20

20.0%

COSTO TOTAL UNITARIO

$391,417

ANALISIS UNITARIO
ITEM
LUMINARIA SODIO 150 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE DE COBRE THW 12 WG
BRAZO LUMINARIA 3/4
LUMINARIA DE SODIO LTP - VC 150 W

UNIDAD
ML
UN
UN

CANTIDAD
4.00
1.00
1.00

VALOR UNI.
$395.00
$15,000.00
$188,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

VALOR UNI.
$7,420.00
$4,131.00

15.3.4
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,580.00
$15,000.00
$188,000.00

$204,580.00
VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
216,181
$43,236.20
$43,236.20

20.0%

COSTO TOTAL UNITARIO

$259,417

ANALISIS UNITARIO
ITEM
LUMINARIA SODIO 250 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.3.5
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE DE COBRE THW 12 WG
BRAZO LUMINARIA 3/4
LUMINARIA DE SODIO LTP - VC 250 W

UNIDAD
ML
UN
UN

CANTIDAD
4.00
1.00
1.00

$50.00

VALOR UNI.
$395.00
$15,000.00
$310,000.00

VALOR PARCIAL
$1,580.00
$15,000.00
$310,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$326,580.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
338,181
$67,636.20
$67,636.20

20.0%

COSTO TOTAL UNITARIO

$405,817

ANALISIS UNITARIO
ITEM
LUMINARIA SODIO 400 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE DE COBRE THW 12 WG
BRAZO LUMINARIA 3/4
LUMINARIA DE SODIO LTP - VC 400 W

UNIDAD
ML
UN
UN

CANTIDAD
4.00
1.00
1.00

VALOR UNI.
$395.00
$15,000.00
$291,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

VALOR UNI.
$7,420.00
$4,131.00

15.3.6
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,580.00
$15,000.00
$291,000.00

$307,580.00
VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
319,181
$63,836.20
$63,836.20

20.0%

COSTO TOTAL UNITARIO

$383,017

ANALISIS UNITARIO
ITEM
PROYECTOR SNF-011/400W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.3.7
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PROYECTOR SNF - 011 / T 400W

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$423,000.00

VALOR PARCIAL
$423,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.10
4.00

$423,000.00

VALOR UNI.
$14,478.05
$8,262.00

VALOR PARCIAL
$14,478.05
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,740.05
445,790
$89,158.01
$89,158.01

20.0%

COSTO TOTAL UNITARIO

$534,948

ANALISIS UNITARIO
ITEM
PROYECTOR PHLC-720 MERCUR
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PROYECTOR PHLC 720 - MERC

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$585,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.10
4.00

VALOR UNI.
$14,478.05
$8,262.00
subtotal

Total Costo Directo

15.3.8
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$585,000.00

$585,000.00
VALOR PARCIAL
$14,478.05
$8,262.00
$22,740.05
607,790

A.I.U.
Total Costo Indirecto

20.0%

$121,558.01
$121,558.01

COSTO TOTAL UNITARIO

$729,348

ANALISIS UNITARIO
ITEM
PROYECTOR SNF-011T/T1000
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.3.9
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PROYECTOR SNF - 011 / T 1000 W

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$910,000.00

VALOR PARCIAL
$910,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
4.10
4.00

$910,000.00

VALOR UNI.
$14,478.05
$8,262.00

VALOR PARCIAL
$14,478.05
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,740.05
932,790
$186,558.01
$186,558.01

20.0%

COSTO TOTAL UNITARIO

$1,119,348

ANALISIS UNITARIO
ITEM
REFLECTOR DE PISO 250 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.3.10
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PROYECTOR PISO RRA 250 W

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$353,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
3.70

VALOR PARCIAL
$353,000.00

$353,000.00

VALOR UNI.
$8,931.89
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$8,931.89
$8,931.89

20.0%

361,982
$72,396.38
$72,396.38

COSTO TOTAL UNITARIO

$434,378

ANALISIS UNITARIO
ITEM
REFLECTOR DE PISO 400 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.3.11
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PROYECTOR PISO RRA 400 W

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$395,000.00

VALOR PARCIAL
$395,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
4.00

$395,000.00

VALOR UNI.
$8,262.00

VALOR PARCIAL
$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,262.00
403,312
$80,662.40
$80,662.40

20.0%

COSTO TOTAL UNITARIO

$483,974

ANALISIS UNITARIO
ITEM
SOPORTE PROYECTORES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.3.12
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SOPORTES PARA REFLECTORES

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$87,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
7.80
7.80

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$87,000.00

$87,000.00

VALOR UNI.
$7,610.26
$4,236.92

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$7,610.26
$4,236.92
$11,847.18

20.0%

98,897
$19,779.44
$19,779.44
$118,677

ITEM
CORAZA P/INST.FLCTES.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.1.1
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE DE COBRE THW 12 WG
CONECTOR CORAZA DE 1 / 2"
CORAZA METALICA DE 1 / 2 "

UNIDAD
ML
UN
UN

CANTIDAD
3.00
1.00
1.50

$50.00

VALOR UNI.
$395.00
$870.00
$5,500.00

VALOR PARCIAL
$1,185.00
$870.00
$8,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
7.80

$10,305.00

VALOR UNI.
$4,236.92

VALOR PARCIAL
$4,236.92

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,236.92
14,592
$2,918.38
$2,918.38

20.0%

COSTO TOTAL UNITARIO

$17,510

ANALISIS UNITARIO
ITEM
INST.FLCTE
I.EQUIPO

No. ITEM
UNIDAD:

15.1.2
und
UN

(6P) PLACA

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERNO DE 1 / 2" ALT VEL.1 3/4"
CARGA FULMINANTE FUERTE 330

UNIDAD
UN
UN

CANTIDAD
6.00
6.00

$50.00

VALOR UNI.
$250.00
$300.00

VALOR PARCIAL
$1,500.00
$1,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
15.70
15.70

$3,300.00

VALOR UNI.
$3,780.89
$2,104.97

VALOR PARCIAL
$3,780.89
$2,104.97

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,885.86
9,236
$1,847.17
$1,847.17

20.0%

COSTO TOTAL UNITARIO

$11,083

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

15.1.3
und

INST.FLCTE. (4P) PLACA


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UN
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERNO DE 1 / 2" ALT VEL.1 3/4"
CARGA FULMINANTE FUERTE 330

UNIDAD
UN
UN

CANTIDAD
4.00
4.00

$50.00

VALOR UNI.
$250.00
$300.00

VALOR PARCIAL
$1,000.00
$1,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
24.00
24.00

$2,200.00

VALOR UNI.
$2,473.33
$1,377.00

VALOR PARCIAL
$2,473.33
$1,377.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,850.33
6,100
$1,220.07
$1,220.07

20.0%

COSTO TOTAL UNITARIO

$7,320

ANALISIS UNITARIO
ITEM
LAMPARA 2x40" BAJO PLACA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.1.4
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERNO DE 1 / 2" ALT VEL.1 3/4"
CARGA FULMINANTE FUERTE 330
LAMPARA FLUORESCENTE 2 X 40 X - 20KM

UNIDAD
UN
UN
UN

CANTIDAD
4.00
4.00
1.00

$50.00

VALOR UNI.
$250.00
$300.00
$120,000.00

VALOR PARCIAL
$1,000.00
$1,200.00
$120,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$122,200.00

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
128,026
$25,605.10
$25,605.10

20.0%

COSTO TOTAL UNITARIO

$153,631

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

15.1.6
und

LAMPARA 2x48" BAJO PLACA


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UN
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERNO DE 1 / 2" ALT VEL.1 3/4"
CARGA FULMINANTE FUERTE 330
LAMPARA SLIM 2 X 48 X - 20KM

UNIDAD
UN
UN
UN

CANTIDAD
4.00
4.00
1.00

$50.00

VALOR UNI.
$250.00
$300.00
$127,000.00

VALOR PARCIAL
$1,000.00
$1,200.00
$127,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$129,200.00

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
135,026
$27,005.10
$27,005.10

20.0%

COSTO TOTAL UNITARIO

$162,031

ANALISIS UNITARIO
ITEM
LAMPARA 2x96" BAJO PLACA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.1.7
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERNO DE 1 / 2" ALT VEL.1 3/4"
CARGA FULMINANTE FUERTE 330
LAMPARA SLIM 2 X 96 1 -91K

UNIDAD
UN
UN
UN

CANTIDAD
6.00
6.00
1.00

$50.00

VALOR UNI.
$250.00
$300.00
$148,000.00

VALOR PARCIAL
$1,500.00
$1,800.00
$148,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$151,300.00

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
157,126
$31,425.10
$31,425.10

20.0%

COSTO TOTAL UNITARIO

$188,551

ANALISIS UNITARIO
ITEM
LAMPARA 4x20" BAJO PLACA

No. ITEM
UNIDAD:

15.1.9
und
UN

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERNO DE 1 / 2" ALT VEL.1 3/4"
CARGA FULMINANTE FUERTE 330
LAMPARA FLUORESCENTE 4 X 20 X - 20K

UNIDAD
UN
UN
UN

CANTIDAD
4.00
4.00
1.00

$50.00

VALOR UNI.
$250.00
$300.00
$120,000.00

VALOR PARCIAL
$1,000.00
$1,200.00
$120,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$122,200.00

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
128,026
$25,605.10
$25,605.10

20.0%

COSTO TOTAL UNITARIO

$153,631

ANALISIS UNITARIO
ITEM
LAMPARA 4x48" BAJO PLACA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.1.10
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERNO DE 1 / 2" ALT VEL.1 3/4"
CARGA FULMINANTE FUERTE 330
LAMPARA SLIM 4 X 48 X -13K

UNIDAD
UN
UN
UN

CANTIDAD
4.00
4.00
1.00

$50.00

VALOR UNI.
$250.00
$300.00
$175,600.00

VALOR PARCIAL
$1,000.00
$1,200.00
$175,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$177,800.00

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
183,626
$36,725.10
$36,725.10

20.0%

COSTO TOTAL UNITARIO

$220,351

ANALISIS UNITARIO
ITEM
SOCKETS + BALASTO P/40 W
I.EQUIPO

No. ITEM
UNIDAD:

15.1.11
und
UN

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ARRANCADOR TUBO CORRIENTE
SOCKETS DULUX FLUORESCENTE
BALASTO MERCURIO 400 W

UNIDAD
UN
UN
UN

CANTIDAD
1.00
1.00
1.00

$50.00

VALOR UNI.
$8,100.00
$2,500.00
$45,000.00

VALOR PARCIAL
$8,100.00
$2,500.00
$45,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$55,600.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
67,201
$13,440.20
$13,440.20

20.0%

COSTO TOTAL UNITARIO

$80,641

ANALISIS UNITARIO
ITEM
SOCKETS + BALASTO P/48 W
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.1.12
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOCKETS PARA TUBO SLIM - LINE
BALASTRO E. C. SLIM - LINE 2 X 48

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

$50.00

VALOR UNI.
$2,950.00
$34,000.00

VALOR PARCIAL
$2,950.00
$34,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
8.00
8.00

$36,950.00

VALOR UNI.
$7,420.00
$4,131.00

VALOR PARCIAL
$7,420.00
$4,131.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,551.00
48,551
$9,710.20
$9,710.20

20.0%

COSTO TOTAL UNITARIO

$58,261

ANALISIS UNITARIO
ITEM
TIROS P/INST.FLCTE.
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

15.1.13
und
UN
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

100.00

$50.00

$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PERNO DE 1 / 2" ALT VEL.1 3/4"
CARGA FULMINANTE FUERTE 330

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

$50.00

VALOR UNI.
$250.00
$300.00

VALOR PARCIAL
$250.00
$300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
55.00
55.00

$550.00

VALOR UNI.
$1,079.27
$600.87

VALOR PARCIAL
$1,079.27
$600.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,680.15
2,280
$456.03
$456.03

20.0%

COSTO TOTAL UNITARIO

$2,736

ANALISIS UNITARIO
ITEM
SUM. INST. TUBO FLUORESCENTE PLMPARA 2x96'
I.EQUIPO
DESCRIPCION
TARIFA DIA
HERRAMIENTA MENOR
5,000.00

No. ITEM
UNIDAD:

RENDIM.
100.00

15.1.14
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO FLUORESCENTE SLIM 96"

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$5,220.00

VALOR PARCIAL
$5,220.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
20.00

$5,220.00

VALOR UNI.
$1,652.40

VALOR PARCIAL
$1,652.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,652.40
6,922
$1,384.48
$1,384.48

20.0%

COSTO TOTAL UNITARIO

$8,307

ANALISIS UNITARIO
ITEM
LUMINARIA
I.EQUIPO

No. ITEM
UNIDAD:
DJK 125 W

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.50

VALOR UNI.
$1,428.57

15.4.1
und
UN
VALOR PARCIAL
$1,428.57

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
FAROL DJK 70 W

UNIDAD
UN

CANTIDAD
1.00

$1,428.57

VALOR UNI.
$205,000.00

VALOR PARCIAL
$205,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.

$205,000.00

VALOR UNI.

4.00

VALOR PARCIAL

$8,262.00

$8,262.00

subtotal

$8,262.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

214,691
$42,938.11
$42,938.11

20.0%

COSTO TOTAL UNITARIO

$257,629

ANALISIS UNITARIO
ITEM
LUMINARIA PARA POSTE
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.50

15.4.2
und
UN

VALOR UNI.
$1,428.57

VALOR PARCIAL
$1,428.57

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LUMINARIA Y JK - A 400W . SODIO

UNIDAD
UN

CANTIDAD
1.00

$1,428.57

VALOR UNI.
$230,000.00

VALOR PARCIAL
$230,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.

$230,000.00

VALOR UNI.

4.00

VALOR PARCIAL

$8,262.00

$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,262.00
239,691
$47,938.11
$47,938.11

20.0%

COSTO TOTAL UNITARIO

$287,629

ANALISIS UNITARIO
ITEM
LUMINARIA PEDESTAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.50

VALOR UNI.
$1,428.57
subtotal

15.4.3
und
UN
VALOR PARCIAL
$1,428.57
$1,428.57

II.MATERIALES DE OBRA
DESCRIPCION
FAROL DE PEDESTAL 70 W

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$352,000.00

VALOR PARCIAL
$352,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.

$352,000.00

VALOR UNI.

4.00

VALOR PARCIAL

$8,262.00

$8,262.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,262.00
361,691
$72,338.11
$72,338.11

20.0%

COSTO TOTAL UNITARIO

$434,029

ANALISIS UNITARIO
ITEM
RIEL ELECTRICO 2.34 m
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.4.4
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
RIEL ELECTRICO 30 AMP

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$29,000.00

VALOR PARCIAL
$29,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
2.80
2.80

$29,000.00

VALOR UNI.
$21,200.00
$11,802.86

VALOR PARCIAL
$21,200.00
$11,802.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$33,002.86
62,053
$12,410.57
$12,410.57

20.0%

COSTO TOTAL UNITARIO

$74,463

ANALISIS UNITARIO
ITEM
ROSETA BAKELITA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA

15.4.5
und
UN
VALOR PARCIAL
$50.00
$50.00

DESCRIPCION
ROSETA BAKELITA

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$900.00

VALOR PARCIAL
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
14.00

$900.00

VALOR UNI.
$2,360.57

VALOR PARCIAL
$2,360.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,360.57
3,311
$662.11
$662.11

20.0%

COSTO TOTAL UNITARIO

$3,973

ANALISIS UNITARIO
ITEM
ROSETA PORCELANA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

15.4.6
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ROSETA PORCELANA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$2,500.00

VALOR PARCIAL
$2,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
33,048.00

RENDIM.
16.00

$2,500.00

VALOR UNI.
$2,065.50

VALOR PARCIAL
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,065.50
4,616
$923.10
$923.10

20.0%

COSTO TOTAL UNITARIO

$5,539

ANALISIS UNITARIO
ITEM
BARRAS AYUDA MINUSVALIDOS. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BARRA AYUDA MINUSVALIDOS

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$78,000.00

16.2.1
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$78,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,360.00
33,048.00

RENDIM.
16.00
16.00

$78,000.00

VALOR UNI.
$3,710.00
$2,065.50

VALOR PARCIAL
$3,710.00
$2,065.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,775.50
83,826
$16,765.10
$16,765.10

20.0%

COSTO TOTAL UNITARIO

$100,591

ANALISIS UNITARIO
ITEM
DISPENSADOR JABON ACERO INOX. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.2.2
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
DISPENSADOR JABON ACERO INOX
CEMENTO BLANCO

UNIDAD
UN
KG

CANTIDAD
1.00
0.55

$50.00

VALOR UNI.
$63,800.00
$800.00

VALOR PARCIAL
$63,800.00
$440.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
5.40

$64,240.00

VALOR UNI.
$5,564.44

VALOR PARCIAL
$5,564.44

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,564.44
69,854
$13,970.89
$13,970.89

20.0%

COSTO TOTAL UNITARIO

$83,825

ANALISIS UNITARIO
ITEM
DISPENSADOR TOALLAS ACERO INOX. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
DISPENSADOR TOALLAS ACERO INOX
CEMENTO BLANCO

UNIDAD
UN
KG

CANTIDAD
1.00
0.55

VALOR UNI.
$86,000.00
$800.00

16.2.3
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$86,000.00
$440.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
5.40

$86,440.00

VALOR UNI.
$5,564.44

VALOR PARCIAL
$5,564.44

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,564.44
92,054
$18,410.89
$18,410.89

20.0%

COSTO TOTAL UNITARIO

$110,465

ANALISIS UNITARIO
ITEM
JUEGO DE INCRUSTAR ACUACER. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.2.4
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
JUEGO INCRUSTAR ACUACER
CEMENTO BLANCO

UNIDAD
UN
KG

CANTIDAD
1.03
1.54

$50.00

VALOR UNI.
$37,000.00
$800.00

VALOR PARCIAL
$38,110.00
$1,232.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$39,342.00

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
53,003
$10,600.57
$10,600.57

20.0%

COSTO TOTAL UNITARIO

$63,603

ANALISIS UNITARIO
ITEM
JUEGO DE INCRUSTAR NOVA. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.00

VALOR UNI.
$1,250.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
JUEGO INCRUSTAR NOVA
CEMENTO BLANCO

UNIDAD
UN
KG

CANTIDAD
1.03
1.54

VALOR UNI.
$48,500.00
$800.00

16.2.5
und
UN
VALOR PARCIAL
$1,250.00
$1,250.00
VALOR PARCIAL
$49,955.00
$1,232.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$51,187.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
72,853
$14,570.65
$14,570.65

20.0%

COSTO TOTAL UNITARIO

$87,424

ANALISIS UNITARIO
ITEM
JUEGO DE INCRUSTAR ROYAL. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.00

16.2.6
und
UN

VALOR UNI.
$1,250.00

VALOR PARCIAL
$1,250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
JUEGO INCRUSTAR ROYAL
CEMENTO BLANCO

UNIDAD
UN
KG

CANTIDAD
1.03
1.54

$1,250.00

VALOR UNI.
$55,125.00
$800.00

VALOR PARCIAL
$56,778.75
$1,232.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$58,010.75

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
79,677
$15,935.40
$15,935.40

20.0%

COSTO TOTAL UNITARIO

$95,612

ANALISIS UNITARIO
ITEM
PAPELERA ACERO INOX. 400 MS. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PAPELERA ACERO INOX 400
CEMENTO BLANCO

UNIDAD
UN
KG

CANTIDAD
1.03
0.55

VALOR UNI.
$21,500.00
$800.00

subtotal

16.2.7
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$22,145.00
$440.00

$22,585.00

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
29,440
$5,888.08
$5,888.08

20.0%

COSTO TOTAL UNITARIO

$35,329

ANALISIS UNITARIO
ITEM
PAPELERA ACUACER. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.2.8
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PAPELERA ACUACER
CEMENTO BLANCO

UNIDAD
UN
KG

CANTIDAD
1.03
0.55

$50.00

VALOR UNI.
$12,500.00
$800.00

VALOR PARCIAL
$12,875.00
$440.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$13,315.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
18,809
$3,761.87
$3,761.87

20.0%

COSTO TOTAL UNITARIO

$22,571

ANALISIS UNITARIO
ITEM
REJILLA CON SOSCO 3 x 2". C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
REJILLA CON SOSCO 3 X 2
CEMENTO GRIS

UNIDAD
UN
KG

CANTIDAD
1.00
0.20

VALOR UNI.
$2,000.00
$400.00

subtotal
III.MANO DE OBRA

16.2.9
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$2,000.00
$80.00

$2,080.00

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
30.00

VALOR UNI.
$2,064.68
$1,001.60

VALOR PARCIAL
$2,064.68
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
5,196
$1,039.26
$1,039.26

20.0%

COSTO TOTAL UNITARIO

$6,236

ANALISIS UNITARIO
ITEM
REJILLA PLASTICA 3 x 2". C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.2.10
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REJILLA PLASTICA SOSCO 3 X 2
PEGACOR BLANCO

UNIDAD
UN
KG

CANTIDAD
1.00
0.20

$50.00

VALOR UNI.
$4,500.00
$48,500.00

VALOR PARCIAL
$4,500.00
$9,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
30.00

$14,200.00

VALOR UNI.
$2,064.68
$1,001.60

VALOR PARCIAL
$2,064.68
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
17,316
$3,463.26
$3,463.26

20.0%

COSTO TOTAL UNITARIO

$20,780

ANALISIS UNITARIO
ITEM
REJILLA SIFON 20 x 20". C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
REJILLA SIFON PC 20 X 20
CEMENTO GRIS

UNIDAD
UN
KG

CANTIDAD
1.00
1.00

VALOR UNI.
$6,500.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

16.2.11
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$6,500.00
$400.00

$6,900.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

51,617.00
30,048.00

25.00
30.00

$2,064.68
$1,001.60

$2,064.68
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
10,016
$2,003.26
$2,003.26

20.0%

COSTO TOTAL UNITARIO

$12,020

ANALISIS UNITARIO
ITEM
REJILLA SIFON S 4.5 x 3.5". C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.2.12
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REJILLA SIFON 4,5 X 3,5
CEMENTO GRIS

UNIDAD
UN
KG

CANTIDAD
1.00
1.00

$50.00

VALOR UNI.
$4,000.00
$400.00

VALOR PARCIAL
$4,000.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
30.00

$4,400.00

VALOR UNI.
$2,064.68
$1,001.60

VALOR PARCIAL
$2,064.68
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
7,516
$1,503.26
$1,503.26

20.0%

COSTO TOTAL UNITARIO

$9,020

ANALISIS UNITARIO
ITEM
REJILLA VENTILACION 15 x 15. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
REJILLA SIFON PC 15 X 15
CEMENTO GRIS

UNIDAD
UN
KG

CANTIDAD
1.00
0.20

VALOR UNI.
$2,500.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
51,617.00

RENDIM.
25.00

VALOR UNI.
$2,064.68

16.2.13
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$2,500.00
$80.00

$2,580.00
VALOR PARCIAL
$2,064.68

Ayudante ( incluye 100% de prestaciones)

30,048.00

30.00

$1,001.60

$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
5,696
$1,139.26
$1,139.26

20.0%

COSTO TOTAL UNITARIO

$6,836

ANALISIS UNITARIO
ITEM
REJILLA VENTILACION 20 x 20. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.2.14
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REJILLA SIFON PC 20 X 20
CEMENTO GRIS

UNIDAD
UN
KG

CANTIDAD
1.00
0.20

$50.00

VALOR UNI.
$6,500.00
$400.00

VALOR PARCIAL
$6,500.00
$80.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
30.00

$6,580.00

VALOR UNI.
$2,064.68
$1,001.60

VALOR PARCIAL
$2,064.68
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
9,696
$1,939.26
$1,939.26

20.0%

COSTO TOTAL UNITARIO

$11,636

ANALISIS UNITARIO
ITEM
TAPARREGISTRO 15 x 15. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TAPA REGISTRO 15 X 15
CEMENTO GRIS

UNIDAD
UN
KG

CANTIDAD
1.00
0.20

VALOR UNI.
$2,500.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
30.00

VALOR UNI.
$2,064.68
$1,001.60

16.2.15
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$2,500.00
$80.00

$2,580.00
VALOR PARCIAL
$2,064.68
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
5,696
$1,139.26
$1,139.26

20.0%

COSTO TOTAL UNITARIO

$6,836

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
TAPARREGISTRO 20 x 20. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
9.00

16.2.16
und
UN

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TAPA REGISTRO 20 X 20
CEMENTO GRIS

UNIDAD
UN
KG

CANTIDAD
1.00
0.20

$555.56

VALOR UNI.
$130,000.00
$400.00

VALOR PARCIAL
$130,000.00
$80.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
30.00

$130,080.00

VALOR UNI.
$2,064.68
$1,001.60

VALOR PARCIAL
$2,064.68
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
133,702
$26,740.37
$26,740.37

20.0%

COSTO TOTAL UNITARIO

$160,442

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
SECADOR ELCTRICO PMANOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
SECADOR ELECTRICO P / MANOS
PULSADOR
CEMENTO GRIS

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

EXCELL
UN
KG

1.00
0.20

$755,000.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

16.2.17
und
UN

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

VALOR UNI.
$10,323.40
$6,009.60

$755,000.00
$80.00

$755,080.00
VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
771,463
$154,292.60
$154,292.60

20.0%

COSTO TOTAL UNITARIO

$925,756

ANALISIS UNITARIO
ITEM
DESMONTE APARATOS SANITARIOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
II.MATERIALES DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

16.1.1
und
UN

TARIFA DIA
5,000.00
135,000.00

RENDIM.
100.00
18.00

VALOR UNI.
$50.00
$7,500.00
subtotal

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$50.00
$7,500.00
$7,550.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.50
6.50

$0.00

VALOR UNI.
$7,941.08
$4,622.77

VALOR PARCIAL
$7,941.08
$4,622.77

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,563.85
20,114
$4,022.77
$4,022.77

20.0%

COSTO TOTAL UNITARIO

$24,137

ANALISIS UNITARIO
ITEM
DUCHA ANTIVANDALICA DOCOL. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
DUCHA ANTIVANDALICA

UNIDAD
UNIDAD

CANTIDAD
1.00

VALOR UNI.
$80,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.50
8.50

VALOR UNI.
$6,072.59
$3,535.06

16.1.2
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$80,800.00

$80,800.00
VALOR PARCIAL
$6,072.59
$3,535.06

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,607.65
90,458
$18,091.53
$18,091.53

20.0%

COSTO TOTAL UNITARIO

$108,549

ANALISIS UNITARIO
ITEM
DUCHA CALYPSO MEZCLADOR. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.3
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
DUCHA CALYPSO MEZCLADOR

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$38,600.00

VALOR PARCIAL
$38,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$38,600.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
44,094
$8,818.87
$8,818.87

20.0%

COSTO TOTAL UNITARIO

$52,913

ANALISIS UNITARIO
ITEM
DUCHA CALYPSO SENCILLA. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
DUCHA CALYPSO SENCILLA

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$18,450.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

VALOR UNI.
$3,441.13
$2,003.20
subtotal

16.1.4
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$18,450.00

$18,450.00
VALOR PARCIAL
$3,441.13
$2,003.20
$5,444.33

Total Costo Directo


A.I.U.
Total Costo Indirecto

23,944
$4,788.87
$4,788.87

20.0%

COSTO TOTAL UNITARIO

$28,733

ANALISIS UNITARIO
ITEM
GRIFERIA ANTIVANDALICA LAVAMANOS. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.5
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
GRIFERIA ANTIVANDALICA LAVAMANOS

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$127,000.00

VALOR PARCIAL
$127,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$127,000.00

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
136,124
$27,224.78
$27,224.78

20.0%

$163,349
ANALISIS UNITARIO
ITEM
GRIFERIA ANTIVANDALICA ORINAL. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
GRIFERIAN ANTIVANDALICA ORINAL

UNIDAD
UNIDAD

CANTIDAD
1.00

VALOR UNI.
$106,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

VALOR UNI.
$3,441.13
$2,003.20
subtotal

16.1.6
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$106,000.00

$106,000.00
VALOR PARCIAL
$3,441.13
$2,003.20
$5,444.33

Total Costo Directo


A.I.U.
Total Costo Indirecto

111,494
$22,298.87
$22,298.87

20.0%

COSTO TOTAL UNITARIO

$133,793

ANALISIS UNITARIO
ITEM
GRIFERIA ANTIVANDALICA SANITARIO. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

16.1.7
und
UN

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
GRIFERIA ANTIVANDALICA SANITARIO

UNIDAD
UNIDAD

CANTIDAD
1.00

$555.56

VALOR UNI.
$252,000.00

VALOR PARCIAL
$252,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$252,000.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
258,000
$51,599.98
$51,599.98

20.0%

COSTO TOTAL UNITARIO

$309,600

ANALISIS UNITARIO
ITEM
GRIFERIA LAVAMANOS TIPO GRIVAL SIMIL.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
GRIFERIA LAVAMANOS LOIRA 4" CONJ CR

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$75,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

VALOR UNI.
$4,301.42
$2,504.00
subtotal

Total Costo Directo

16.1.8
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$75,600.00

$75,600.00
VALOR PARCIAL
$4,301.42
$2,504.00
$6,805.42
82,455

A.I.U.
Total Costo Indirecto

20.0%

$16,491.08
$16,491.08

COSTO TOTAL UNITARIO

$98,947

ANALISIS UNITARIO
ITEM
GRIFERIA LAVAMANOS PRISMA 8". S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

16.1.9
und
UN

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
GRIFERIA LAVAMANOS PRISMA 8" CONJ CR

UNIDAD
UN

CANTIDAD
1.00

$555.56

VALOR UNI.
$72,200.00

VALOR PARCIAL
$72,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$72,200.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
79,561
$15,912.19
$15,912.19

20.0%

COSTO TOTAL UNITARIO

$95,473

ANALISIS UNITARIO
ITEM
GRIFERIA LAVAMANOS URANO 8" CR. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.10
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
GRIFERIA LAVAMANOS URANO 8" CONJ CR

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$171,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

VALOR PARCIAL
$171,400.00

$171,400.00

VALOR UNI.
$4,301.42
$2,504.00
subtotal

Total Costo Directo


A.I.U.

VALOR PARCIAL
$50.00

VALOR PARCIAL
$4,301.42
$2,504.00
$6,805.42

20.0%

178,255
$35,651.08

Total Costo Indirecto

$35,651.08

COSTO TOTAL UNITARIO

$213,907

ANALISIS UNITARIO
ITEM
GRIFERIA LAVAPLATOS IRIS HALCON. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.11
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LAVAPLATOS IRIS P / HALCON CR

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$57,500.00

VALOR PARCIAL
$57,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$57,500.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
64,355
$12,871.08
$12,871.08

20.0%

COSTO TOTAL UNITARIO

$77,227

ANALISIS UNITARIO
ITEM
GRIFERIA LAVAPLATOS PRISMA SOBRP. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

16.1.12
und
UN

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
LAVAPLATOS PRISMA CR

UNIDAD
UN

CANTIDAD
1.00

$555.56

VALOR UNI.
$98,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

VALOR PARCIAL
$98,000.00

$98,000.00

VALOR UNI.
$4,301.42
$2,504.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$555.56

VALOR PARCIAL
$4,301.42
$2,504.00
$6,805.42

20.0%

105,361
$21,072.19
$21,072.19

COSTO TOTAL UNITARIO

$126,433

ANALISIS UNITARIO
ITEM
GRIFERIA PARA ORINAL. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.13
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
GRIFERIA ORINAL TRADIC C

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$65,400.00

VALOR PARCIAL
$65,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$65,400.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
72,255
$14,451.08
$14,451.08

20.0%

COSTO TOTAL UNITARIO

$86,707

ANALISIS UNITARIO
ITEM
INST. FLOTADOR PARA SANITARIOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.15
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

VALOR PARCIAL

$0.00

VALOR UNI.
$6,452.13
$3,756.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$6,452.13
$3,756.00
$10,208.13

20.0%

10,258
$2,051.63
$2,051.63

COSTO TOTAL UNITARIO

$12,310

ANALISIS UNITARIO
ITEM
INST. GRIFERIA LAVAMANOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.16
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.40
6.40

$0.00

VALOR UNI.
$8,065.16
$4,695.00

VALOR PARCIAL
$8,065.16
$4,695.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,760.16
12,810
$2,562.03
$2,562.03

20.0%

COSTO TOTAL UNITARIO

$15,372

ANALISIS UNITARIO
ITEM
INST. GRIFERIA LAVAPLATOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.17
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.40
6.40

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL

$0.00

VALOR UNI.
$8,065.16
$4,695.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$8,065.16
$4,695.00
$12,760.16

20.0%

12,810
$2,562.03
$2,562.03
$15,372

ANALISIS UNITARIO
ITEM
INST. GRIFERIA ORINAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.18
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.40
6.40

$0.00

VALOR UNI.
$8,065.16
$4,695.00

VALOR PARCIAL
$8,065.16
$4,695.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,760.16
12,810
$2,562.03
$2,562.03

20.0%

COSTO TOTAL UNITARIO

$15,372

ANALISIS UNITARIO
ITEM
INST. GRIFERIA SANITARIOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.19
und
UN

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.40
6.40

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL

$0.00

VALOR UNI.
$8,065.16
$4,695.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$8,065.16
$4,695.00
$12,760.16

20.0%

12,810
$2,562.03
$2,562.03
$15,372

ANALISIS UNITARIO
ITEM
INST. LLAVES INDIVIDUALES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.20
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$0.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
10,258
$2,051.63
$2,051.63

20.0%

COSTO TOTAL UNITARIO

$12,310

ANALISIS UNITARIO
ITEM
INSTALACION APARATO SANITARIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

16.1.21
und
UN

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO BLANCO

UNIDAD
KG

CANTIDAD
0.50

$555.56

VALOR UNI.
$800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$400.00

$400.00

VALOR UNI.
$12,904.25
$7,512.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$555.56

VALOR PARCIAL
$12,904.25
$7,512.00
$20,416.25

20.0%

21,372
$4,274.36
$4,274.36
$25,646

ITEM
LAVAMANOS ACUACER 732 + GRIF. 50110. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.22
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LAVAMANOS ACUACER 732 + GRIFERIA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$68,300.00

VALOR PARCIAL
$68,300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$68,300.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
78,558
$15,711.63
$15,711.63

20.0%

COSTO TOTAL UNITARIO

$94,270

ANALISIS UNITARIO
ITEM
LAVAMANOS ACUACER 732. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.23
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LAVAMANOS ACUACER 732

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$43,200.00

VALOR PARCIAL
$43,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$43,200.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
53,458
$10,691.63
$10,691.63

20.0%

COSTO TOTAL UNITARIO

$64,150

ANALISIS UNITARIO
No. ITEM

16.1.24

ITEM
LAVAMANOS NOVA 734 + GRIF. 47110. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LAVAMANOS NOVA 734 + GRIFERIA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$135,000.00

VALOR PARCIAL
$135,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$135,000.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
145,258
$29,051.63
$29,051.63

20.0%

COSTO TOTAL UNITARIO

$174,310

ANALISIS UNITARIO
ITEM
LAVAMANOS NOVA 734. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.25
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LAVAMANOS NOVA 734

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$95,000.00

VALOR PARCIAL
$95,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$95,000.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
105,258
$21,051.63
$21,051.63

20.0%

COSTO TOTAL UNITARIO

$126,310

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

16.1.26
und

LAVAMANOS NOVA 738 + GRIF. 47110. S/I


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UN
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LAVAMANOS NOVA 738 + GRIFERIA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$83,250.00

VALOR PARCIAL
$83,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$83,250.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
93,508
$18,701.63
$18,701.63

20.0%

COSTO TOTAL UNITARIO

$112,210

ANALISIS UNITARIO
ITEM
ORINAL 06102 GRIF. 70700. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.28
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ORINAL 060102 + GRIFERIA ORINAL TRAD

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$182,100.00

VALOR PARCIAL
$182,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$182,100.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
192,358
$38,471.63
$38,471.63

20.0%

COSTO TOTAL UNITARIO

$230,830

ANALISIS UNITARIO
ITEM
ORINAL CON FLUXOMETRO. S/I

No. ITEM
UNIDAD:

16.1.29
und
UN

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ORINAL CON FLUXOMETRO

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$208,500.00

VALOR PARCIAL
$208,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$208,500.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
218,758
$43,751.63
$43,751.63

20.0%

COSTO TOTAL UNITARIO

$262,510

ANALISIS UNITARIO
ITEM
ORINAL CON GRIFERIA ANTIVANDALICA. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.30
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ORINAL + GRIFERIA ANTIVANDALICA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$450,000.00

VALOR PARCIAL
$450,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$450,000.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
460,258
$92,051.63
$92,051.63

20.0%

COSTO TOTAL UNITARIO

$552,310

ANALISIS UNITARIO
ITEM
ORINAL MEDIANO
I.EQUIPO

No. ITEM
UNIDAD:

16.1.31
und
UN

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ORINAL MEDIANO

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$65,400.00

VALOR PARCIAL
$65,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$65,400.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
75,658
$15,131.63
$15,131.63

20.0%

COSTO TOTAL UNITARIO

$90,790

ANALISIS UNITARIO
ITEM
POCETA ACERO INOX. 35x40 + GRIFERIA. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.32
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
POCETA ACERO INOX 35 X 40 + GRIFERIA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$44,200.00

VALOR PARCIAL
$44,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$44,200.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
54,458
$10,891.63
$10,891.63

20.0%

COSTO TOTAL UNITARIO

$65,350

ANALISIS UNITARIO
ANALISIS UNITARIO
ITEM
SANITARIO CON GRIF. ANTIVANDALICA. S/I

No. ITEM
UNIDAD:

16.1.34
und
UN

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SANITARIO + GRIFERIA ANTIVANDALICA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$3,800.00

VALOR PARCIAL
$3,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$3,800.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
14,058
$2,811.63
$2,811.63

20.0%

COSTO TOTAL UNITARIO

$16,870

ANALISIS UNITARIO
ITEM
SANITARIO INFANTIL MANCESA 2634. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.35
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SANITARIO INFANTIL MANCESA 2634

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$253,000.00

VALOR PARCIAL
$253,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$253,000.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
273,466
$54,693.25
$54,693.25

20.0%

COSTO TOTAL UNITARIO

$328,160

ANALISIS UNITARIO
ITEM
SANITARIO INSTITUCIONAL FLUXMETRO. S/I
I.EQUIPO

No. ITEM
UNIDAD:

16.1.36
und
UN

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SANITARIO INST + FLUXOMETRO

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$218,570.00

VALOR PARCIAL
$218,570.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$218,570.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
239,036
$47,807.25
$47,807.25

20.0%

COSTO TOTAL UNITARIO

$286,844

ANALISIS UNITARIO
ITEM
SANITARIO MINUSV. FLUXMETRO. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.37
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SANITARIO INST + FLUXOMETRO
BARRA MINUSVALIDO

UNIDAD
UN
UN

CANTIDAD
1.00
1.00

$50.00

VALOR UNI.
$218,570.00
$78,000.00

VALOR PARCIAL
$218,570.00
$78,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$296,570.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
317,036
$63,407.25
$63,407.25

20.0%

COSTO TOTAL UNITARIO

$380,444

ANALISIS UNITARIO
ITEM
SANITARIO NOVA 30351 BLANCO. S/I
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

16.1.38
und
UN
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

100.00

$50.00

$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SANITARIO NOVA 3035 BLANCO

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$205,100.00

VALOR PARCIAL
$205,100.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$205,100.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
225,566
$45,113.25
$45,113.25

20.0%

COSTO TOTAL UNITARIO

$270,680

ANALISIS UNITARIO
ITEM
SANITARIO ACUACER S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.1.39
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SANITARIO ACUACER

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$198,400.00

VALOR PARCIAL
$198,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
4.00
4.00

$198,400.00

VALOR UNI.
$12,904.25
$7,512.00

VALOR PARCIAL
$12,904.25
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$20,416.25
218,866
$43,773.25
$43,773.25

20.0%

COSTO TOTAL UNITARIO

$262,640

ANALISIS UNITARIO
ITEM
LLAVE INDIVIDUAL LAVAMANOS. C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

16.3.1
und
UN
VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LLAVE INDIVIDUAL LAVAMANOS

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$7,210.00

VALOR PARCIAL
$7,210.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$7,210.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
14,065
$2,813.08
$2,813.08

20.0%

COSTO TOTAL UNITARIO

$16,879

ANALISIS UNITARIO
ITEM
LLAVE MANGUERA 1/2". C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.3.2
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LLAVE MANGUERA 1 / 2"

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$3,500.00

VALOR PARCIAL
$3,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$3,500.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
8,994
$1,798.87
$1,798.87

20.0%

COSTO TOTAL UNITARIO

$10,793

ANALISIS UNITARIO
ITEM
LLAVE TERMINAL CROMADA 1/2". C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

16.3.3
und
UN
VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LLAVE TERMINAL CROMADA 1 / 2"

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$9,600.00

VALOR PARCIAL
$9,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$9,600.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
15,094
$3,018.87
$3,018.87

20.0%

COSTO TOTAL UNITARIO

$18,113

ANALISIS UNITARIO
ITEM
TANQUE PLASTICO 1000 LTS. S/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.3.4
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TANQUE PLASTICO 1000 LTS COLEMPAQUES

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$260,700.00

VALOR PARCIAL
$260,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

$260,700.00

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
301,583
$60,316.50
$60,316.50

20.0%

COSTO TOTAL UNITARIO

$361,899

ANALISIS UNITARIO
ITEM
TANQUE PLASTICO 5000 LTS. S/I ???
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

16.3.5
und
UN
VALOR PARCIAL
$50.00
$50.00

II.MATERIALES DE OBRA
DESCRIPCION
TANQUE PLASTICO 5000 LTS COLEMPAQUES

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$1,175,500.00

VALOR PARCIAL
$1,175,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.00
2.00

$1,175,500.00

VALOR UNI.
$25,808.50
$15,024.00

VALOR PARCIAL
$25,808.50
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$40,832.50
1,216,383
$243,276.50
$243,276.50

20.0%

COSTO TOTAL UNITARIO

$1,459,659

ANALISIS UNITARIO
ITEM
VALVULA LAVADERO 2". C/I
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

16.3.6
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VALVULA LAVADERO
CEMENTO GRIS

UNIDAD
UN
KG

CANTIDAD
1.00
0.20

$50.00

VALOR UNI.
$5,600.00
$400.00

VALOR PARCIAL
$5,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
30.00

$5,600.00

VALOR UNI.
$2,064.68
$1,001.60

VALOR PARCIAL
$2,064.68
$1,001.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,066.28
8,716
$1,743.26
$1,743.26

20.0%

COSTO TOTAL UNITARIO

$10,460

ANALISIS UNITARIO
ITEM
ARMADURA MADERA Y MALLA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA

17.1.1
und
M2
VALOR PARCIAL
$50.00
$50.00

DESCRIPCION
MALLA CON VENA 0,60 X 2,00
REPISA ORDINARIO 3 m
PUNTILLA CON CABEZA

UNIDAD
UN
UN
UN

CANTIDAD
0.73
2.16
0.04

VALOR UNI.
$3,800.00
$1,360.00
$1,500.00

VALOR PARCIAL
$2,774.00
$2,937.60
$60.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$5,771.60

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
17,488
$3,497.61
$3,497.61

20.0%

COSTO TOTAL UNITARIO

$20,986

ANALISIS UNITARIO
ITEM
C. RASO BOVEDAS DRYWALL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

17.1.2
und
M2

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CIELO RASO DRY WALL BOVEDA
VINILTEX
SUB-CONTRATO INSTALACION

UNIDAD
M2
GL
%

CANTIDAD
1.00
0.04
20.00

$555.56

VALOR UNI.
$28,450.00
$46,840.00
$46,190.00

VALOR PARCIAL
$28,450.00
$1,873.60
$9,238.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$39,561.60

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
40,117
$8,023.43
$8,023.43

20.0%

COSTO TOTAL UNITARIO

$48,141

ANALISIS UNITARIO
ITEM
C. RASO PLANO DRYWALL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.00

VALOR UNI.
$500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

17.1.3
und
M2
VALOR PARCIAL
$500.00
$500.00
VALOR PARCIAL

CIELO RASO DRY WALL PLANO


VINILTEX
SUB-CONTRATO INSTALACION

M2
GL
%

1.00
0.04
20.00

$24,500.00
$46,840.00
$42,500.00

$24,500.00
$1,873.60
$8,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$34,873.60

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
35,374
$7,074.72
$7,074.72

20.0%

COSTO TOTAL UNITARIO

$42,448

ANALISIS UNITARIO
ITEM
C.RASO YESO (OCULTO)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

17.1.4
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CIELO RASO CARRIL OCULTO

UNIDAD
M2

CANTIDAD
1.00

$50.00

VALOR UNI.
$35,200.00

VALOR PARCIAL
$35,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$35,200.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
43,417
$8,683.30
$8,683.30

20.0%

COSTO TOTAL UNITARIO

$52,100

ANALISIS UNITARIO
ITEM
C.RASO YESO SEMI OCULTO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CIELO RASO CARRIL SEMI - OCULTO

UNIDAD
M2

CANTIDAD
1.00

VALOR UNI.
$43,860.00

17.1.5
und
M2
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL
$43,860.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$43,860.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
52,582
$10,516.41
$10,516.41

20.0%

COSTO TOTAL UNITARIO

$63,098

ANALISIS UNITARIO
ITEM
CIELO RASO DURACUSTIC 5/8"
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.

17.1.6
und
M2

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
DURACUSTIC R HEWIN - FIBERGLASS 5/8"
SUB-CONTRATO INSTALACION

UNIDAD
LM
%

CANTIDAD
1.00
43.00

$0.00

VALOR UNI.
$12,000.00
$22,460.00

VALOR PARCIAL
$12,000.00
$9,657.80

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$21,657.80

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
21,658
$4,331.56
$4,331.56

20.0%

COSTO TOTAL UNITARIO

$25,989

ANALISIS UNITARIO
ITEM
LAMINA PLANA
I.EQUIPO

No. ITEM
UNIDAD:
ETERNIT

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
MEDIA CAA EN VIROLA
TIRAS LISTADO 3 X 3 X 3

UNIDAD
ML
ML

CANTIDAD
0.54
4.32

VALOR UNI.
$60,000.00
$580.00

17.1.7
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$32,400.00
$2,505.60

PUNTILLA CON CABEZA DE 2"


PLACA ETERNIT MEDIA X 4 mm
MERULEX I.F. TRANSPARENTE

LB
UN
KG

0.27
1.37
0.01

$1,500.00
$18,720.00
$15,300.00

$405.00
$25,646.40
$153.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$61,110.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
69,327
$13,865.30
$13,865.30

20.0%

COSTO TOTAL UNITARIO

$83,192

ANALISIS UNITARIO
ITEM
LISTON M.H. PINO ROMERON
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

17.1.8
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MEDIA CAA EN VIROLA
TIRAS ALISTADO 3 X 3 X 3
PUNTILLA CON CABEZA DE 2"
LISTON MH. PINO ROMERON
TOC MADERA TRANSPARENTE

UNIDAD
ML
ML
LB
M2
KG

CANTIDAD
0.54
4.32
0.27
1.08
0.05

$50.00

VALOR UNI.
$1,500.00
$580.00
$1,500.00
$60,000.00
$13,500.00

VALOR PARCIAL
$810.00
$2,505.60
$405.00
$64,800.00
$675.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$69,195.60

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
80,912
$16,182.41
$16,182.41

20.0%

COSTO TOTAL UNITARIO

$97,094

ANALISIS UNITARIO
ITEM
LISTON M.H. VIROLA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
MEDIA CAA EN VIROLA
TIRAS ALISTADO 3 X 3 X 3
PUNTILLA CON CABEZA DE 2"

UNIDAD
ML
ML
LB

CANTIDAD
0.54
4.32
0.27

VALOR UNI.
$1,500.00
$580.00
$1,500.00

17.1.9
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$810.00
$2,505.60
$405.00

LISTON MH. VIROLA


TOC MADERA TRANSPARENTE

M2
KG

1.08
0.05

$25,000.00
$13,500.00

$27,000.00
$675.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$31,395.60

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
43,112
$8,622.41
$8,622.41

20.0%

COSTO TOTAL UNITARIO

$51,734

ANALISIS UNITARIO
ITEM
LUXACELL ACERO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

17.1.10
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CIELO RASO ALUZINC CELL 5X5

UNIDAD
M2

CANTIDAD
1.03

$50.00

VALOR UNI.
$205,000.00

VALOR PARCIAL
$211,150.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$211,150.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
221,408
$44,281.63
$44,281.63

20.0%

COSTO TOTAL UNITARIO

$265,690

ANALISIS UNITARIO
ITEM
LUXALON ACERO ACUST.P 80
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CIELORASO ACE ACUSTICO 84R V5

UNIDAD
M2

CANTIDAD
1.03

VALOR UNI.
$92,600.00

17.1.11
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$95,378.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$95,378.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
105,636
$21,127.23
$21,127.23

20.0%

COSTO TOTAL UNITARIO

$126,763

ANALISIS UNITARIO
ITEM
LUXALON ACERO DECOR P 130
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

17.1.12
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CIELORASO ACE ACUSTICO 130B

UNIDAD
M2

CANTIDAD
1.03

$50.00

VALOR UNI.
$212,000.00

VALOR PARCIAL
$218,360.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$218,360.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
228,618
$45,723.63
$45,723.63

20.0%

COSTO TOTAL UNITARIO

$274,342

ANALISIS UNITARIO
ITEM
LUXALON ALUMINIO P 80
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

VALOR UNI.
$2,500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CIELORASO ALUMINIO ACUSTICO 84R

UNIDAD
M2

CANTIDAD
1.03

VALOR UNI.
$110,000.00

17.1.13
und
M2
VALOR PARCIAL
$2,500.00
$2,500.00
VALOR PARCIAL
$113,300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$113,300.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
126,008
$25,201.63
$25,201.63

20.0%

COSTO TOTAL UNITARIO

$151,210

ANALISIS UNITARIO
ITEM
LUXALON GALV.ACUST. P 130
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

17.1.14
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CIELORASO ALUZ ACUSTICO 30B

UNIDAD
M2

CANTIDAD
1.03

$50.00

VALOR UNI.
$205,460.00

VALOR PARCIAL
$211,623.80

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.00
8.00

$211,623.80

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
221,882
$44,376.39
$44,376.39

20.0%

COSTO TOTAL UNITARIO

$266,258

ANALISIS UNITARIO
ITEM
MALLA PARA
I.EQUIPO

No. ITEM
UNIDAD:
PAETAR

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
MALLA CON VENA 0,60 X 2,00
PUNTILLA CON CABEZA DE 2"

UNIDAD
UN
LB

CANTIDAD
0.73
0.02

VALOR UNI.
$3,800.00
$1,500.00

17.1.15
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$2,774.00
$30.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$2,804.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
8,298
$1,659.67
$1,659.67

20.0%

COSTO TOTAL UNITARIO

$9,958

ANALISIS UNITARIO
ITEM
TABLEX
I.EQUIPO

No. ITEM
UNIDAD:

17.1.16
und
M2

19 mm

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
REPISA ORDINARIA 3m
PUNTILLA CON CABEZA DE 2"
MERULEX I.F. TRANSPARENTE
PUERTA TABLEX OK . PIZANO 19mm

UNIDAD
ML
LB
KG
UN

CANTIDAD
2.54
2.06
0.20
0.27

$50.00

VALOR UNI.
$1,360.00
$1,500.00
$15,300.00
$95,000.00

VALOR PARCIAL
$3,454.40
$3,090.00
$3,060.00
$25,650.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$35,254.40

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
48,915
$9,783.05
$9,783.05

20.0%

COSTO TOTAL UNITARIO

$58,698

ANALISIS UNITARIO
ITEM
TRIPLEX PIZANO
I.EQUIPO

No. ITEM
UNIDAD:
9 mm

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
REPISA ORDINARIA 3m
PUNTILLA CON CABEZA DE 2"
MERULEX I.F. TRANSPARENTE
TRIPLEX PIZANO 9 mm

UNIDAD
ML
LB
KG
UN

CANTIDAD
2.54
2.06
0.20
0.27

VALOR UNI.
$1,360.00
$1,500.00
$15,300.00
$67,750.00

subtotal

17.1.17
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$3,454.40
$3,090.00
$3,060.00
$18,292.50

$27,896.90

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
39,613
$7,922.67
$7,922.67

20.0%

COSTO TOTAL UNITARIO

$47,536

ANALISIS UNITARIO
ITEM
DIVISIONES BAOS EN ACERO INOX.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

17.2.1
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
DIVISION DE BAO ACERO INOX

UNIDAD
M2

CANTIDAD
1.00

$50.00

VALOR UNI.
$95,000.00

VALOR PARCIAL
$95,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$95,000.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
95,050
$19,010.00
$19,010.00

20.0%

COSTO TOTAL UNITARIO

$114,060

ANALISIS UNITARIO
ITEM
DIVISIONES BAOS EN LAMINA. PINT HORNO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
DIVISION BAO EN PINTURA HORNEABLE

UNIDAD
M2

CANTIDAD
1.00

VALOR UNI.
$123,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

17.2.2
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$123,000.00

$123,000.00
VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
123,050
$24,610.00
$24,610.00

20.0%

COSTO TOTAL UNITARIO

$147,660

ANALISIS UNITARIO
ITEM
BARNIZ S/MUEBLES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.3.1
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
TAPAPOROS NOGAL
SUB - CONTRATO PINTURA
BARNIZ BRILLANTE EXTERIOR

UNIDAD
UN
GL
%
GL

CANTIDAD
3.15
0.11
45.00
0.28

$50.00

VALOR UNI.
$1,900.00
$33,200.00
$28,104.00
$39,580.00

VALOR PARCIAL
$5,985.00
$3,652.00
$12,646.80
$11,082.40

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$33,366.20

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
33,416
$6,683.24
$6,683.24

20.0%

COSTO TOTAL UNITARIO

$40,099

ANALISIS UNITARIO
ITEM
ESMALTE S/ MADERA LLENA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
TAPAPOROS NOGAL
ESMALTE MATE SUPERSINTETICO
DISOLVENTE THINNER

UNIDAD
UN
GL
GL
GL

CANTIDAD
1.05
0.02
0.04
0.02

VALOR UNI.
$1,900.00
$33,200.00
$50,150.00
$10,300.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
22.00
22.00

VALOR UNI.
$2,815.64
$1,570.55
subtotal

18.3.2
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,995.00
$664.00
$2,006.00
$206.00
$4,871.00
VALOR PARCIAL
$2,815.64
$1,570.55
$4,386.18

Total Costo Directo


A.I.U.
Total Costo Indirecto

9,307
$1,861.44
$1,861.44

20.0%

COSTO TOTAL UNITARIO

$11,169

ANALISIS UNITARIO
ITEM
ESMALTE S/ MADERA LINEAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.3.3
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
TAPAPOROS NOGAL
ESMALTE MATE SUPERSINTETICO
DISOLVENTE THINNER

UNIDAD
UN
GL
GL
GL

CANTIDAD
0.16
0.01
0.01
0.01

$50.00

VALOR UNI.
$1,900.00
$33,200.00
$50,150.00
$10,300.00

VALOR PARCIAL
$304.00
$332.00
$501.50
$103.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
90.00
90.00

$1,240.50

VALOR UNI.
$688.27
$383.91

VALOR PARCIAL
$688.27
$383.91

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,072.18
2,363
$472.54
$472.54

20.0%

COSTO TOTAL UNITARIO

$2,835

ANALISIS UNITARIO
ITEM
ESMALTE S/ MARCOS MADERA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.3.4
und
M2

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
TAPAPOROS NOGAL
ESMALTE MATE SUPERSINTETICO
DISOLVENTE THINNER

UNIDAD
UN
GL
GL
GL

CANTIDAD
0.60
0.01
0.02
0.01

$50.00

VALOR UNI.
$1,900.00
$33,200.00
$50,150.00
$10,300.00
subtotal

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
50.00
50.00

VALOR PARCIAL
$1,140.00
$332.00
$1,003.00
$103.00
$2,578.00

VALOR UNI.
$1,238.88
$691.04
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$1,238.88
$691.04
$1,929.92

20.0%

4,558
$911.58
$911.58

COSTO TOTAL UNITARIO

$5,470

ANALISIS UNITARIO
ITEM
ESMALTE S/MUEBLES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.3.5
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
TAPAPOROS NOGAL
ESMALTE MATE SUPERSINTETICO
DISOLVENTE THINNER

UNIDAD
UN
GL
GL
GL

CANTIDAD
7.00
0.11
0.14
0.12

$50.00

VALOR UNI.
$1,900.00
$33,200.00
$50,150.00
$10,300.00

VALOR PARCIAL
$13,300.00
$3,652.00
$7,021.00
$1,236.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
7.00
6.00

$25,209.00

VALOR UNI.
$8,849.14
$5,758.67

VALOR PARCIAL
$8,849.14
$5,758.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$14,607.81
39,867
$7,973.36
$7,973.36

20.0%

COSTO TOTAL UNITARIO

$47,840

ANALISIS UNITARIO
ITEM
LACA PISOS MADERA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.3.6
und
M2

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
BARNIZ VITRFLEX
DISOLVENTE THINNER

UNIDAD
GL
GL

CANTIDAD
0.02
0.01

$50.00

VALOR UNI.
$65,000.00
$10,300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
6.50
6.50

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$1,300.00
$103.00

$1,403.00

VALOR UNI.
$9,529.85
$5,315.69

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$9,529.85
$5,315.69
$14,845.54

20.0%

16,299
$3,259.71
$3,259.71
$19,558

ANALISIS UNITARIO
ITEM
TINTILLA S/
I.EQUIPO

No. ITEM
UNIDAD:

18.3.7
und
M2

MUEBLES

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
TAPAPOROS NOGAL
TINTILLA P / MADERA CAF

UNIDAD
UN
GL
GL

CANTIDAD
3.15
0.11
0.18

$50.00

VALOR UNI.
$1,900.00
$33,200.00
$35,250.00

VALOR PARCIAL
$5,985.00
$3,652.00
$6,345.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
6.50
6.50

$15,982.00

VALOR UNI.
$9,529.85
$5,315.69

VALOR PARCIAL
$9,529.85
$5,315.69

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$14,845.54
30,878
$6,175.51
$6,175.51

20.0%

COSTO TOTAL UNITARIO

$37,053

ANALISIS UNITARIO
ITEM
TINTILLA S/ MADERA LLENA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.3.8
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
TAPAPOROS NOGAL
TINTILLA P / MADERA CAF

UNIDAD
UN
GL
GL

CANTIDAD
0.50
0.02
0.02

$50.00

VALOR UNI.
$1,900.00
$33,200.00
$35,250.00

VALOR PARCIAL
$950.00
$664.00
$705.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
19.00
19.00

$2,319.00

VALOR UNI.
$3,260.21
$1,818.53

VALOR PARCIAL
$3,260.21
$1,818.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,078.74
7,448
$1,489.55
$1,489.55

20.0%

COSTO TOTAL UNITARIO

$8,937

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

18.3.9
und

TINTILLA S/ MADERA LINEAL


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

ML
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
TAPAPOROS NOGAL
TINTILLA P / MADERA CAF

UNIDAD
UN
GL
GL

CANTIDAD
0.16
0.01
0.01

$50.00

VALOR UNI.
$1,900.00
$33,200.00
$35,250.00

VALOR PARCIAL
$304.00
$332.00
$352.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
95.00
95.00

$988.50

VALOR UNI.
$652.04
$363.71

VALOR PARCIAL
$652.04
$363.71

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,015.75
2,054
$410.85
$410.85

20.0%

COSTO TOTAL UNITARIO

$2,465

ANALISIS UNITARIO
ITEM
CARBURO
I.EQUIPO

No. ITEM
UNIDAD:

18.1.1
und
M2

S/PAETE

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CAL
AGUA

UNIDAD
KG
M3

CANTIDAD
1.50
0.00

$50.00

VALOR UNI.
$320.00
$8,000.00

VALOR PARCIAL
$480.00
$1.60

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
36.00
36.00

$481.60

VALOR UNI.
$1,720.67
$959.78

VALOR PARCIAL
$1,720.67
$959.78

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,680.44
3,212
$642.41
$642.41

20.0%

COSTO TOTAL UNITARIO

$3,854

ANALISIS UNITARIO
ITEM
ESMALTE SOBRE LAMINA LLENA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

18.1.2
und
M2
VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
ESMALTE SINTETICO PINTULUX
DISOLVENTE THINNER

UNIDAD
UN
GL
GL

CANTIDAD
0.16
0.04
0.03

$50.00

VALOR UNI.
$1,900.00
$60,220.00
$10,300.00

VALOR PARCIAL
$304.00
$2,408.80
$309.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
25.00
25.00

$3,021.80

VALOR UNI.
$2,477.76
$1,382.08

VALOR PARCIAL
$2,477.76
$1,382.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,859.84
6,932
$1,386.33
$1,386.33

20.0%

COSTO TOTAL UNITARIO

$8,318

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
ESTUCO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

18.1.3
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
YESO CORRIENTE VENCEDOR
CAOLIN
CEMENTO GRIS
PABMERIL PLIEGO 9 X 11"

UNIDAD
BT
BT
KG
UN

CANTIDAD
0.01
0.09
0.26
0.02

$50.00

VALOR UNI.
$12,000.00
$8,500.00
$400.00
$1,900.00

VALOR PARCIAL
$120.00
$765.00
$104.00
$38.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
48.00
48.00

$1,027.00

VALOR UNI.
$1,290.50
$719.83

VALOR PARCIAL
$1,290.50
$719.83

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,010.33
3,087
$617.47
$617.47

20.0%

COSTO TOTAL UNITARIO

$3,705

ANALISIS UNITARIO
ITEM
VINILO MUROS INTERIORES 3 MANOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA

18.1.4
und
M2
VALOR PARCIAL
$555.56
$555.56

DESCRIPCION
VINILTEX
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
GL

CANTIDAD
0.040

TARIFA DIA
61,944.00
34,552.00

RENDIM.
52.00
52.00

VALOR UNI.
$46,840.00
subtotal

VALOR PARCIAL
$1,873.60
$1,873.60

VALOR UNI.
$1,191.23
$664.46

VALOR PARCIAL
$1,191.23
$664.46

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,855.69
4,285
$856.97
$856.97

20.0%

COSTO TOTAL UNITARIO

$5,142

ANALISIS UNITARIO
ITEM
FILOS Y DILATACIONES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.1.5
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
AGUA
ARENA DE PEA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
M3
M3

CANTIDAD
0.10
0.01
0.01

TARIFA DIA
51,617.00
30,048.00

RENDIM.
48.00
48.00

$50.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00
subtotal

VALOR PARCIAL
$40.00
$80.00
$300.00
$420.00

VALOR UNI.
$1,075.35
$626.00

VALOR PARCIAL
$1,075.35
$626.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,701.35
2,171
$434.27
$434.27

20.0%

COSTO TOTAL UNITARIO

$2,606

ANALISIS UNITARIO
ITEM
MARMOLINA
I.EQUIPO

No. ITEM
UNIDAD:
S/PAETE

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
MARMOLINA
CAL
CARBURO No 2
AGUA
CEMENTO BLANCO

UNIDAD
BT
KG
KG
M3
KG

CANTIDAD
0.36
0.17
0.17
0.00
1.05

VALOR UNI.
$9,500.00
$320.00
$600.00
$8,000.00
$800.00
subtotal

III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

18.1.6
und
M2
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$3,420.00
$54.40
$102.00
$1.60
$840.00
$4,418.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

61,944.00
34,552.00

50.00
50.00

$1,238.88
$691.04

$1,238.88
$691.04

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,929.92
6,398
$1,279.58
$1,279.58

20.0%

COSTO TOTAL UNITARIO

$7,678

ANALISIS UNITARIO
ITEM
VINILO S/PAETE 2 MANOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.1.7
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VINILTEX

UNIDAD
GL

CANTIDAD
0.04

$50.00

VALOR UNI.
$46,840.00

VALOR PARCIAL
$1,873.60

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
60.00
60.00

$1,873.60

VALOR UNI.
$1,032.40
$575.87

VALOR PARCIAL
$1,032.40
$575.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,608.27
3,532
$706.37
$706.37

20.0%

COSTO TOTAL UNITARIO

$4,238

ANALISIS UNITARIO
ITEM
VINILO BAJO PLACA - 2 MANOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
45.00

VALOR UNI.
$111.11
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VINILTEX

UNIDAD
GL

CANTIDAD
0.05

VALOR UNI.
$46,840.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
50.00
50.00

VALOR UNI.
$1,238.88
$691.04

18.1.8
und
M2
VALOR PARCIAL
$111.11
$111.11
VALOR PARCIAL
$2,342.00

$2,342.00
VALOR PARCIAL
$1,238.88
$691.04

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,929.92
4,383
$876.61
$876.61

20.0%

COSTO TOTAL UNITARIO

$5,260

ANALISIS UNITARIO
ITEM
ANTICORR. S/LAMINA LLENA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.2.1
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
ANTICORROSIVO ROJO
DISOLVENTE THINNER

UNIDAD
UN
GL
GL

CANTIDAD
1.05
0.03
0.01

$50.00

VALOR UNI.
$1,900.00
$30,000.00
$10,300.00

VALOR PARCIAL
$1,995.00
$900.00
$103.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
32.00
32.00

$2,998.00

VALOR UNI.
$1,935.75
$1,079.75

VALOR PARCIAL
$1,935.75
$1,079.75

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,015.50
6,064
$1,212.70
$1,212.70

20.0%

COSTO TOTAL UNITARIO

$7,276

ANALISIS UNITARIO
ITEM
ANTICORR. S/LAMINA LINEAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
ANTICORROSIVO ROJO
DISOLVENTE THINNER

UNIDAD
UN
GL
GL

CANTIDAD
0.63
0.01
0.01

VALOR UNI.
$1,900.00
$30,000.00
$10,300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
42.00
42.00

VALOR UNI.
$1,474.86
$822.67
subtotal

Total Costo Directo

18.2.2
und
ML
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$1,197.00
$300.00
$103.00

$1,600.00
VALOR PARCIAL
$1,474.86
$822.67
$2,297.52
3,948

A.I.U.
Total Costo Indirecto

20.0%

$789.50
$789.50

COSTO TOTAL UNITARIO

$4,737

ANALISIS UNITARIO
ITEM
ESMALTE S/ LAMINA LLENA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
21.00

18.2.3
und
M2

VALOR UNI.
$238.10

VALOR PARCIAL
$238.10

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
ESMALTE SINTETICO PINTULUX
DISOLVENTE THINNER

UNIDAD
UN
GL
GL

CANTIDAD
1.05
0.04
0.03

$238.10

VALOR UNI.
$1,900.00
$60,220.00
$10,300.00

VALOR PARCIAL
$1,995.00
$2,408.80
$309.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
25.00
25.00

$4,712.80

VALOR UNI.
$2,477.76
$1,382.08

VALOR PARCIAL
$2,477.76
$1,382.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,859.84
8,811
$1,762.15
$1,762.15

20.0%

COSTO TOTAL UNITARIO

$10,573

ANALISIS UNITARIO
ITEM
ESMALTE S/ LAMINA LINEAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
35.00

18.2.4
und
ML

VALOR UNI.
$142.86
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
ESMALTE SINTETICO PINTULUX
DISOLVENTE THINNER

UNIDAD
UN
GL
GL

CANTIDAD
0.16
0.01
0.01

$142.86

VALOR UNI.
$1,900.00
$60,220.00
$10,300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
40.00
40.00

VALOR PARCIAL
$304.00
$602.20
$103.00

$1,009.20

VALOR UNI.
$1,548.60
$863.80
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$142.86

VALOR PARCIAL
$1,548.60
$863.80
$2,412.40

20.0%

3,564
$712.89
$712.89

COSTO TOTAL UNITARIO

$4,277

ANALISIS UNITARIO
ITEM
ESMALTE S/ MARCOS LAMINA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
40.00

18.2.5
und
ML

VALOR UNI.
$125.00

VALOR PARCIAL
$125.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
ESMALTE SINTETICO PINTULUX
DISOLVENTE THINNER

UNIDAD
UN
GL
GL

CANTIDAD
0.60
0.02
0.02

$125.00

VALOR UNI.
$1,900.00
$60,220.00
$10,300.00

VALOR PARCIAL
$1,140.00
$1,204.40
$206.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
45.00
45.00

$2,550.40

VALOR UNI.
$1,376.53
$767.82

VALOR PARCIAL
$1,376.53
$767.82

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,144.36
4,820
$963.95
$963.95

20.0%

COSTO TOTAL UNITARIO

$5,784

ANALISIS UNITARIO
ITEM
WASH-PRIMER
I.EQUIPO

No. ITEM
UNIDAD:

18.2.6
und
M2

S/ALUMINIO

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
13.00

VALOR UNI.
$384.62
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PABMERIL PLIEGO 9 X 11"
WASH PRIMER A PINTURA
WASH PRIMER B CATALIZADOR

UNIDAD
UN
GL
GL

CANTIDAD
1.05
0.48
0.48

$384.62

VALOR UNI.
$1,900.00
$17,550.00
$10,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
17.00
16.00

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$1,995.00
$8,424.00
$5,088.00

$15,507.00

VALOR UNI.
$3,643.76
$2,159.50

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$384.62

VALOR PARCIAL
$3,643.76
$2,159.50
$5,803.26

20.0%

21,695
$4,338.98
$4,338.98
$26,034

ITEM
ANTIHUMEDAD FACHADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
25.00

18.4.1
und
M2

VALOR UNI.
$200.00

VALOR PARCIAL
$200.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SIKA TRANSPARENTE

UNIDAD
KG

CANTIDAD
0.15

$200.00

VALOR UNI.
$10,100.00

VALOR PARCIAL
$1,515.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
30.00
30.00

$1,515.00

VALOR UNI.
$2,064.80
$1,151.73

VALOR PARCIAL
$2,064.80
$1,151.73

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,216.53
4,932
$986.31
$986.31

20.0%

COSTO TOTAL UNITARIO

$5,918

ANALISIS UNITARIO
ITEM
COLORPLAST
I.EQUIPO

No. ITEM
UNIDAD:

18.4.2
und
M2

FACHADA

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
22.00

VALOR UNI.
$227.27

VALOR PARCIAL
$227.27

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
RUSTIPLAST

UNIDAD
M2

CANTIDAD
1.03

$227.27

VALOR UNI.
$11,100.00

VALOR PARCIAL
$11,433.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
27.00
27.00

$11,433.00

VALOR UNI.
$2,294.22
$1,279.70

VALOR PARCIAL
$2,294.22
$1,279.70

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,573.93
15,234
$3,046.84
$3,046.84

20.0%

COSTO TOTAL UNITARIO

$18,281

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

18.4.3
und

DEMARCACION CANCHA MULTIPLE


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

ML
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BROCHA DE CERDA 4"
PINTURA AMARILLA TRAFICO

UNIDAD
UNIDAD
GL

CANTIDAD
1.00
0.01

$50.00

VALOR UNI.
$10,000.00
$57,700.00

VALOR PARCIAL
$10,000.00
$577.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
18.00
18.00

$10,577.00

VALOR UNI.
$3,441.33
$1,919.56

VALOR PARCIAL
$3,441.33
$1,919.56

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,360.89
15,988
$3,197.58
$3,197.58

20.0%

COSTO TOTAL UNITARIO

$19,185

ANALISIS UNITARIO
ITEM
DEMARCACION CON MARMOLINA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.4.4
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MARMOLINA

UNIDAD
BT

CANTIDAD
0.05

$50.00

VALOR UNI.
$9,500.00

VALOR PARCIAL
$475.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
60.00
60.00

$475.00

VALOR UNI.
$1,032.40
$575.87

VALOR PARCIAL
$1,032.40
$575.87

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,608.27
2,133
$426.65
$426.65

20.0%

COSTO TOTAL UNITARIO

$2,560

ANALISIS UNITARIO
ITEM
ESGRAFIADO
I.EQUIPO

No. ITEM
UNIDAD:
FACHADA
DESCRIPCION

TARIFA DIA

RENDIM.

VALOR UNI.

18.4.5
und
M2
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

100.00

$50.00

$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
DECORAPLAST

UNIDAD
M2

CANTIDAD
1.00

$50.00

VALOR UNI.
$7,000.00

VALOR PARCIAL
$7,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
19.00
19.00

$7,000.00

VALOR UNI.
$3,260.21
$1,818.53

VALOR PARCIAL
$3,260.21
$1,818.53

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,078.74
12,129
$2,425.75
$2,425.75

20.0%

COSTO TOTAL UNITARIO

$14,554

ANALISIS UNITARIO
ITEM
ESTUCO Y PINTURA TABLEROS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

18.4.6
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CAOLIN
CEMENTO GRIS
PABMERIL PLIEGO 9"X11
VINILTEX
YESO CORRIENTE VENCEDOR
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
BT
KG
UNIDAD
GL
BT

CANTIDAD
0.09
0.26
0.02
0.05
0.01

TARIFA DIA
61,944.00
34,552.00

RENDIM.
25.00
25.00

$50.00

VALOR UNI.
$8,500.00
$400.00
$1,900.00
$46,840.00
$12,000.00
subtotal

VALOR PARCIAL
$765.00
$104.00
$38.00
$2,342.00
$120.00
$3,369.00

VALOR UNI.
$2,477.76
$1,382.08

VALOR PARCIAL
$2,477.76
$1,382.08

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,859.84
7,279
$1,455.77
$1,455.77

20.0%

COSTO TOTAL UNITARIO

$8,735

ANALISIS UNITARIO
ITEM
LINEAS TRAFICO 0.10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56

18.4.7
und
ML
VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BROCHA DE CERDA 4"
PINTURA AMARILLA TRAFICO

UNIDAD
UNIDAD
GL

CANTIDAD
1.00
0.01

$555.56

VALOR UNI.
$10,000.00
$57,700.00

VALOR PARCIAL
$10,000.00
$577.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.
80.00
80.00

$10,577.00

VALOR UNI.
$774.30
$431.90

VALOR PARCIAL
$774.30
$431.90

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,206.20
12,339
$2,467.75
$2,467.75

20.0%

COSTO TOTAL UNITARIO

$14,807

ANALISIS UNITARIO
ITEM
MARMOPLAST
I.EQUIPO

No. ITEM
UNIDAD:

18.4.8
und
M2

FACHADA

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MARMOLPLAST

UNIDAD
M2

CANTIDAD
1.03

$50.00

VALOR UNI.
$9,000.00

VALOR PARCIAL
$9,270.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.

$9,270.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
9,320
$1,864.00
$1,864.00

20.0%

COSTO TOTAL UNITARIO

$11,184

ANALISIS UNITARIO
ITEM
SILCOPLAST
I.EQUIPO

No. ITEM
UNIDAD:
FACHADA

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA

18.4.9
und
M2
VALOR PARCIAL
$50.00
$50.00

DESCRIPCION
CARALPLAST

UNIDAD
M2

CANTIDAD
1.03

VALOR UNI.
$7,200.00

VALOR PARCIAL
$7,416.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
61,944.00
34,552.00

RENDIM.

$7,416.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
7,466
$1,493.20
$1,493.20

20.0%

COSTO TOTAL UNITARIO

$8,959

ANALISIS UNITARIO
ITEM
CERRADURA SAFE ALCOBA 5141
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

19.1.1
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CERRADURA SAFE ALCOBA VENECIA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$36,500.00

VALOR PARCIAL
$36,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
6.88

$36,500.00

VALOR UNI.
$4,367.44

VALOR PARCIAL
$4,367.44

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,367.44
40,917
$8,183.49
$8,183.49

20.0%

COSTO TOTAL UNITARIO

$49,101

ANALISIS UNITARIO
ITEM
CERRADURA SAFE BAO REF 152
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CERRADURA SAFE BAO CLASICO

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$26,000.00

19.1.2
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$26,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
6.88

$26,000.00

VALOR UNI.
$4,367.44

VALOR PARCIAL
$4,367.44

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,367.44
30,417
$6,083.49
$6,083.49

20.0%

COSTO TOTAL UNITARIO

$36,501

ANALISIS UNITARIO
ITEM
CERRADURA SAFE ENTRADA 142A
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

19.1.3
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CERRADURA SAFE ENTRADA

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$32,500.00

VALOR PARCIAL
$32,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
6.88

$32,500.00

VALOR UNI.
$4,367.44

VALOR PARCIAL
$4,367.44

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,367.44
36,917
$7,383.49
$7,383.49

20.0%

COSTO TOTAL UNITARIO

$44,301

ANALISIS UNITARIO
ITEM
CERRADURA SAFE ENTRADA PRINCIPAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

VALOR UNI.
$555.56
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CERRADURA SAFE ENTRADA PPAL

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$42,250.00

19.1.4
und
UN
VALOR PARCIAL
$555.56
$555.56
VALOR PARCIAL
$42,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
11.60

$42,250.00

VALOR UNI.
$2,590.34

VALOR PARCIAL
$2,590.34

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,590.34
45,396
$9,079.18
$9,079.18

20.0%

COSTO TOTAL UNITARIO

$54,475

ANALISIS UNITARIO
ITEM
CERRADURA SCHLAGE BAO A 40 S
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

19.1.5
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CERRADURA SCHLAGE BAO A 40 S

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$19,400.00

VALOR PARCIAL
$19,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
6.88

$19,400.00

VALOR UNI.
$4,367.44

VALOR PARCIAL
$4,367.44

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,367.44
23,817
$4,763.49
$4,763.49

20.0%

COSTO TOTAL UNITARIO

$28,581

ANALISIS UNITARIO
ITEM
CERRADURA SCHLAGE ENTRADA A 80 PD
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CERRADURA SCHLAGE ENTRADA A 80 PD

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$18,100.00

subtotal

19.1.6
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$18,100.00

$18,100.00

III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
6.88

VALOR UNI.
$4,367.44

VALOR PARCIAL
$4,367.44

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,367.44
22,517
$4,503.49
$4,503.49

20.0%

COSTO TOTAL UNITARIO

$27,021

ANALISIS UNITARIO
ITEM
CERRADURA SOBREPONER PUERTA METALICA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

19.1.7
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CERRADURA YALE ENTRADA HIERRO

UNIDAD
UN

CANTIDAD
1.00

$50.00

VALOR UNI.
$41,400.00

VALOR PARCIAL
$41,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
11.44

$41,400.00

VALOR UNI.
$2,626.57

VALOR PARCIAL
$2,626.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,626.57
44,077
$8,815.31
$8,815.31

20.0%

COSTO TOTAL UNITARIO

$52,892

ANALISIS UNITARIO
ITEM
INSTALACION POMA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
2.80

VALOR UNI.
$10,731.43

19.1.8
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL

$0.00
VALOR PARCIAL
$10,731.43

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,731.43
10,781
$2,156.29
$2,156.29

20.0%

COSTO TOTAL UNITARIO

$12,938

ANALISIS UNITARIO
ITEM
INSTALACION PORTON MADERA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

19.1.9
und
UN

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$50.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
36,056.00

RENDIM.
8.00

$0.00

VALOR UNI.
$4,507.00

VALOR PARCIAL
$4,507.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,507.00
4,557
$911.40
$911.40

20.0%

COSTO TOTAL UNITARIO

$5,468

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CIERRAPUERTAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
CERROJO DE SEGURIDAD 35mm

UNIDAD
UNIDAD

CANTIDAD
1.00

VALOR UNI.
$31,980.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
36,056.00

RENDIM.
15.60

VALOR UNI.
$2,311.28
subtotal

19.2.1
und
UN
VALOR PARCIAL
$50.00
$50.00
VALOR PARCIAL
$31,980.00

$31,980.00
VALOR PARCIAL
$2,311.28
$2,311.28

Total Costo Directo


A.I.U.
Total Costo Indirecto

34,341
$6,868.26
$6,868.26

20.0%

COSTO TOTAL UNITARIO

$41,210

ANALISIS UNITARIO
ITEM
SOPORTE PARA PUERTA VIDRIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

19.2.2
und
UN

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
SOPORTE PUERTA VIDRIO

UNIDAD
UNIDAD

CANTIDAD
1.00

$555.56

VALOR UNI.
$48,500.00

VALOR PARCIAL
$48,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
36,056.00

RENDIM.
15.60

$48,500.00

VALOR UNI.
$2,311.28

VALOR PARCIAL
$2,311.28

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,311.28
51,367
$10,273.37
$10,273.37

20.0%

COSTO TOTAL UNITARIO

$61,640

ANALISIS UNITARIO
ITEM
ESPEJO BISELADO 4 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

19.3.1
und
M2

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ESPEJO BISELADO

UNIDAD
M2

CANTIDAD
1.00

$50.00

VALOR UNI.
$55,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
36,056.00

RENDIM.
15.60

VALOR PARCIAL
$55,200.00

$55,200.00

VALOR UNI.
$2,311.28
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$2,311.28
$2,311.28

20.0%

57,561
$11,512.26
$11,512.26

COSTO TOTAL UNITARIO

$69,074

ANALISIS UNITARIO
ITEM
INSTALACION ESPEJOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

19.3.2
und
M2

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$555.56

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
36,056.00

RENDIM.
9.00

$0.00

VALOR UNI.
$4,006.22

VALOR PARCIAL
$4,006.22

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,006.22
4,562
$912.36
$912.36

20.0%

COSTO TOTAL UNITARIO

$5,474

ANALISIS UNITARIO
ITEM
VIDRIO CRUDO TRANSPARENTE 4 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

19.3.3
und
M2

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VIDRIO TRANSPARENTE 4mm

UNIDAD
M2

CANTIDAD
1.00

$50.00

VALOR UNI.
$26,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
36,056.00

RENDIM.
9.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$26,500.00

$26,500.00

VALOR UNI.
$4,006.22

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$4,006.22
$4,006.22

20.0%

30,556
$6,111.24
$6,111.24
$36,667

ANALISIS UNITARIO
ITEM
VIDRIO CRUDO TRANSPARENTE 5 MM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

19.3.4
und
M2

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
VIDRIO TRANSPARENTE 5mm

UNIDAD
M2

CANTIDAD
1.00

$555.56

VALOR UNI.
$30,500.00

VALOR PARCIAL
$30,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
36,056.00

RENDIM.
9.00

$30,500.00

VALOR UNI.
$4,006.22

VALOR PARCIAL
$4,006.22

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,006.22
35,062
$7,012.36
$7,012.36

20.0%

COSTO TOTAL UNITARIO

$42,074

ANALISIS UNITARIO
ITEM
CERRAMIENTO TIPICO S. E. D.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
TUBO 10*4CMS CAL.18
TUBO 4*4 CMS CAL.18
TUBO MUEBLE VERTICAL 1"*1" CAL 18
ANGULO 1"*1"*1/8
ANGULO 2"*2"* 1/8"
SOLDADURA 60-13 D=1/8"
MALLA ONDULADA CAL 8 HUECOS DE 5*5 CMS
LOSETA PREFABRICADA 40*40*.05
CONCRETO DADO Y PILOTIN 3.000 PSI
ACERO DE REFUERZO 60000 PSI 1/2"
ACERO DE REFUERZO 60000 PSI 3/8"
ALAMBRE NEGRO No 18
RECEBO
BASE EN SUELO CEMENTO
ANTICORROSIVO GALON
PINTURA ELECTROSTATICA ( 2 CARAS)

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
2.00
0.08

UNIDAD
ML
ML
ML
ML
ML
KG
M2
UNIDAD
M3
KG
KG
KG
M3
M3
M2
M2

CANTIDAD
1.50
2.00
1.00
3.00
1.50
0.35
2.50
2.50
0.08
5.00
3.40
0.42
0.07
0.058
0.02
5.00

VALOR UNI.
$2,500.00
$875.00
subtotal

VALOR PARCIAL
$2,500.00
$875.00
$3,375.00

VALOR UNI.
$9,280.00
$4,450.00
$2,300.00
$2,500.00
$5,660.00
$4,200.00
$13,640.00
$3,435.00
$310,000.00
$1,780.00
$1,780.00
$2,000.00
$25,000.00
$76,000.00
$30,000.00
$15,000.00

VALOR PARCIAL
$13,920.00
$8,900.00
$2,300.00
$7,500.00
$8,490.00
$1,470.00
$34,100.00
$8,587.50
$24,800.00
$8,900.00
$6,052.00
$840.00
$1,750.00
$4,408.00
$600.00
$75,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
72.00
72.00

20.3.1
und
ML

VALOR UNI.
$716.90
$417.33

$207,617.50
VALOR PARCIAL
$716.90
$417.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,134.24
212,127
$42,425.35
$42,425.35

20.0%

COSTO TOTAL UNITARIO

$254,552

ANALISIS UNITARIO
ITEM
CERRAMIENTO TUBO Y MALLA ONDULADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
TUBO 10*4CMS CAL.18
TUBO 4*4 CMS CAL.18
TUBO MUEBLE VERTICAL 1"*1" CAL 18
ANGULO 1"*1"*1/8
ANGULO 2"*2"* 1/8"
SOLDADURA 60-13 D=1/8"
MALLA ONDULADA CAL 8 HUECOS DE 5*5 CMS
LOSETA PREFABRICADA 40*40*.05
CONCRETO DADO Y PILOTIN 3.000 PSI
ACERO DE REFUERZO 1/2" 60000 PSI
ACERO DE REFUERZO 3/8" 60000 PSI
ALAMBRE NEGRO No 18
RECEBO COMUN
BASE EN SUELO CEMENTO
ANTICORROSIVO GALON
PINTURA ELECTROSTATICA ( 2 CARAS)

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
2.00
0.08

UNIDAD
ML
ML
ML
ML
ML
KG
M2
UNIDAD
M3
KG
KG
KG
M3
M3
GL
M2

CANTIDAD
1.50
2.00
1.00
3.00
1.50
0.35
2.50
2.50
0.08
5.00
3.40
0.42
0.07
0.058
0.02
5.00

20.3.2
und
M2

VALOR UNI.
$2,500.00
$875.00
subtotal

VALOR PARCIAL
$2,500.00
$875.00
$3,375.00

VALOR UNI.
$9,280.00
$4,450.00
$2,274.00
$2,500.00
$5,660.00
$4,200.00
$13,640.00
$3,435.00
$310,000.00
$1,780.00
$1,780.00
$2,000.00
$25,000.00
$76,000.00
$30,000.00
$15,000.00

VALOR PARCIAL
$13,920.00
$8,900.00
$2,274.00
$7,500.00
$8,490.00
$1,470.00
$34,100.00
$8,587.50
$24,800.00
$8,900.00
$6,052.00
$840.00
$1,750.00
$4,408.00
$600.00
$75,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
72.00
72.00

$207,591.50

VALOR UNI.
$716.90
$417.33

VALOR PARCIAL
$716.90
$417.33

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,134.24
212,101
$42,420.15
$42,420.15

20.0%

COSTO TOTAL UNITARIO

$254,521

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CONCRETO DADOS. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR CONCRETO

TARIFA DIA
5,000.00
25,000.00

RENDIM.
2.00
1,500.00

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 2500 PSI

UNIDAD
M3

CANTIDAD
1.10

20.3.3
und
M3

VALOR UNI.
$2,500.00
$16.67
subtotal

VALOR PARCIAL
$2,500.00
$16.67
$2,516.67

VALOR UNI.
$200,000.00

VALOR PARCIAL
$220,000.00

PUNTILLA CON CABEZA 2"


TABLA BURRA ORDINARIO
REPISA ORDINARIO 3m

LB
ML
ML

2.12
3.52
1.10

$1,500.00
$2,400.00
$1,360.00

$3,180.00
$8,448.00
$1,496.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.50

$233,124.00

VALOR UNI.
$103,234.00
$60,096.00

VALOR PARCIAL
$103,234.00
$60,096.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$163,330.00
398,971
$79,794.13
$79,794.13

20.0%

COSTO TOTAL UNITARIO

$478,765

ANALISIS UNITARIO
ITEM
CONCRETO POBRE DE LIMPIEZA 2000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR CONCRETO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 2500 PSI

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
2.00
1,500.00

UNIDAD
M3

CANTIDAD
1.10

20.3.4
und
M3

VALOR UNI.
$2,500.00
$16.67
subtotal

VALOR PARCIAL
$2,500.00
$16.67
$2,516.67

VALOR UNI.
$200,000.00

VALOR PARCIAL
$220,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.50

$220,000.00

VALOR UNI.
$103,234.00
$60,096.00

VALOR PARCIAL
$103,234.00
$60,096.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$163,330.00
385,847
$77,169.33
$77,169.33

20.0%

COSTO TOTAL UNITARIO

$463,016

ANALISIS UNITARIO
ITEM
CONCRETO VIGAS DE CIMENTACION
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR CONCRETO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 2500 PSI
PUNTILLA CON CABEZA 2"

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
25,000.00

RENDIM.
2.00
1,500.00

UNIDAD
M3
LB

CANTIDAD
1.10
2.12

20.3.5
und
M3

VALOR UNI.
$2,500.00
$16.67
subtotal

VALOR PARCIAL
$2,500.00
$16.67
$2,516.67

VALOR UNI.
$200,000.00
$1,500.00

VALOR PARCIAL
$220,000.00
$3,180.00

TABLA BURRA ORDINARIO


REPISA ORDINARIO 3m

ML
ML

3.52
1.10

$1,353.00
$1,360.00

$4,762.56
$1,496.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.50

$229,438.56

VALOR UNI.
$103,234.00
$60,096.00

VALOR PARCIAL
$103,234.00
$60,096.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$163,330.00
395,285
$79,057.05
$79,057.05

20.0%

COSTO TOTAL UNITARIO

$474,342

ANALISIS UNITARIO
ITEM
MUROS DE CONTENCION EN CONCRETO H/2.00
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBRADOR CONCRETO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 3000 PSI
PUNTILLA CON CABEZA 2"
REPISA ORDINARIO 3 M
TABLA BURRA ORDINARIO
VARA DE CLAVO
VARA DE CLAVO 3M
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

No. ITEM
UNIDAD:

20.3.6
und
M3

TARIFA DIA
5,000.00
25,000.00

RENDIM.
2.00
1,500.00

VALOR UNI.
$2,500.00
$16.67
subtotal

VALOR PARCIAL
$2,500.00
$16.67
$2,516.67

UNIDAD
M3
LB
ML
ML
ML
ML

CANTIDAD
1.03
2.12
1.97
4.34
2.56
2.56

VALOR UNI.
$220,000.00
$1,500.00
$1,360.00
$1,353.00
$850.00
$850.00
subtotal

VALOR PARCIAL
$226,600.00
$3,180.00
$2,679.20
$5,872.02
$2,176.00
$2,176.00
$242,683.22

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.50
0.50

VALOR UNI.
$103,234.00
$60,096.00

VALOR PARCIAL
$103,234.00
$60,096.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$163,330.00
408,530
$81,705.98
$81,705.98

20.0%

COSTO TOTAL UNITARIO

$490,236

ANALISIS UNITARIO
ITEM
PILOTES HINCADOS DE 25 x 25
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
2.00

VALOR UNI.
$2,500.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
PILOTES HINCADOS DE 25 x 25

UNIDAD
UN

CANTIDAD
1.00

VALOR UNI.
$75,400.00

20.3.7
und
ML
VALOR PARCIAL
$2,500.00
$2,500.00
VALOR PARCIAL
$75,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
5.00
5.00

$75,400.00

VALOR UNI.
$10,323.40
$6,009.60

VALOR PARCIAL
$10,323.40
$6,009.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$16,333.00
94,233
$18,846.60
$18,846.60

20.0%

COSTO TOTAL UNITARIO

$113,080

ANALISIS UNITARIO
ITEM
CERRAMIENTO EN MAMPOSTERIA H=2,4 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION
REPISA 0.08*4*3M
DURMIENTE 5*5 *3M ORD
TABLA BURRA ORD. 20*3M
A.C.P.M
PUNTILLA 2" C/C
PARAL TELESCOPICO
SECCION ANDAMIO
MORDAZA METALICA
CONCRETO 3.000 PSI
ACERO DE REFUERZO
ALAMBRE NEGRO N0 18
MORTERO DE PEGA 1:3
LADRILLO RECOCIDO COMUN
CONCRETO CICLOPEO 50-50

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
2.00
14.00
80.00

UNIDAD
ML
ML
ML
GL
LB
DIA
DIA
DIA
M3
KG
KG
M3
UNIDAD
M3

CANTIDAD
4.00
7.00
7.00
0.10
2.00
0.10
30.00
0.20
0.15
22.00
1.00
0.06
165.00
0.17

20.3.8
und
M2

VALOR UNI.
$2,500.00
$9,642.86
$2,875.00
subtotal

VALOR PARCIAL
$2,500.00
$9,642.86
$2,875.00
$15,017.86

VALOR UNI.
$1,360.00
$450.00
$1,353.00
$3,500.00
$1,500.00
$70.00
$70.00
$120.00
$220,000.00
$1,780.00
$2,000.00
$212,700.00
$560.00
$119,587.00

VALOR PARCIAL
$5,440.00
$3,150.00
$9,471.00
$350.00
$3,000.00
$7.00
$2,100.00
$24.00
$33,000.00
$39,160.00
$2,000.00
$12,762.00
$92,400.00
$20,329.79

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
100.00
100.00

$223,193.79

VALOR UNI.
$516.17
$300.48

VALOR PARCIAL
$516.17
$300.48

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$816.65
239,028
$47,805.66
$47,805.66

20.0%

COSTO TOTAL UNITARIO

$286,834

ANALISIS UNITARIO
ITEM
PORTON EN TUBO Y MALLA ONDULADA
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

20.3.9
und
M2
VALOR PARCIAL

HERRAMIENTA MENOR
ANDAMIO

5,000.00
70.00

2.00
0.08

$2,500.00
$875.00

$2,500.00
$875.00
$3,375.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TUBO 4*4 CMS CAL.18
ANGULO 1"*1"*1/8
ANGULO 2"*2"* 1/8"
MALLA ONDULADA CAL 8 HUECOS DE 5*5 CMS
SOLDADURA 60-13 D=1/8"
ANTICORROSIVO GALON
PINTURA ELECTROSTATICA ( 2 CARAS)

UNIDAD
ML
ML
ML
M2
KG
M2
M2

CANTIDAD
4.00
3.00
1.50
1.00
0.20
0.02
2.00

VALOR UNI.
$4,450.00
$2,500.00
$5,660.00
$13,640.00
$4,200.00
$30,000.00
$15,000.00

VALOR PARCIAL
$17,800.00
$7,500.00
$8,490.00
$13,640.00
$840.00
$600.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
67,104.00
36,056.00

RENDIM.
23.36
23.36

$78,870.00

VALOR UNI.
$2,872.60
$1,543.49

VALOR PARCIAL
$2,872.60
$1,543.49

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,416.10
86,661
$17,332.22
$17,332.22

20.0%

COSTO TOTAL UNITARIO

$103,993

ANALISIS UNITARIO
ITEM
EXCAVACION MANUAL TIERRA. H=2.50 MS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
9.00

20.1.1
und
M3

VALOR UNI.
$555.56

VALOR PARCIAL
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$555.56

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
15.60

$0.00

VALOR UNI.
$1,926.15

VALOR PARCIAL
$1,926.15

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,926.15
2,482
$496.34
$496.34

20.0%

COSTO TOTAL UNITARIO

$2,978

ANALISIS UNITARIO
ITEM
EXCAVACION MECANICA EN MATERIAL COMUN
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

20.1.2
und
M3
VALOR PARCIAL

HERRAMIENTA MENOR
VOLQUETA
CARGADOR FRONTAL
II.MATERIALES DE OBRA
DESCRIPCION

5,000.00
135,000.00
230,000.00

UNIDAD

9.00
10.00
60.00

CANTIDAD

$555.56
$13,500.00
$3,833.33
subtotal
VALOR UNI.

$555.56
$13,500.00
$3,833.33
$17,888.89
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
17,889
$3,577.78
$3,577.78

20.0%

COSTO TOTAL UNITARIO

$21,467

ANALISIS UNITARIO
ITEM
RECEBO COMPACTADO COMUN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VIBROCOMPACTADOR A GASOLINA
II.MATERIALES DE OBRA
DESCRIPCION
RECEBO COMPACTADO COMUN

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
35,000.00

RENDIM.
4.00
26.00

UNIDAD
M3

CANTIDAD
1.34

20.1.3
und
M3

VALOR UNI.
$1,250.00
$1,346.15
subtotal

VALOR PARCIAL
$1,250.00
$1,346.15
$2,596.15

VALOR UNI.
$25,000.00

VALOR PARCIAL
$33,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
4.00

$33,500.00

VALOR UNI.
$7,512.00

VALOR PARCIAL
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,512.00
43,608
$8,721.63
$8,721.63

20.0%

COSTO TOTAL UNITARIO

$52,330

ANALISIS UNITARIO
ITEM
RELLENOS MATERIAL COMUN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
24.00

VALOR UNI.
$208.33

20.1.4
und
M3
VALOR PARCIAL
$208.33

$0.00
$208.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
RECEBO COMUN

UNIDAD
M3

CANTIDAD
1.25

VALOR UNI.
$25,000.00

VALOR PARCIAL
$31,250.00
$0.00
$0.00
$0.00
$0.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
24.00

$31,250.00

VALOR UNI.
$1,252.00

VALOR PARCIAL
$1,252.00

subtotal

$1,252.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

32,710
$6,542.07
$6,542.07

20.0%

COSTO TOTAL UNITARIO

$39,252

ANALISIS UNITARIO
ITEM
RELLENOS MATERIAL SELECCIONADO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
24.00

20.1.5
und
M3

VALOR UNI.
$208.33

VALOR PARCIAL
$208.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
MATERIAL SELECCIONADO

UNIDAD
M3

CANTIDAD
1.25

$208.33

VALOR UNI.
$1,800.00

VALOR PARCIAL
$2,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.

$2,250.00

VALOR UNI.

24.00

$1,252.00

VALOR PARCIAL
$0.00
$1,252.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,252.00
3,710
$742.07
$742.07

20.0%

COSTO TOTAL UNITARIO

$4,452

ANALISIS UNITARIO
ITEM
ACERO DE REFUERZO 34000 PSI
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal

20.5.1
und
KG
VALOR PARCIAL

$0.00

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
$0.00
$0.00

20.0%

COSTO TOTAL UNITARIO

$0

ANALISIS UNITARIO
ITEM
ACERO DE REFUERZO 60000 PSI
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

20.5.2
und
KG

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA
51,617.00
30,048.00

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
$0.00
$0.00

20.0%

COSTO TOTAL UNITARIO

$0

ANALISIS UNITARIO
ITEM
MALLAS ELECTROSOLDADAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
120.00

VALOR UNI.
$41.67
subtotal

II.MATERIALES DE OBRA

20.5.3
und
KG
VALOR PARCIAL
$41.67
$41.67

DESCRIPCION
MALLA ELECTROSOLDADA

UNIDAD
M2

CANTIDAD
1.00

VALOR UNI.
$58,500.00

VALOR PARCIAL
$58,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
120.00
120.00

$58,500.00

VALOR UNI.
$430.14
$250.40

VALOR PARCIAL
$430.14
$250.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$680.54
59,222
$11,844.44
$11,844.44

20.0%

COSTO TOTAL UNITARIO

$71,067

ANALISIS UNITARIO
ITEM
CUNETA TRAPEZOIDAL 3000 PSI RFZO. H:20 - B:30 - b:20 (INC. BASE EN RECEBO)
I.EQUIPO
DESCRIPCION
TARIFA DIA
RENDIM.
HERRAMIENTA MENOR
5,000.00
7.00
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
ACERO DE REFUERZO
ALAMBRE NEGRO No 18
ALQUILER FORMALETA
VIBRADOR A GASOLINA TIPO RANA
RECEBO COMUN

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
KG
KG
M2
UNIDAD
M3

CANTIDAD
0.075
0.80
0.20
0.20
0.08
0.20
2.00
0.10
1.00
0.20
0.07

No. ITEM
UNIDAD:

20.5.4
und
ML

VALOR UNI.
$714.29
subtotal

VALOR PARCIAL
$714.29
$714.29

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,500.00
$1,500.00
$1,750.00
$2,000.00
$85.00
$35,000.00
$25,000.00

VALOR PARCIAL
$16,500.00
$1,088.00
$90.00
$270.60
$280.00
$300.00
$3,500.00
$200.00
$85.00
$7,000.00
$1,750.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$31,063.60

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
42,730
$8,546.01
$8,546.01

20.0%

COSTO TOTAL UNITARIO

$51,276

ANALISIS UNITARIO
ITEM
CANAL EN CONCRETO CON LADRILLO REJILLA
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

20.5.5
und
ML
VALOR PARCIAL

HERRAMIENTA MENOR
ALQUILER FORMALETA
VIBRADOR A GASOLINA

5,000.00
85.00
25,000.00

10.00
1.00
20.00

$500.00
$85.00
$1,250.00

$500.00
$85.00
$1,250.00
$1,835.00

VALOR UNI.
$220,000.00
$1,360.00
$450.00
$1,353.00
$3,500.00
$1,500.00
$1,750.00
$2,000.00
$212,700.00
$25,000.00
$310.00
subtotal

VALOR PARCIAL
$16,500.00
$1,088.00
$90.00
$270.60
$280.00
$300.00
$3,500.00
$200.00
$4,254.00
$1,750.00
$13,950.00
$42,182.60

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO DE 3.000 PSI
REPISA .08*4*4
DURMIENTE 5*5 ORD 3ML
TABLA BURRA ORD. .2*3ML
A.C.P.M
PUNTILLA DE 2" S/CABEZA
ACERO DE REFUERZO
ALAMBRE NEGRO No 18
MORTERO DE PEGA1:3
RECEBO
LADRILLO REJILLA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
M3
ML
UNIDAD
UNIDAD
GL
LB
KG
KG
M3
M3
UNIDAD

CANTIDAD
0.075
0.80
0.20
0.20
0.08
0.20
2.00
0.10
0.02
0.07
45.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
52,184
$10,436.82
$10,436.82

20.0%

COSTO TOTAL UNITARIO

$62,621

ANALISIS UNITARIO
ITEM
ADOQUIN CONCRETO PEATONAL. 6 CMS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

20.2.1
und
M2

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ADOQUIN CONCRETO 11 X 6 X 20
AGUA
ARENA DE PEA

UNIDAD
UN
M3
M3

CANTIDAD
50.00
0.00
0.02

$50.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

subtotal

COSTO TOTAL UNITARIO


ANALISIS UNITARIO

VALOR PARCIAL
$20,000.00
$24.00
$600.00

$20,624.00

VALOR UNI.
$5,161.70
$3,004.80

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$5,161.70
$3,004.80
$8,166.50

20.0%

28,841
$5,768.10
$5,768.10
$34,609

ITEM
ADOQUIN CONCRETO VEHICULAR. 8 CMS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

20.2.2
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ADOQUIN CONCRETO 11 X 8 X 20
AGUA
ARENA DE PEA

UNIDAD
UN
M3
M3

CANTIDAD
50.00
0.00
0.02

$50.00

VALOR UNI.
$400.00
$8,000.00
$30,000.00

VALOR PARCIAL
$20,000.00
$24.00
$600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$20,624.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
28,841
$5,768.10
$5,768.10

20.0%

COSTO TOTAL UNITARIO

$34,609

ANALISIS UNITARIO
ITEM
ADOQUIN DE GRES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

20.2.3
und
M2

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
COLOR MINERAL
AGUA
ADOQUIN GRES 10 X 20 X 2,5
ARENA DE PEA

UNIDAD
KG
M3
M2
M3

CANTIDAD
1.03
0.01
1.03
0.03

$50.00

VALOR UNI.
$12,600.00
$8,000.00
$525.00
$30,000.00

VALOR PARCIAL
$12,978.00
$40.00
$540.75
$900.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.60
10.60

$14,458.75

VALOR UNI.
$4,869.53
$2,834.72

VALOR PARCIAL
$4,869.53
$2,834.72

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,704.25
22,213
$4,442.60
$4,442.60

20.0%

COSTO TOTAL UNITARIO

$26,656

ANALISIS UNITARIO
No. ITEM

20.2.4

ITEM
BASE ASFALTO 1350. 7 CMS
I.EQUIPO
DESCRIPCION
BENITIN DE 500 P - 750
HERRAMIENTA MENOR

UNIDAD:

TARIFA DIA
15,000.00
5,000.00

RENDIM.
20.18
9.00

und
M3

VALOR UNI.
$743.31
$555.56

VALOR PARCIAL
$743.31
$555.56

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
BASE 7 cm 1350 EN OBRA
ASFALTO MC--70 PARA LIGA
EQUIPO DE LAB. DE SUELOS Y PAVIMENTOS

UNIDAD
M3
LT
DIA

CANTIDAD
1.20
0.80
0.01

$1,298.87

VALOR UNI.
285,000.00
$530.00
$40,000.00

VALOR PARCIAL
$342,000.00
$424.00
$400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
20.00
20.00

$342,824.00

VALOR UNI.
$2,580.85
$1,502.40

VALOR PARCIAL
$2,580.85
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,083.25
348,206
$69,641.22
$69,641.22

20.0%

COSTO TOTAL UNITARIO

$417,847

ANALISIS UNITARIO
ITEM
CONCRETO BASE GRADAS DE 0.30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

20.2.5
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TABLA CHAPA ORDINARIO
CONCRETO CORRIENTE 2500 PSI

UNIDAD
ML
M2

CANTIDAD
1.02
0.10

$50.00

VALOR UNI.
$1,716.00
200,000.00

VALOR PARCIAL
$1,750.32
$20,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.80
8.80

$21,750.32

VALOR UNI.
$5,865.57
$3,414.55

VALOR PARCIAL
$5,865.57
$3,414.55

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,280.11
31,080
$6,216.09
$6,216.09

20.0%

COSTO TOTAL UNITARIO

$37,297

ANALISIS UNITARIO
No. ITEM

20.2.6

ITEM
CONCRETO ESCOBEADO. H = 0.10
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
7.00

und
M2

VALOR UNI.
$714.29

VALOR PARCIAL
$714.29

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TABLA CHAPA ORDINARIO
CONCRETO CORRIENTE 2500 PSI

UNIDAD
ML
M3

CANTIDAD
0.51
0.11

$714.29

VALOR UNI.
$1,716.00
200,000.00

VALOR PARCIAL
$875.16
$22,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.00
7.00

$22,875.16

VALOR UNI.
$7,373.86
$4,292.57

VALOR PARCIAL
$7,373.86
$4,292.57

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,666.43
35,256
$7,051.17
$7,051.17

20.0%

COSTO TOTAL UNITARIO

$42,307

ANALISIS UNITARIO
ITEM
CONCRETO ESTAMPADO O IMPRESO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
6.00

20.2.7
und
M2

VALOR UNI.
$833.33

VALOR PARCIAL
$833.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
TABLA CHAPA ORDINARIO
CONCRETO CORRIENTE 2500 PSI
PLANTILLA METALICA

UNIDAD
ML
M3
M2

CANTIDAD
0.51
0.11
1.00

$833.33

VALOR UNI.
$1,716.00
200,000.00
$800.00

VALOR PARCIAL
$875.16
$22,000.00
$800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$23,675.16

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
38,119
$7,623.87
$7,623.87

20.0%

COSTO TOTAL UNITARIO

$45,743

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

20.2.8
und

DILATACIONES EN LADRILLO DE 0.25


I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

ML
TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CEMENTO GRIS
LADRILLO PRENSADO SANTA FE
ARENA DE PEA

UNIDAD
KG
UN
M3

CANTIDAD
2.50
12.90
0.01

$50.00

VALOR UNI.
$400.00
$550.00
$30,000.00

VALOR PARCIAL
$1,000.00
$7,095.00
$300.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$8,395.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
13,889
$2,777.87
$2,777.87

20.0%

COSTO TOTAL UNITARIO

$16,667

ANALISIS UNITARIO
ITEM
JUNTAS DILATACION ASFALTO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

20.2.9
und
ML

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ASFALTO TIPO 190 / 220

UNIDAD
KG

CANTIDAD
1.20

$50.00

VALOR UNI.
950.00

VALOR PARCIAL
$1,140.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
150.00

$1,140.00

VALOR UNI.
$200.32

VALOR PARCIAL
$200.32

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$200.32
1,390
$278.06
$278.06

20.0%

COSTO TOTAL UNITARIO

$1,668

ANALISIS UNITARIO
ITEM
LOSETAS DE CONCRETO DE 40 x 40 x 4.5
I.EQUIPO

No. ITEM
UNIDAD:

20.2.10
und
M2

DESCRIPCION
HERRAMIENTA MENOR
FORMALETA METALICA

TARIFA DIA
5,000.00
310,000.00

RENDIM.
6.00
0.50

VALOR UNI.
$833.33
$620,000.00
subtotal

VALOR PARCIAL
$833.33
$620,000.00
$620,833.33

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 2500 PSI

UNIDAD
M3

CANTIDAD
0.01

VALOR UNI.
200,000.00

VALOR PARCIAL
$1,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$1,600.00

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
636,044
$127,208.83
$127,208.83

20.0%

COSTO TOTAL UNITARIO

$763,253

ANALISIS UNITARIO
ITEM
LOSETAS DE CONCRETO DE 50 x 50 x 6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
FORMALETA METALICA
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 2500 PSI

No. ITEM
UNIDAD:

20.2.11
und
M2

TARIFA DIA
5,000.00
310,000.00

RENDIM.
6.00
0.50

VALOR UNI.
$833.33
$620,000.00
subtotal

VALOR PARCIAL
$833.33
$620,000.00
$620,833.33

UNIDAD
M3

CANTIDAD
0.02

VALOR UNI.
200,000.00

VALOR PARCIAL
$3,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.00
6.00

$3,000.00

VALOR UNI.
$8,602.83
$5,008.00

VALOR PARCIAL
$8,602.83
$5,008.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,610.83
637,444
$127,488.83
$127,488.83

20.0%

COSTO TOTAL UNITARIO

$764,933

ANALISIS UNITARIO
ITEM
PAVIMENTO EN CONCR.e=.017
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

20.2.12
und
M2
VALOR PARCIAL

VIBRADOR GASOLINA
HERRAMIENTA MENOR
FORMALETA METALICA
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO PAVIMENTO 41 kg / cm2

25,000.00
5,000.00
310,000.00

UNIDAD
M2

10.00
10.00
0.85

CANTIDAD
0.17

$2,500.00
$500.00
$364,705.88
subtotal
VALOR UNI.
310,000.00

$2,500.00
$500.00
$364,705.88
$367,705.88
VALOR PARCIAL
$52,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$52,700.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
428,572
$85,714.48
$85,714.48

20.0%

COSTO TOTAL UNITARIO

$514,287

ANALISIS UNITARIO
ITEM
PAVIMENTO EN CONCR.e=.018
I.EQUIPO
DESCRIPCION
VIBRADOR GASOLINA
HERRAMIENTA MENOR
FORMALETA METALICA

No. ITEM
UNIDAD:

TARIFA DIA
25,000.00
5,000.00
310,000.00

RENDIM.
10.00
10.00
0.85

20.2.13
und
M2

VALOR UNI.
$2,500.00
$500.00
$364,705.88

VALOR PARCIAL
$2,500.00
$500.00
$364,705.88

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO PAVIMENTO 41 kg / cm2

UNIDAD
M3

CANTIDAD
0.18

$367,705.88

VALOR UNI.
310,000.00

VALOR PARCIAL
$55,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$55,800.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
431,672
$86,334.48
$86,334.48

20.0%

COSTO TOTAL UNITARIO

$518,007

ANALISIS UNITARIO
ITEM
RECUBRIMIENTO SINTETICO PLEXIPAVE

No. ITEM
UNIDAD:

20.2.14
und
M2

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
100.00

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
RECUBRIMIENTO SINTETICO PLEXIPAVE

UNIDAD
M2

CANTIDAD
1.05

$50.00

VALOR UNI.
$20,000.00

VALOR PARCIAL
$21,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$21,000.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
29,217
$5,843.30
$5,843.30

20.0%

COSTO TOTAL UNITARIO

$35,060

ANALISIS UNITARIO
No. ITEM
UNIDAD:

20.2.15
und
M2

ITEM
RODADURA B-1350. 2.5 CMS
I.EQUIPO
DESCRIPCION
BENITIN DE 500 P - 750
HERRAMIENTA MENOR

TARIFA DIA
15,000.00
5,000.00

RENDIM.
12.00
12.00

VALOR UNI.
$1,250.00
$416.67
subtotal

VALOR PARCIAL
$1,250.00
$416.67
$1,666.67

II.MATERIALES DE OBRA
DESCRIPCION
RODADURA ASFALTICA B - 1350

UNIDAD
M3

CANTIDAD
0.03

VALOR UNI.
190,000.00

VALOR PARCIAL
$5,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.00
12.00

$5,700.00

VALOR UNI.
$4,301.42
$2,504.00

VALOR PARCIAL
$4,301.42
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,805.42
14,172
$2,834.42
$2,834.42

20.0%

COSTO TOTAL UNITARIO

$17,007

ANALISIS UNITARIO
ITEM
SARDINEL EN CONCRETO
I.EQUIPO

No. ITEM
UNIDAD:

20.2.16
und
ML

DESCRIPCION
VIBRADOR GASOLINA
HERRAMIENTA MENOR
FORMALETA METALICA

TARIFA DIA
25,000.00
5,000.00
90.00

RENDIM.
34.40
25.00
0.80

VALOR UNI.
$726.74
$200.00
$112.50
subtotal

VALOR PARCIAL
$726.74
$200.00
$112.50
$1,039.24

II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO CORRIENTE 2500 PSI

UNIDAD
M2

CANTIDAD
0.08

VALOR UNI.
200,000.00

VALOR PARCIAL
$16,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$16,000.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
22,484
$4,496.72
$4,496.72

20.0%

COSTO TOTAL UNITARIO

$26,980

ANALISIS UNITARIO
ITEM
BASE ESTABILIZADA B-600 - CEMENTO 5%
I.EQUIPO
DESCRIPCION
MOTONIVELADORA CAT 12-F
CILINDRO GALION
TANQUE DE AGUA FORD 600

No. ITEM
UNIDAD:

TARIFA DIA
450,000.00
260,000.00
290,000.00

RENDIM.
56.00
56.00
56.00

20.2.17
und
M3

VALOR UNI.
$8,035.71
$4,642.86
$5,178.57

VALOR PARCIAL
$8,035.71
$4,642.86
$5,178.57

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
RECEBO B -600

UNIDAD
M3

CANTIDAD
1.30

$17,857.14

VALOR UNI.
35,000.00

VALOR PARCIAL
$45,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.10
12.10

$45,500.00

VALOR UNI.
$4,265.87
$2,483.31

VALOR PARCIAL
$4,265.87
$2,483.31

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,749.17
70,106
$14,021.26
$14,021.26

20.0%

COSTO TOTAL UNITARIO

$84,128

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

20.2.18
und

RODADURA B-1350 - E= 10 CMS


I.EQUIPO
DESCRIPCION
BENITIN DE 500 P - 750
HERRAMIENTA MENOR

M2
TARIFA DIA
15,000.00
5,000.00

RENDIM.
10.00
10.00

VALOR UNI.
$1,500.00
$500.00
subtotal

VALOR PARCIAL
$1,500.00
$500.00
$2,000.00

II.MATERIALES DE OBRA
DESCRIPCION
RODADURA ASFALTICA B - 1350

UNIDAD
M3

CANTIDAD
0.15

VALOR UNI.
190,000.00

VALOR PARCIAL
$28,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$28,500.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
38,667
$7,733.30
$7,733.30

20.0%

COSTO TOTAL UNITARIO

$46,400

ANALISIS UNITARIO
No. ITEM
UNIDAD:

20.4.1
und
UN

ITEM
ARBOLES ALTURA 1.50 MTS
I.EQUIPO
DESCRIPCION
VOLQUETA
CARGADOR
HERRAMIENTA MENOR

TARIFA DIA
135,000.00
230,000.00
5,000.00

RENDIM.
28.00
150.00
15.00

VALOR UNI.
$4,821.43
$1,533.33
$333.33
subtotal

VALOR PARCIAL
$4,821.43
$1,533.33
$333.33
$6,688.10

II.MATERIALES DE OBRA
DESCRIPCION
CEDRO NOGAL
FALSO PIMIENTO
HOLY ROJO
EUGENIA
PINO ROMERON
CAUCHO SABANERO
GUAYACAN
CHICALA
PALMA DE CERA
POMARROSO
MAGNOLIO
PALMA FENICIA
CARBONERO

UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD

CANTIDAD
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

VALOR UNI.
$11,600.00
$23,200.00
$17,400.00
$11,600.00
$23,200.00
$2,900,000.00
$580,000.00
$17,000.00
$1,740,000.00
$46,400.00
$139,200.00
$25,500.00
$290,000.00
subtotal

VALOR PARCIAL
$11,600.00
$23,200.00
$17,400.00
$11,600.00
$23,200.00
$2,900,000.00
$580,000.00
$17,000.00
$1,740,000.00
$46,400.00
$139,200.00
$25,500.00
$290,000.00
$11,600.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
25.00

VALOR UNI.
$2,064.68
$1,201.92

VALOR PARCIAL
$2,064.68
$1,201.92

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,266.60

20.0%

21,555
$4,310.94
$4,310.94

COSTO TOTAL UNITARIO

$25,866

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
JARDINERAS
I.EQUIPO
DESCRIPCION
VOLQUETA
CARGADOR
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
JARDINERAS POR M2 12 A 15 PLANTAS /M2

TARIFA DIA
135,000.00
230,000.00
5,000.00

RENDIM.
39.00
620.00
4.00

UNIDAD
M2

CANTIDAD
1.00

20.4.2
und
M2

VALOR UNI.
$3,461.54
$370.97
$1,250.00
subtotal

VALOR PARCIAL
$3,461.54
$370.97
$1,250.00
$5,082.51

VALOR UNI.
$25,000.00

VALOR PARCIAL
$25,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$25,000.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
38,249
$7,649.80
$7,649.80

20.0%

COSTO TOTAL UNITARIO

$45,899

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
PRADIZACION
I.EQUIPO
DESCRIPCION
VOLQUETA
CARGADOR
HERRAMIENTA MENOR

TARIFA DIA
135,000.00
230,000.00
5,000.00

RENDIM.
179.00
1,156.00
28.00

II.MATERIALES DE OBRA
DESCRIPCION
PRADO

UNIDAD
M2

CANTIDAD
1.00

20.4.4
und
M2

VALOR UNI.
$754.19
$198.96
$178.57
subtotal

VALOR PARCIAL
$754.19
$198.96
$178.57
$1,131.72

VALOR UNI.
$2,700.00

VALOR PARCIAL
$2,700.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
50.000

$2,700.00

VALOR UNI.
$600.96

VALOR PARCIAL
$600.96

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$600.96
4,433
$886.54
$886.54

20.0%

COSTO TOTAL UNITARIO

$5,319

ANALISIS UNITARIO
ITEM
TIERRA NEGRA PARA EMPRADIZACIN
I.EQUIPO

No. ITEM
UNIDAD:

20.4.5
und
M3

DESCRIPCION
VOLQUETA
CARGADOR
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
TIERRA NEGRA PARA EMPRADIZACIN

TARIFA DIA
135,000.00
230,000.00
5,000.00

RENDIM.
48.00
48.00
21.00

UNIDAD
M3

CANTIDAD
1.05

VALOR UNI.
$2,812.50
$4,791.67
$238.10
subtotal

VALOR PARCIAL
$2,812.50
$4,791.67
$238.10
$7,842.26

VALOR UNI.
$29,850.00

VALOR PARCIAL
$31,342.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
21.00
21.00

$31,342.50

VALOR UNI.
$2,457.95
$1,430.86

VALOR PARCIAL
$2,457.95
$1,430.86

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,888.81
43,074
$8,614.71
$8,614.71

20.0%

COSTO TOTAL UNITARIO

$51,688

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
ASEO GENERAL
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
12.00

21.1.1
und
M2

VALOR UNI.
$416.67

VALOR PARCIAL
$416.67

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$416.67

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
12.00

$0.00

VALOR UNI.
$2,504.00

VALOR PARCIAL
$2,504.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,504.00
2,921
$584.13
$584.13

20.0%

COSTO TOTAL UNITARIO

$3,505

ANALISIS UNITARIO
ITEM
LIMPIEZA DE FACHADAS
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

21.1.2
und
M2
VALOR PARCIAL

HERRAMIENTA MENOR
ANDAMIO

5,000.00
70.00

15.60
5.00

$320.51
$14.00

$320.51
$14.00
$334.51

VALOR UNI.
$8,000.00

VALOR PARCIAL
$480.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ACIDO MURIATICO

UNIDAD
GL

CANTIDAD
0.06

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.60
15.60

$480.00

VALOR UNI.
$3,308.78
$1,926.15

VALOR PARCIAL
$3,308.78
$1,926.15

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,234.94
6,049
$1,209.89
$1,209.89

20.0%

COSTO TOTAL UNITARIO

$7,259

ANALISIS UNITARIO
ITEM
LIMPIEZA MUROS INTERIORES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
15.60

21.1.3
und
M2

VALOR UNI.
$320.51

VALOR PARCIAL
$320.51

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
AGUA
JABON
PAO LIMPIADOR

UNIDAD
M3
GL
UNIDAD

CANTIDAD
0.00
0.05
0.02

$320.51

VALOR UNI.
$8,000.00
$2,500.00
$800.00

VALOR PARCIAL
$2.00
$125.00
$16.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.60
15.60

$143.00

VALOR UNI.
$3,308.78
$1,926.15

VALOR PARCIAL
$3,308.78
$1,926.15

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,234.94
5,698
$1,139.69
$1,139.69

20.0%

COSTO TOTAL UNITARIO

$6,838

ANALISIS UNITARIO
ITEM
RETIRO DE ESCOMBROS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
10.00

VALOR UNI.
$500.00

21.1.4
und
M3
VALOR PARCIAL
$500.00

VOLQUETA

135,000.00

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

10.00

CANTIDAD

$13,500.00
subtotal
VALOR UNI.

$13,500.00
$14,000.00
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
10.00

$0.00

VALOR UNI.
$3,004.80

VALOR PARCIAL
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,004.80
17,005
$3,400.96
$3,400.96

20.0%

COSTO TOTAL UNITARIO

$20,406

ANALISIS UNITARIO
ITEM
LIMPIEZA DE CANALES Y BAJANTES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
15.00

21.1.5
und
ML

VALOR UNI.
$333.33

VALOR PARCIAL
$333.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$333.33

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
15.00

$0.00

VALOR UNI.
$2,003.20

VALOR PARCIAL
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,003.20
2,337
$467.31
$467.31

20.0%

COSTO TOTAL UNITARIO

$2,804

ANALISIS UNITARIO
ITEM
SONDEO Y REVISIN DE DESAGUES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
15.00

VALOR UNI.
$333.33
subtotal

II.MATERIALES DE OBRA

21.1.6
und
ML
VALOR PARCIAL
$333.33
$333.33

DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$0.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
5,778
$1,155.53
$1,155.53

20.0%

COSTO TOTAL UNITARIO

$6,933

ANALISIS UNITARIO
ITEM
LIMPIEZA DE CAJAS DE INSPECCIN
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
15.60

21.1.7
und
UN

VALOR UNI.
$320.51

VALOR PARCIAL
$320.51

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$320.51

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
10.00
10.00

$0.00

VALOR UNI.
$5,161.70
$3,004.80

VALOR PARCIAL
$5,161.70
$3,004.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$8,166.50
8,487
$1,697.40
$1,697.40

20.0%

COSTO TOTAL UNITARIO

$10,184

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CONCRETO 1:2:2 (3500 PSI)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
1.50

II.MATERIALES DE OBRA
DESCRIPCION
ARENA LAVADA DE RIO

UNIDAD
M3

CANTIDAD
0.67

25.3.1
und
M3

VALOR UNI.
$3,333.33
subtotal

VALOR PARCIAL
$3,333.33
$3,333.33

VALOR UNI.
$58,000.00

VALOR PARCIAL
$38,860.00

ARENA FINA DE RIO


AGUA
CEMENTO GRIS

M3
M3
KG

0.67
0.23
420.00

$69,000.00
$8,000.00
$400.00

$46,230.00
$1,840.00
$168,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.64
3.64

$254,930.00

VALOR UNI.
$14,195.12
$8,266.30

VALOR PARCIAL
$14,195.12
$8,266.30

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,461.42
280,725
$56,144.95
$56,144.95

20.0%

COSTO TOTAL UNITARIO

$336,870

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CONCRETO 1:2:2,5 (3000 PSI)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.64

II.MATERIALES DE OBRA
DESCRIPCION
ARENA LAVADA DE RIO
GRAVILLA DE RIO
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
M3
KG

CANTIDAD
0.62
0.796
0.32
384.00

25.3.2
und
M3

VALOR UNI.
$1,373.63
subtotal

VALOR PARCIAL
$1,373.63
$1,373.63

VALOR UNI.
$58,000.00
$58,000.00
$8,000.00
$400.00

VALOR PARCIAL
$35,960.00
$46,168.58
$2,560.00
$153,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.64
3.64

$238,288.58

VALOR UNI.
$14,195.12
$8,266.30

VALOR PARCIAL
$14,195.12
$8,266.30

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,461.42
262,124
$52,424.72
$52,424.72

20.0%

COSTO TOTAL UNITARIO

$314,548

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CONCRETO 1:2:3 (2500 PSI)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.64

II.MATERIALES DE OBRA
DESCRIPCION
ARENA LAVADA DE RIO
GRAVILLA DE RIO
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
M3
KG

CANTIDAD
0.56
0.835
0.21
350.00

25.3.3
und
M3

VALOR UNI.
$1,373.63
subtotal

VALOR PARCIAL
$1,373.63
$1,373.63

VALOR UNI.
$58,000.00
$58,000.00
$8,000.00
$400.00

VALOR PARCIAL
$32,190.00
$48,430.00
$1,680.00
$140,000.00

subtotal

$222,300.00

III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.64
3.64

VALOR UNI.
$14,195.12
$8,263.46

VALOR PARCIAL
$14,195.12
$8,263.46

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,458.58
246,132
$49,226.44
$49,226.44

20.0%

COSTO TOTAL UNITARIO

$295,359

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CONCRETO 1:2:4 (2000 PSI)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.64

II.MATERIALES DE OBRA
DESCRIPCION
ARENA LAVADA DE RIO
GRAVILLA DE RIO
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
M3
KG

CANTIDAD
0.60
0.715
0.20
325.00

25.3.4
und
M3

VALOR UNI.
$1,373.63
subtotal

VALOR PARCIAL
$1,373.63
$1,373.63

VALOR UNI.
$58,000.00
$58,000.00
$8,000.00
$400.00

VALOR PARCIAL
$34,800.00
$41,470.00
$1,560.00
$130,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.64
3.64

$207,830.00

VALOR UNI.
$14,195.12
$8,263.46

VALOR PARCIAL
$14,195.12
$8,263.46

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,458.58
231,662
$46,332.44
$46,332.44

20.0%

COSTO TOTAL UNITARIO

$277,995

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
CONCRETO 1:3:3 (1500 PSI)
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.64

II.MATERIALES DE OBRA
DESCRIPCION
ARENA LAVADA DE RIO
GRAVILLA DE RIO
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
M3
KG

CANTIDAD
0.56
0.920
0.16
230.00

VALOR UNI.
$1,373.63
subtotal

VALOR PARCIAL
$1,373.63
$1,373.63

VALOR UNI.
$58,000.00
$58,000.00
$8,000.00
$400.00

VALOR PARCIAL
$32,190.00
$53,360.00
$1,312.00
$92,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.64
3.64

25.3.5
und
M3

VALOR UNI.
$14,195.12
$8,263.46

$178,862.00
VALOR PARCIAL
$14,195.12
$8,263.46

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,458.58
202,694
$40,538.84
$40,538.84

20.0%

COSTO TOTAL UNITARIO

$243,233

ANALISIS UNITARIO
ITEM
CASETON DE GUADUA DE 0.70 x 0.13
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
70.00

25.6.1
und
ML

VALOR UNI.
$71.43

VALOR PARCIAL
$71.43

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
PUNTILLA CON CABEZA 1 / 2"
PUNTILLA CON CABEZA 2"
ESTERILLA DE GUADUA
DURMIENTE

UNIDAD
KG
LB
LB
M2
ML

CANTIDAD
0.01
0.10
0.10
0.90
0.90

$71.43

VALOR UNI.
$2,000.00
$1,500.00
$1,500.00
$4,100.00
$450.00

VALOR PARCIAL
$20.00
$150.00
$150.00
$3,690.00
$405.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
70.00
70.00

$4,415.00

VALOR UNI.
$737.39
$429.26

VALOR PARCIAL
$737.39
$429.26

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,166.64
5,653
$1,130.61
$1,130.61

20.0%

COSTO TOTAL UNITARIO

$6,784

ANALISIS UNITARIO
ITEM
CASETON DE GUADUA DE 0.70 x 0.18
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
63.00

VALOR UNI.
$79.37
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
PUNTILLA CON CABEZA 1 / 2"
PUNTILLA CON CABEZA 2"
ESTERILLA DE GUADUA
DURMIENTE
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
LB
LB
M2
ML

CANTIDAD
0.02
0.20
0.20
1.00
1.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
63.00
63.00

25.6.2
und
ML
VALOR PARCIAL
$79.37
$79.37

VALOR UNI.
$2,000.00
$1,500.00
$1,500.00
$4,100.00
$450.00
subtotal

VALOR PARCIAL
$30.00
$300.00
$300.00
$4,100.00
$450.00
$5,180.00

VALOR UNI.
$819.32
$476.95

VALOR PARCIAL
$819.32
$476.95

subtotal

$1,296.27

Total Costo Directo


A.I.U.
Total Costo Indirecto

6,556
$1,311.13
$1,311.13

20.0%

COSTO TOTAL UNITARIO

$7,867

ANALISIS UNITARIO
ITEM
CASETON DE GUADUA DE 0.70 x 0.28
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
60.00

25.6.3
und
ML

VALOR UNI.
$83.33

VALOR PARCIAL
$83.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
PUNTILLA CON CABEZA 1 / 2"
PUNTILLA CON CABEZA 2"
ESTERILLA DE GUADUA
DURMIENTE
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
LB
LB
M2
ML

CANTIDAD
0.02
0.20
0.20
1.25
1.50

TARIFA DIA
51,617.00
30,048.00

RENDIM.
60.00
60.00

$83.33

VALOR UNI.
$2,000.00
$1,500.00
$1,500.00
$4,100.00
$1,437.00
subtotal

VALOR PARCIAL
$30.00
$300.00
$300.00
$5,125.00
$2,155.50
$7,910.50

VALOR UNI.
$860.28
$500.80

VALOR PARCIAL
$860.28
$500.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,361.08
9,355
$1,870.98
$1,870.98

20.0%

COSTO TOTAL UNITARIO

$11,226

ANALISIS UNITARIO
ITEM
CASETON DE GUADUA DE 0.70 x 0.30
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
60.00

25.6.4
und
ML

VALOR UNI.
$83.33
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
ALAMBRE NEGRO No 18
PUNTILLA CON CABEZA 1 / 2"
PUNTILLA CON CABEZA 2"
ESTERILLA DE GUADUA
DURMIENTE
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
KG
LB
LB
M2
ML

CANTIDAD
0.02
0.20
0.20
1.25
1.50

TARIFA DIA
51,617.00
30,048.00

RENDIM.
60.00
60.00

VALOR PARCIAL
$83.33
$83.33

VALOR UNI.
$2,000.00
$1,500.00
$1,500.00
$4,100.00
$450.00
subtotal

VALOR PARCIAL
$30.00
$300.00
$300.00
$5,125.00
$675.00
$6,430.00

VALOR UNI.
$860.28
$500.80

VALOR PARCIAL
$860.28
$500.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,361.08

20.0%

7,874
$1,574.88
$1,574.88

COSTO TOTAL UNITARIO

$9,449

ANALISIS UNITARIO
ITEM
CASETON DE LONA DE 0.70 x 0.35
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
66.00

25.6.5
und
ML

VALOR UNI.
$75.76

VALOR PARCIAL
$75.76

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
LONA PLASTICA PARA CASETON
GRAPA INDUSTRIAL
TIRAS ALISTADO 3 X3 X3
PUNTILLA CON CABEZA 2"
LISTON DE ORDINARIO
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
M2
LB
ML
LB
ML

CANTIDAD
1.96
0.03
2.24
0.53
3.14

TARIFA DIA
51,617.00
30,048.00

RENDIM.
60.00
60.00

$75.76

VALOR UNI.
$4,500.00
$4,500.00
$580.00
$1,500.00
$2,500.00
subtotal

VALOR PARCIAL
$8,820.00
$135.00
$1,299.20
$795.00
$7,850.00
$18,899.20

VALOR UNI.
$860.28
$500.80

VALOR PARCIAL
$860.28
$500.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,361.08
20,336
$4,067.21
$4,067.21

20.0%

COSTO TOTAL UNITARIO

$24,403

ANALISIS UNITARIO
ITEM
CASETON DE LONA DE 0.70 x 0.60
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
60.00

25.6.6
und
ML

VALOR UNI.
$83.33
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
LONA PLASTICA PARA CASETON
GRAPA INDUSTRIAL
TIRAS ALISTADO 3 X3 X3
PUNTILLA CON CABEZA 2"
SUB- CONTRATO CARPINTERIA
LISTON DE ORDINARIO
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
M2
LB
ML
LB
%
ML

CANTIDAD
2.80
0.03
2.25
0.90
45.00
5.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
60.00
60.00

VALOR PARCIAL
$83.33
$83.33

VALOR UNI.
$4,500.00
$4,500.00
$580.00
$1,500.00
$14,000.00
$2,500.00
subtotal

VALOR PARCIAL
$12,600.00
$135.00
$1,305.00
$1,350.00
$6,300.00
$12,500.00
$34,190.00

VALOR UNI.
$860.28
$500.80

VALOR PARCIAL
$860.28
$500.80

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

$1,361.08

20.0%

35,634
$7,126.88
$7,126.88
$42,761

ANALISIS UNITARIO
ITEM
FORMALETA COLUMNAS EN LISTON
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
15.00
15.00

25.6.7
und
M2

VALOR UNI.
$333.33
$4.67

VALOR PARCIAL
$333.33
$4.67

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA COLUMNAS EN MADERA

UNIDAD
M2/DIA

CANTIDAD
1.00

$338.00

VALOR UNI.
$31.00

VALOR PARCIAL
$31.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
15.00
15.00

$31.00

VALOR UNI.
$3,441.13
$2,003.20

VALOR PARCIAL
$3,441.13
$2,003.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$5,444.33
5,813
$1,162.67
$1,162.67

20.0%

COSTO TOTAL UNITARIO

$6,976

ANALISIS UNITARIO
ITEM
FORMALETA ENTREPISOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

25.6.8
und
MS

VALOR UNI.
$50.00

VALOR PARCIAL
$50.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ALQUILER FORMALETA MADERA PLACA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD
M2/DIA

CANTIDAD
1.00

TARIFA DIA
51,617.00
30,048.00

RENDIM.
12.50
12.50

$50.00

VALOR UNI.
$85.00
subtotal

VALOR PARCIAL
$85.00
$85.00

VALOR UNI.
$4,129.36
$2,403.84

VALOR PARCIAL
$4,129.36
$2,403.84

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,533.20
6,668
$1,333.64
$1,333.64

20.0%

COSTO TOTAL UNITARIO

$8,002

ANALISIS UNITARIO
ITEM
FORMALETA ESCALERAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
29.00

VALOR UNI.
$172.41

25.6.9
und
M2
VALOR PARCIAL
$172.41

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA ESCALERA EN MADERA

UNIDAD
M2/DIA

CANTIDAD
1.00

$172.41

VALOR UNI.
$15,000.00

VALOR PARCIAL
$15,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
29.00
29.00

$15,000.00

VALOR UNI.
$1,779.90
$1,036.14

VALOR PARCIAL
$1,779.90
$1,036.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,816.03
17,988
$3,597.69
$3,597.69

20.0%

COSTO TOTAL UNITARIO

$21,586

ANALISIS UNITARIO
ITEM
FORMALETA MUROS Y TANQUES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA MUROS Y TANQUES MADERA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
29.00

UNIDAD
M2

CANTIDAD
1.00

25.6.10
und
M2

VALOR UNI.
$172.41
subtotal

VALOR PARCIAL
$172.41
$172.41

VALOR UNI.
$13,000.00

VALOR PARCIAL
$13,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
29.00
29.00

$13,000.00

VALOR UNI.
$1,779.90
$1,036.14

VALOR PARCIAL
$1,779.90
$1,036.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,816.03
15,988
$3,197.69
$3,197.69

20.0%

COSTO TOTAL UNITARIO

$19,186

ANALISIS UNITARIO
ITEM
FORMALETA PREFABRICADOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
25.00

VALOR UNI.
$200.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA EN MADERAPREFABRICADOS

UNIDAD
M2

CANTIDAD
1.00

VALOR UNI.
$7,000.00
subtotal

III.MANO DE OBRA

25.6.11
und
M2
VALOR PARCIAL
$200.00
$200.00
VALOR PARCIAL
$7,000.00
$7,000.00

DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
25.00

VALOR UNI.
$2,064.68
$1,201.92

VALOR PARCIAL
$2,064.68
$1,201.92

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,266.60
10,467
$2,093.32
$2,093.32

20.0%

COSTO TOTAL UNITARIO

$12,560

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
FORMALETA VIGAS AEREAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
25.00

II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA VIGAS AEREAS

UNIDAD
M2

CANTIDAD
1.00

25.6.12
und
M2

VALOR UNI.
$200.00
subtotal

VALOR PARCIAL
$200.00
$200.00

VALOR UNI.
$8,500.00

VALOR PARCIAL
$8,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
25.00
25.00

$8,500.00

VALOR UNI.
$2,064.68
$1,201.92

VALOR PARCIAL
$2,064.68
$1,201.92

subtotal

$3,266.60

Total Costo Directo


A.I.U.
20.0%
Total Costo Indirecto
COSTO TOTAL UNITARIO

11,967
$2,393.32
$2,393.32
$14,360

ANALISIS UNITARIO
ITEM
FORMALETA ZAPATAS Y VIGAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
29.00

25.6.13
und
M2

VALOR UNI.
$172.41
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA ZAPATAS

UNIDAD
M2

CANTIDAD
1.00

$172.41

VALOR UNI.
$10,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
29.00
29.00

VALOR PARCIAL
$10,500.00

$10,500.00

VALOR UNI.
$1,779.90
$1,036.14
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$172.41

VALOR PARCIAL
$1,779.90
$1,036.14
$2,816.03

20.0%

13,488
$2,697.69
$2,697.69

COSTO TOTAL UNITARIO

$16,186

ANALISIS UNITARIO
ITEM
USO FORMALETA COLUMNAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA COLUMNAS EN MADERA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
64.00
64.00

UNIDAD
M2

CANTIDAD
1.00

25.6.14
und
M2

VALOR UNI.
$78.13
$1.09
subtotal

VALOR PARCIAL
$78.13
$1.09
$79.22

VALOR UNI.
$31.00

VALOR PARCIAL
$31.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
64.00
64.00

$31.00

VALOR UNI.
$806.52
$469.50

VALOR PARCIAL
$806.52
$469.50

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$1,276.02
1,386
$277.25
$277.25

20.0%

COSTO TOTAL UNITARIO

$1,663

ANALISIS UNITARIO
ITEM
USO FORMALETA ENTREPISOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
100.00

25.6.15
und
M2

VALOR UNI.
$50.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA ENTREPISOS

UNIDAD
M2

CANTIDAD
1.00

$50.00

VALOR UNI.
$85.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
100.00
100.00

VALOR PARCIAL
$85.00

$85.00

VALOR UNI.
$516.17
$300.48
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$50.00

VALOR PARCIAL
$516.17
$300.48
$816.65

20.0%

952
$190.33
$190.33

COSTO TOTAL UNITARIO

$1,142

ANALISIS UNITARIO
ITEM
USO FORMALETA ESCALERA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
21.00

25.6.16
und
M2

VALOR UNI.
$238.10

VALOR PARCIAL
$238.10

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA ESCALERA EN MADERA

UNIDAD
M2

CANTIDAD
1.00

$238.10

VALOR UNI.
$15,000.00

VALOR PARCIAL
$15,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
29.00
29.00

$15,000.00

VALOR UNI.
$1,779.90
$1,036.14

VALOR PARCIAL
$1,779.90
$1,036.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,816.03
18,054
$3,610.83
$3,610.83

20.0%

COSTO TOTAL UNITARIO

$21,665

ANALISIS UNITARIO
ITEM
USO FORMALETA MUROS Y TANQUES
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
29.00

25.6.17
und
M2

VALOR UNI.
$172.41
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA MUROS Y TANQUES MADERA

UNIDAD
M2

CANTIDAD
1.00

$172.41

VALOR UNI.
$13,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
29.00
29.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$13,000.00

$13,000.00

VALOR UNI.
$1,779.90
$1,036.14

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$172.41

VALOR PARCIAL
$1,779.90
$1,036.14
$2,816.03

20.0%

15,988
$3,197.69
$3,197.69
$19,186

ANALISIS UNITARIO
ITEM
USO FORMALETA PREFABRICADOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
29.00

25.6.18
und
M2

VALOR UNI.
$172.41

VALOR PARCIAL
$172.41

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA EN MADERAPREFABRICADOS

UNIDAD
M2

CANTIDAD
1.00

$172.41

VALOR UNI.
$7,000.00

VALOR PARCIAL
$7,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
29.00
29.00

$7,000.00

VALOR UNI.
$1,779.90
$1,036.14

VALOR PARCIAL
$1,779.90
$1,036.14

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$2,816.03
9,988
$1,997.69
$1,997.69

20.0%

COSTO TOTAL UNITARIO

$11,986

ANALISIS UNITARIO
ITEM
USO FORMALETA VIGAS AEREAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
22.00

25.6.19
und
M2

VALOR UNI.
$227.27
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA VIGAS AEREAS

UNIDAD
M2

CANTIDAD
1.00

$227.27

VALOR UNI.
$8,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
22.00
22.00

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
$8,500.00

$8,500.00

VALOR UNI.
$2,346.23
$1,365.82

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$227.27

VALOR PARCIAL
$2,346.23
$1,365.82
$3,712.05

20.0%

12,439
$2,487.86
$2,487.86
$14,927

ANALISIS UNITARIO
ITEM
USO FORMALETA ZAPATAS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
4.00

25.6.20
und
M2

VALOR UNI.
$1,250.00

VALOR PARCIAL
$1,250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
FORMALETA ZAPATAS

UNIDAD
M2

CANTIDAD
1.00

$1,250.00

VALOR UNI.
$10,500.00

VALOR PARCIAL
$10,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.60
3.60

$10,500.00

VALOR UNI.
$14,338.06
$8,346.67

VALOR PARCIAL
$14,338.06
$8,346.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$22,684.72
34,435
$6,886.94
$6,886.94

20.0%

COSTO TOTAL UNITARIO

$41,322

ANALISIS UNITARIO
No. ITEM
UNIDAD:

25.4.1
und
HR

ITEM
ANDAMIO TUBULAR
I.EQUIPO
DESCRIPCION
ALQUILER ANDAMIO TUBULAR

TARIFA DIA
70.00

RENDIM.
8.00

VALOR UNI.
$8.75
subtotal

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL
$8.75
$8.75
VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
9
$1.75
$1.75

20.0%

COSTO TOTAL UNITARIO

$11

ANALISIS UNITARIO
No. ITEM

25.4.2

ITEM
HERRAMIENTA ACABADOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
27.00

und
HR

VALOR UNI.
$185.19

VALOR PARCIAL
$185.19

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$185.19

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
185
$37.04
$37.04

20.0%

COSTO TOTAL UNITARIO

$222

ANALISIS UNITARIO
ITEM
HERRAMIENTA CARGUE Y RETIRO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
25.00

25.4.3
und
HR

VALOR UNI.
$200.00

VALOR PARCIAL
$200.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$200.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
200
$40.00
$40.00

20.0%

COSTO TOTAL UNITARIO

$240

ANALISIS UNITARIO
ITEM

No. ITEM
UNIDAD:

25.4.4
und

HERRAMIENTA CICLOPEO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

HR
TARIFA DIA
5,000.00

RENDIM.
18.00

VALOR UNI.
$277.78

VALOR PARCIAL
$277.78

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$277.78

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
278
$55.56
$55.56

20.0%

COSTO TOTAL UNITARIO

$333

ANALISIS UNITARIO
ITEM
HERRAMIENTA CIMIENTOS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
18.00

25.4.5
und
HR

VALOR UNI.
$277.78

VALOR PARCIAL
$277.78

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$277.78

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
278
$55.56
$55.56

20.0%

COSTO TOTAL UNITARIO

$333

ANALISIS UNITARIO
ITEM
HERRAMIENTA ESTRUCTURA

No. ITEM
UNIDAD:

25.4.6
und
HR

I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
14.00

VALOR UNI.
$357.14

VALOR PARCIAL
$357.14

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$357.14

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
357
$71.43
$71.43

20.0%

COSTO TOTAL UNITARIO

$429

ANALISIS UNITARIO
ITEM
HERRAMIENTA EXCAVACION
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
22.00

25.4.7
und
HR

VALOR UNI.
$227.27

VALOR PARCIAL
$227.27

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$227.27

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
227
$45.45
$45.45

20.0%

COSTO TOTAL UNITARIO

$273

ANALISIS UNITARIO
ITEM
HERRAMIENTA MAMPOSTERIA
I.EQUIPO

No. ITEM
UNIDAD:

25.4.8
und
HR

DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
29.00

VALOR UNI.
$172.41

VALOR PARCIAL
$172.41

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$172.41

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
172
$34.48
$34.48

20.0%

COSTO TOTAL UNITARIO

$207

ANALISIS UNITARIO
ITEM
HERRAMIENTA MORTEROS
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
24.00

25.4.9
und
HR

VALOR UNI.
$208.33

VALOR PARCIAL
$208.33

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$208.33

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
208
$41.67
$41.67

20.0%

COSTO TOTAL UNITARIO

$250

ANALISIS UNITARIO
ITEM
HERRAMIENTA PAETES
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

25.4.10
und
HR
VALOR PARCIAL

HERRAMIENTA MENOR

5,000.00

20.00

$250.00

$250.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$250.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$0.00
250
$50.00
$50.00

20.0%

COSTO TOTAL UNITARIO

$300

ANALISIS UNITARIO
ITEM
CUADRILLA A (1 AY)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

25.1.1
und
HR

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
8.00

$0.00

VALOR UNI.
$3,756.00

VALOR PARCIAL
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$3,756.00
3,756
$751.20
$751.20

20.0%

COSTO TOTAL UNITARIO

$4,507

ANALISIS UNITARIO
ITEM
CUADRILLA B (1 OF)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

25.1.2
und
HR
VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)

TARIFA DIA
51,617.00

RENDIM.
8.00

$0.00

VALOR UNI.
$6,452.13

VALOR PARCIAL
$6,452.13

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$6,452.13
6,452
$1,290.43
$1,290.43

20.0%

COSTO TOTAL UNITARIO

$7,743

ANALISIS UNITARIO
ITEM
CUADRILLA C (1 OF + 1 AY)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

25.1.3
und
HR

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.000
8.000

$0.00

VALOR UNI.
$6,452.13
$3,756.00

VALOR PARCIAL
$6,452.13
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,208.13
10,208
$2,041.63
$2,041.63

20.0%

COSTO TOTAL UNITARIO

$12,250

ANALISIS UNITARIO
ITEM
CUADRILLA D (1 OF + 2 AY)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

25.1.4
und
HR
VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.000
4.000

$0.00

VALOR UNI.
$6,452.13
$7,512.00

VALOR PARCIAL
$6,452.13
$7,512.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,964.13
13,964
$2,792.83
$2,792.83

20.0%

COSTO TOTAL UNITARIO

$16,757

ANALISIS UNITARIO
ITEM
CUADRILLA E (1 OF + 3 AY)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

25.1.5
und
HR

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.000
2.667

$0.00

VALOR UNI.
$6,452.13
$11,268.00

VALOR PARCIAL
$6,452.13
$11,268.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$17,720.13
17,720
$3,544.03
$3,544.03

20.0%

COSTO TOTAL UNITARIO

$21,264

ANALISIS UNITARIO
ITEM
CUADRILLA F (1 OF + 4 AY)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal

25.1.6
und
HR
VALOR PARCIAL

$0.00

II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
8.000
2.000

$0.00

VALOR UNI.
$6,452.13
$15,024.00

VALOR PARCIAL
$6,452.13
$15,024.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$21,476.13
21,476
$4,295.23
$4,295.23

20.0%

COSTO TOTAL UNITARIO

$25,771

ANALISIS UNITARIO
ITEM
CUADRILLA G (2 OF + 3 AY)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

25.1.7
und
HR

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51617.00
30048.00

RENDIM.
4.000
2.667

$0.00

VALOR UNI.
$12,904.25
$11,268.00

VALOR PARCIAL
$12,904.25
$11,268.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$24,172.25
24,172
$4,834.45
$4,834.45

20.0%

COSTO TOTAL UNITARIO

$29,007

ANALISIS UNITARIO
ITEM
CUADRILLA I (1 OF ESP + 1 AY)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

subtotal
II.MATERIALES DE OBRA

25.1.9
und
HR
VALOR PARCIAL

$0.00

DESCRIPCION

UNIDAD

CANTIDAD

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial Especializado(incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,359.55
30,048.00

RENDIM.
8.000
8.000

$0.00

VALOR UNI.
$7,419.94
$3,756.00

VALOR PARCIAL
$7,419.94
$3,756.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$11,175.94
11,176
$2,235.19
$2,235.19

20.0%

COSTO TOTAL UNITARIO

$13,411

ANALISIS UNITARIO
ITEM
CUADRILLA J (1 OF ESP)
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

25.1.10
und
HR

VALOR UNI.

VALOR PARCIAL

subtotal
II.MATERIALES DE OBRA
DESCRIPCION

UNIDAD

CANTIDAD

$0.00

VALOR UNI.

VALOR PARCIAL

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial especializado(incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
59,359.55

RENDIM.
8.000

$0.00

VALOR UNI.
$7,419.94

VALOR PARCIAL
$7,419.94

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,419.94
7,420
$1,483.99
$1,483.99

20.0%

COSTO TOTAL UNITARIO

$8,904

ANALISIS UNITARIO
ITEM
MORTERO 1:1:10 CAL - ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.00

UNIDAD
M3

CANTIDAD
1.25

25.2.1
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00

VALOR PARCIAL
$37,500.00

AGUA
CEMENTO GRIS
CAL PROMICAL

M3
KG
KG

0.13
81.50
81.50

$8,000.00
$400.00
$600.00

$1,071.20
$32,600.00
$48,900.00
$120,071.20

VALOR UNI.
$17,205.67
$10,016.00

VALOR PARCIAL
$17,205.67
$10,016.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.00
3.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$27,221.67
148,960
$29,791.91
$29,791.91

20.0%

COSTO TOTAL UNITARIO

$178,751

ANALISIS UNITARIO
ITEM
MORTERO 1:1:3 CAL-ARENA SEMILAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
ARENA SEMILAVADA
AGUA
CEMENTO GRIS
CAL PROMICAL

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.00

UNIDAD
M3
M3
KG
KG

CANTIDAD
1.09
0.23
227.00
227.00

25.2.2
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$20,000.00
$8,000.00
$400.00
$600.00

VALOR PARCIAL
$21,800.00
$1,808.00
$90,800.00
$136,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$250,608.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
262,291
$52,458.13
$52,458.13

20.0%

COSTO TOTAL UNITARIO

$314,749

ANALISIS UNITARIO
ITEM
MORTERO 1:1:4 CAL- ARENA SEMILAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
ARENA SEMILAVADA
AGUA
CEMENTO GRIS
CAL PROMICAL

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.00

UNIDAD
M3
M3
KG
BTO

CANTIDAD
1.16
0.21
182.00
182.00

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$20,000.00
$8,000.00
$400.00
$600.00

VALOR PARCIAL
$23,200.00
$1,648.00
$72,800.00
$109,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

25.2.3
und
M3

VALOR UNI.

$206,848.00
VALOR PARCIAL

Ayudante ( incluye 100% de prestaciones)

30,048.00

3.00

$10,016.00

$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
218,531
$43,706.13
$43,706.13

20.0%

COSTO TOTAL UNITARIO

$262,237

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:10 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
1.10
M3
KG

CANTIDAD
1.25
0.13
133.90

25.2.4
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$37,500.00
$1,000.00
$53,560.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$92,060.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
103,743
$20,748.53
$20,748.53

20.0%

COSTO TOTAL UNITARIO

$124,491

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:11 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
1.25
0.12
160.00

25.2.5
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$37,500.00
$984.00
$64,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$102,484.00

VALOR UNI.
$10,016.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

VALOR PARCIAL
$10,016.00
$10,016.00

20.0%

114,167
$22,833.33
$22,833.33
$137,000

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:12 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
1.25
0.11
142.00

25.2.6
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$37,500.00
$904.00
$56,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$95,204.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
106,887
$21,377.33
$21,377.33

20.0%

COSTO TOTAL UNITARIO

$128,264

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:2 ARENA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
ARENA DE RIO
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
M3
KG

CANTIDAD
1.07
1.07
0.26
640.00

25.2.7
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$58,000.00
$8,000.00
$400.00

VALOR PARCIAL
$32,100.00
$62,060.00
$2,060.00
$256,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$352,220.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
363,903
$72,780.53
$72,780.53

20.0%

COSTO TOTAL UNITARIO

$436,683

ANALISIS UNITARIO
ITEM
MORTERO 1:3 ARENA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.00

VALOR UNI.
$1,666.67

25.2.8
und
M3
VALOR PARCIAL
$1,666.67

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
ARENA DE RIO
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
M3
KG

CANTIDAD
1.09
1.09
0.23
454.00

$1,666.67

VALOR UNI.
$30,000.00
$58,000.00
$8,000.00
$400.00

VALOR PARCIAL
$32,700.00
$63,220.00
$1,812.80
$181,600.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$279,332.80

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
291,015
$58,203.09
$58,203.09

20.0%

COSTO TOTAL UNITARIO

$349,219

ANALISIS UNITARIO
ITEM
MORTERO 1:3 IMPERMEAB. ARENA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
ARENA DE RIO
AGUA
CEMENTO GRIS
SIKA 1

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.00

UNIDAD
M3
M3
M3
KG
KG

CANTIDAD
1.09
1.09
0.23
454.00
2.26

25.2.9
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$58,000.00
$8,000.00
$400.00
$3,600.00

VALOR PARCIAL
$32,700.00
$63,220.00
$1,812.80
$181,600.00
$8,136.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$287,468.80

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
299,151
$59,830.29
$59,830.29

20.0%

COSTO TOTAL UNITARIO

$358,982

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:4 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
1.16
0.21
375.00

25.2.10
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$34,800.00
$1,648.00
$150,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$186,448.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
198,131
$39,626.13
$39,626.13

20.0%

COSTO TOTAL UNITARIO

$237,757

ANALISIS UNITARIO
ITEM
MORTERO 1:4 IMPERMEAB. ARENA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
ARENA DE RIO
AGUA
CEMENTO GRIS
SIKA1

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.00

UNIDAD
M3
M3
M3
KG
KG

CANTIDAD
1.16
1.16
0.21
364.00
2.00

25.2.11
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$58,000.00
$8,000.00
$400.00
$3,600.00

VALOR PARCIAL
$34,800.00
$67,280.00
$1,648.00
$145,600.00
$7,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$256,528.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
268,211
$53,642.13
$53,642.13

20.0%

COSTO TOTAL UNITARIO

$321,853

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:5 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
1.23
0.19
302.00

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$36,900.00
$1,524.00
$120,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

25.2.12
und
M3

VALOR UNI.
$10,016.00
subtotal

$159,224.00
VALOR PARCIAL
$10,016.00
$10,016.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

170,907
$34,181.33
$34,181.33

20.0%

COSTO TOTAL UNITARIO

$205,088

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:5 ARENA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
ARENA DE RIO
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
M3
KG

CANTIDAD
1.20
1.20
0.19
302.00

25.2.13
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$58,000.00
$8,000.00
$400.00

VALOR PARCIAL
$36,000.00
$69,600.00
$1,524.00
$120,800.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$227,924.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
239,607
$47,921.33
$47,921.33

20.0%

COSTO TOTAL UNITARIO

$287,528

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:6 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
1.20
0.18
261.00

25.2.14
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$36,000.00
$1,400.80
$104,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$141,800.80

VALOR UNI.
$10,016.00
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO
ANALISIS UNITARIO

VALOR PARCIAL
$10,016.00
$10,016.00

20.0%

153,483
$30,696.69
$30,696.69
$184,180

No. ITEM
UNIDAD:

ITEM
MORTERO 1:6 ARENA LAVADA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
ARENA DE RIO
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
M3
KG

CANTIDAD
1.20
1.20
0.18
261.00

25.2.15
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$58,000.00
$8,000.00
$400.00

VALOR PARCIAL
$36,000.00
$69,600.00
$1,400.80
$104,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$211,400.80

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
223,083
$44,616.69
$44,616.69

20.0%

COSTO TOTAL UNITARIO

$267,700

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:7 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
1.23
0.16
228.00

25.2.16
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$36,900.00
$1,296.00
$91,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$129,396.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
141,079
$28,215.73
$28,215.73

20.0%

COSTO TOTAL UNITARIO

$169,294

ANALISIS UNITARIO
ITEM
MORTERO 1:8 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
II.MATERIALES DE OBRA

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
3.00

VALOR UNI.
$1,666.67
subtotal

25.2.17
und
M3
VALOR PARCIAL
$1,666.67
$1,666.67

DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
1.25
0.15
203.00

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$37,500.00
$1,236.00
$81,200.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$119,936.00

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
131,619
$26,323.73
$26,323.73

20.0%

COSTO TOTAL UNITARIO

$157,942

ANALISIS UNITARIO
No. ITEM
UNIDAD:

ITEM
MORTERO 1:9 ARENA DE PEA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

TARIFA DIA
5,000.00

RENDIM.
3.00

II.MATERIALES DE OBRA
DESCRIPCION
ARENA DE PEA
AGUA
CEMENTO GRIS

UNIDAD
M3
M3
KG

CANTIDAD
1.25
0.14
166.00

25.2.18
und
M3

VALOR UNI.
$1,666.67
subtotal

VALOR PARCIAL
$1,666.67
$1,666.67

VALOR UNI.
$30,000.00
$8,000.00
$400.00

VALOR PARCIAL
$37,500.00
$1,154.40
$66,400.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
30,048.00

RENDIM.
3.00

$105,054.40

VALOR UNI.
$10,016.00

VALOR PARCIAL
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$10,016.00
116,737
$23,347.41
$23,347.41

20.0%

COSTO TOTAL UNITARIO

$140,084

ANALISIS UNITARIO
ITEM
PODA DE RBOLES DE 1.00 m. A 5.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
MOTOSIERRA
II.MATERIALES DE OBRA
DESCRIPCION
LASO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00
30,000.00

RENDIM.
11.00
9.00
9.00
11.00

UNIDAD
ML

CANTIDAD
2.50

VALOR UNI.
$454.55
$15,000.00
$25,555.56
$2,727.27
subtotal

VALOR PARCIAL
$454.55
$15,000.00
$25,555.56
$2,727.27
$43,737.37

VALOR UNI.
$500.00

VALOR PARCIAL
$1,250.00

subtotal
III.MANO DE OBRA
DESCRIPCION

TARIFA DIA

RENDIM.

25.7.1
und
UN

VALOR UNI.

$1,250.00
VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

51,617.00
30,048.00

11.00
11.00

$4,692.45
$2,731.64

$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
52,411
$10,482.29
$10,482.29

20.0%

COSTO TOTAL UNITARIO

$62,894

ANALISIS UNITARIO
ITEM
PODA DE RBOLES DE 5.10 m. A 10.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
MOTOSIERRA
II.MATERIALES DE OBRA
DESCRIPCION
LASO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00
30,000.00

RENDIM.
9.00
8.50
8.50
9.00

UNIDAD
ML

CANTIDAD
5.00

25.7.2
und
UN

VALOR UNI.
$555.56
$15,882.35
$27,058.82
$3,333.33
subtotal

VALOR PARCIAL
$555.56
$15,882.35
$27,058.82
$3,333.33
$46,830.07

VALOR UNI.
$500.00

VALOR PARCIAL
$2,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.00
9.00

$2,500.00

VALOR UNI.
$5,735.22
$3,338.67

VALOR PARCIAL
$5,735.22
$3,338.67

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$9,073.89
58,404
$11,680.79
$11,680.79

20.0%

COSTO TOTAL UNITARIO

$70,085

ANALISIS UNITARIO
ITEM
PODA DE RBOLES DE 10.10 m. A 15.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
MOTOSIERRA
II.MATERIALES DE OBRA
DESCRIPCION
LASO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00
30,000.00

RENDIM.
7.50
8.00
8.00
7.50

UNIDAD
ML

CANTIDAD
5.00

VALOR UNI.
$666.67
$16,875.00
$28,750.00
$4,000.00
subtotal

VALOR PARCIAL
$666.67
$16,875.00
$28,750.00
$4,000.00
$50,291.67

VALOR UNI.
$500.00

VALOR PARCIAL
$2,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
7.50
7.50

25.7.3
und
UN

VALOR UNI.
$6,882.27
$4,006.40
subtotal

$2,500.00
VALOR PARCIAL
$6,882.27
$4,006.40
$10,888.67

Total Costo Directo


A.I.U.
Total Costo Indirecto

63,680
$12,736.07
$12,736.07

20.0%

COSTO TOTAL UNITARIO

$76,416

ANALISIS UNITARIO
ITEM
PODA DE RBOLES DE 15.10 m. A 20.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
MOTOSIERRA
II.MATERIALES DE OBRA
DESCRIPCION
LASO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00
30,000.00

RENDIM.
6.35
4.00
4.00
6.35

UNIDAD
ML

CANTIDAD
5.00

25.7.4
und
UN

VALOR UNI.
$787.40
$33,750.00
$57,500.00
$4,724.41
subtotal

VALOR PARCIAL
$787.40
$33,750.00
$57,500.00
$4,724.41
$96,761.81

VALOR UNI.
$500.00

VALOR PARCIAL
$2,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
6.35
6.35

$2,500.00

VALOR UNI.
$8,128.66
$4,731.97

VALOR PARCIAL
$8,128.66
$4,731.97

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$12,860.63
112,122
$22,424.49
$22,424.49

20.0%

COSTO TOTAL UNITARIO

$134,547

ANALISIS UNITARIO
ITEM
PODA DE RBOLES MAYORES DE 20.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
MOTOSIERRA
II.MATERIALES DE OBRA
DESCRIPCION
LASO ml

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00
30,000.00

RENDIM.
9.25
4.00
4.00
9.25

UNIDAD
ml

CANTIDAD
10.00

25.7.5
und
UN

VALOR UNI.
$540.54
$33,750.00
$57,500.00
$3,243.24
subtotal

VALOR PARCIAL
$540.54
$33,750.00
$57,500.00
$3,243.24
$95,033.78

VALOR UNI.
$500.00

VALOR PARCIAL
$5,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.25
9.25

$5,000.00

VALOR UNI.
$5,580.22
$3,248.43
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

VALOR PARCIAL
$5,580.22
$3,248.43
$8,828.65

20.0%

108,862
$21,772.49
$21,772.49
$130,635

ANALISIS UNITARIO
ITEM
TALA DE RBOLES DE 1.00 m. A 5.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION
LASO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
3.00
4.00
4.00

UNIDAD
ML

CANTIDAD
5.00

25.8.1
und
UN

VALOR UNI.
$1,666.67
$33,750.00
$57,500.00
subtotal

VALOR PARCIAL
$1,666.67
$33,750.00
$57,500.00
$92,916.67

VALOR UNI.
$500.00

VALOR PARCIAL
$2,500.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
3.00
3.00

$2,500.00

VALOR UNI.
$17,205.67
$10,016.00

VALOR PARCIAL
$17,205.67
$10,016.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$27,221.67
122,638
$24,527.67
$24,527.67

20.0%

COSTO TOTAL UNITARIO

$147,166

ANALISIS UNITARIO
ITEM
TALA DE RBOLES DE 5.10 m. A 10.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION
LASO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
0.94
4.00
4.00

UNIDAD
ML

CANTIDAD
10.00

25.8.2
und
UN

VALOR UNI.
$5,319.15
$33,750.00
$57,500.00
subtotal

VALOR PARCIAL
$5,319.15
$33,750.00
$57,500.00
$96,569.15

VALOR UNI.
$500.00

VALOR PARCIAL
$5,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.94
0.94

$5,000.00

VALOR UNI.
$55,058.13
$32,051.20

VALOR PARCIAL
$55,058.13
$32,051.20

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$87,109.33
188,678
$37,735.70
$37,735.70

20.0%

COSTO TOTAL UNITARIO

$226,414

ANALISIS UNITARIO
ITEM
TALA DE RBOLES DE 10.10 m. A 15.00 m.
I.EQUIPO
DESCRIPCION

No. ITEM
UNIDAD:

TARIFA DIA

RENDIM.

VALOR UNI.

25.8.3
und
UN
VALOR PARCIAL

HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION
LASO

5,000.00
135,000.00
230,000.00

UNIDAD
ML

1.17
4.00
4.00

CANTIDAD
10.00

$4,273.50
$33,750.00
$57,500.00
subtotal

$4,273.50
$33,750.00
$57,500.00
$95,523.50

VALOR UNI.
$500.00

VALOR PARCIAL
$5,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.17
1.17

$5,000.00

VALOR UNI.
$44,258.95
$25,764.63
subtotal

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
$44,258.95
$25,764.63
$70,023.58
$140,047.16
240,571
$48,114.13
$48,114.13

20.0%

COSTO TOTAL UNITARIO

$288,685

ANALISIS UNITARIO
ITEM
TALA DE RBOLES DE 15.10 m. A 20.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION
LASO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
1.75
3.00
3.00

UNIDAD
ML

CANTIDAD
20.00

25.8.4
und
UN

VALOR UNI.
$2,857.14
$45,000.00
$76,666.67
subtotal

VALOR PARCIAL
$2,857.14
$45,000.00
$76,666.67
$124,523.81

VALOR UNI.
$500.00

VALOR PARCIAL
$10,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
1.75
1.75

$10,000.00

VALOR UNI.
$29,495.43
$17,170.29

VALOR PARCIAL
$29,495.43
$17,170.29

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$46,665.71
181,190
$36,237.90
$36,237.90

20.0%

COSTO TOTAL UNITARIO

$217,427

ANALISIS UNITARIO
ITEM
TALA DE RBOLES MAYORES DE 20.00 m.
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
VOLQUETA
CARGADOR
II.MATERIALES DE OBRA
DESCRIPCION
LASO

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
135,000.00
230,000.00

RENDIM.
2.53
3.00
3.00

UNIDAD
ML

CANTIDAD
20.00

25.8.5
und
UN

VALOR UNI.
$1,976.28
$45,000.00
$76,666.67
subtotal

VALOR PARCIAL
$1,976.28
$45,000.00
$76,666.67
$123,642.95

VALOR UNI.
$500.00

VALOR PARCIAL
$10,000.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
2.53
2.53

$10,000.00

VALOR UNI.
$20,442.38
$11,900.20

VALOR PARCIAL
$20,442.38
$11,900.20

subtotal

$32,342.57

Total Costo Directo


A.I.U.
Total Costo Indirecto

165,986
$33,197.11
$33,197.11

20.0%

COSTO TOTAL UNITARIO

$199,183

ANALISIS UNITARIO
ITEM
ESTRUCTURA EN PERFIL ACESCO 15*15
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
TUBO ESTRUCTURAL 15*15 6,3 mm
SOLDADURA ELECTRICA 004-3/23"

No. ITEM
UNIDAD:

25.8.6
und
ML

TARIFA DIA
5,000.00
70.00

RENDIM.
17.00
0.08

VALOR UNI.
$294.12
$875.00
subtotal

VALOR PARCIAL
$294.12
$875.00
$1,169.12

UNIDAD
ML
KG

CANTIDAD
1.00
0.35

VALOR UNI.

VALOR PARCIAL
$0.00

subtotal
III.MANO DE OBRA
DESCRIPCION
SUBCONTRATO DE ORNAMENTACION

TARIFA DIA
%

RENDIM.
0.45

$0.00

VALOR UNI.

subtotal

VALOR PARCIAL
$0.00
$0.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

20.0%

COSTO TOTAL UNITARIO

1,169
$233.82
$233.82
$1,403

ANALISIS UNITARIO
ITEM
ORINAL ANTIVANDALICO
DESCRIPCION
HERRAMIENTA MENOR

MATERIALES DE OBRA
ORINAL BLANCO REF: GR-08860, PARA VALVULA
ANTIVANDALICA TIPO PUSH
VALVULA CON BOTON ANTIVANDALICO BAJA
PRESION REF: DO-17015006
GRAPAS PARA ORINAL Y LAVAMANOS GRIVAL
DESAGUE SIFON PARA ORINAL REF: GR-93300
TUBO CONECTOR PARA ORINAL PEQUEO Y
VALVULA ANTIVANDALICA
III.MANO DE OBRA
DESCRIPCION

No. ITEM
UNIDAD:

25.8.7
und
und
VALOR UNI.
VALOR PARCIAL
1,000.00
1,000.00

TARIFA DIA
5,000.00

RENDIM.
5.00

UNIDAD

CANTIDAD

Unidad

1.00

93,500.64

93,500.64

Unidad
Unidad
Unidad

1.00
1.00
1.00

133,632.00
4,903.32
6,980.88

133,632.00
4,903.32
6,980.88

Unidad

1.00

41,760.00
Sub total

41760
280,776.84

TARIFA DIA

RENDIM.

VALOR UNI.

Sub total
VALOR UNI.

1,000.00
VALOR PARCIAL

VALOR PARCIAL

Oficial (incluye 100% de prestaciones)


Ayudante ( incluye 100% de prestaciones)

59,360.00
33,048.00

5.00
5.00

11,872.00
6,609.60
Sub total

Total Costo Directo


A.I.U.
Total Costo Indirecto

20.0%

COSTO TOTAL UNITARIO

11,872.00
6,609.60
18,481.60
300,258
$60,051.69
$60,051.69
$360,310

ANALISIS UNITARIO
ITEM
SANITARIO ANTIVANDALICO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

25.8.8
und
und
TARIFA/DIA
RENDIMIENTO VALOR UNITARIO
VALOR PARCIAL
5,000.00
5.00
1,000.00
1,000.00
Sub total
1,000.00
UNIDAD
CANTIDAD
VALOR UNI.
VALOR PARCIAL

MATERIALES DE OBRA
SANITARIO PORCELANA CON HUECOS PARA
MUEBLE COLOR BLANCO REF: IC-IP41
Unidad
VALVULA DE DESCARGA PARA SANITARIO DE 1
1/2" PRESION DE 2,13 LIBRAS HASTA 21,33 LIBRS BAJA PRESION REF: DO- 01021500
Unidad
BOTON METALICO TIPO PUSH ANTIVANDALICO, DOCOLUnidad
TUBOS CONECTORES TCDIC
Unidad
JUEGO DE ACCESORIOS PARA CONECTAR
SANITARIO PARTE POSTERIOR REF: DO-TCDIC
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

Unidad

TARIFA DIA
59360
33048

1.00

100,224.00

100,224.00

1.00
1.00
1.00

67,860.00
91,872.00
47,560.00

67,860.00
91,872.00
47,560.00

1.00

25,056.00
Sub total

25,056.00
332,572.00

RENDIM.
5.00
5.00

VALOR UNI.
11,872.00
6,609.60
Sub total

VALOR PARCIAL
11,872.00
6,609.60
18,481.60

Total Costo Directo


A.I.U.
Total Costo Indirecto

20.0%

COSTO TOTAL UNITARIO

352,054
$70,410.72
$70,410.72
$422,464

ANALISIS UNITARIO
ITEM
LAVAMANOS ANTIVANDALICO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA/DIA
RENDIMIENTO VALOR UNITARIO
5,000.00
5.00
1,000.00
Sub total
MATERIALES DE OBRA
UNIDAD
CANTIDAD
VALOR UNI.
LAVAMANOS BLANCO REF: GR-01301-900
Unidad
1.00
77,026.32
SIFON PLASTICO GRIS REF: GF-580322
Unidad
1.00
3,944.00
DESAGUE PARA LAVAMANOS SENCILLO SIN REBOSE Unidad
1.00
4,408.00
VALVULA REF: 0121500
Unidad
1.00
75,400.00
BOTON TIPO PUSH
Unidad
1.00
92,800.00
COPA MANTANIMIENTO GRIFERIA Ref: DO-00054700
Unidad
1.00
39,440.00
TUBOS CONECTORES TCDIC
Unidad
1.00
47,560.00
Sub total
III.MANO DE OBRA
DESCRIPCION
TARIFA DIA
RENDIM.
VALOR UNI.
Oficial (incluye 100% de prestaciones)
59,360.00
5.00
11872
Ayudante ( incluye 100% de prestaciones)
33,048.00
5.00
6609.6
Sub total

25.8.8
und
und
VALOR PARCIAL
1,000.00
1,000.00
VALOR PARCIAL
77,026.32
3,944.00
4,408.00
75,400.00
92,800.00
39,440.00
47,560.00
340,578.32
VALOR PARCIAL
11,872.00
6,609.60
18,481.60

Total Costo Directo


A.I.U.
Total Costo Indirecto

360,060
$72,011.98
$72,011.98

20.0%

COSTO TOTAL UNITARIO

$432,072

ANALISIS UNITARIO
ITEM
DISPENSADOR DE TOALLAS DE PAPEL
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

25.8.8
und
und
TARIFA/DIA
RENDIMIENTO VALOR UNITARIO
VALOR PARCIAL
5,000.00
100.00
50.00
50.00
Sub total
50.00

UNIDAD
MATERIALES DE OBRA
DISPENSADOR DE TOALLAS DE PAPEL EN ACERO INOXIDABLE
UN
CEMENTO BLANCO
KG
MANO DE OBRA
AYUDANTE AA

30,048.00

CANTIDAD
VALOR UNITARIO
1.00
86000
0.55
800.00
Sub total
5.40

VALOR PARCIAL
86000
440
86440

5,564.44

5,564.44
5,564.44

Sub total
Total Costo Directo
A.I.U.
Total Costo Indirecto

92,054
$18,410.89
$18,410.89

20.0%

COSTO TOTAL UNITARIO

$110,465

ANALISIS UNITARIO
ITEM
JUEGO DE INCRUSTACIONES
HERRAMIENTA MENOR

No. ITEM
UNIDAD:
5,000.00

100.00

25.8.8
und
und
50.00

50.00
50.00

CANTIDAD
VALOR UNITARIO
1.03
37,000.00
1.54
800.00
Sub total

VALOR PARCIAL
38,110.00
1,232.00
39,342.00

Sub total
MATERIALES DE OBRA
JUEGO DE INCRUSTACIONES
CEMENTO BLANCO

UNIDAD
UN
KG

MANO DE OBRA
OFICIAL AA
AYUDANTE AA

51617
30048

6.00
6.00

8,602.83
5,008.00
Sub total

Total Costo Directo


A.I.U.
Total Costo Indirecto
COSTO TOTAL UNITARIO

20.0%

8,602.83
5,008.00
13,610.83

53,003
$10,600.57
$10,600.57
$63,603

ANALISIS UNITARIO
ITEM
SECADOR DE MANOS TIPO PUSH
DESCRIPCION
HERRAMIENTA MENOR
MATERIALES DE OBRA

No. ITEM
UNIDAD:

25.8.8
und
und
TARIFA/DIA
RENDIMIENTO VALOR UNITARIO
VALOR PARCIAL
5,000.00
100
50.00
50.00
Sub total
50.00
UNIDAD
CANTIDAD
VALOR UNITARIO
VALOR PARCIAL

SECADOR MANOS TIPO PUSH


CEMENTO GRIS

UN
KG

1.00
0.20

755,000.00
400.00
Sub total

755,000.00
80.00
755,080.00

5.00
5.40

10,323.40
5,564.44
Sub total

10,323.40
5,564.44
15,887.84

MANO DE OBRA
OFICIAL AA
AYUDANTE AA

51,617.00
30,048.00

Total Costo Directo


A.I.U.
Total Costo Indirecto

771,018
$154,203.57
$154,203.57

20.0%

COSTO TOTAL UNITARIO

$925,221

ANALISIS UNITARIO
ITEM
PAPELERA EN ACERO INOXIDABLE
DESCRIPCION
HERRAMIENTA MENOR
MATERIALES DE OBRA
PAPELERA EN ACERO INOXIDABLE INOX REF: 400
CEMENTO GRIS

No. ITEM
UNIDAD:
TARIFA/DIA
RENDIMIENTO VALOR UNITARIO
5,000.00
100.00
50.00
Sub total
UNIDAD
CANTIDAD
VALOR UNITARIO
UN
1.03
21,500.00
KG
0.55
800.00
Sub total

25.8.8
und
und
VALOR PARCIAL
50.00
50.00
VALOR PARCIAL
22,145.00
440.00
22,585.00

MANO DE OBRA
OFICIAL AA
AYUDANTE AA

51,617.00
30,048.00

12.00
12.00

4,301.42
2,504.00

4,301.42
2,504.00
29,440.42

Sub total
Total Costo Directo
A.I.U.
Total Costo Indirecto

52,075
$10,415.08
$10,415.08

20.0%

COSTO TOTAL UNITARIO

$62,491

ANALISIS UNITARIO
ITEM
ESPEJO BISELADO 4 mm
DESCRIPCION
HERRAMIENTA MENOR
MATERIALES DE OBRA
ESPEJO BISELADO 4 mm

No. ITEM
UNIDAD:
TARIFA/DIA
RENDIMIENTO VALOR UNITARIO
5,000.00
100.00
50.00
Sub total
UNIDAD
CANTIDAD
VALOR UNITARIO
UN
1.00
55,200.00
Sub total

25.8.8
und
und
VALOR PARCIAL
50.00
50.00
VALOR PARCIAL
55,200.00
55,200.00

MANO DE OBRA
AYUDANTE DD

36,056.00

15.60

2,311.28

2,311.28
2,311.28

Sub total
Total Costo Directo
A.I.U.
Total Costo Indirecto

57,561
$11,512.26
$11,512.26

20.0%

COSTO TOTAL UNITARIO

$69,074

ANALISIS UNITARIO
ITEM
BARRA DE APOYO DISCAPACITADOS

No. ITEM
UNIDAD:

25.8.8
und
und

DESCRIPCION
HERRAMIENTA MENOR
MATERIALES DE OBRA
BARRA DE APOYO DISCAPACITADOS

TARIFA/DIA
RENDIMIENTO VALOR UNITARIO
5,000.00
100.00
50.00
Sub total
UNIDAD
CANTIDAD
VALOR UNITARIO
UN
1.00
78,000.00
Sub total

VALOR PARCIAL
50.00
50.00
VALOR PARCIAL
78,000.00
78,000.00

MANO DE OBRA
AYUDANTE BB
OFICIAL BB

33,048.00
59,360.00

16.00
16.00

2,065.50
3,710.00

2,065.50
3,710.00
5,775.50

Sub total
Total Costo Directo
A.I.U.
Total Costo Indirecto

83,826
$16,765.10
$16,765.10

20.0%

COSTO TOTAL UNITARIO

$100,591

ANALISIS UNITARIO
ITEM
CONCRETO ENDURECIDO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
200.00

und
M2

VALOR UNI.
$25.00

VALOR PARCIAL
$25.00

subtotal
II.MATERIALES DE OBRA
DESCRIPCION
AGUA
ROCKTOP ROJO
CONCRETO 2.000 PSI E= 5CMS PISO

UNIDAD
M3
KG
M3

CANTIDAD
0.01
3.50
0.05

$25.00

VALOR UNI.
$8,000.00
$230,000.00
$2,500.00

VALOR PARCIAL
$80.00
$805,000.00
$132.50

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
11.00
11.00

$805,212.50

VALOR UNI.
$4,692.45
$2,731.64

VALOR PARCIAL
$4,692.45
$2,731.64

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$7,424.09
812,662
$162,532.32
$162,532.32

20.0%

COSTO TOTAL UNITARIO

$975,194

ANALISIS UNITARIO
ITEM
VENTANA EN LAMINA C.R CON VIDRIO
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

VALOR UNI.
$5.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
VIDRIO DE 4 M.M
BISAGRA ALUMINIO EXT 2"
SOLDADURA ELECTRICA 004-3 / 23"
ANTICORROSIVO ROJO CLARO

UNIDAD
M2
UN
KG
GL

CANTIDAD
1.05
1.05
0.16
0.23

VALOR UNI.
$55,200.00
$350.00
$43,860.00
$350,000.00

und
M2
VALOR PARCIAL
$5.00
$5.00
VALOR PARCIAL
$57,960.00
$367.50
$7,017.60
$80,500.00

MANIJA PARA VENTANA


SUB - CONTRATO ORNAMENTACION
ANGULO EN HIERRO DE 3/4 X 1/8 "
LAMINA COLD ROLLED CAL 18
III.MANO DE OBRA
DESCRIPCION
Ayudante ( incluye 100% de prestaciones)

UN
%
ML
UN

TARIFA DIA
30,048.00

1.00
37.00
1.94
0.44

RENDIM.
45.00

$41,400.00
$4,500.00
$4,500.00
$92,800.00
subtotal

$41,400.00
$1,665.00
$8,730.00
$40,832.00
$238,472.10

VALOR UNI.
$13,521.60

VALOR PARCIAL
$13,521.60

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$13,521.60
251,999
$50,399.74
$50,399.74

20.0%

COSTO TOTAL UNITARIO

$302,398

ANALISIS UNITARIO
ITEM
CUBIERTA EN ALUCIN
I.EQUIPO
II.MATERIALES DE OBRA
DESCRIPCION
CUBIERTA EN ALUCIN 333C TIPO SANDWICH
CON ALISLAMIENTO ACUSTICO EN FIBRA DE
VIDRIO. CAL. 28, INCLUYE PINTURA DOS CARAS
III.MANO DE OBRA
DESCRIPCION
SUBCONTRATO DE INSTALACION

No. ITEM
UNIDAD:

UNIDAD

M2

TARIFA DIA
127,000.00

CANTIDAD

1.05

RENDIM.
45.00

und
M2

VALOR UNI.

VALOR PARCIAL

$75,800.00
subtotal

$79,590.00
$79,590.00

VALOR UNI.
$57,150.00

VALOR PARCIAL
$57,150.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$57,150.00
136,740
$27,348.00
$27,348.00

20.0%

COSTO TOTAL UNITARIO

$164,088

ANALISIS UNITARIO
ITEM
DUCHA ANTIVANDALICA
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1,000.00

VALOR UNI.
$5.00
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
DUCHA ANTIVANDALICA DOCOL REF:
DO17125106, INCLUYE VALVULA, BOTON,BRAZO
Y POMA
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

UNIDAD

UNIDAD

TARIFA DIA
51,617.00
30,048.00

CANTIDAD

1.00

RENDIM.
5.00
5.00

VALOR UNI.

und
M2
VALOR PARCIAL
$5.00
$5.00
VALOR PARCIAL

$233,160.00
subtotal

$233,160.00
$233,160.00

VALOR UNI.
$2,580.85
$1,502.40

VALOR PARCIAL
$2,580.85
$1,502.40

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$4,083.25
237,248
$47,449.65
$47,449.65

20.0%

COSTO TOTAL UNITARIO

$284,698

ANALISIS UNITARIO
ITEM
TANQUE SUBTERRANEO AGUA POTABLE H=-4.58m
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00

RENDIM.
1.50

330.77
II.MATERIALES DE OBRA
DESCRIPCION
EXCAVACION MANUAL Y RETIRO
RECEBO COMUN B200

UNIDAD
M3
M3

PLACAS DE CONCRETO DE 3000 PSI e=0.10 cm


M2
REFUERZO MALLA ELECTROSOLDADA
M2
IMPERMEABLIZACION MANTO ASFALTICO CON POLIETILENO
M2
PASOS ESCALERA DE GATO
ML
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

und
und

VALOR UNI.
$3,333.33

VALOR PARCIAL
$3,333.33

subtotal
CANTIDAD
12.00
3.41
122.00
122.00
122.00
4.00

RENDIM.
1.50
1.50

$3,333.33

VALOR UNI.
$24,000.00
$25,000.00

VALOR PARCIAL
$288,000.00
$85,250.00

$38,007.01
$6,410.00
$18,445.50
$48,842.00
subtotal

$4,636,855.69
$782,020.00
$2,250,351.00
$195,368.00
$8,237,844.69

VALOR UNI.
$34,411.33
$20,032.00

VALOR PARCIAL
$34,411.33
$20,032.00

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$54,443.33
8,295,621
$1,659,124.27
$1,659,124.27

20.0%

COSTO TOTAL UNITARIO

$9,954,746

ANALISIS UNITARIO
ITEM
ESTRUCTURA CUBIERTA PERFIL DE 16*6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
TUBO ESTRUCTURAL 16*6 1,5 mm
SOLDADURA ELECTRICA 004-3/23"
SUBCONTRATO DE ORNAMENTACION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
17.00
0.08

UNIDAD
ML
KG
%

CANTIDAD
1.05
0.35
45.00

und
ML

VALOR UNI.
$294.12
$875.00
subtotal

VALOR PARCIAL
$294.12
$875.00
$1,169.12

VALOR UNI.
$26,342.67
$43,860.00
$35,000.00

VALOR PARCIAL
$27,659.80
$15,351.00
$77,777.78

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$120,788.58

20.0%

121,958
$24,391.54
$24,391.54

COSTO TOTAL UNITARIO

$146,349

ANALISIS UNITARIO
ITEM
ESTRUCTURA CUBIERTA PERFIL DE 12*6
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
TUBO ESTRUCTURAL 12*6 1,5 mm
SOLDADURA ELECTRICA 004-3/23"
SUBCONTRATO DE ORNAMENTACION

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
17.00
0.08

UNIDAD
ML
KG
%

CANTIDAD
1.05
0.35
45.00

und
ML

VALOR UNI.
$294.12
$875.00
subtotal

VALOR PARCIAL
$294.12
$875.00
$1,169.12

VALOR UNI.
$21,056.33
$43,860.00
$35,000.00

VALOR PARCIAL
$22,109.15
$15,351.00
$77,777.78

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$115,237.93
116,407
$23,281.41
$23,281.41

20.0%

COSTO TOTAL UNITARIO

$139,688

ANALISIS UNITARIO
ITEM
LOSA ALIGERADA CASETON DE 0.50. 3000 PSI
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR
ANDAMIO
II.MATERIALES DE OBRA
DESCRIPCION
CONCRETO 3000 PSI
VIBRADOR A GASOLINA
CASETON
FORMALETA ENTREPISO MES
MADERA ORDINARIA EN LISTON 3.00 m
ALAMBRE NEGRO N 18
PUNTILLA CON CABEZA 2"

No. ITEM
UNIDAD:

TARIFA DIA
5,000.00
70.00

RENDIM.
1.90
0.24

UNIDAD
M3
DD
M2
M2
ML
KG
LB

CANTIDAD
0.150
0.03
1.00
1.00
7.60
0.09
0.64

und
M2

VALOR UNI.
$2,631.58
$291.67
subtotal

VALOR PARCIAL
$2,631.58
$291.67
$2,923.25

VALOR UNI.
$220,000.00
$14,400.00
$6,932.50
$2,100.00
$510.00
$1,800.00
$1,262.00

VALOR PARCIAL
$33,000.00
$432.00
$6,932.50
$2,100.00
$3,876.00
$162.00
$807.68

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
0.37
0.82

$47,310.18

VALOR UNI.
$19,098.29
$24,639.36

VALOR PARCIAL
$19,098.29
$24,639.36

subtotal
Total Costo Directo
A.I.U.
Total Costo Indirecto

$43,737.65
93,971
$18,794.22
$18,794.22

20.0%

COSTO TOTAL UNITARIO

ANALISIS UNITARIO
TUBERIA PVC SANITARIA 8"

No. ITEM

$112,765

3.2.16

ITEM
I.EQUIPO
DESCRIPCION
HERRAMIENTA MENOR

UNIDAD:
TARIFA DIA
5000

RENDIM.
9.7

ML

VALOR UNI.
515.46
subtotal

II.MATERIALES DE OBRA
DESCRIPCION
TUBERIA PVC SANITARIA 8 "
SOLDADURA PVC LIQUIDA 1 / 4
LIMPIADOR REMOVEDOR 760 GRMS

UNIDAD
ML
GL
GL

CANTIDAD
1.00
0.07
0.07

515.4639175

VALOR UNI.
24600
46120.00
25788.00

subtotal
III.MANO DE OBRA
DESCRIPCION
Oficial (incluye 100% de prestaciones)
Ayudante ( incluye 100% de prestaciones)

TARIFA DIA
51,617.00
30,048.00

RENDIM.
9.7
9.7

subtotal

COSTO TOTAL UNITARIO

VALOR PARCIAL
24600
3228.4
1805.16

39984.57

VALOR UNI.
5,321.34
3,097.73

Total Costo Directo


A.I.U.
Total Costo Indirecto

VALOR PARCIAL
515.4639175

VALOR PARCIAL
5,321.34
3,097.73
8,419.07

20%

48,919.11
9,783.82
9,783.82
58,702.93

0.0625
16

3125

ITEM

LADRILLOS

INSUMO

UN

CRUCETA MADERA INMUNIZADA 2,5 m

UN

DIAGONAL MADERA INMUNIZADA

UN

durmiente ordinario 4m
ESTERILLA DE GUADUA

UN

LISTON ORDINARIO 10x2.2x3

CONCRETOS

M3

ML

M2

PILOTE MADERA HINCADO (18/25)

ML

planchon 4m

UN

planchon ordinario 3m

UN

repisa abarco 3m

UN

repisa ordinario 3m

ML

tabla burra 3m

ML

tabla burra ordinario

ML

tabla chapa 3m

ML

tabla chapa ordinario

UN

tiras alistado 3x3x3 ordinario

ML

vara de clavo 3m

ML

viga ordinario 0,2x0,1x4m


BLOQUE DE ESCORIA

UN

BLOQUE No 6

UN

bloque No. 4

UN

bloque No. 5
LADRILLO PRENSADO SANTA FE

UN

LADRILLO COCIDO CLARO

UN

LADRILLO PORTANTE SANTA FE

UN

ladrillo tolete comun


LADRILLO TOLETE FINO LIVIANO

UN

LADRILLO REJILLA
ARENAS

UN

Agua
CERCO MADERA INMUNIZADA 2,5 m

ML

UN

UN
UNIDAD

arena de pea

M3

arena lavada de rio

M3

base granular

M3

granito travertino peruano

BT

gravilla de rio

M3

piedra zonga

M3

recebo comun

M3

tierra negra
TIERRA SECA

M3
M3

TRITURADO DE RIO

M3

ESTRUCTURA TANGENTE CPS

UN

CERCO MADERA INMUNIZADA 2,5 m

UN

ARENA FINA DE RIO

M3

ARENA SEMILAVADA
BANCAS EN CONCRETO DE 0.60 CON ESPALDAR DE 1.80 *0.6
DE ANCHO
BLOQUE CONCRETO 12 X 19 X 39

M3
UN
UN

Concreto 2000 psi (Mezclado en obra)

M3

Concreto premezclado 2000 psi

M3

Concreto 2500 psi (Mezclado en obra)

M3

Concreto premezclado 2500 psi

M3

Concreto 3000 psi ( Mezclado en obra)

M3

Concreto premezclado 3000 psi


CONCRETO FLUIDO 3000 PSI

M3

CONCRETO GRAVA FINA -2000 PSI

M3

DIVISIONES PBAOS EN LOSETAS DE CONCRETO E= 6 cm.

M2

M3

LOSA CONCRETO PREPLANA 3.000 PSI

M2

PANELES PREFABRICADOS DE 0.07

M2

PASOS PREFABRICADOS ESCALERA DE 0.30

ML

PILOTES HINCADOS DE 25 x 25

UN

PILOTES HINCADOS DE 30 x 30
TOPES CONCRETO PARQUEADERO DE 1.80 *.15*.17

UN
UNIDAD

TUBO CONCRETO 10"

ML

TUBO CONCRETO 12"

ML

TUBO CONCRETO 8"

ML

ABRAZADERA EN U TIPO .1

UN

ABRAZADERA 1 SALIDA TIPO 2


ABRAZADERA 2 SALIDA TIPO.3

UN

ABRAZADERA SIN SALIDA T-2

UN
KG

ACERO DE REFUERZO 34000 PSI


ACERO DE REFUERZO 37000 PSI

UN

ACERO DE REFUERZO 60000 PSI

KG
KG

ALAMBRE GALVANIZADO No-12

KG

ANGULO EN HIERRO 2" X 1 1/4"

UN

ALAMBRE NEGRO No 18

KG

VARILLA CUADRA 9mm.

ML

ANCLAJE HKB II 58" 434 HILTI


CARGA FULMINANTE MEDIA 330

UN

CEMENTO BLANCO

KG

CEMENTO GRIS

KG

UN

CINTA TEFLON

RL

CLAVO ALTA VELOCIDAD 1/4 X 2

UN

CHAZO PARA TORNILLO 1/8 X 1-1/4

UN

CHAZOS DE MADERA 10 X 10

UN

CHAZO EN MADERA 4X4

UN

DILATACION EN BRONCE PC09

ML

DISCO DE DIAMANTE 9"

UN

ESPARRAGO 5/8" X 20

UN

FLOTADOR METALICO DE 2"

UN

GEOTEXTIL NO TEJIDO 1600


GRAFIL DE 6 MM

M2
KG

GRAPA GALVANIZADA TUBO 1

UN

GRAPA PRENSORA

UN

HIERRO RECTO a -37 1/4"

KG

HIERRO RECTO a -37 3/8"


HILO ALUMINIO 0,7X0,9

KG

ICOPOR 1 CM

UN

ICOPOR LAMINA DE 2 cm

UN

LAMINA COL ROLED CAL.16

UN

LAMINA COL ROLED CAL.18

UN

LAMINA GALVANIZADA CAL.20

UN

LAMINA GALVANIZADA CAL.22

UN

LAMINA GALVANIZADA CAL.26

UN

MALLA ONDULADA

M2

MALLA PARA GAVIONES


MALLAS ELECTROSOLDADAS

M2
UN

PERNO 1/2 ALT.VEL 1 3/4

UN

PUNTILLA CON CABEZA 2"


REFUERZOS HIERRO 37000 FG

KG

SOPORTES METALICOS

KG

ml

LB

SELLADOR

GL

PLATINA DE 1-1/4" X 1/4

KG

ALQUILER EQUIPOS

TORNILLO ACERO GALVANIZADO 5X 5/8"

UN

TORNILLO ACERO GALVANIZADO 8X 5/8"

UN

TORNILLO CERRAJE 5/8 X 1 1/2

UN

TORNILLO DE ACERO 7 X 5/8

UN

TORNILLO ESPIGO 5 / 8 X 24"

UN

TORNILLO GOLOSO 1/8 X 1-1/4

UN

TORNILLO LAMINA DIAM 3/8

UN

TUERCA ACERO 1/4

UN

Bisagra comun 3"

UN

Portacandado simple

UN

PIRLAN ALUMINIO DORADO

ML

BISAGRA ALUMINIO EXT 2"

UN

ALQUILER CORTADORA CON OPERARIO

DD

andamio tubular seccin

DD

COMPRESOR DE 2 MARTILLOS
CONTRATO CASETON
FORMALETA ENTREPISO

DD
ML
M2/DD

GRUA EXTENSION PARA POSTES


MORDAZA METALICA ($127/DIA JUEGO)

ACCESORIOS PVC

DD
DIA/JGO

PARAL TELESCOPICO

DD

vibrador concreto
VIBRO COMPACTADOR TIPO RANA

DD
DD

VOLQUETA

VJ

CARGADOR FRONTAL

HR

CODO 90 PVC SANITARIO DE 6" C X C

UN

CODO 90 C X C PVC - S 6"

UN

CODO 90 C X C PVC - SANITARIA 2"

UN

CODO 90 C X C PVC SANITARIO 3"

UN

CODO 90 C X C PVC SANITARIO 4"

UN

CODO 90 PVC SANITARIO DE 2" C X C

UN

CODO CPVC 1 / 2"

UN

CODO CPVC 3 / 4"

UN

CODO DE 90 PRESION PVC 1 1 / 2"

UN

CODO DE 90 PRESION PVC 1 1/ 2"

UN

CODO DE 90 PRESION PVC 1 1/4"

UN

CODO DE 90 PRESION PVC 2 "

UN

CODO DE 90 PRESION PVC 3/ 4 "

UN

CODO DE 90 PRESION PVC 1"

UN

CODO DE 90 PRESION PVC 1/ 2"

UN

CODO DE 90 PRESION PVC 1/2 "

UN

CODO DE 90 PRESION PVC-P

UN

2"

CODO GALVANIZADO 1"

UN

CODO GALVANIZADO 2"

UN

CODO GALVANIZADO DE 1 / 2"

UN

CODO GALVANIZADO DE 1 -1 / 2"

UN

CODO GALVANIZADO DE 3 / 4"

UN

CODO H,G, 2"

UN

LIMPIADOR REMOVEDOR 760 GRMS


SOLDADURA PVC LIQUIDA 1 / 4

GL

TAPON SOLDADO PVC 3"

UN

TAPON SOLDADO PVC 4"

UN

GL

TAPON SOLDADO PVC 6"

UN

TEE PRESION PVC 2"

UN

TEE PRESION PVC 1 1/ 2"

UN

TEE PRESION PVC 1 1/4"

UN

TEE PRESION PVC 1 / 2"

UN

TUBERIA HG

GALVANIZADOS

ACCESORIOS GRES

TRANSPORTES

COMBUSTIBLES

TEE PRESION PVC 1"

UN

TEE PRESION PVC 3/4"

UN

TEE H.G. 2"

UN

TEE PVC - S 4"

UN

TEE PVC - S 6"

UN

TEE PVC - SANITARIA 2"

UN

TEE PVC - SANITARIA 3"

UN

TUBERIA PVC L 2"

ML

TUBERIA PVC SANITARIA 2"

ML

TUBERIA PVC SANITARIA 3"

ML

TUBERIA PVC SANITARIA 4"

ML

TUBERIA PVC SANITARIA 6"

ML

TUBERIA DRENAJE PVC 4"

ML

TUBO PVC AGUAS LLUVIAS 3"

ML

TUBO AGUAS NEGRAS 1 1/2

ML

TUBO CPVC 1 / 2"

ML

TUBO CPVC 3 / 4"

ML

TUBO DRENAJE 100 mm

ML

TUBO GALVANIZADO 1-1 / 2"

ML

TUBO GALVANIZADO 1 / 2"

ML

TUBO GALVANIZADO 1"

ML

TUBO GALVANIZADO 2"

ML

TUBO GALVANIZADO 3 / 4"

ML

TUBO H.G DE 2"

ML

TUBO PRESION RDE 13,5 PVC 1"

ML

TUBO PRESION RDE 11 PVC 3 / 4"

ML

TUBO PRESION RDE 21 PVC 1 1 / 2"

ML

TUBO PRESION RDE 21 PVC 2"

ML

TUBO PRESION RDE 9 PVC 1 / 2"

ML

TUBO PVC AGUA LLUVIA DE 3"

ML

TUBO PVC ALL DE 4"

ML

TUBO PVC ALL DE 2"

ML

TUBO PVC -P RDE 21 DE 1 - 1 /4 "

ML

TUBO PVC -P RDE 21 DE 1 "

ML

UNIVERSAL GALVANIZADA 2"

UN

UNIVERSAL GALVANIZADA 1 1 / 2"

UN

UNIVERSAL GALVANIZADA 1 / 2"

UN

UNIVERSAL GALVANIZADA 1"

UN

UNIVERSAL GALVANIZADA 3 / 4"

UN

CODO GRES 4"

UN

CODO GRES 6"

UN

TEE GRES 4"

UN

TEE GRES 6"

UN

TUBO DRENAJE GRES 4"

UN

TUBO GRES 10"

ML

TUBO GRES 6"

ML

TUBO GRES 8"

ML

SUBCONTRATO ELECTRICO PARARRAYOS

AISLADOR SUSPENSION ANSI 52 - 1

HR

TRANSPORTE CAMION

VJ

CAMION 3 TON REDES

DD

CAMPERO PASAJEROS
RETENIDA TERMINAL POSTE VARIOS BT

DD
UN

A.C.P.M

GL

AISLADOR TENSOR ANSI 54-1

UN

RETENIDA TERMINAL POSTE VARIOS MT

M2

AISLADOR TENSOR ANSI 54-2

UN

SERVICIOS PUBLICOS

CAJA CONTADOR ACUEDUCTO

UN

ELECTRICOS

ABRAZADERA UNA SALIDA TIPO 2

UN

ACCESORIOS PARA CANALETA PLASTICA

UN

ADAPTADOR TERMINAL CAMPANA 4

UN

ADAPTADOR TERMINAL CONDUIT 1/2

UN

ADAPTADOR TERMINAL CONDUIT 1

UN

ADAPTADOR TERMINAL CONDUIT 3/4

UN

AISLADOR DE PIN ANSI 55 - 1

HC

AISLADOR DE PIN ANSI 52 - 1

UN

AISLADOR DE PIN ANSI 55 - 2

UN

AISLADOR ESPIGO 2,5m

UN

AISLADOR ESPIGO 34,5 ANSI 56-3


AISLADOR SUSPENSION ANSI 52 - 1

UN

AISLADOR TENSOR ANSI 54-1

UN

UN

ALAMBRE COBRE DESNUDO 10 AWG

ML

ALAMBRE COBRE DESNUDO 12 AWG

KG

ALAMBRE COBRE DESNUDO 8 AWG

KG

ALAMBRE COBRE DESNUDO AWG 14

KG

ALAMBRE COBRE THW 10 AWG

ML

ALAMBRE COBRE THW 12 AWG

ML

ALAMBRE COBRE THW 14 AWG

ML

BARRAJE PREMOLDEADO B.T.600 v

UN

BRAZO LUMINARIA

UN

BORNA TERNIMAL 4/0 MCM

UN

BOTON TIMBRE LUM 040 C

UN

BREAKERS 2000 BIPOLAR HQP 30A

UN

CABLE ALUMINIO DESNUDO 1 AWG

ML

CABLE ALUMINIO DESNUDO 4 AWG

ML

CABLE ALUMINIO DESNUDO AF 2 / 0

ML

CABLE ALUMINIO DESNUDO AF 4 / 0

ML

CABLE COBRE THW 6 AWG

ML

CABLE COBRE THW 8 AWG

ML

CABLE ACERO GALVANIZADO 3/8

ML

CABLE COBRE THW 1/0 AWG

ML

CABLE COBRE THW 250 Kcmil

ML

CABLE COBRE THW 300 Kcmil

ML

CABLE COBRE THW 350 Kcmil

ML

CABLE COBRE THW 4/ 0 AWG

ML

CABLE COBRE THW 4/0 AWG

ML

CABLE COBRE THW 400 Kcmil

ML

CABLE COBRE THW 500 Kcmil

ML

CABLE COBRE THW 2 AWG

ML

CABLE COBRE THW 4 AWG

ML

CABLE TRIPLEX 15 KV 2 / 0

ML

CABLE TRIPLEX 15 KV 4 / 0

ML

CABLE UTP CATEGORIA 5/4 PARES BELDE

ML

CAJA 4X4MET DEKO AK 2V

UN

CAJA CUADRADA 10X10X10

UN

CAJA DOBLE CONDUIT

UN

CAJA MONOFASICA 6 CIRCUITOS

UN

CAJA MONOFASICA 12 CIRCUITOS


CAJA OCTOGONAL CONDUIT

UN

CAJA PARA CUATRO CONTADORES

UN

CAJA PARA UN MEDIDOR


CAJA SENCILLA CONDUIT

UN

UN

UN

CAJA SENCILLA CONDUIT

UN

CAJA TRIFASICA 12 CIRCUITOS

UN

CAJA TRIFASICA 6 CIRCUITOS


CANALETA METALICA CON DIVISION 10

UN

CANALETA PLASTICA PANDUIT 10

UN

CINTA BANDIT 1 / 2

RL

UN

CINTA BANDIT 3/4

RL

COLLARIN DOS SALIDAS 4,5

UN

CONECTOR CORAZA 1/2"

UN

CONECTOR RESORTE ROJO

UN

CONECTOR TUBULAR 1 / 0

UN

CONECTOR TUBULAR 4 / 0

UN

CORAZA METALICA DE 1/2"

UN

CORTA CIRCUITO ENCHUFABLE BIPOLAR 30A

UN

CORTA CIRCUITOS ENCHUFABLE BIPOLAR 50 A

UN

CORTA CIRCUITOS ENCHUFABLE BIPOLAR 100 A

UN

CORTA CIRCUITOS ENCHUFABLE BIPOLAR 100A

UN

CORTA CIRCUITOS ENCHUFABLE TRIPOLAR 100 A

UN

CORTA CIRCUITOS ENCHUFABLE TRIPOLAR 30 A

UN

CORTA CIRCUITOS ENCHUFABLE TRIPOLAR 50 A

UN

CORTA CIRCUITOS ENCHUFABLE UNIPOLAR 30 A

UN

CORTA CIRCUITOS ENCHUFABLE UNIPOLAR 50 A

UN

CORTA CIRCUITOS INDUSTRIAL 600-1200 A

UN

CORTA CIRCUITOS INDUSTRIAL FD 30 A

UN

CORTA CIRCUITOS INDUSTRIAL TRIP

UN

CORTA CIRCUITOS INDUSTRIAL TRIPOLAR FD 100 A

UN

CORTA CIRCUITOS INDUSTRIAL TRIPOLAR FD 150 A

UN

CORTA CIRCUITOS INDUSTRIAL TRIPOLAR FD 50 A

UN

CURVA CONDUIT GALVANIZADA 4"

UN

DUCTO DOBLE PARED 4

ML

DUCTO ELECTRICO LIVIANO 3"

ML

DUCTO ELECTRICO LIVIANO 4" PVC

ML

DUCTO ELECTRONICO LIVIANO 4

ML

DUCTO ELECTRONICO PESADO 4

ML

DUCTO ETERNIT 4"

ML

ESTRIBO PARA MEDIA TENSION

UN

GRAPA DE SUSPENSION 6 - 2 / 0

UN

GRAPA P / OPERAR EN CALIENTE

UN

GRAPA TERMINAL 6-2/0 N1

UN

GRAPA TERMINAL 2/0 A 4/0

UN

GRAPA TERMINAL TIPO RECTO

UN

GUARDA CABO PARA CABLE 3/8

UN

HEBILLA 1 / 2

UN

HERRAJE PARA ESTRUCTURA FINAL CPS

UN

INTERRUPTOR CONMUTABLE

UN

INTERRUPTOR CONMUTABLE SENCILLO

UN

INTERRUPTOR CUATRO VIAS

UN

INTERRUPTOR DOBLE

UN

INTERRUPTOR DOBLE LUM 101 C


INTERRUPTOR SENCILLO

ML

INTER-SENC- INTR CONMUTABLE

UN

LIBRO ETIQUET. 190 DATOS

UN

LINE CORD CAT 5 24 AWG

UN

PARARRAYO OXIDO ZINC BTA

UN

PATCH CORD CAT 5 24

UN

PERNO DE OJO 5/8 X 5. 45

UN

PLACA IDENTIFICACION 2X 1 cms

UN

PLACA IDENTIFICACION 3X5 cm

UN

PLACA IDENTIFICACION 8 X 5 cms


PLATINA DIAGONALES 1,1 cm

UN

PORTA AISLADOR UN PUESTO

UN

RETENIDA PARA BAJA TENS.

UN

RETENIDA PARA MEDIA TENS. CPS

UN

UN

RIEL ELECTRICO 30 AMP.

MORTEROS

ROSETA (PLAFON)

UN

SALIDA PARA CORDON

UN

SILLA CRUCETA TIPO ICEL

UN

TABLERO PARA LLAVE 12 CIRCUITOS

UN

TABLERO PARA LLAVE 24 CIRCUITOS

UN

TABLERO PARA LLAVE 36 CIRCUITOS

UN

TABLERO PARA TOTALIZADOR 12 CIRCUITOS

UN

TABLERO PARA TOTALIZADOR 18 CIRCUITOS

UN

TABLERO PARA TOTALIZADOR 24 CIRCUITOS


TAPA TROQUELADA METALICA 2 ORIFICIOS

UN

TERMINAL PREMOL INT / 0 - 500

UN

TERMINAL PREMOL INT 4 -2 / 0

UN

TOMA JACK RJ 45- 110 JACK CAT 5e AMP

UN

TOMA RJ 45 - 110 JACK SNAP

UN

TOMA CORRIENTE DE POLO AISLADO

UN

TOMA CORRIENTE DOBLE

UN

TOMA DOBLE AMERICANA

UN

TOMA SENCILLA AMERICANA

UN

TOMA TRIFASICA

UN

TUBO CONDUIT GALVANIZADA 1"

ML

TUBO CONDUIT GALVANIZADA 3/4"

ML

TUBO CONDUIT GALVANIZADA 4"

ML

TUBO CONDUIT GALVANIZADO 1 1/2

ML

TUBO CONDUIT GRIS 1

ML

TUBO CONDUIT GRIS 1/2

ML

TUBO CONDUIT GRIS 3/4

ML

UN

TUBO CONDUIT PVC 1/2

ML

TUERCA OJO ALARGADO 5/8

UN

UNION A.C. CONICA 4"

UN

UNION CONDUIT GALVANIZADA 4"

UN

UNION CONDUIT PVC 3"

UN

UNION CONDUIT PVC 4"

UN

VARILLA ANCLAJE 3/4 X 2m

UN

VARILLA CW 3/4 X 2,40

UN

VARILLA CW 5/8 X 2,40

UN

VIGUETA ANCLA DE RETENIDA

UN

WALL PLATE AJUSTE SENCILLO

UN

ZUMBADOR 110VOLTS.

UN

TUBO CONDUIT PVC 3/4"

ML

TUBO CONDUIT PVC 1"

ML

TUBO CONDUIT PVC 1 1/2"

ML

ZUMBADOR 110VOLTS. AVE 207

UN

DIAGONAL VARILLA 5/8 "CPS

UN

MORTERO 1 : 4

M3

MORTERO 1 :2

M3

MORTERO 1:3

M3

MORTERO SECO PAETE 50KG/CM

TON

MORTERO SECO PEGA 105KG/CM

TON

ALAMBRES

MORTERO SECO PISO 125 KG/CM

TON

MORTERO SECO PISO 140 KG/CM

TON

ALAMBRE DE PUAS No. 12


REGISTRO TOYA DE 1/2"

UN

SUB- CONTRATO ELECTRICO CU TRIPLEX INT. 4/0


MANO DE OBRA

TEJAS

MORTEROS

KG
%

SUB- CONTRATO ELECTRICO CU TRIPLEX EXT. 3/0

OFICIAL ESPECIALIZADO

DD

OFICIAL (Incluye 100% prestaciones)

DD

AYUDANTE (incluye 100% prrestaciones)

DD

TEJA ETERNIT No. 6

UN

Gancho Teja eternit

UN

Caballete teja eternit

UN

CUPULA TRAGANTE C 4X2

UN

CUPULA TRAGANTE C 6X4

UN

CABALLETE CANALETA 43 ARTICULADO

UN

CABALLETE CANALETA 90 ARTICULADO

UN

TORNILLO DE FIJACION CANALETA 43

UN

TORNILLO DE FIJACION CANALETA 90

UN

CANALETA 43 ETERNIT X 3.5

UN

CANALETA 43 ETERNIT X 4.00

UN

CANALETA 43 ETERNIT X 4.50

UN

CANALETA 43 ETERNIT X 5.00

UN

CANALETA 43 ETERNIT X 5.50

UN

CANALETA 43 ETERNIT X 6.00

UN

CANALETA 90 ACRILICO 3mm

UN

CANALETA 90 ETERNIT X 3.75

UN

CANALETA 90 ETERNIT X 4.5

UN

CANALETA 90 ETERNIT X 5.25

UN

CANALETA 90 ETERNIT X 6.00

UN

CANALETA 90 ETERNIT X 7.00

UN

CANALETA 90 ETERNIT X 9.00

UN

CLARABOYA ETERNIT No.4

UN

CLARABOYA ETERNIT No.6

UN

CUBIERTA EN ALUMINIO TIPO SANDWICH

M2

PLACA ETERNT MEDIA 1.22X1.22 X 4mm

UN

DOMO BURBUJA DE 90X90

UN

TEJA DE BARRO

M2

TAPA CIERRE CANALETA 43

UN

TAPA CIERRE CANALETA 90

UN

TEJA ONDURIB .88 UTIL .78

M2

TEJA ETERNIT No.4

M2

TEJA ETERNIT No.8

M2

TEJA ETERNIT No.10

M2

TEJA ACRILICA No.4

UN

TEJA ACRILICA No.6

UN

TEJA ACRILICA No.8

UN

TEJA ACRILICA No.10

UN

TEJA PLASTICA AJOVER No.4

UN

TEJA PLASTICA AJOVER No.6

UN

TEJA PLASTICA AJOVER No.8

UN

TEJA PLASTICA AJOVER No.10

UN

TEJA TERMOACUSTIC TIPO AJOVER

UN

AMARRE TEJA

UN

DOMOS ACRILICOS BURBUJA 1X1.1 X 3mm

UN

Mortero 1:2

M3

Mortero 1:3

M3

Mortero 1:4

M3

ACPM
TRANSPORTE CONTENEDOR

DD

CONTRATO ALQUILER CAMPAMENTO SHELTER OFICINA 40

MS

TORNILLO PARA MADERA 1" No. 6


PERFIL ABIERTO GALVANIZADO 120X60 CAL. 16

LB

CUBiERTA TRAPEZOIDAL ACESCO 3,05

ML
ML

CARGADOR FRONTAL
BASTIDOR OTOBO 2" X 2 " X 2,9

DD

COMISION DE TOPOGRAFIA

DD

VALLA INFORMATIVA 2*1

UN

BULDOZER D-6
SUB-CONTRATO HIDRAULICO Y SANITARIO

DD

CODOS 45 GRAD.PRESION PVC 1/2 "


LLAVE TERMINAL CORRIENTE LIVIANA 1/2 "

UN

CABLE ALUMINIO AISLADO PVC 1/0 AWG

ML

ML

%
UN

CABLE ALUMINIO AISLADO PVC 2/0 AWG

ML

CAJA PARA TACO 100 A 4 CIRCUITOS

UN

CABLE TELEFONOS 2 PARES

ML

TOMA TELEFONICA

UN

CAJA GALVANIZADA 5800

UN
UN

ACOPLE DE ALUMINIO DE 1/2"

UNIDAD

GRIFERIA SANITARIO GRIVAL

JGO

CONTRATO REVISION Y REP. BAJANTES

UN

ARREGLO DOMO ACRILICO

M2

SOPORTES METALICOS

KG

TAPON PVC P
SOLDADURA CPVC
CINTA TEFLON
PINTURA TRAFICO AMARILLA
RETROEXCAVADORA
MOTOSIERRA
GASOLINA

PINTURAS

un

LONA VERDE

ACOPLE SANITARIO

PUERTAS

DD

MONTACARGAS 5 TONELADAS

UNIDAD
1/4GL
ROLLO
GLN
DD
DD
GLN

LASO

ML

MOTOSIERRA

DD

VIBROCOMPACTADORA A GASOLINA

DD

MOTONIVELADORA
TRANSPORTE EQUIPO

DD

HOJA PUERTA TRIPLEX 0,61

UN

HOJA PUERTA TRIPLEX 0,81

UN

HOJA PUERTA TRIPLEX 1,01

UN

PUERTA FORTEC RESIDENCIAL 0,71

UN

PUERTA FORTEC RESIDENCIAL 1,00

UN

PUERTA FORTEC RESIDENCIAL 1,50

UN

PUERTA Y MARCO FLORMORADO 0,80

UN

PUERTA Y MARCO FLORMORADO 1,00

UN

PUERTA TABLEX OK . PIZANO 19mm

UN

PINTURA TRAFICO AMARILLA


ANTICORROSIVO ROJO CLARO

GL

TAPAPOROS NOGAL

GL

BARNIZ BRILLANTE EXTERIOR

GL

ESMALTE MATE SUPERSINTETICO

GL

DISOLVENTE THINNER

GL

GL

GL

IMPERMEAB.

TINTILLA P / MADERA CAF

GL

CARBURO No 2

KG

ESMALTE SINTETICO PINTULUX

GL

VINILTEX

GL

WASH PRIMER A PINTURA

GL

WASH PRIMER B CATALIZADOR

GL

RUSTIPLAST

M2

MARMOLPLAST

M2

CARAPLAST

M2

BARNIZ VITRIFLEX

GL

PINTURA ELECTROSTATICA ( 2 CARAS)

M2

SIKA - 1 IMPERMEABILIZANTE INTEGRAL

KG

PERMAGLASS 6 FIBERGLASS

M2

ALUMOL RECUBRIMIENTO ALUMINIO

KG

ASFALTO TIPO 190 / 220

KG

MANTO FIBERGLASS 500xt

M2

PINTURA BITUMINOSA SOBRE TELA ASFALT. 2 MANOS

GL

SIKA TRANSPARENTE

KG

SUB-CONTRATO ELECTRICO RED MEDIA TEN.TRIPLEX 4/0


VALVULAS

POSTES CONC.

POSTE MADERA

PISOS

CHEQUE RED WHITE 3 / 4"

UN

CHEQUE RED WHITE 1"

UN

CHEQUE RED WHITE 1 -1/2 "

UN

REGISTRO RED WHITE DE 2"

UN

REGISTRO RED WHITE DE 1 - 1 / 2"

UN

REGISTRO RED WHITE DE 1 / 2"

UN

REGISTRO RED WHITE DE 3 / 4"

UN

REGISTRO TOYA DE 2"

UN

REGISTRO TOYA DE 1/2"

UN

VALVULA DE BOLA 200 Lb - 1 / 2"

UN

REGISTRO TOYA 3/4"

UN

SUB-CONTRATO ELECTRICO RED MEDIA TEN.TRIPLEX 2/0

POSTE CONCRETO LINEA 10m 1050-kg

UN

POSTE CONCRETO LINEA 10m 750-kg

UN

POSTE CONCRETO LINEA 12m 1050-kg

UN

POSTE CONCRETO LINEA 12m 510-kg

UN

POSTE CONCRETO LINEA 12m 750-kg

UN

POSTE CONCRETO LINEA 14m 1050-kg

UN

POSTE CONCRETO LINEA 6m 510-kg

UN

POSTE CONCRETO LINEA 8m 1050-kg

UN

POSTE CONCRETO REFORZADO 18m 1350-kg

UN

CABLE ALUMINIO DESNUDO AF 4 / 0

ML

POSTE MADERA INMUNIZADA 8 m

UN

POSTE MADERA INMUNIZADA 10 m

UN

POSTE MADERA INMUNIZADA 12 m

UN

CABLE ALUMINIO DESNUDO 4 AWG


ADOQUIN CONCRETO 11X8X20

UN

ADOQUIN GRES 10 X 20 X 2,5

M2

BALDOSA ALFA BH-5 33 X 33

M2

BALDOSA ALFA L1 33 X 33

M2

BALDOSA ALFA P - 5 33 X 33

M2

CERAMIC A 11*11

M2

CERAMIC A20*20 EGEO BLANCO

M2

CERAMICA CORONA 20 X 20

M2

CERAMIC A 30 *30BLANCO

M2

ML

CERAMICA CORONA 34 X 34

M2

COLOR MINERAL

KG

PLASTICOS
INST. COBRE

ORNAMENTACION

LUMINARIAS

DUCHA CRISTANAC 120*0.90

UN

CRISTANAC 20 - G1 96521

M2

DILATACION EN BRONCE PC 09

ML

GRANITO TRAVERTINO No,3

M2

LISTON M. H. AMARILLO

M2

LISTON M. H. GUAYACAN

M2

GUARDAESCOBA VIROLA 6 CMS

ML

GUARDAESCOBA VIROLA 8 CMS

ML

LISTON M. H. ORDINARIO

M2

PARKET GUAYACAN

M2

PISO PAK RESIDENCIAL 2,00 mm

M2

PISO PAK RESIDENCIAL 1,60 mm

M2

PISO PAK RESIDENCIAL 3,0 mm

M2

GUARDAESCOBA PISOPACK 6.8 CMS


TABLETA CORRIENTE GRES 10 X 10

ML
M2

TABLETA CORRIENTE GRES 33 X 33

M2

TABLON CUARTO

M2

VINISOL COMERCIAL 2 mm

M2

VINISOL COMERCIAL 1,6 mm

M2

VINISOL TRAFICO PESADO 2 mm

M2

VINISOL TRAFICO PESADO 3 mm

M2

ROCKTOP ROJO

KG

TABLETA 10*10 GRES EGIPCIA

M2

GUARDAESCOBA VINISOL 6.8 CMS

ML

ARENA DE POZO

M3

POLISEC CALIBRE 6

M2

MORTERO 1: 5 ARENA DE PEA

M3

CODO DE 45 COBRE C X C 1 / 2"

UN

CODO DE 45 COBRE C X C 3 / 4"

UN

SOLDADURA ESTAO PARA COBRE

LB

TUBO COBRE TIPO L 1 / 2"

ML

TUBO COBRE TIPO L 3 / 4"

ML

VENTANA CORREDIZA 1,2 X 1,2

M2

VENTANA ALUMINIO FIJA

M2

BARANDA Y PASAMANOS TUBO 1 -1 / 2"

ML

BARRA AYUDA MINUSVALIDOS

UN

VENTANA ALUMINIO SERIE 3831 AL. C/1

M2

BALA FLUORESCENTE D = 17,5 cm

UN

BALA INCANDESCENTE DE 60 W

UN

BALA INCANDESCENTE DE 150 W

UN

LUMINARIA MERCURIO PE- VP 125 W

UN

LUMINARIA MERCURIO PE- VP 250 W

UN

LUMINARIA MERCURIO PE- VP 400 W

UN

LUMINARIA DE SODIO LTP - VC 150 W

UN

LUMINARIA DE SODIO LTP - VC 250 W

UN

LUMINARIA DE SODIO LTP - VC 400 W

UN

PROYECTOR SNF - 011 / T 400W

UN

PROYECTOR PHLC 720 - MERC

UN

PROYECTOR SNF - 011 / T 1000 W

UN

PROYECTOR PISO RRA 250 W

UN

PROYECTOR (REFLECTOR) PISO RRA 400 W

UN

SOPORTES PARA REFLECTORES

UN

LAMPARA FLUORESCENTE 2 X 40 X - 20KM

UN

LAMPARA SLIM 2 X 48 X - 20KM

UN

LAMPARA SLIM 2 X 96 1 -91K

UN

LAMPARA FLUORESCENTE 4 X 20 X - 20K

UN

ACC. BAOS

CIELO RASOS

LAMPARA SLIM 4 X 48 X -13K

UN

SOCKETS DULUX FLUORESCENTE

UN

BALASTO MERCURIO 400 W

UN

ARRANCADOR TUBO CORRIENTE

UN

SOCKETS PARA TUBO SLIM - LINE

UN

BALASTO E. C. SLIM - LINE 2 X 48

UN

TUBO FLUORESCENTE SLIM 96"

UN

FAROL DJK 70 W

UN

LUMINARIA Y JK - A 400W . SODIO

UN

FAROL DE PEDESTAL 70 W

UN

CODO BAJANTE 45

UN

DISPENSADOR JABON ACERO INOX

UN

DISPENSADOR TOALLAS ACERO INOX

UN

JUEGO INCRUSTAR ACUACER

UN

JUEGO INCRUSTAR NOVA

UN

JUEGO INCRUSTAR ROYAL

UN

PAPELERA ACERO INOX 400

UN

PAPELERA ACUACER

UN

SECADOR ELECTRICO P / MANOS

UN

DUCHA CALYPSO MEZCLADOR

UN

DUCHA CALYPSO SENCILLA

UN

GRIFERIA ANTIVANDALICA LAVAMANOS

UN

GRIFERIA LAVAMANOS LOIRA 4" CONJ CR

UN

GRIFERIA ANTIVANDALICA SANITARIO

UN

GRIFERIA ANTIVAND. ORINAL

UN

GRIFERIA LAVAMANOS PRISMA 8" CONJ CR

UN

GRIFERIA LAVAMANOS URANO 8" CONJ CR

UN

LAVAPLATOS IRIS P / HALCON CR

UN

LAVAPLATOS PRISMA CR

UN

GRIFERIA ORINAL TRADIC C

UN

LAVAMANOS ACUACER 732 + GRIFERIA

UN

LAVAMANOS ACUACER 732

UN

LAVAMANOS NOVA 734 + GRIFERIA

UN

LAVAMANOS NOVA 734

UN

LAVAMANOS NOVA 738 + GRIFERIA

UN

ORINAL 060102 + GRIFERIA ORINAL TRAD

UN

ORINAL CON FLUXOMETRO

UN

ORINAL MEDIANO

UN

POCETA ACERO INOX 35 X 40 + GRIFERIA

UN

SANITARIO INFANTIL MANCESA 2634

UN

SANITARIO INST + FLUXOMETRO

UN

SANITARIO NOVA 3035 BLANCO

UN

SANITARIO ACUACER

UN

LLAVE INDIVIDUAL LAVAMANOS

UN

LLAVE MANGUERA 1 / 2"

UN

LLAVE TERMINAL CROMADA 1 / 2"

UN

TANQUE PLASTICO 1000 LTS COLEMPAQUES

UN

TANQUE PLASTICO 5000 LTS COLEMPAQUES

UN

VALVULA LAVADERO 2"

UN

DIVISION DE BAO ACERO INOX

M2

CIELO RASO DRY WALL BOVEDA

M2

CIELO RASO DRY WALL PLANO

M2

CIELO RASO CARRIL OCULTO

M2

CIELO RASO CARRIL SEMI - OCULTO

M2

DURACUSTIC R HEWIN - FIBERGLASS

LM

CIELORASO ALUZINC CELL D5 X 5

M2

CERRAJERIA

VIDRIOS

VIVERO

ANCLAJES

CIELORASO ACE ACUSTICO 84R V5

M2

CIELORASO ACE ACUSTICO 130B

M2

CIELORASO ALUMINIO ACUSTICO 84R

M2

CIELORASO ALUZ ACUSTICO 30B

M2

CERRADURA SAFE ALCOBA VENECIA

UN

CERRADURA SAFE BAO CLASICO

UN

CERRADURA SAFE ENTRADA

UN

CERRADURA SAFE ENTRADA PPAL

UN

CERRADURA SCHLAGE BAO A 40 S

UN

CERRADURA SCHLAGE ENTRADA A 80 PD

UN

CERRADURA YALE ENTRADA HIERRO

UN

ESPEJO BISELADO 4mm

M2

VIDRIO TRANSP. 4mm

M2

VIDRIO TRANSP. 5mm


CEDRO NOGAL

UN

FALSO PIMIENTO

UN

HOLY ROJO

UN

EUGENIA

UN

PINO ROMERON

UN

CAUCHO SABANERO

UN

GUAYACAN

UN

CHICALA

UN

PALMA DE CERA

UN

POMARROSO

UN

MAGNOLIO

UN

PALMA FENICIA
CARBONERO

UN

JARDINERAS POR M2 12 A 15 PLANTAS /M2

M2

JARDIN ORNAMENTAL POR M2 12 A 15 PLANTAS /M2

M2

PRADO

M2

SUBCONTRATO INST. ANCLAJE

GL

IGAS GRIS MASILLA

KG

SUB. INST. EQUIP. HIDRONEUMATICO

SUB. INST. CUBIERTAS

SUB.INST. CUBIERTAS BARRO/AC

SUB.ORNAMENTACION

SOLDADURA ELECTRICA 004-3/23"

KG

CERCHA ANG. 1"X1"X1/8" CEL. D. 5/8" H: 35 CM

ML

CORREA PERFIL RECTG. 10X4 CM.

ML

CORREAS 2 D. 1/2" ARR. 1" D. 5/8" CEL

ML

ESTRUCTURA DOMOS

KG

BROCHA DE CERDA 4"

UN

ACCESORIO T

UN

ANCLAJE AUTOPERFORANTE 1/2"

UN

BANDEJA PORTACABLE

UN

SOPORTE PARA BANDEJA

UN

CABLE COBRE THW 2/0 AWG

ML

TUBO MUEBLE CAL. 18 1"

ML

ADAPTADOR TERMINAL CONDUIT 1 1/2"

UN

MANIJA PARA VENTANA

UN

M2

UN

PEGANTE BOXER

GL

TRIPLEX PIZANO 4mm.

M2

TRIPLEX ESTRUCTURALPIZANO 7 mm.

UN

ALAMBRE COBRE THW 8 AWG

ML

ENCHAPE FLORMORADO

M2

MADERA FLOR MORADO PIEZA

ML

TORNILLO PARA MADERA 2" No.9

UN

CEDRO CAQUETA PIEZA

UN

PEGANTE COLBON

KG

WIN DE ALUMINIO

ML

MARMOLINA

BT

GRANITO

BT

PULIDA GRANITO

M2

MOSAICO VITREO

M2

PULIDA GRANITO

ML

SUB. GRANITO POCETA ASEO

UN

CORTA CIRCUITOS ENCHUFABLE BIPOLAR 100A

UN

MARCO Y TAPA CAJA

UN

EXCAVACION MANUAL

M3

ANDEN EN CONCRETO e / 0,08

M2

ARO PARA TAPA TELEFONOS

UN

CONSOLA PARA CAMARA ,80

UN

PLACA BASE CONCRETO 0,15

M2

BLOQUE PARA CAMARA TELEFONICA

UN

SUMINISTRO PERNO PARA CONSOLA

UN

ARMADA FUNDIDA/ DESMONTE BOVEDA C A

M2

COLOCACION CONS CAMARA DE INSPECCION

UN

SUMINISTRO PELDAO PARA CONS CAJA INSP

UN

MURO EN BLOQUE CONCRETO PARA CAMARA T

M2

ROTURA EN CONCRETO CAMARA ETB

M3

MATERIAL DE EXCAVACION

M3

TUBO CORTINA DUCHA

ML

CABLE COBRE THW12AWG

ML

CABLE COBRE THW 10 AWG

ML

CABLE COBRE DESNUDO AWG No. 2

ML

CABLE COBRE DESNUDO AWG No. 4

ML

CABLE COBRE DESNUDO AWG No. 6

ML

SUBCONTRATO ELECTRICO

CABLE COBRE DESNUDO AWG No. 1/0

ML

CABLE COBRE DESNUDO AWG No. 2/0

ML

CABLE COBRE DESNUDO AWG No. 3/0

ML

CABLE COBRE DESNUDO AWG No. 4/0

ML

UNION PVC SANITARIA 4"

UN

TAPA PARA CAMARA AP DOBLE

UN

MARCO PARA TAPA CAMARA DOBLE

UN

PAETE LISO MUROS 1:4

M2

RELLENOS AGREGADO PETREO

M3

REJILLA CON SOSCO 3X2

UN

REJILLA PLASTICA SOSCO 3X2

UN

REJILLA SIFON PC 20X20

UN

REJILLA SIFON 4,5X3,5

UN

REJILLA PC 15X15

UN

ROSETA PORCELANA

UN

PEGACOR BLANCO

KG

SOPORTE PUERTA DE VIDRIO

UN

TAPA REGISTRO 15X15

UN

TAPA REGISTRO 20X20

UN

DUCHA ANTIVANDALICA

UN

GRIFERIA LAVAMANOS URANO CONJ. CR

UN

ORINAL +GRIFERIA ANTIBANDALICA

UN

SANITARIO +GRIFERIA ANTIBANDALICA

UN

MALLA CON VENA 0,6*2,0

UN

MEDIA CAA EN VIROLA

ML

LISTON MH PINO ROMERON

M2

TOC MADERA TRANSPARENTE

KG

LISTON MH VIROLA

M2

MERULEX I.F. TRANSPARENTE

KG

TRIPLEX PIZANO 9mm.

UN

DIVISION BAO PINTURA HORNEABLE

M2

PABMERIL PLIEGO 9*11"

UN

SUBCONTRATO PINTURA

CAL

KG

CARBURO No. 2

KG

YESO VENCEDOR

BT

CAOLIN

BT

DECORPLAST

M2

CERROJO DE SEGURIDAD 35 mm.

UN

TUBO 10*4cm. CAL. 18

ML

TUBO 4*4cm. CAL. 18

ML

ANGULO 1*1*1/8

ML

ANGULO 2*2*1/8

ML

LOSETA CONCRETO PREF. ,4*,4,,05

UN

DADO CONCRETO Y PILOTIN

M3

BASE SUELO CEMENTO

M3

CONCRETO CICLOPEO 50*50

M3

TAPA PARA CAMARA AP

UN

MARCO PARA TAPA CAMARA AP

UN

PLATINA HIERRO 2*1/2*1/4

ML

ANGULO EN HIERRO 2 1/2" X 3/16"

ML

SUBCONTRATO ORNAMENTACION CAMARA AP

SUBCONTRATO ELECTRICO MARCO TAPA CAMARA DOBLE

SUBCONTRATO ORNAMENTACION MARCO CAM. DOBLE

BENITIN DE 500 P-750

DD

BASE 7 CM. 1350 EN OBRA

M3

ASFALTO MC-70 PARA LIGA

LT

EQUIPO DE LAB. SUEKLOS Y PAVIMENTOS

DD

FORMALETA METALICA

DD/M2

CONCRETO PAVIMENTO 41 KG/CM2

M2

RODADURA ASFALTICA B-1350

M3

HERRAMIENTA MENOR

DD

CILINDRO GALION

DD

TANQUE DE AGUA F-600

DD

RECEBO B-600

M3

SUBCONTRATO CARPINTERIA

LONA PLASTICA PARA CASETON

M2

GRAPA INDUSTRIAL

LB

MOTOSIERRA

DD

TUBO ESTRUC. NEGRO 2"

ML

SUBCONTRATO ORNAMENTACION CAMARA AP

AMARRE PLASTICO COLRING 4,6MM.

UN

INSTALACION PISO VINILO CON PEGANTE

M2

PISO PAK RESIDENCIAL 3,0 mm

M2

PISO PAK RESIDENCIAL 1,60 mm

M2

PISO PAK RESIDENCIAL 2,00 mm

M2

LOSETA PREFABRICADA A-50

M2

LOSETA PREFABRICADA A-40

M2

LISTON M. H. GUAYACAN

M2

ARENA LAVADA DE PEA

M3

ADOQUIN CONCRETO 11X6X20

UN

INTERRPTOR SENCILLO DEKO 010 B

UN

INTERRUPTOR SENCILLO AVE 601

UN

INTERRUPTOR SENCILLO AVE 201

UN

INTERRUPTOR SENCILLO LX010C

UN

INTERRUPTOR TRIPLE LUM 111C

UN

INTERRUPTOR TRIPLE DEKO 111B

UN

INTERRUPTOR TRIPLE AVE413 LP

UN

INTERRUPTOR TRIPLE AVE 633

UN

INTERRUPTOR DOBLE LUM 101C

UN

INTERRUPTOR DOBLE DEKO 101B

UN

INTERRUPTOR DOBLE AVE 611

UN

CUATRO VIAS DEKO 020BV

UN

BOTON TIMBRE DEKO 040BL

UN

BOTON TIMBRE AVE 605

UN

CONCRETO 1:3:3

M3

ACERO DE REFUERZO 37000 PSI 3/8"

KG

VIGA MADERA INMUNIZADA 2,5m

UN

TORNILLO ACERO 7X5/8"

UN

SUB-CONTRATO ELECTRICO TUBO GALV. 1"

SUB-CONTRATO ELECTRICO TUBO GALV. 3/4"

UNION CONDUIT GALVANIZADA 3"

UN

TUBO CONDUIT GALVANIZADA 3"

ML

CURVA CONDUIT GALVANIZADA 3"

UN

CABLE ALUMINIO DESNUDO AF 2 / 0

ML

CABLE ALUMINIO DESNUDO 1 AWG

ML

SUBCONTRATO DE ORNAMENTACION TAPA CAM.AP DOBLE

GUARDAESCOBA EN CEDRO 6 CM

ML

GUARDAESCOBA EN CEDRO 8 CM

ML

SUB-CONTRATO HIDRAULICO Y SANITARIO BAJANT. 3

SUB-CONTRATO ORNAMENTACION BAJANTE PVC 3

SUB CONTRATO INSTALACION CABALLETE LISO

SUB CONTRATO INSTALACION CANAL LAM. GALV. 15X20

SUB CONTRATO INSTALACION CANAL LAM. GALV. 20X50

SUB CONTRATO INSTALACION CANAL LAM. GALV D=0,75

SUB CONTRATO INSTALACION CANAL LAM. GALV D=0,50

SUB CONTRATO INSTALACION CANAL LAM. GALV D=1,00

CANAL REF. 3501002 BLANCO

ML

TAPA EXTERNA BLANCO

UN

UNION CANAL BLANCO

UN

SOPORTE CANAL BLANCO

UN

SUB CONTRATO INSTALACION CANAL PVC 3"

SUB CONTRATO INSTALACION FLANCHE 0,10

SUB CONTRATO INSTALACION FLANCHE 0,20/0,30

CABALLETE ETERNIT ART. C-90 SUPERIOR

UN

SUB CONTRATO INSTALACION MOTOBOMBA

FORMALETA VIGA AEREA

M2

FORMALETA MADERA PREFABRICADOS

M2

FORMALETA MUROS Y TANQUES EN MADERA

M2

FORMALETA ESCALERA EN MADERA

M2

FORMALETA COLUMNAS EN MADERA

M2/DD

FORMALETA ZAPATAS

M2

JABON LIQUIDO

GL

PAO LIMPIADOR

UN

ACIDO MURIATICO

GL

RECUBRIMIENTO SINT. PLEXIPAVE

M2

PLANTILLA METALICA

M2

MATERIAL SELECCIONADO

M3

SUB - CONTRATO ORNAMENTACION

SUB - CONTRATO INSTALACION BARANDA


SUB-CONTRATO CARPINTERIA HOJA PUERTA FLOR MORADO
0.80
CEDRO MACHO PIEZA 3.0

%
%
UN

SUB-CONTRATO CARPINTERIA PUERTA MARCO Y HOJA

SUB-CONTRATO CARPINTERIA MUROS EN TRIPLEX

SUB-CONTRATO CARPINTERIA MUROS EN FLORMORADO


SUB-CONTRATO
CARPINTERIA
PASAMANOS
FLORMORADO
SUB-CONTRATO CARPINTERIA PIRLANES DE MADERA

%
EN
%
%

SUB-CONTRATO CARPINTERIA VENTANERIA DE MADERA

ESCUDO GOLPEADOR CERRADURA

UNIDAD

SUB-CONTRATO ELECTRICO PROYEC. SNF-011/400W

SUB-CONTRATO ELECTRICO PROYEC. PHLC-720 MERCU.

SUB-CONTRATO ELECTRICO PROYEC. SNF-011T/T1000

SUB-CONTRATO ELECTRICO SOPORTE PROYECTORES

SUB-CONTRATO INSTALACION CIELO RASO DRY-WALL


PLANO
SUB-CONTRATO INSTALACION CIELO RASO BOVEDA DRYWALL
SUB-CONTRATO INSTALACION CIELO RASO DURACUSTIC

%
%
%

SUB - CONTRATO PINTURA BARNIZ SOBRE MUEBLES

SUB - CONTRATO PINTURA BARNIZ SOBRE MADERA LLENA

SUB - CONTRATO PINTURA BARNIZ SOBRE MADERA LINEAL

SUB - CONTRATO PINTURA BARNIZ SOBRE MARCOS


MADERA
SUB - CONTRATO PINTURA ESMALTE SOBRE MUEBLES

SUB - CONTRATO LACA PISOS MADERA

SUB - CONTRATO TINTILLA SOBRE MUEBLES

SUB - CONTRATO TINTILLA SOBRE MADERA LLENA

SUB - CONTRATO TINTILLA SOBRE MADERA LINEAL

SUB - CONTRATO CARBURO SOBRE PAETE

SUB-CONTRATO ESMALTE SOBRE LAMINA LLENA

SUB-CONTRATO VINILO MUROS 3 MANOS

SUB-CONTRATO MARMOLINA SOBRE PAETE

SUB-CONTRATO INSTALACION FLANCHE

SUB-CONTRATO VINILO MUROS 2 MANOS

SUB-CONTRATO ANTICORROSIVO S/LAMINA LLENA

SUB-CONTRATO VINILO BAJO PLACA 2 MANOS

SUB - CONTRATO PINTURA ANTICORROSIVO

SUB - CONTRATO PINTURA SOBRE L. LLENA


SUB - CONTRATO PINTURA ESMALTE SOBRE LAMINA LINEAL

%
%

SUB - CONTRATO PINTURA SOBRE MARCOS LAMINA

SUB - CONTRATO PINTURA WASH PRIMER

SUB - CONTRATO PINTURA ANTIHUMEDAD

SUB CONTRATO TOPOGRAFICO

TACO TERMOMAGNETICO UNIPOLAR HOP 30 A

UN

FORMALETA SUMIDEROS

UN

HIERRO FIGURADO 1/2 A 60

KG

REJILLA Y MARCO HTA 0.7 X 0.3

UN

SEGUETA NICHOLSON
SUB-CONTRATO
1/2"
SUB-CONTRATO
1/2"
SUB-CONTRATO
3/4"
SUB-CONTRATO
ELEVADO PVC
SUB-CONTRATO
ELEVADO GALV.

UNIDAD

HIDRAULICO Y SANITARIO ACOMET. GALV.


%
HIDRAULICO Y SANITARIO ACOMET. PVC.
%
HIDRAULICO Y SANITARIO ACOMET. PVC
%
HIDRAULICO Y SANITARIO CONEX. TANQUE
%
HIDRAULICO Y SANITARIO CONEX. TANQUE
%

SUB-CONTRATO HIDRAULICO Y SANITARIO FLOTADOR

SUB-CONTRATO HIDRAULICO Y SANITARIO RED COBRE 1/2"

SUB-CONTRATO HIDRAULICO Y SANITARIO RED COBRE 3/4"

SUB-CONTRATO HIDRAULICO Y SANITARIO CPVC 1/2"-3/4"

SUB-CONTRATO
1"
SUB-CONTRATO
2"
SUB-CONTRATO
1/2"
SUB-CONTRATO
GALV.3/4"
SUB-CONTRATO
1 1/2"

HIDRAULICO Y SANITARIO RED SUM. GALV.


%
HIDRAULICO Y SANITARIO RED. SUM. GALV.
%
HIDRAULICO Y SANITARIO RED SUM. GALV.
%
HIDRAULICO Y SANITARIO

RED.

SUM.
%

HIDRAULICO Y SANITARIO RED. SUM. GALV.


%

SUB-CONTRATO HIDRAULICO Y SANITARIO RED. SUM. PVC 1"

SUB-CONTRATO HIDRAULICO Y SANITARIO RED SUM. PVC 2"

SUB-CONTRATO HIDRAULICO Y SANITARIO RED SUM. PVC


1/2"
SUB-CONTRATO HIDRAULICO Y SANITARIO RED SUM. PVC
3/4"
SUB-CONTRATO HIDRAULICO Y SANITARIO RED SUM. PVC 1
1/2"

%
%
%

SUB-CONTRATO HIDRAULICO Y SANITARIO REGISTRO 1"

SUB-CONTRATO HIDRAULICO Y SANITARIO REGISTRO 1/2"

SUB-CONTRATO HIDRAULICO Y SANITARIO REGISTRO 3/4"

SUB-CONTRATO HIDRAULICO Y SANITARIO PVC RDE 21 1 1/4"


SUB-CONTRATO HIDRAULICO Y SANITARIO PVC RDE 21 1 1/2"

%
%

SUB-CONTRATO HIDRAULICO Y SANITARIO PVC RDE 21 2"

SUB-CONTRATO HIDRAULICO Y SANITARIO REGISTRO 1 1/2"

SUB-CONTRATO HIDRAULICO Y SANITARIO REGISTRO 2"

SUB-CONTRATO HIDRAULICO Y SANITARIO PVC-P 1 1/2"

SUB-CONTRATO HIDRAULICO Y SANITARIO FLOTADOR MEC.

SUB-CONTRATO HIDRAULICO CHEQUE RED. WHITE 3/4"


SUB-CONTRATO HIDRAULICO Y SANITARIO PUNTO SUM.
GALV.
SUB-CONTRATO HIDRAULICO Y SANITARIO PUNTO AGUA
CALIENTE
SUB-CONTRATO HIDRAULICO Y SANITARIO PUNTO AGUA
FRIA
SUB-CONTRATO HIDRAULICO Y SANITARIO PUNTO DESAGUE
2"
SUB-CONTRATO HIDRAULICO Y SANITARIO PUNTO DESAGUE
3", 4"
SUB-CONTRATO HIDRAULICO Y SANITARIO BAJANTE AGUAS
LLUVIAS PVC 3"
SUB-CONTRATO HIDRAULICO Y SANITARIO BAJANTE AGUAS
LLUVIAS PVC 4"
SUB-CONTRATO HIDRAULICO Y SANITARIO BAJANTE AGUAS
NEGRAS PVC 3"
SUB-CONTRATO HIDRAULICO Y SANITARIO BAJANTE AGUAS
NEGRAS PVC 4"
SUB-CONTRATO HIDRAULICO Y SANITARIO BAJANTE AGUAS
NEGRAS PVC 4"
SUB-CONTRATO HIDRAULICO Y SANITARIO REVENTILACION
PVC 3"
SUB-CONTRATO HIDRAULICO Y SANITARIO REVENTILACION
PVC 2"
SUB-CONTRATO HIDRAULICO Y SANITARIO REVENTILACION
PVC 4"
SUB-CONTRATO HIDRAULICO Y SANITARIO INSTALACION
APARATO SANITARIO
SUB-CONTRATO HIDRAULICO Y SANITARIO INSTALACION
BOMBAS AGUA

%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%

DUCTO METALICO SIN DIVISION .30

UN

SUB-CONTRATO ELECTRICO ACOMETIDA 1"

OFICIAL BB

DD

AYUDANTE BB

DD

INTERRUPTOR NO AUTOMATICO TRIPOLAR 10-100A

UN

OFICIAL CABLEADO EST.

DD

AYUDANTE CABLEADO EST.

DD

LACADA PISO MADERA

M2

OFICIAL DD

DD

AYUDANTE DD
SUBCONTRATO
CUBIERTA
SUBCONTRATO
CUBIERTA MANTO

DD
INSTALACION

IMPERMEABILIZACION

INSTALACION

IMPERMEABILIZACION

M2
M2

OFICIAL PINTURA

DD

AYUDANTE PINTURA

DD

MOTO BOMBA MANUAL

UN

CINTA METALICA

HR

EQUIPO DE NIVELACION

HR

ESTACION ELECTRONICA TOTAL

HR

MIRA AUTONIVELANTE

HR

MOJON DE CONCRETO

UNIDAD

LAMINA DE ZINC H:2.00 MTS.

UN

VALVULA DE CIOMPUERTA DE 1/2"

UN

Cndt PVC TUBO PLACA 3 M 1/2"

ML

CAJA GVNZD 5800

UN

JUEGO BOQUILLAS 1/2"

JG

c&a ALAMBRE ATT 2*22

ML

AVE 605 BOTON TIMBRE

UN

c&a ALAMBRE N 14 DESNUDO

ML

AVE 611 INTERRUPTOR DOBLE

UN

AVE 666 TOMA DOBLE AMERICANA

UN

c&a ALAMBRE TW 12

ML

c&a ALAMBRE TW 14

ML

AVE 030 ROSETA

UN

TUBO CONDUIT PVC 1"

ML

JUEGO BOQUILLAS DE 1"

JG

ALAMBRE TW 10 AWG

UN

AVE 020T3 TOMA TRIPOLAR 20 AMP

UN

CUBIERTA EN ALUCIN 333C TIPO SANDWICH CON


ALISLAMIENTO ACUSTICO EN FIBRA DE VIDRIO. CAL. 28,
INCLUYE PINTURA DOS CARAS

M2

SUBCONTRATO DE INSTALACION

M2

DUCHA ANTIVANDALICA DOCOL REF: DO17125106, INCLUYE


VALVULA, BOTON,BRAZO Y POMA

UN

PASOS ESCALERA DE GATO

ML

RECEBO COMPACTADO B-200


CORTE ASFALTO

ML

TUBO ESTRUCTURAL DE 16*6 1.5 mm

ML

TUBO ESTRUCTURAL DE 12*6 1,5 mm

ML

SUBCONTRATO DE ORNAMENTACION CUBIERTA

EXCAVACION MANUAL H=1.00

M3

MALLA ELECTROSOLDADA 60.000 PSI

M2

VIBRADOR DE CONCRETO

DD

OFICIAL

HC

AYUDANTE

HC

CASETON

M2

MADERA ORDINARIA EN LISTON 3.00 m

ML

ALAMBRE NEGRO N 18

KG

PUNTILLA CON CABEZA 2"

LB

CONCRETO 3000 PSI

M3

MORTERO 1:5

LT

ORINAL BLANCO REF: GR-08860, PARA VALVULA


ANTIVANDALICA TIPO PUSH

UN

VALVULA CON BOTON ANTIVANDALICO BAJA


PRESION REF: DO-17015006

UN

GRAPAS PARA ORINAL Y LAVAMANOS GRIVAL

UN

DESAGUE SIFON PARA ORINAL REF: GR-93300

UN

TUBO CONECTOR PARA ORINAL PEQUEO Y


VALVULA ANTIVANDALICA

UN

SANITARIO PORCELANA CON HUECOS PARA


MUEBLE
BLANCOPARA
REF:SANITARIO
IC-IP41
VALVULACOLOR
DE DESCARGA
DE 1

UN

1/2" PRESION DE 2,13 LIBRAS HASTA 21,33 LIBRS BAJA PRESION REF: DO- 01021500

UN

BOTON METALICO TIPO PUSH ANTIVANDALICO,


DOCOL

UN

TUBOS CONECTORES TCDIC


JUEGO DE ACCESORIOS PARA CONECTAR
SANITARIO PARTE POSTERIOR REF: DO-TCDIC

UN

LAVAMANOS BLANCO REF: GR-01301-900

UN

SIFON PLASTICO GRIS REF: GF-580322

UN

DESAGUE PARA LAVAMANOS SENCILLO SIN


REBOSE
VALVULA REF: 0121500

UN
UN

BOTON TIPO PUSH

UN

COPA MANTANIMIENTO GRIFERIA Ref: DO00054700

UN

TUBOS CONECTORES TCDIC

UN

DISPENSADOR DE TOALLAS DE PAPEL EN


ACERO INOXIDABLE

UN

JUEGO DE INCRUSTACIONES ACUACER

UN

SECADOR DE MANOS TIPO PUSH

UN

PAPELERAS ACERO INOXIDABLE

UN

ESPEJO BISELADO 4 mm

M2

ESPEJO BISELADO 4 mm h= 1,50 (cuerpo entero)

M2

BARRA APOYO PARA DISCAPACITADOS

UN

MUEBLE PARA LAMPARAS EXISTENTES

UN

AYUDANTE DD

DD

OFICIAL BB

DD

AYUDANTE BB

DD

ASEO

GB

BLOQUE
12*19*39
CANCHA ESTRUCTURAL
MULTIPLE FIJA CON
TABLERO
ACRILICO

UN

UN

JGO

MALLA NYLON BICOLOR

UN

SUB CONTRATO DE INSTALACION CANCHAS


MULTIPLES

GLB

MALLA NYLON MICROFUTBOL

UN

POSTES PARA CANCHA DE VOLLEYBALL

UN

SUB CONTRATO DE INSTALACION CANCHA


VOLLEYBALL

GLB

TRANSPORTE

GLB

MALLA VOLLEYBALL NAYLON, DOS COLORES,


GUAYA Y DOBLE TENSOR

UN

CANCHA VOLLEYBALL

UN

BROCHA CERDA 4"

UN

PINTURA AMRILLA TRAFICO

GALON

Oficial (incluye 100% de prestaciones)

DD

CORTES PAVIMENTO

ML

DEMOLICION PAVIMENTO

M3

GRUA EXTENSION PARA POSTES

DD

EXCAVACION MANUAL

M3

RECEBO COMPACTO B-200

M3

RECEBO COMPACTO B-600

M3

BASE ASFALTO 1350. 7 CMS

M2

ASFALTO MDC N2

M3

RODADURA B-1350. 2.5 CMS

M2

SUBCONTRATO CODENSA

GLB

PROYECTOR PHLC 720 - MERC

UN

OFICIAL

DD

AYUDANTE

DD

ANDAMIO

DD

TRASLADO PUNTO ELECTRICO

GLB

TRANSPORTE LAMINA DE FIBRIT

M2

TABLERO EN FIBRA DE VIDRIO

UN

VALOR NETO ($)

IVA 16%

VALOR TOTAL ($)


8000.00
37000.00
37000.00
5500.00
450.00
4100.00
2500.00
25000.00
13920.00
8120.00
9280.00
1360.00
2400.00
1353.00
1716.00
4060.00
580.00
850.00
7250.00
450.00
476.00
450.00
450.00
550.00
560.00
850.00
455.00
480.00
310.00
30000.00
58000.00
17500.00
18000.00
58000.00
31900.00
25000.00
29850.00
52000.00
53000.00
$219,200.00
37000.00
69000.00
20000.00
76560.00
1230.00
190000.00
241000.00
200000.00
256000.00
220000.00
267000.00
264704.45
250444.00
24000.00

24360.00
18000.00
14000.00
75400.00
92800.00
48720.00
20230.00
30000.00
15000.00
8200.00
7200.00
9280.00
5800.00
1750.00
1750.00
1780.00
2200.00
32000.00
2000.00
6985.00
2870.00
300.00
800.00
400.00
1300.00
190.00
250.00
150.00
350.00
4200.00
250000.00
5700.00
134000.00
2100.00
2400.00
3500.00
4640.00
2100.00
2100.00
1700.00
7000.00
14000.00
29500.00
22100.00
30000.00
28500.00
40715.00
13640.00
1900.00
58500.00
250.00
1500.00
1850.00
3200.00
45000.00
9600.00

1550.00
3900.00
1100.00
1920.00
2900.00
48.00
15.00
20.00
500.00
1500.00
2600.00
750.00
20000.00
70.00
220000.00
9900.00
85.00
280000.00
120.00
70.00
25000.00
35000.00
135000.00
230000.00
63133.00
63133.00
1908.00
4144.00
7803.00
1908.00
1007.00
1821.00
4157.00
4157.00
2225.00
7902.00
686.00
1344.00
360.00
360.00
5530.00
2500.00
5500.00
1300.00
3800.00
5500.00
5500.00
25788.00
46120.00
13518.00
24580.00
32500.00
8706.00
6343.00
4164.00
411.00

1513.00
324.00
6500.00
10068.00
0.00
3777.00
4877.00
10220.00
6900.00
11968.00
16678.00
35319.00
16200.00
6813.00
6500.00
5643.00
9275.00
15450.00
11000.00
4500.00
7500.00
13700.00
5750.00
13700.00
3300.00
2255.00
5415.00
11858.00
1788.00
4800.00
11747.00
3700.00
4150.00
2300.00
16000.00
11000.00
4500.00
8033.00
5500.00
6500.00
7500.00
6500.00
7500.00
13920.00
25500.00
7500.00
9500.00
533350.00
20200.00
70000.00
180000.00
108000.00
546437.00
3650.00
7700.00
45850.00

9200.00
38000.00
150.00
93000.00
850.00
282.00
659.00
350.00
13200.00
25700.00
8700.00
5800.00
50000.00
18500.00
2500.00
2900.00
11788.00
36100.00
35772.00
1205.00
395.00
282.00
235600.00
15000.00
19500.00
10000.00
23000.00
2600.00
1100.00
3100.00
5200.00
3450.00
2420.00
2000.00
22069.00
54850.00
65650.00
76420.00
29800.00
29800.00
87100.00
113815.00
8100.00
5100.00
215000.00
292000.00
780.00
3200.00
1200.00
1200.00
32880.00
37800.00
400.00
17250.00
28750.00
600.00

600.00
185000.00
115000.00
18000.00
2000.00
40000.00
45000.00
6000.00
870.00
150.00
16000.00
4200.00
5500.00
25900.00
31500.00
36000.00
36000.00
78100.00
44600.00
64000.00
7000.00
9600.00
78100.00
33000.00
26000.00
56000.00
9550.00
64000.00
123850.00
14100.00
6000.00
10450.00
10450.00
14000.00
23600.00
28000.00
8000.00
20000.00
12000.00
16000.00
16850.00
400.00
500.00
468000.00
5500.00
5200.00
5200.00
4400.00
5000.00
3600.00
3500.00
26250.00
7500.00
130000.00
9200.00
2500.00

200.00
1500.00
4800.00
5000.00
2400.00
585500.00
90000.00
29000.00
820.00
2800.00
2800.00
185000.00
290820.00
335000.00
360350.00
446368.00
427300.00
2000.00
590000.00
140000.00
15000.00
10000.00
7500.00
3600.00
3200.00
1700.00
4800.00
5500.00
4500.00
65000.00
12120.00
11500.00
7000.00
8500.00
1660.00
4800.00
2500.00
13200.00
4817.00
7169.00
9500.00
30000.00
8000.00
454000.00
4500.00
3950.00
1700.00
3162.00
6230.00
5600.00
5300.00
166200.00
212700.00
212700.00
122300.00
133200.00

133780.00
140000.00
2810.00
21300.00
0.00

0.00
59359.55
51617

51617.00

30048

30048.00
23000.00
600.00
20343.00
5700.00
12650.00
20380.00
23600.00
1200.00
3200.00
69950.00
82590.00
87200.00
93600.00
101530.00
110550.00
214500.00
80800.00
96900.00
120150.00
129500.00
151000.00
206450.00
28470.00
45690.00
44400.00
18720.00
77500.00
21230.00
3720.00
10100.00
20800.00
16000.00
32000.00
40000.00
23085.00
35550.00
46200.00
56200.00
21500.00
32200.00
43000.00
53800.00
34100.00
450.00
49550.00
282000.00
215000.00

166200.00
3500.00
150000.00
272000.00
1200000.00
20.00
79000.00
13000.00
1800.00
350000.00
600.00
180000.00
350000.00
680000.00
0.00
425.00
4000.00
4675.00
5700.00
8491.00
461.00
4430.00
350.00
2500.00
1800.00
10000.00
9800.00
112000.00
2800.00
450.00
49500.00
850.00
57700.00
325000.00
30000.00
4600.00
500.00
30000.00
35000.00
450000.00
500.00
64000.00
72100.00
49900.00
43550.00
51250.00
63400.00
185000.00
225000.00
95000.00
57700.00
30000.00
33200.00
39580.00
50150.00
10300.00

35250.00
600.00
60220.00
46840.00
17550.00
10600.00
11100.00
9000.00
7200.00
65000.00
15000.00
3600.00
2750.00
15550.00
950.00
7300.00
53450.00
10100.00
0.00
35100.00
50700.00
35970.00
95800.00
47200.00
28500.00
30000.00
97000.00
21300.00
4500.00
32000.00
0.00
398000.00
307400.00
533600.00
400000.00
417600.00
710000.00
100000.00
230000.00
1400000.00
11800.00
125000.00
180000.00
245000.00
2450.00
400.00
525.00
29116.00
26000.00
26000.00
0.00
15076.00
13000.00
17100.00
20421.00
12600.00

3900.00
64300.00
22000.00
27500.00
7500.00
9200.00
7500.00
65000.00
21500.00
15500.00
23500.00
850.00
9123.00
18290.00
12500.00
19115.00
17050.00
19115.00
21200.00
2200.00
10120.00
1450.00
35000.00
570.00
145000.00
1800.00
1300.00
18000.00
37000.00
35000.00
175000.00
70000.00
9280.00
78000.00
85000.00
67500.00
14000.00
14000.00
220000.00
115000.00
298000.00
188000.00
310000.00
291000.00
423000.00
585000.00
910000.00
353000.00
395000.00
87000.00
120000.00
127000.00
148000.00
120000.00

175600.00
2500.00
45000.00
8100.00
2950.00
34000.00
5220.00
205000.00
230000.00
352000.00
4500.00
63800.00
86000.00
37000.00
48500.00
55125.00
21500.00
12500.00
755000.00
38600.00
18450.00
127000.00
75600.00
252000.00
106000.00
72200.00
23200.00
57500.00
98000.00
65400.00
68300.00
43200.00
135000.00
95000.00
83250.00
182100.00
208500.00
65400.00
44200.00
253000.00
218570.00
205100.00
198400.00
7210.00
3500.00
9600.00
260700.00
1175500.00
5600.00
95000.00
28450.00
24500.00
35200.00
43860.00
12000.00
205000.00

92600.00
212000.00
110000.00
205460.00
36500.00
26000.00
32500.00
42250.00
19400.00
18100.00
41400.00
55200.00
26500.00
30500.00
11600.00
23200.00
17400.00
11600.00
23200.00
2900000.00
580000.00
17000.00
1740000.00
46400.00
139200.00
25500.00
290000.00
25000.00
25000.00
2700.00
0.00
9650.00
0.00
0.00
0.00
22000.00
4200.00
22000.00
8500.00
21500.00
4000.00
10000.00
5304.00
11024.00
21780.00
10309.00
27580.00
2300.00
2274.00
1980.00

33000.00
10580.00
44100.00
2400.00
48000.00
18000.00
60.00
35000.00
9500.00
1500.00
9500.00
18000.00
37500.00
69200.00
37500.00
0.00
49200.00
60000.00
$24,000.00
$55,000.00
$20,000.00
$15,000.00
$52,000.00
$3,364.00
$2,675.00
$71,874.00
$9,818.00
$5,900.00
$6,000.00
$28,515.00
$6,200.00
$3,550.00
1755.00
2538.00
12760.00
6126.00
5597.00
0.00
20213.00
24331.00
32596.00
40779.00
5137.00

80000.00
111000.00
7900.00
44500.00
2500.00
2000.00
4500.00
6500.00
4000.00
2500.00
850.00
48500.00
4500.00
5500.00
130000.00
80800.00
171400.00
450000.00
3800.00
1500.00
60000.00
13500.00
25000.00
15300.00
67750.00
123000.00
1900.00
0.00
320.00
600.00
12000.00
8500.00
7000.00
31980.00
9280.00
4450.00
2500.00
5660.00
3435.00
310000.00
76000.00
175000.00
119587.00

81151.00
4300.00
2700.00
50720.00
0.00
38000.00
15000.00
285000.00
530.00
40000.00
90.00
310000.00
190000.00
5000.00

260000.00
290000.00
35000.00
14000.00
1057.00
4500.00
30000.00
7930.00
82473.00
380.00
1000.00
21500.00
14500.00
16000.00
21500.00
21500.00
24200.00
25000.00
400.00
2200.00
2200.00
2200.00
2200.00
8200.00
8200.00
8200.00
8200.00
20000.00
20000.00

20000.00
13000.00
10000.00
2000.00
211000.00
1780.00
75000.00
1950.00
0.00
0.00
24000.00
14700.00
76800.00
10500.00
5500.00
54262.00
6500.00
8000.00
0.00
28994.00
0.00
0.00
30000.00
42000.00
28000.00
45000.00
11500.00
4500.00
5500.00
1500.00
29000.00
11850.00
0.00
23600.00
0.00
8500.00
7000.00
13000.00
15000.00
31.00
10500.00
2500.00
800.00

8000.00
20000.00
800.00
1800.00
22000.00
22000.00
81340.00
50000.00
165000.00
22580.00
25385.00
19150.00
14540.00
47810.00
2000.00
0.00
0.00
0.00
0.00
42500.00
46190.00
22460.00
28104.00
0.00
0.00
0.00
39350.00
15815.00
28408.00
6835.00
1666.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00

0.00
0.00
0.00
8500.00
5280.00
14000.00
1400.00
78000.00

3200
175600.00
159000.00
174000.00
246000.00
357000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
127000.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22400.00
0.00
59360.00
33048.00
24000.00
72264.00
39064.00
14000.00
67104.00
36056.00
6500.00
9500.00
61944.00
34552.00
350000.00
630.00
1500.00
6000.00
1300.00
1800.00
14500.00

15900.00
1660.00
400.00
130.00
189.00
2230.00
188.00
2890.00
2100.00
395.00
282.00
820.00
3012.00
310.00
619.00
2110.00

75800
20000.00

233160
48842.00
41341.29
7000.00
26342.67
21056.33
35000.00
22511.41
6410.00
14400.00
22777.35
11049.35
6932.50

510
1800
1262
313200
139.59
93500.64
133632
4903.32
6980.88

41760
100224
67860
91872
47560
25056
77026.32
3944
4408
75400
92800
39440
47560
86000
37000
755000
21500
55200
55200
78000
70000
36056
59360
33048
150000
1230
1650000
14400
550000
240000
210000
40000
120000

120000
243600
10000
57700
61944
8000
92538.4
280000
24394.33
41341.29
42880
348206.12
197200
14172.08
2500000
585000
59360
33048
3500
200000
6960
410000

ALCALDA MAYOR DE BOGOT D.C.


SECRETARA DE EDUCACIN
SUBDIRECCIN DE PLANTAS FSICAS
RELACIN DE PRECIOS UNITARIOS PARA LA VIGENCIA DE _______________________________________

ITEM

DESCRIPCIN

UN

TOTAL PRECIO UNIT.

1 PRELIMINARES

1.3 DEMOLICIONES

1 PRELIMINARES

1.1

OBRAS PRELIMINARES

1.1.1

ALQUILER CAMPAMENTO SHELTER OFICINA 40

1.1.2
1.1.3

CAMPAMENTO EN MADERA - TEJA A.C. - PISO EN CONC. 2000 PSI E=5


CMS
CAMPAMENTO 36 M2 MADERA - TEJA A.C. - PISO EN CONC. 2000 PSI E=5
CMS

MS

3,968,000.00

M2

62,421.95

UN

2,212,062.29

1.1.4

CERRAMIENTO EN ALAMBRE DE PUA H= 2 MTS

ML

32,766.50

1.1.5

CERRAMIENTO EN LAMINA. H = 2.25

ML

222,347.89

1.1.6

CERRAMIENTO EN TABLA. H=1.80

ML

25,685.14

1.1.7

CERRAMIENTO VARA CLAVO Y LAMINA H = 2.00

ML

22,765.17

1.1.8

CERRAMIENTO EN REPISA Y LONA VERDE H = 2.00

ML

12,997.56

1.1.9

LIMPIEZA, DESCAPOTE, RETIRO SOBR. - MANUAL

M2

9,836.53

1.1.10

LIMPIEZA, DESCAPOTE, RETIRO SOBR. - MECANICO

M2

6,478.57

1.1.11

LOCALIZACION Y REPLANTEO DE CIMIENTOS

M2

4,248.31

1.1.12

LOCALIZACION Y REPLANTEO CON EQUIPO

M2

23,995.83

1.1.13

LOCALIZACION Y REPLANTEO MANUAL

M2

3,856.21

1.1.14

LOCALIZACION Y REPLANTEO DE MUROS

M2

3,396.63

1.1.15

VALLA INFORMATIVA 2.00 X 1.00

UN

371,666.25

1.1.16

TRANSPORTE E INST. DE CERRAMIENTO EXISTENTE EN VARA CLAVO Y


LAMINA H = 2.00

ML

24,452.67

1.1.17

RETIRO CERRAMIENTO EN VARA CLAVO Y LAMINA H = 2.00

ML

5,588.83

1.1.18

REPLANTEO Y NIVELACIN MANUAL DE TERRENO NATURAL

M2

9,681.69

1.2

1.2 INSTALACION SERVICIOS PROVISIONALES

1.2.1

RED AGUA PROVISIONAL. L = 50 MS

UN

328,695.00

1.2.2

RED ELECTRICA PROVISIONAL. L = 50 MS

UN

1,325,302.00

1.2.3

RED TELEFONICA PROVISIONAL

UN

274,671.00

M2

5,530.22

1.3

DEMOLICIONES - DESMONTES - RETIROS

1.3.1

DEMOLICION CIELO RASO FALSO CON R. SOB.

1.3.2

DEMOLICION CIMIENTOS CON R. SOB.

M3

145,064.00

1.3.3

DEMOLICION CONCRETOS CON R. SOB.

M3

146,730.67

1.3.4

DEMOLICION CONSTRUCC. EXIST. CON R. SOB.

M2

9,986.53

1.3.5

DEMOLICION ENCHAPES CON R. SOB

M2

11,014.36

1.3.6

DEMOLICION ORINAL LAVAM. CORRIDO CON R. SOB

ML

6,995.45

1.3.7

DEMOLICION MUROS EN BLOQUE CON R. SOB.

M2

7,755.07

1.3.8

DEMOLICION MUROS PANELES PREF/R. SOBR.

M2

6,342.30

1.3.9

DEMOLICION MUROS TOLETE 0.12 CON R. SOB.

M2

8,886.53

1.3.10

DEMOLICION MUROS TOLETE 0.25 CON R. SOB.

M2

12,519.11

1.3.11

DEMOLICION PAETES CON R. SOB.

M2

6,089.33

1.3.12

DEMOLICION PAVIMENTO ASFALTICO

M3

92,538.40

1.3.13

DEMOLICION PISOS EN BALDOSIN CON R. SOB.

M2

6,089.33

1.3.14

DEMOLICION PISOS EN TABLON CON R. SOB.

M2

6,431.00

1.3.15

DEMOLICION PLACA ALIGER. 0.25 CON R.SOB.

M2

23,027.46

1.3.16

DEMOLICION PLACA ALIGER. 0.45 CON R.SOB.

M2

34,519.20

1.3.17

DEMOLICION PLACA MACIZA 0.10 CON R. SOB.

M2

23,009.60

1.3.18

DEMOLICION PLACA MACIZA 0.15 CON R. SOB.

M2

28,029.86

1.3.19

DEMOLICION PLACA MACIZA 0.30 CON R. SOB.

M2

41,495.39

1.3.20

DEMOLICION PLACA PISO 0.10 CON R. SOB.

M2

22,527.46

1.3.21

DEMOLICION VIGAS Y COLUMNAS CON R. SOB.

M3

105,520.22

1.3.22

DESMONTE APARATOS SANITARIOS CON R. SOB.

UN

16,781.77

1.3.23

DESMONTE C. RASOS ACRILICOS CON R. SOB.

M2

7,528.49

1.3.24

DESMONTE CANALES Y BAJANTES CON R. SOB.

ML

4,748.28

1.3.25

DESMONTE CBTAS ASBESTO CEMENTO/R.SOB.

M2

12,241.74

1.3.26

DESMONTE CBTAS LAMINA ZINC CON R. SOB.

M2

8,986.94

1.3.27

DESMONTE CERRAMIENTO MALLA ESLAB.

M2

6,898.49

1.3.28

DESMONTE PUERTAS CON MARCOS CON R. SOB.

UN

5,635.77

1.3.29

DESMONTE REJAS CON R. SOB.

M2

9,562.17

1.3.30

DESMONTE TEJA DE BARRO CON R. SOB.

M2

11,807.89

1.3.31

DESMONTE VENTANAS Y VIDRIOS CON R. SOB.

M2

7,153.32

1.3.32

ESCARIFICAR PAETES CON R. SOB.

M2

6,574.75

1.3.33

ESCARIFICAR PISOS CON R. SOB.

M2

6,845.98

1.3.34

RETIRO DE MANTOS ASFALTICOS CON RETIRO DE SOB.

M2

7,849.20

1.3.35

DESMONTE Y RETIRO DE CERRAMIENTO EN LMINA H=2.00

M2

23,631.14

1.3.36

DEMOLICION MESN CORRIDO CON R. SOB

ML

9,317.82

1.3.37

DESMONTE TANQUES ELEVADOS CON R. SOB. (INC. SUSP. DE


CONEXIONES)

UN

131,369.23

1.3.38

SUSPENSIN DE SALIDA SANITARIA

UN

13,316.73

1.3.39

DESMONTE DE TUBERA SANITARIA

ML

3,829.18

1.3.40

CAMBIO DE ACOPLE SANITARIO

UN

8,810.87

1.3.41

INSTALACION TANQUE PSANITARIO (M.O.)

UN

9,629.44

1.3.42

REVISIN y REP. TANQUE PSANITARIO (LAVADO, CAMBIO FLOTADOR y


ACCESORIOS)

UN

22,633.13

1.3.43

REVISION Y REPARACION DE BAJANTES

UN

5,339.32

1.3.44

REPARACIN DE DOMOS ACRLICOS (INC. SOPORTES METLICOS)

M2

134,183.13

1.3.45

SUSPENSIN DE SALIDA HIDRULICA

UN

63,180.71

1.3.46

DEMOLICION ESCALERAS EN CONC. REFZDO. CON R. SOB.

M3

181,286.36

1.3.47

DESMONTE Y RETIRO DE DIVISIONES MET. PBAOS

M2

10,473.34

1.3.48

DESMONTE Y RETIRO DE DIVISIONES MODULARES

M2

9,388.40

1.1

1.4 VARIOS - PRELIMINARES

1.4.1

DEMARCACION EXTERIOR SEGURIDAD

ML

3,808.83

1.4.2

DESMONTE CANCHA MULTIPLE CON R. SOB.

UN

173,011.46

1.4.3

RETIRO DE SOBRANTES

M3

17,839.73

1.4.4

TALA ARBOLES. H = 5 - 10 MS

UN

64,786.37

1.4.5

TRASCIEGO CARRETILLA

M3

4,718.08

2 CIMENTACION

2.1

EXCAVACIONES, RELLENOS Y REEMPLAZOS

2.1.1

BASE ARENA CEMENTO 1:20

M3

93,086.86

2.1.2

ENTIBADOS EN MADERA

M2

12,521.34

2.1.3

EXCAVACION EN ROCA

M3

98,222.20

2.1.4

EXCAVACION MANUAL EN RECEBO COMPACTADO

M3

24,349.33

2.1.5

EXCAVACION MANUAL TIERRA. H=2.50 CON RET. DE SOB.

M3

24,349.33

2.1.6

EXCAVACION MANUAL TIERRA. H=2.50-3.50 MTS - CON RET. DE SOB.

M3

26,018.46

2.1.7

EXCAVACION MANUAL TIERRA. H=3.50-5.00 MTS - CON RET. DE SOB.

M3

26,917.17

2.1.8

EXCAVACION MECANICA EN MATERIAL COMUN CON RET. DE SOB.

M3

18,100.00

2.1.9

EXPLANACION MANUAL Y EXTENDIDA

M3

10,014.77

2.1.10

EXPLANACION MECNICA Y EXTENDIDA

M3

9,349.24

2.1.11

EXPLANACION Y RETIRO

M3

23,996.56

2.1.12

PERFILACION DE TALUD - E MX. = 1 MT

M3

4,578.18

2.1.13

RECEBO COMPACTADO B-200

M3

41,341.29

2.1.14

RECEBO COMPACTADO COMUN

M3

41,341.29

2.1.15

RELLENOS COMPACTOS TIERRA - RECEBO COMN 1:1

M3

44,416.06

2.1.16

RELLENOS MATERIAL COMUN

M3

39,916.56

2.1.17

RELLENOS
MATERIAL
EXCAVACIN

M3

7,922.08

2.1.18

RELLENOS EN TRITURADO 2,5"

M3

84,372.08

SELECCIONADO

PROVENIENTE

DE

LA

2.2

CONCRETOS PARA CIMENTACION

2.2.1

CONCRETO CICLOPEO - 40% CONC. 3000 PSI

M3

155,829.50

2.2.2

CONCRETO CICLOPEO - 40% CONC.2500 PSI

M3

147,429.50

2.2.3

CONCRETO CICLOPEO - 60% CONC. 2500 PSI

M3

182,730.50

2.2.4

CONCRETO CICLOPEO - CONC. 60% 3000 PSI

M3

192,432.50

2.2.5

CONCRETO DADOS. 3000 PSI

M3

337,929.11

2.2.6

CONCRETO POBRE DE LIMPIEZA 2000 PSI

M3

14,758.28

2.2.7

CONCRETO VIGAS DE CIMENTACION 3000 PSI

M3

363,221.54

2.2.8

CONCRETO VIGAS TEE 25x25 20x40. 3000 PSI

M3

347,529.83

2.2.9

CONCRETO VIGAS TEE 25x25 20x50. 3000 PSI

M3

357,376.68

2.2.10

CONCRETO ZAPATAS. 3000 PSI

M3

341,519.78

2.2.11

MUROS DE CONTENCION CONCRETO. 3000 PSI

M3

360,424.98

2.2.12

PEDESTALES CONC. 3000 PSI

M3

345,444.82

2.2.13

PILOTES HINCADOS DE 25 x 25

ML

79,942.66

2.2.14

PILOTES HINCADOS DE 30 x 30

ML

97,864.66

2.2.15

PILOTES PRE-EXCAVADOS CON RFZO. - 30 cm.

ML

55,929.99

2.2.16

PLACA CONTRAPISO EN CONCRETO 3000 PSI - E= 8 cm.

M2

28,609.44

2.2.17

PLACA CONTRAPISO EN CONCRETO 3000 PSI - E= 10 cm.

M2

33,229.44

2.2.18

PLACA CONTRAPISO EN CONCRETO 3000 PSI - E= 12 cm.

M2

33,229.44

2.2.19

PLACA CONTRAPISO EN CONCRETO 3000 PSI - E= 15 cm.

M2

44,229.44

2.2.20

CONCRETO PARA PLACA FLOTANTE 3000 PSI - E= 70 cm.

M2

129,740.40

2.2.21

CONCRETO PARA PLACA FLOTANTE 3000 PSI - E= 80 cm.

M2

138,540.40

2.2.22

SUBMURACION EN CONCRETO CICLOPEO - 60% CONC. 2500 PSI

M3

182,730.50

2.2.23

CONCRETO PARA ZAPATAS 3000 PSI

M3

342,704.84

2.3

ACERO DE REFUERZO - CIMENTACION

2.3.1

ACERO DE REFUERZO 37000 PSI

KG

2,043.65

2.3.2

ACERO DE REFUERZO 60000 PSI

KG

2,073.65

2.3.3

GRAFIL DE 6 MM

KG

2,633.65

2.3.4

MALLAS ELECTROSOLDADAS

KG

58,733.65

2.4

VARIOS - CIMENTACION

2.4.1

DEMOLICION CABEZAS PILOTES DE CONCRETO

M3

300,793.18

2.4.2

DEMOLICION CIMIENTOS ENTERRADOS

M3

197,208.88

2.4.3

GAVIONES EN MALLA DE TRIPLE TORSIN PIEDRA ZONGA

M3

120,453.57

2.4.4

ICOPOR AISLAMIENTO 1 CM

M2

7,700.48

2.4.5

PAETES TALUDES

M2

5,479.40

2.4.6

PILOTE MADERA HINCADO (18/25)

ML

30,777.67

3 DESAGES E INST. SUBTERRANEAS

3.2

3.2 DESAGES PARA AGUAS NEGRAS

3.2.1

ACCESORIO PVC-S 2"

UN

239,507.57

3.2.2

ACCESORIO PVC-S 3"

UN

129,589.29

3.2.3

ACCESORIO PVC-S 4"

UN

128,166.79

3.2.4

ACCESORIO PVC-S 6"

UN

120,835.73

3.2.4

ACCESORIOS DE GRES 4" (INC. ATRAQUE)

UN

118,214.29

3.2.5

ACCESORIOS DE GRES 6" (INC. ATRAQUE)

UN

118,814.29

3.2.6

TUBERIA CONCRETO 10" (INC. ATRAQUE)

ML

77,343.28

3.2.7

TUBERIA CONCRETO 12" (INC. ATRAQUE)

ML

66,779.15

3.2.8

TUBERIA CONCRETO 8" (INC. ATRAQUE)

ML

91,060.91

3.2.9

TUBERIA DE GRES 10" (INC. ATRAQUE)

ML

66,143.17

3.2.10

TUBERIA DE GRES 4" (INC. ATRAQUE)

ML

89,578.91

3.2.11

TUBERIA DE GRES 6" (INC. ATRAQUE)

ML

97,402.32

3.2.12

TUBERIA DE GRES 8" (INC. ATRAQUE)

ML

80,954.91

3.2.13

TUBERIA PVC-SANITARIA 2"

ML

211,557.12

3.2.14

TUBERIA PVC-SANITARIA 3"

ML

192,272.40

3.2.15

TUBERIA PVC-SANITARIA 4"

ML

181,788.78

3.2.16

TUBERIA PVC-SANITARIA 6"

ML

108,088.74

3.2.17

TUBERIA PVC-L 2"

ML

215,799.52

3.2.18

PUNTO DESAGUE PVC 2"

UN

60,571.91

3.2.19

PUNTO DESAGUE PVC 3" y 4"

UN

74,110.95

3.2.20

TAPON SOLDADO PVC 3"

UN

218,414.01

3.2.21

TAPON SOLDADO PVC 4"

UN

173,795.33

3.2.22

TAPON SOLDADO PVC 6"

UN

69,471.19

3.3

DRENAJES

3.3.1

RELLENO EN GRAVILLA DE RIO

M3

64,871.42

3.3.2

TUBERIA DRENAJE GRES 4"

ML

22,441.94

3.3.3

TUBERIA DRENAJE PVC 100 mm.

ML

22,123.25

3.3.4

GEOTEXTIL PARA FILTRO REF. T-1600

M2

619.77

3.4

CONSTRUCCIONES EN MAMPOSTERIA

3.4.1

CAJAS INSPECCION 100 x 100 x 95. S/E

UN

257,462.47

3.4.2

CAJAS INSPECCION 40 x 40 x 35. S/E

UN

80,199.60

3.4.3

CAJAS INSPECCION 60 x 60 x 55. S/E

UN

126,220.22

3.4.4

CAJAS INSPECCION 80 x 80 x 75. S/E

UN

218,267.41

3.4.5

CARCAMO PROTECCION TUB. A. LL. 60 x 40

ML

102,029.00

3.4.6

POZO DE INSPECCION D=1.80 m. H=1.80 m.

UN

353,567.59

3.4.7

SUMIDERO A. LLUVIA 100 x 30 x 100. S/E

UN

775,175.89

3.5

MOVIMIENTO DE TIERRAS

3.5.1

EXCAVACION MANUAL EN RECEBO - INC. RETIRO DE SOBRANTES

M3

38,613.85

3.5.2

EXCAVACION MANUAL TIERRA. H=2.50 MS - INC. RETIRO DE SOBRANTES

M3

62,821.08

3.5.3

RECEBO COMPACTADO COMUN

M3

43,166.50

3.5.4

RELLENOS COMPACTOS TIERRA RECEBO 1:1

M3

70,616.50

3.5.5

RELLENOS MATERIAL COMUN

M3

42,845.33

3.5.6

RELLENOS
MATERIAL
EXCAVACIN

M3

43,262.00

3.6

3.6 VARIOS - DESAGES

3.6.1

CAJA CONTADOR AGUA FIBRIT. S/EXC.

UN

52,183.08

3.6.2

CAMARAS ELECTRICAS DOBLES. S/E

UN

593,872.65

3.6.3

DUCTO ELECTRICO PVC 3". S/E

ML

42,230.14

3.6.4

DUCTOS ELECTRICOS A.C. 4". S/E

ML

59,871.57

3.6.5

DUCTOS ELECTRICOS PVC 4". S/E

ML

47,307.56

4 ESTRUCTURA

SELECCIONADO

PROVENIENTE

DE

LA

4.1

ELEMENTOS VERTICALES EN CONCRETO

4.1.2

COLUMNAS F=12 M2/M3. CONC. 3000 PSI

M3

440,035.52

4.1.3

COLUMNAS F=7.00 M2/M3. CONC. 3000 PSI

M3

375,036.77

4.1.4

COLUMNAS F=8.35 M2/M3. CONC. 3000 PSI

M3

411,147.19

4.1.5

MUROS EN CONCRETO DE 0.10. 3000 PSI

M3

440,211.52

4.2

ELEMENTOS HORIZONTALES EN CONCRETO

4.2.1

VIGAS AEREAS. CONC. 3000 PSI

M3

387,390.74

4.2.2

VIGAS AMARRE SOBRE MUROS. 3000 PSI

M3

436,913.60

4.2.3

VIGAS CANALES. D=1.20 MS. CONC. 3000 PSI

M3

387,390.74

4.2.4

VIGAS PREFABRICADAS. CONC. 3000 PSI

M3

341,271.00

4.3

LOSAS EN CONCRETO

4.3.1

ENTREPISO ALIGERADO CON BLOQUE DE ESCORIA. C. 3000 PSI

M2

51,308.89

4.3.2

LAMINA COLABORANTE 0.10 CONC. 3000 PSI

M2

46,786.06

4.3.3

LOSA ALIGERADA CASETON DE 0.30. 3000 PSI

M2

74,894.63

4.3.4

LOSA ALIGERADA CASETON DE 0.35. 3000 PSI

M2

81,756.70

4.3.5

LOSA ALIGERADA CASETON DE 0.40. 3000 PSI

M2

89,776.79

4.3.6

LOSA ALIGERADA CASETON DE 0.45. 3000 PSI

M2

102,618.18

4.3.7

LOSA ALIGERADA CASETON DE 0.50. 3000 PSI

M2

112,387.05

4.3.8

LOSA CONCRETO CON PREPLANA. 3000 PSI

M2

42,017.69

4.3.9

LOSA MACIZA DE 0.10. CONC. 3000 PSI

M2

38,007.01

4.3.10

LOSA MACIZA DE 0.12. CONC. 3000 PSI

M2

44,712.52

4.3.11

LOSA MACIZA DE 0.15. CONC. 3000 PSI

M2

56,228.52

4.4

ELEMENTOS VARIOS EN CONCRETO

4.4.1

ESCALERAS EN CONCRETO. CONC. 3000 PSI

M3

572,337.83

4.4.2

TANQUE ELEVADO. CONC. 3000 PSI

M3

584,670.06

4.4.3

TANQUE SUBTERRANEO. CONC. 3000 PSI

M3

530,125.08

4.5

ACERO DE REFUERZO - ESTRUCTURA

4.5.1

ACERO DE REFUERZO 37000 PSI

TN

2,253,923.33

4.5.2

ACERO DE REFUERZO 60000 PSI

TN

2,313,883.33

4.5.3

GRAFIL DE 6 MM

KG

4.5.4

MALLAS ELECTROSOLDADAS

UN

1,912.41

5 MAMPOSTERIA

5.1

MAMPOSTERIA EN BLOQUE DE CONCRETO

5.1.1

BLOQUE ESTRUCTURAL DE 12 x 19 x 39

M2

29,417.71

5.1.2

BLOQUE ESTRUCTURAL DE 14 x 19 x 39

M2

29,417.71

5.1.3

BLOQUE ESTRUCTURAL TIPO PIEDRA DE 0.16

M2

29,417.71

5.2

MAMPOSTERIA EN LADRILLO TOLETE Y HUECO

5.2.1

CORTE LADRILLO

UN

50.00

5.2.2

MUROS LAD. PORTANTE PRENSADO DE 0.15

M2

59,614.64

5.2.3

MUROS LAD. PORTANTE PRENSADO DE 0.25

M2

87,367.13

5.2.4

MUROS LAD. TOLETE FINO PERFORADO DE 0.12

M2

44,139.13

5.2.5

MUROS LAD. TOLETE FINO PERFORADO DE 0.25

M2

85,607.00

5.2.6

MUROS LADRILLO HUECO # 4 DE 0.09

M2

21,734.67

5.2.7

MUROS LADRILLO HUECO # 5 DE 0.115

M2

13,424.67

5.2.8

MUROS LADRILLO HUECO # 6 DE 0.23

M2

29,500.71

5.2.9

MUROS LADRILLO PRENSADO DE 0.06. V0C

M2

29,471.43

5.2.10

MUROS LADRILLO PRENSADO DE 0.12. V2C

M2

43,114.64

5.2.11

MUROS LADRILLO PRENSADO DE 0.25. V2C

M2

84,330.17

5.2.12

MUROS LADRILLO TOLETE COMUN DE 0.07

M2

25,871.03

5.2.13

MUROS LADRILLO TOLETE COMUN DE 0.12

M2

43,172.94

5.2.14

MUROS LADRILLO TOLETE COMUN DE 0.25

M2

82,308.83

5.2.15

SOBRECIMIENTO LADRILLO TOLETE 12 x 25

ML

33,324.26

5.2.16

SOBRECIMIENTO LADRILLO TOLETE 25 x 25

ML

33,963.60

5.3

ELEMENTOS EN MAMPOSTERIA

5.3.1

ALFAJIAS LADRILLO PRENSADO

ML

18,262.80

5.3.2

ALFAJIAS LADRILLO TOLETE

ML

16,363.81

5.3.3

BORDILLO ZOCALO LADRILLO PRENSADO

ML

18,326.42

5.3.4

DINTEL LADRILLO HUECO # 4

ML

11,671.74

5.3.5

DINTEL LADRILLO HUECO # 5

ML

11,671.74

5.3.6

DINTEL LADRILLO HUECO # 6

ML

12,165.34

5.3.7

ENCHAPES LADRILLO PRENSADO

M2

37,390.71

5.3.8

ENCHAPES LADRILLO TOLETE

M2

37,390.71

5.3.9

REMATES LADRILLO PORTANTE PRENSADO

ML

24,456.11

5.3.10

REMATES LADRILLO PRENSADO

ML

17,016.11

5.3.11

REMATES LADRILLO TOLETE

ML

15,952.11

5.4

ELEMENTOS ESTRUCTURALES Y NO ESTR.

5.4.1

ANCLAJE EPOXICO CONCRETO 3/4"

UN

11,632.00

5.4.2

ANCLAJE EPOXICO CONCRETO 3/8"

UN

11,632.00

5.4.3

GROUTING - MORTERO DE RELLENO

M3

366,288.57

5.4.4

JUNTA DILATACION ICOPOR 2 CM. H = 0.50

ML

8,112.76

5.5

ACERO DE REFUERZO - MAMPOST.

5.5.1

ACERO DE REFUERZO 37000 PSI

KG

5.5.2

ACERO DE REFUERZO 60000 PSI

KG

5.5.3

GRAFIL DE 6 MM

KG

5.5.4

MALLAS ELECTROSOLDADAS

KG

0.00

5.6

VARIOS - MAMPOSTERIA

5.6.1

BORDILLO PARA ASEOS. H = 0.40 MS

ML

16,533.42

5.6.2

BORDILLO PARA DUCHAS. H = 0.20 MS

ML

17,707.13

5.6.3

CHAZOS PARA CARPINTERIA

UN

2,070.23

5.6.4

INSTALACION CARPINTERIA METALICA

M2

12,017.78

5.6.5

INSTALACION DE DIVISIONES MODULARES

M2

12,017.78

PREFABRICADOS EN CONCRETO Y OTROS

6.1

ELEMENTOS PREFABRICADOS EN CONCRETO

6.1.1

ALFAJIA CONCRETO PREF. DE 0.15

ML

15,606.09

6.1.2

ALFAJIA CONCRETO PREF. DE 0.25

ML

25,377.88

6.1.3

ALFAJIA CONCRETO PREF. DE 0.30

ML

28,234.57

6.1.4

DINTEL PREFABRICADO CONCRETO 10 x 20

ML

24,106.58

6.1.5

DINTEL PREFABRICADO CONCRETO 15 x 20

ML

24,106.58

6.1.6

DINTEL PREFABRICADO CONCRETO 15 x 30

ML

27,914.58

6.1.7

DINTEL PREFABRICADO CONCRETO 20 x 20

ML

27,914.58

6.1.8

DINTEL PREFABRICADO CONCRETO 25 x 30

ML

56,264.33

6.1.9

PANELES PREFABRICADOS DE 0.07

M2

28,833.13

6.1.10

PASOS PREFABRICADOS ESCALERA DE 0.30

ML

33,258.89

6.1.11

PREFABRICADO ARENERA. ROMPEOLAS

ML

30,708.44

6.1.12

TOPES CONCRETO PARQUEADERO

UN

57,183.38

6.1.13

DIVISIONES PBAOS EN LOSETAS DE CONCRETO E= 6 cm.

M2

30,486.90

6.2

ELEMENTOS CONCRETO FUNDIDOS SITIO

6.2.1

BANCAS EN CONCRETO DE 0.60

UN

103,984.94

6.2.2

CINTAS DE AMARRE CUBIERTAS DE 15 x 10

ML

20,287.69

6.2.3

CINTAS DE AMARRE CUBIERTAS DE 25 x 10

ML

22,052.01

6.2.4

COLUMNETAS CUBIERTAS DE 15 x 12

ML

56,381.76

6.2.5

MESONES EN CONCRETO DE 0.40

ML

58,486.42

6.2.6

MESONES EN CONCRETO DE 0.60

ML

69,591.60

7 INST. HIDRAULICA SANITARIA Y DE GAS

7.1

7.1 ACOMETIDA

7.1.1

ACOMETIDA GALV. 1/2" 5 MT

UN

133,145.12

7.1.2

ACOMETIDA PVC 1/2" 5 MT

UN

138,040.85

7.1.3

ACOMETIDA PVC 3/4" 5 MT

UN

8,080.88

7.2

CONEXION A TANQUES

7.2.1

CONEXIN COMPLETA TANQUE ELEVADO EN PVC

UN

248,963.30

7.2.2

CONEX.TANQUE ELEVADO GALV

UN

367,983.81

7.2.3

FLOTADOR MECANICO

UN

182,310.00

7.4

RED GENERAL DE AGUA FRIA

7.4.1

ACCESORIOS PVC-P DE 1" (SUM. E INST.)

UN

3,948.06

7.4.2

ACCESORIOS PVC-P DE 1/2" (SUM. E INST.)

UN

2,487.86

7.4.3

ACCESORIOS PVC-P DE 3/4" (SUM. E INST.)

UN

2,655.16

7.4.4

ACCESORIOS PVC-P DE 1 1/4" (SUM. E INST.)

UN

7,951.16

7.4.5

RED COBRE

1/2"

ML

42,365.20

7.4.6

RED COBRE

3/4"

ML

40,015.20

7.4.7

RED SUMINISTRO CPVC 1/2"

ML

11,674.54

7.4.8

RED SUMINISTRO CPVC 3/4"

ML

15,895.14

7.4.9

RED SUMINISTRO GALV. 1"

ML

15,213.00

7.4.10

RED SUMINISTRO GALV. 2"

ML

29,311.00

7.4.11

RED SUMINISTRO GALV. 1/2"

ML

11,463.00

7.4.12

RED SUMINISTRO GALV. 3/4"

ML

14,875.50

7.4.13

RED SUMINISTRO GALV.1 1/2

ML

25,626.00

7.4.14

RED SUMINISTRO PVC

1"

ML

9,258.98

7.4.15

RED SUMINISTRO PVC

2"

ML

23,234.30

7.4.16

RED SUMINISTRO PVC 1/2"

ML

7,179.38

7.4.17

RED SUMINISTRO PVC 3/4"

ML

7,832.73

7.4.18

RED SUMINISTRO PVC 1 1/2"

ML

18,551.04

7.4.19

REGISTRO P/D RED WITHE 1"

UN

62,479.46

7.4.20

REGISTRO P/D RED WITHE 1/2"

UN

36,746.46

7.4.21

REGISTRO P/D RED WITHE 3/4"

UN

39,246.46

7.4.22

REGISTRO DE BOLA 200 Lb. - 1/2"

UN

12,746.46

7.4.23

CHEQUE P/D RED WITHE 1"

UN

64,144.56

7.4.24

TUBERIA PVC-P RDE 9 DE 1/2"

ML

7,153.52

7.4.25

TUBERIA PVC-P RDE 11 DE 3/4"

ML

8,412.63

7.4.26

TUBERIA PVC-P RDE 13.5 DE 1"

ML

14,135.12

7.4.27

TUBERIA PVC-P RDE 21 DE 1 1/4"

ML

12,482.54

7.4.28

TUBERIA PVC-P RDE 21 DE 1 1/2"

ML

15,898.12

7.4.29

TUBERIA PVC-P RDE 21 DE 2"

ML

23,339.78

7.4.30

SUM. E INSTALACIN
AUTOMTICO

UN

581,923.81

7.4.31

REGISTRO P/D RED WITHE SIMILAR 1 1/2"

UN

64,306.46

7.4.32

REGISTRO P/D RED WITHE SIMILAR 2"

UN

120,336.46

7.4.33

ACCESORIOS PVC-P DE 1 1/2"

UN

11,777.64

7.4.34

ACCESORIOS PVC-P DE 2"

UN

15,407.03

7.4.35

TUBERIA H.G. DE 2"

ML

28,109.76

7.4.36

ACCESORIOS H.G. DE 2"

UN

19,859.76

7.4.37

FLOTADOR MECNICO PTANQUE SANIT.

UN

182,310.00

7.4.38

CHEQUE P/D RED WITHE 3/4"

UN

44,658.67

7.6

PUNTOS HIDRAULICOS

7.6.1

PUNTO SUMINISTRO GALV

UN

73,034.22

7.6.2

PUNTO AGUA CALIENTE CPVC

UN

55,715.45

7.6.3

PUNTO AGUA FRIA PVC

UN

51,588.35

MOTOBOMBA

MANUAL

CON

ENCENDIDO

7.7

SALIDAS SANITARIAS

7.7.1

PUNTO DESAGUE PVC 2"

UN

43,772.52

7.7.2

PUNTO DESAGUE PVC 3";4"

UN

66,174.27

7.8

BAJANTES VENTILACIONES REVENT. A.N.

7.8.1

ACCESORIOS PVC-S DE 2"

ML

11,585.79

7.8.2

BAJANTE A.LL.

PVC 3"

ML

13,130.13

7.8.3

BAJANTE A.LL.

PVC 4"

ML

20,667.74

7.8.4

BAJANTE A.N.

PVC 3"

ML

20,210.97

7.8.5

BAJANTE A.N.

PVC 4"

ML

27,766.17

7.8.6

BAJANTE A.N.

PVC 6"

ML

54,199.18

7.8.7

REVENTILACION

ML

20,290.22

7.8.8

VENTILACION Y REVENTILACION

PVC 2"

ML

14,230.94

7.8.9

VENTILACION Y REVENTILACION

PVC 4"

ML

26,443.19

7.9

RAMALES Y BAJANTES A. LLUVIAS

7.9.1

TUBERIA PVC-L 2"

ML

11,146.35

7.9.2

TUBERIA PVC-L 4"

ML

19,363.97

PVC 3"

7,10

MONTAJE DE APARATOS

7.10.1

INST. APARATO SANITARIO

7.12

EQUIPOS

7.12.1

INST. BOMBAS

7.12.2

INST.EQUIP.HIDRONEUMATICO

8 INST. ELECTRICA, TELEFONICA

AGUA

UN

7,357.71

UN

254,265.38

UN

462,090.00

8.1

SALIDAS PARA ALUMBRADO Y TOMAS

8.1.1

SALIDA + INT.AVE 601 PVC

UN

103,209.76

8.1.2

SALIDA + INT.LUM 10C PVC

UN

34,866.76

8.1.3

SALIDA BOMBA TRIF.

CN

UN

121,976.92

8.1.4

SALIDA BOMBA TRIF.

PVC

UN

248,127.30

8.1.5

SALIDA BOTON TIMBRE CN

UN

44,559.12

8.1.6

SALIDA BOTON TIMBRE PVC

UN

35,588.75

8.1.7

SALIDA CAMARA TV

CN

UN

202,840.80

8.1.8

SALIDA CAMARA TV

PVC

UN

54,399.88

8.1.9

SALIDA CAMPANA TIMBRE CN

UN

35,174.31

8.1.10

SALIDA CAMPANA TIMBRE PVC

UN

26,049.17

8.1.11

SALIDA CANTONERA

CN

UN

92,580.77

8.1.12

SALIDA CANTONERA

PVC

UN

44,032.09

8.1.13

SALIDA CUATRO VIAS

PVC

UN

39,999.21

8.1.14

SALIDA DOBLE

UN

30,230.61

8.1.15

SALIDA DOBLE CONM.

UN

39,399.21

8.1.16

SALIDA FLOTADOR

CN

UN

186,490.77

8.1.17

SALIDA FLOTADOR

PVC

UN

61,566.33

8.1.18

SALIDA FOTOCELDA

UN

40,800.09

8.1.19

SALIDA LAMPARA MURO PVC

UN

44,406.85

8.1.20

SALIDA LAMPARA PISO PVC

UN

32,112.85

8.1.21

SALIDA LAMPARA TECHO PVC

UN

40,309.65

8.1.23

SALIDA MOTOR PUERTA CN

UN

292,542.29

8.1.24

SALIDA MOTOR PUERTA PVC

UN

107,378.85

8.1.25

SALIDA P/TEMPORIZADOR PVC

UN

45,431.28

8.1.26

SALIDA PARA CONTACTOR PVC

UN

48,512.53

8.1.27

SALIDA PUNTO ALARMA CN

UN

93,602.29

8.1.28

SALIDA PUNTO ALARMA PVC

UN

46,075.37

8.1.29

SALIDA PVC+TOMA DBL. AVE

UN

42,662.13

8.1.30

SALIDA PVC+TOMA DBL. DEKO

UN

45,062.13

8.1.31

SALIDA PVC+TOMA PISO AVE

UN

45,062.13

8.1.32

SALIDA PVC+TOMA SNC. AVE

UN

44,662.13

8.1.33

SALIDA PVC+TOMA TRIF. AVE

UN

46,262.13

8.1.34

SALIDA PVC+TOMA TRIF.AVE

UN

46,262.13

PVC
PVC

PVC

8.1.35

SALIDA PVC+TOMA+INT. AVE

UN

49,240.73

8.1.36

SALIDA SENCILLA

UN

38,862.13

8.1.37

SALIDA SENCILLA CONM. PVC

UN

46,103.23

8.1.38

SALIDA SENCILLA+CONM. PVC

UN

47,115.20

8.1.39

SALIDA SONIDO

CN

UN

74,445.56

8.1.40

SALIDA SONIDO

PVC

UN

25,101.81

8.1.41

SALIDA TOMA BIF. 20 A PVC

UN

38,812.13

8.1.42

SALIDA TOMA MURO+INT. PVC

UN

42,940.73

8.1.43

SALIDA TOMA SNC. 20 A PVC

UN

38,662.13

8.1.44

SALIDA TOMA SNC. MURO CN

UN

60,891.29

8.1.45

SALIDA TOMA SNC. P.T. PVC

UN

39,312.13

8.1.46

SALIDA TOMA SNC. PISO PVC

UN

39,462.13

8.1.47

SALIDA TOMA SNC.MURO PVC

UN

42,234.13

8.1.48

SALIDA TOMA TRIF.50 A PVC

UN

45,621.23

8.1.49

SALIDA TRIPLE

UN

72,876.49

8.2

BANDEJAS DE DISTRIBUCION

8.2.1

BANDEJA TIPO ESCALERA 30 x 80

ML

84,553.21

8.2.2

CANALETA METALICA 10 x 4

ML

29,956.98

8.2.3

CANALETA METALICA 10 x 4

ML

29,956.98

8.2.4

CANALETA PLASTICA 10 x 4

ML

26,444.09

8.2.6

DUCTOS VERTICALES 30 x 8

ML

90,895.46

PVC

PVC

8.3

ACOMETIDAS Y CONDUCTORES

8.3.1

ACOMETIDA PARCIAL MONOFSICA - 1#8 + 1#10 + 1#12

ML

42,782.76

8.3.2

ACOMETIDA PARCIAL BIFSICA - 2#8 + 1#10 + 1#12

ML

19,599.11

8.3.3

ACOMETIDA PARCIAL TRIFSICA - 3#8 + 1#10 + 1#12

ML

24,787.64

8.3.4

ALAMBRE Cu No.10

ML

2,935.15

8.3.5

ALAMBRE Cu DESNUDO No. 8

ML

5,701.15

8.3.6

ALAMBRE Cu DESNUDO No.10

ML

1,933.15

8.3.7

ALAMBRE Cu DESNUDO No.12

ML

2,201.67

8.3.8

CABLE Cu

No. 2 AWG

ML

9,830.15

8.3.9

CABLE Cu

No. 4 AWG

ML

6,830.15

8.3.10

CABLE Cu

No. 6 AWG

ML

5,180.15

8.3.11

CABLE Cu No. 8 AWG

8.3.12

RED BAJA TENSION

8.3.13

ML

4,150.15

7x4/0 AWG

ML

226,572.29

RED BAJA TENSION

7x400 MCM

ML

627,672.29

8.3.14

RED BAJA TENSION

11x300 MCM

ML

740,627.84

8.3.15

RED BAJA TENSION

2 (7x300 MCM)

ML

937,072.29

8.3.16

RED BAJA TENSION

2 (7x4/0 AWG)

Ml

435,172.29

8.3.17

RED BAJA TENSION

2 (7x400 MCM)

Ml

1,237,372.29

8.3.18

RED BAJA TENSION

2 (7x500 MCM)

Ml

1,611,382.29

8.3.19

RED BAJA TENSION 3x1/0 +1x2 AWG

ML

80,565.10

8.3.20

RED BAJA TENSION 3x2 +1x4 AWG

ML

35,152.55

8.3.21

RED BAJA TENSION 3x2/0 +1x1/0 AWG

ML

34,721.55

8.3.22

RED BAJA TENSION 3x350 +1x250 MCM

ML

289,862.55

8.3.23

RED BAJA TENSION 3x4/0 +1x2/0 AWG

ML

97,452.55

8.3.24

RED BAJA TENSION 3x400 +1x300 MCM

ML

332,702.55

8.3.25

TUBERIA CN

1" INCRUST

ML

17,708.79

8.3.26

TUBERIA CN

1" SUSPEND

ML

22,182.97

8.3.27

TUBERIA CN 1 1/2 INCRUST

ML

19,423.97

8.3.28

TUBERIA CN 1 1/2 SUSPEND

ML

24,856.04

8.3.29

TUBERIA PVC

1" INCRUST

ML

10,336.88

8.3.30

TUBERIA PVC

1" SUSPEND

ML

12,638.88

8.3.31

TUBERIA PVC 1 1/2 INCRUST

ML

12,786.26

8.3.32

TUBERIA PVC 1 1/2 SUSPEND

ML

17,426.26

8.3.33

TUBO CN 1 1/2"+3#6 + # 8

ML

78,518.99

8.3.34

TUBO CN 1"

ML

169,938.06

8.3.35

TUBO PVC 1 1/2+3#6+#8+#10

ML

75,912.70

8.3.36

TUBO PVC 1" 3#8+#10+#12

ML

180,956.63

8.4

TABLEROS E INTERRUPTORES

8.4.1

BREAKERS 2 X 30 AMPERIOS

UN

34,651.00

8.4.2

CAJA MONOFASICA 6 CIRC.

UN

64,982.67

8.4.3

CAJA MONOFASICA 12 CIRC.

UN

103,567.66

8.4.4

CAJA PARA 1 MEDIDOR

UN

72,853.81

8.4.5

CAJA PARA 4 MEDIDORES

UN

203,946.08

8.4.6

CAJA TRIFASICA

6 CIRC.

UN

177,905.33

8.4.7

CAJA TRIFASICA 12 CIRC.

UN

251,229.66

8.4.8

INT.AUT.ENCH.1 x 30 A

UN

8,552.18

8.4.9

INT.AUT.ENCH.1 x 50 A

UN

10,902.00

8.4.10

INT.AUT.ENCH.2 x 30 A

UN

27,327.00

8.4.11

INT.AUT.ENCH.2 x 50 A

UN

32,927.00

8.4.12

INT.AUT.ENCH.2 x 100 A

UN

61,427.00

8.4.13

INT.AUT.ENCH.3 x 30 A

UN

46,027.00

8.4.14

INT.AUT.ENCH.3 x 50 A

UN

65,702.40

8.4.15

INT.AUT.ENCH.3 x 100 A

UN

79,802.40

8.4.16

INT.AUT.IND. 3 x 30 A

UN

35,165.50

8.4.17

INT.AUT.IND. 3 x 50 A

UN

66,165.50

8.4.18

INT.AUT.IND. 3 x 100 A

UN

58,165.50

8.4.19

INT.AUT.IND. 3 x 150 A

UN

11,715.50

8.4.20

INT.AUT.IND. 3 x 300 A

UN

28,165.50

8.4.21

INT.AUT.IND. 3 x 600 A

UN

28,165.50

8.4.22

INT.AUT.IND. 3 x 1200 A

UN

80,721.06

8.4.23

TABLERO ESP.TOT. 12 CIRC.

UN

426,029.05

8.4.24

TABLERO ESP.TOT. 18 CIRC.

UN

513,247.05

+3#8 + #10

8.4.25

TABLERO ESP.TOT. 24 CIRC.

UN

495,379.05

8.4.26

TABLERO P/LLAVE 12 CIRC.

UN

233,704.00

8.4.27

TABLERO P/LLAVE 24 CIRC.

UN

358,899.05

8.4.28

TABLERO P/LLAVE 36 CIRC.

UN

435,641.41

8.5

TELEFONOS

8.5.1

CAJA DE PASO RECTANGULAR

UN

330,998.57

8.5.2

CAMARA ETB

TIPO 13

UN

1,865,715.14

8.5.3

CAMARA ETB

TIPO 14

UN

3,564,696.69

8.5.4

CAMARA ETB

TIPO 18

UN

3,220,029.28

8.5.5

CANALIZACION TELEFON.SUBT. 2 x 4" PVC

ML

74,021.22

8.5.6

CANALIZACION TELEFONICA SUBT. 2 x 4" AC

ML

83,054.14

8.7

CABLEADO ESTRUCTURADO, VOZ Y DATOS

8.7.1

CABLE 1# 10 + 2#12 AWG/THW -

ML

25,797.13

8.7.2

CABLE 1#10 + 2# 2 + 1#10T AWG/THW

ML

23,591.36

8.7.3

CABLE UTP CAT 5 TENDIDO

ML

2,328.96

8.7.4

LINE CORD 1m

ML

10,227.15

8.7.5

PATCH CORD 2 m

ML

12,439.45

8.7.6

SALIDA DE VOZ Y DATOS

UN

31,613.90

8.7.7

SALIDA ELECTECTRICA CORR. REGULADA

UN

19,267.37

8.8

8.8 PUESTA A TIERRA

8.8.1

TIERRA ARMARIO MEDIDORES

UN

47,943.00

8.8.2

TIERRA CAJA MEDIDORES

UN

49,580.00

8.8.3

TIERRA TABLERO GRAL.DIST.

UN

123,502.67

8.9

8.9 PARARRAYOS

8.9.1

PARARRAYOS

UN

540,632.00

8.10

DUCTERIA ELECTRICA

8.10.1

CANALIZACION ELECTRICA SUBT. 2 x 4" AC

ML

85,091.60

8.10.2

CANALIZACION ELECTRICA SUBT. 2 x 4" PVC

ML

121,685.14

8.10.3

CANALIZACION ELECTRICA SUBT. 4 x 4" AC

ML

95,490.86

8.10.4

CANALIZACION ELECTRICA SUBT. 4 x 4" PVC

ML

173,152.86

9 KV - 10KV

8.11

CAMARAS DE INSPECCION

8.11.1

CAMARA INSP DOBLE

UN

863,001.65

8.11.2

CAMARA INSP VEHICULAR

UN

1,550,600.85

8.11.3

CAMARA INSPECCION SENC.

UN

345,702.92

8.11.4

MARCO P/TAPA CAMARA AP

UN

228,313.92

8.11.5

MARCO P/TAPA CAMARA DOBLE

UN

295,638.50

8.11.6

TAPA P/CAMARA AP

UN

83,394.67

8.11.7

TAPA P/CAMARA AP DOBLE

UN

295,638.50

8.12

POSTES DE CONCRETO

8.12.1

POSTE CONCR. 6m 510 Kg

UN

169,163.15

8.12.2

POSTE CONCR. 8m 1050 Kg

UN

299,163.15

8.12.3

POSTE CONCR. 10m 750 Kg

UN

376,563.15

8.12.4

POSTE CONCR. 10m 1050 Kg

UN

467,163.15

8.12.5

POSTE CONCR. 12m 510 Kg

UN

469,163.15

8.12.6

POSTE CONCR. 12m 750 Kg

UN

486,763.15

8.12.7

POSTE CONCR. 14m 1050 Kg

UN

779,163.15

8.12.8

POSTE CONCR. 12M 1050 Kg

UN

602,763.15

8.12.9

POSTE CONCRETO 18m 1350Kg

UN

1,469,163.15

8.12.10 POSTE MADERA 8m PESADO

UN

194,163.15

8.12.11 POSTE MADERA 10m PESADO

UN

249,163.15

8.12.12 POSTE MADERA 12m PESADO

UN

314,163.15

8.13

CABLES DE MEDIA TENSION

8.13.1

RED AEREA 3 x 1; ACSR

ML

28,101.00

8.13.2

RED AEREA 3 x 4; ACSR

ML

18,951.00

8.13.3

RED AEREA 3 x 2/0; ACSR

ML

43,101.00

8.13.4

RED AEREA 3 x 4/0; ACSR

ML

47,001.00

8.13.5

RED MEDIA TENSION TRIPLEX 2/0

ML

298,011.81

8.13.6

RED MEDIATENSION TRIPLEX 4/0

ML

221,011.81

8.13.7

TERMINAL Cu TRIPLEX EXTERIOR 3/0

ML

596,011.81

8.13.8

TERMINAL Cu TRIPLEX INTERIOR 4/0

ML

146,011.81

8.14

TRANSFORMADOR

8.14.1

TIERRA PARARRAYOS /POSTE

UN

81,004.00

UN

38,383.66

8.15

REVISIN GENERAL ELCTRICA

8.15.1

REVISIN Y REPARACIN DE PUNTO ELCTRICO (INC. CAMBIO DE


APARATOS)

8.16

HERRAJES Y CRUCETAS

8.16.1

AISLADOR DE PIN ANSI 52-1

UN

30,075.17

8.16.2

AISLADOR DE PIN ANSI 55-1

UN

13,350.19

8.16.3

AISLADOR SUSP.ANSI 52-1

UN

22,175.17

8.16.4

CERCO MADERA 2.2m VESTIDO

UN

161,201.00

8.16.7

CONECTOR COMP.RAN.PARAL

UN

6,175.17

8.16.8

CONST.VERTICAL ANGULO <50

UN

253,720.57

8.16.9

CONST.VERTICAL ANGULO >50

UN

615,858.63

8.16.10 CORTACIRCUITO CAUELA 100-15KV

UN

63,900.33

8.16.11 DERIVACION 90 C/RET INF

UN

952,270.40

8.16.13 ESTRIBOS MEDIA TENSION

UN

46,063.66

8.16.14 ESTRUCTURA EN ANGULO CPS

UN

1,078,685.76

8.16.15 ESTRUCTURA TANGENTE CPS

UN

229,945.57

8.16.17 GRAPA TERMINAL TIPO RECTO

UN

17,205.10

8.16.18 GRAPAS OPERAR EN CALIENTE

UN

21,975.17

8.16.19 HERRAJE P/ESTR.FINAL CPS

UN

475,222.03

8.16.20 HERRAJES ANG. 90 C/RETEN.

UN

1,278,110.51

8.16.21 PARARRAYOS

UN

540,682.00

8.16.22 RETENIDA DOBLE SIMETRICA

UN

948,148.48

8.16.23 RETENIDA P/BAJA TENSION

UN

586,137.00

8.16.29 RETENIDA P/MEDIA TENS.CPS

UN

91,050.00

8.16.30 RETENIDA TERM. POSTE-VAR.

UN

547,846.79

8.16.31 TUBO GALV.3"+ACC./BAJADA

ML

99,671.33

8.16.32 TUBO GALV.4"+ACC./BAJADA

ML

219,978.00

8.16.33 TUBO GALVANIZADO

ML

12,000.33

8.16.34 TUBO GALVANIZADO 1"

ML

12,846.32

8.16.35 TUERCA DE OJO ALARGADO

UN

5,584.40

8.16.36 VESTIDA P/ESTR.TANG.CPS

UN

270,675.19

8.16.37 VIGA MADERA 205 M VESTIDA

UN

43,501.00

8.16.38 VIGUETA ANCLA DE RETENIDA

UN

111,815.63

9 KV - 10KV

3/4"

8.17

ARMARIO EQUIPOS DE MEDIDA

8.17.1

BARRAJE PREM. 6 SALIDAS

UN

244,890.80

8.17.2

BORNA 4/0

UN

23,400.33

8.19

APARATOS ELECTRICOS

8.19.1

BOTON TIMBRE AVE

UN

4,592.15

8.19.2

BOTON TIMBRE DEKO 040BL

UN

12,115.50

8.19.3

BOTON TIMBRE LUM 040C

UN

12,115.50

8.19.4

CAMPANA TIMBRE AVE 207

UN

7,715.50

8.19.5

CAMPANA TIMBRE AVE 607

UN

6,065.50

8.19.6

CONM. SENCILLO DEKO 020B

UN

7,453.20

8.19.7

CONM. SENCILLO LUM 020C

UN

7,453.20

8.19.8

CONM.SENCILLO AVE 602

UN

7,453.20

8.19.9

INT

4 VIAS DEKO 020BV

UN

15,115.50

8.19.10 INT.

DOBLE AVE 611

UN

22,115.50

8.19.11 INT.

DOBLE DEKO 101B

UN

22,115.50

8.19.12 INT.

DOBLE LUM 101C

UN

22,115.50

8.19.13 INT.

4 VIAS AVE 604

605

UN

7,315.50

8.19.14 INT. TRIPLE AVE 633

UN

10,315.50

8.19.15 INT. TRIPLE AVE 413 LP

UN

10,315.50

8.19.16 INT. TRIPLE DEKO 111B

UN

10,315.50

8.19.17 INT. TRIPLE LUM 111C

UN

10,315.50

8.19.18 INT.SENCILLO

UN

4,315.50

LX010C

8.19.19 INT.SENCILLO AVE 201

UN

4,315.50

8.19.20 INT.SENCILLO AVE 601

UN

4,315.50

8.19.21 INT.SENCILLO DEKO 010B

UN

4,315.50

PAETES

9.1

PAETES SOBRE MUROS

9.1.1

FILOS Y DILATACIONES

ML

3,003.63

9.1.2

PAETE IMPERMEAB. MUROS 1:3. 2 CM

M2

14,882.60

9.1.3

PAETE IMPERMEAB. MUROS 1:4. 2 CM

M2

12,182.60

9.1.4

PAETE LISO CULATAS 1:3 . 2 CM

M2

13,338.22

9.1.5

PAETE LISO CULATAS 1:4. 2 CM

M2

12,450.22

9.1.6

PAETE LISO CULATAS 1:5. 2 CM

M2

12,846.22

9.1.7

PAETE LISO CULATAS 1:6. 2 CM

M2

10,886.22

9.1.8

PAETE LISO SOBRE MUROS 1:4. 2 CM

M2

9,343.28

9.1.9

PAETE LISO SOBRE MUROS 1:5. 2 CM

M2

8,839.28

9.1.10

PAETE LISO SOBRE MUROS 1:6. 2 CM

M2

8,475.28

9.1.11

PAETE LISO SOBRE MUROS 1:7. 2 CM

M2

7,683.28

9.1.12

PAETE RUSTICO MUROS 1:5. 2 CM

M2

9,581.96

9.1.13

RESANES GENERALES

M2

9,291.28

9.2

PAETES BAJO PLACAS

9.2.1

ENTRAMADO MADERA PARA CIELOS RASOS

M2

12,026.04

9.2.2

MALLA BAJO ENTRAMADO

M2

5,927.05

9.2.3

PAETE BAJO ALISTADO GUADUA. 3 CM

M2

13,175.78

9.2.4

PAETE BAJO MALLA 1:4. 3 CM

M2

11,967.09

9.2.5

PAETE BAJO MALLA 1:4. 3 CM

M2

11,967.09

9.2.6

PAETE BAJO MALLA 1:5. 3 CM

M2

11,267.09

9.2.7

PAETE BAJO MALLA 1:6. 3 CM

M2

10,799.09

9.2.8

PAETE LISO BAJO PLACAS 1:4. 2 CM

M2

9,043.28

9.2.9

PAETE LISO BAJO PLACAS 1:5. 2 CM

M2

8,823.28

9.2.10

PAETE RUSTICO BAJO PLACAS 1:5. 2 CM

M2

11,091.09

10

10 PISOS

10.2

ACABADOS PISOS

10.2.1

ADOQUIN CONCRETO PEATONAL. 6 CMS

M2

30,757.13

10.2.2

ADOQUIN CONCRETO VEHICULAR. 8 CMS

M2

30,757.13

10.2.3

ADOQUIN DE GRES

M2

25,222.42

10.2.4

BALD. GRANITO BH-5 DE 33x33. MORT.1:4

M2

43,578.13

10.2.5

BALDOSIN GRANITO L-1 33 x 33. MORT. 1:4

M2

40,368.65

10.2.6

BALDOSIN GRANITO P-5 33 x 33. MORT. 1:4

M2

40,368.65

10.2.7

CERAMICA 20 X 20

M2

26,978.65

10.2.8

CERAMICA 33 X 33

M2

34,650.28

10.2.9

GRANITO PULIDO

M2

70,121.18

10.2.10 GRAVILLA LAVADA

M2

34,280.35

10.2.11 LISTON M. H. AMARILLO

M2

37,095.65

10.2.12 LISTON M. H. GUAYACAN

M2

41,035.65

10.2.13 LISTON M. H. ORDINARIO

M2

15,078.43

10.2.14 LOSETAS DE CONCRETO DE 40 x 40 x 4.5

M2

33,043.50

10.2.15 LOSETAS DE CONCRETO DE 50 x 50 x 6

M2

33,043.50

10.2.16 PARKET GUAYACAN

M2

65,025.00

10.2.17 PISOPACK COMERCIAL 2 MM

M2

17,025.00

10.2.18 PISOPACK RESIDENCIAL 1.6 MM

M2

15,525.00

10.2.19 PISOPACK TRAFICO PESADO 3MM

M2

22,525.00

10.2.20 PULIDA Y BRILLO GRANITO

M2

37,525.00

10.2.21 PULIDA Y LACADA PISOS MADERA

M2

20,525.00

10.2.22 TABLETA GRES DE 10 x 10. MORT. 1:4

M2

21,740.19

10.2.23 TABLETA GRES LISO DE 33 x 33. MORT. 1:4

M2

32,838.20

10.2.24 TABLON CUARTO 26. MORT. 1:4

M2

26,874.50

10.2.25 VINISOL COMERCIAL 2 MM

M2

19,713.45

10.2.26 VINISOL RESIDENCIAL 1.6 MM

M2

17,586.50

10.2.27 VINISOL TRAFICO PESADO 2 MM

M2

20,244.01

10.2.28 VINISOL TRAFICO PESADO 3 MM

M2

21,861.00

10.2.29 ACABADO EN DURO-PISO PBAOS

M2

34,247.14

10.1

BASES PISOS Y AFINADOS

10.1.1

AFINADO ENDUREC. H=0.05. MORT. 1:3

M2

24,329.09

10.1.2

AFINADO IMPERM. PISOS. H = 0.03. M 1:3

M2

18,256.82

10.1.3

AFINADO PISOS VINISOL. H=0.04. MORT. 1:4

M2

17,989.94

10.1.4

AFINADO TERRAZAS. H = 0.08. MORT. 1:4

M2

27,277.82

10.1.5

CEMENTO ESMALTADO. H=1.5. MORT. 1:4

M2

18,541.33

10.1.6

CONCRETO BASE MUEBLE. H = 0.10. 2500 PSI

M2

31,974.05

10.1.7

CONCRETO ESCOBEADO. H = 0.10. 2500 PSI

M2

32,874.21

10.1.8

CONCRETO ESTAMPADO O IMPRESO

M2

43,805.74

10.1.9

POLISEC CAL. 6

M2

2,030.18

10.5

CENEFAS, DILATACIONES Y PIRLANES

10.5.1

CENEFAS EN CONCRETO DE 0.30. 3000 PSI

ML

13,914.06

10.5.2

CENEFAS EN GRANITO PULIDO DE 0.25

ML

39,496.39

10.5.3

DILATACIONES LADRILLO 0.25. MORT. 1:4

ML

18,314.09

10.5.4

PIRLAN DE ALUMINIO

ML

2,031.20

10.4

GRADAS

10.4.1

AFINADO ENDURECIDO PASOS ESCAL. M 1:3

ML

11,930.41

10.4.2

CONCRETO BASE GRADAS DE 0.30. 3000 PSI

ML

17,114.24

10.4.3

GRADAS EN GRANITO PULIDO DE 0.30

ML

37,500.00

10.4.4

GRADAS EN GRAVILLA LAVADA DE 0.30

ML

19,163.05

10.4.5

GRADAS EN TABLETA GRES Y GRAVILLA 0.30

ML

22,776.05

10.4.6

GRADAS LADRILLO DE 0.30. MORT. 1:5

ML

22,354.65

10.4.7

GRADAS TABLETA GRES 0.30. MORT. 1:4

ML

23,932.87

10.3

GUARDAESCOBAS

10.3.1

GUARDAESCOBA CEDRO 6 CM

ML

10,394.94

10.3.2

GUARDAESCOBA CEDRO 8 CM

ML

12,495.50

10.3.3

GUARDAESCOBA EN CEMENTO. MORT. 1:4

ML

9,150.80

10.3.4

GUARDAESCOBA EN GRANITO. H = 0.065

ML

32,729.76

10.3.5

GUARDAESCOBA EN GRAVILLA LAVADA

ML

12,154.02

10.3.6

GUARDAESCOBA EN PISOPACK

ML

1,711.93

10.3.7

GUARDAESCOBA EN VINISOL

ML

2,260.58

10.3.8

GUARDAESCOBA VIROLA 6 CM

ML

10,827.75

10.3.9

GUARDAESCOBA VIROLA 8 CM

ML

12,670.83

10.3.10 GUARDAESCOBA ZOCALO DE GRANITO

ML

43,113.65

10.3.11 GUARDAESCOBA ZOCALO DE GRES

ML

14,526.50

10.3.12 MEDIA CAA EN CEMENTO. MORT. 1:3

ML

8,892.81

10.3.13 MEDIA CAA EN GRANITO. H = 0.065

ML

33,819.17

10.3.14 MEDIA CAA EN GRAVILLA LAVADA

ML

12,734.02

11

11 CUBIERTAS E IMPERMEABILIZACIONES

11.3

ACCESORIOS Y OTROS

11.3.1

BAJANTE LAMINA GALVANIZADA 12 x 6 C. 20

ML

21,560.88

11.3.2

BAJANTE PVC DE 3"

ML

33,148.69

11.3.3

CABALLETE LISO 0.60 X 2.00 CAL. 26 AL.

ML

58,736.45

11.3.4

CANAL LAMINA GALVANIZADA 15 x 20. CAL 20

ML

28,200.00

11.3.5

CANAL LAMINA GALVANIZADA 20 x 50. CAL 20

ML

52,200.00

11.3.6

CANAL LAMINA GALVANIZADA D=.75. CAL 20

ML

37,590.00

11.3.7

CANAL LAMINA GALVANIZADA D=0.50. CAL 20

ML

24,965.00

11.3.8

CANAL LAMINA GALVANIZADA D=1.00. CAL. 20

ML

62,100.00

11.3.9

CANAL PVC DE 3"

ML

24,825.00

11.3.10 FLANCHE LAMINA GALVANIZADA 0.10. CAL. 20

ML

18,780.00

11.3.11 FLANCHE LAMINA GALVANIZADA 0.20. CAL 20

ML

20,788.67

11.3.12 FLANCHE LAMINA GALVANIZADA 0.30. CAL 20

ML

28,588.67

11.3.13 TRAGANTES DE 4"

UN

10,533.25

11.3.14 TRAGANTES DE 6"

UN

17,483.25

11.2

CUBIERTAS

11.2.1

CABALLETE CANALETA 43

ML

63,696.50

11.2.2

CABALLETE CANALETA 90

ML

64,896.50

11.2.3

CABALLETE TEJA ETERNIT ART. C90 SUP.

ML

32,810.95

11.2.4

CANALETA 43 DE 3.50 MS

M2

52,064.50

11.2.5

CANALETA 43 DE 4.00 MS

M2

59,648.50

11.2.6

CANALETA 43 DE 4.50 MS

M2

51,806.50

11.2.7

CANALETA 43 DE 5.00 MS

M2

54,718.37

11.2.8

CANALETA 43 DE 5.50 MS

M2

50,346.59

11.2.9

CANALETA 43 DE 6.00 MS

M2

53,864.39

11.2.10 CANALETA 90 ACRILICO 3 MM

M2

91,086.42

11.2.11 CANALETA 90 DE 3.75 MS

M2

30,702.58

11.2.12 CANALETA 90 DE 4.50 MS

M2

34,521.92

11.2.13 CANALETA 90 DE 5.25 MS

M2

35,167.00

11.2.14 CANALETA 90 DE 6.00 MS

M2

37,466.82

11.2.15 CANALETA 90 DE 7.00 MS

M2

41,337.00

11.2.16 CANALETA 90 DE 9.00 MS

M2

37,975.50

11.2.17 CLARABOYA ETERNIT No 4

M2

41,128.13

11.2.18 CLARABOYA ETERNIT No 6

M2

58,348.13

11.2.19 CUBIERTA ALUMINIO TIPO SANDWICH

M2

60,783.00

11.2.20 DOMOS ACRILICOS 90 X 90

UN

118,382.50

11.2.21 ENTRAMADO TEJA DE BARRO

M2

27,112.98

11.2.22 ENTRAMADO TEJA ONDULADA

M2

19,039.43

11.2.23 INMUNIZANTE CUBIERTAS EN MADERA

M2

5,263.13

11.2.24 MONTAJE/DESMONTE CANALETA 43

M2

8,216.50

11.2.25 MONTAJE/DESMONTE CANALETA 90

M2

8,216.50

11.2.26 MONTAJE/DESMONTE TEJA ACRILICA

M2

6,855.42

11.2.27 MONTAJE/DESMONTE TEJA ONDULADA A.C.

M2

8,225.94

11.2.28 REUBICACION TEJA DE BARRO

M2

12,238.81

11.2.29 REPOSICION TEJA DE BARRO

M2

35,491.40

11.2.30 MONTAJE/DESMONTE CERCHAS Y CORREAS

ML

8,190.00

11.2.31 TAPA CIERRE CANALETA 43

M2

20,214.60

11.2.32 TAPA CIERRE CANALETA 90

M2

31,374.81

11.2.33 TEJA CINDU CLIMATIZADA. ANCHO 0.79

M2

33,464.79

11.2.34 TEJA DE BARRO

M2

39,888.75

11.2.35 TEJA ONDULADA A.C. TIPO ETERNIT No 4

M2

24,851.92

11.2.36 TEJA ONDULADA A.C. TIPO ETERNIT No 6

M2

22,380.36

11.2.37 TEJA ONDULADA A.C. TIPO ETERNIT No 8

M2

22,543.21

11.2.38 TEJA ONDULADA A.C. TIPO ETERNIT No 10

M2

24,543.21

11.2.39 TEJA ACRLICA No 4

UN

29,969.67

11.2.40 TEJA ACRLICA No 6

UN

42,559.32

11.2.41 TEJA ACRLICA No 8

UN

50,083.82

11.2.42 TEJA ACRLICA No 10

UN

47,053.82

11.2.43 TEJA PLSTICA TIPO AJOVER No 4

UN

30,875.97

11.2.44 TEJA PLSTICA TIPO AJOVER No 6

UN

45,342.08

11.2.45 TEJA PLSTICA TIPO AJOVER No 8

UN

56,855.42

11.2.46 TEJA PLSTICA TIPO AJOVER No 10

UN

69,102.08

11.2.47 TEJA VENTILACION No 6

M2

44,975.42

11.2.48 CERCHA EN NGULO 1"x1"x1/8" - CELOSA 5/8" - H=35 cm.

ML

37,561.67

11.2.49 CORREAS 2 " ARRIBA 1 5/8" ABAJO - CELOSA 1 "

ML

35,851.11

11.2.50 CORREAS PERFIL RECTG. 10x4 cm. C.R. CAL. 18 ANTICORR. - ESM.

ML

24,283.89

11.2.51 TEJA THERMO ACUSTIC TIPO AJOVER

M2

44,915.94

11.2.52 DOMOS ACRILICOS SIN ESTRUCTURA

M2

62,647.01

11.2.53 DOMOS ACRILICOS CON ESTRUCTURA

M2

385,333.89

11.1

IMPERMEABILIZACIONES Y AISLAMIENTOS

11.1.1

AFINADO CBTAS PLANAS. MORT. 1:3 IMP.

M2

15,741.50

11.1.2

IMPERM. CANALES MANTO ASF. Y FOIL ALUM.

M2

18,445.50

11.1.3

IMPERMEABILIZACION CUBIERTA PERMA PLY - 3 CAPAS

M2

18,445.50

11.1.4

MANTO ASFALTICO CON FOIL ALUMINIO

M2

18,445.50

11.1.5

MANTO ASFALTICO CON POLIETILENO

M2

11,625.00

11.1.6

MEDIA CAA MORTERO DE PENDIENTE

ML

13,624.50

11.1.7

PINTURA BITUMINOSA SOBRE TELA ASFALT.

M2

9,116.27

12

12 CARPINTERIA METALICA

12.1

CARPINTERIA EN ALUMINIO

12.1.1

VENTANAS ALUM. CORREDIZAS

M2

190,200.00

12.1.2

VENTANAS ALUMINIO FIJAS

M2

79,950.00

12.1.3

VENTANAS SERIE 3831 AL. C/I

M2

94,950.00

12.1.4

VENTANAS SERIE 3831/5020 AL. C/I

M2

94,950.00

12.1.5

VENTANAS SERIE 5020 AL. C/I

M2

93,190.00

12.1.6

VENTANAS SERIE 8025 AL. C/I

M2

94,950.00

12.2

CARPINTERIA EN LAMINA

12.2.1

BARANDA Y PASAMANOS TUBO DE 1 1/2"

ML

19,508.40

12.2.2

CAJAS CONTADORES

UN

25,803.50

12.2.3

ESCALERA DE GATO

ML

48,842.00

12.2.4

INSTALACION CARPINTERIA METALICA

M2

11,050.00

12.2.5

MARCOS PUERTAS LAMINA-.80

UN

28,248.00

12.2.6

MARCOS TAPAS C. INSPECC

UN

163,461.00

12.2.7

PUERTA ENTAMBORADA LAMINA

M2

48,369.00

12.2.8

PUERTA SENCILLA LAMINA

M2

48,369.00

12.2.9

PUERTAS VENTANAS LAMINA

M2

62,784.50

12.2.10 REJA BANCARIA

M2

28,818.90

12.2.11 REJAS LAMINA

M2

32,031.90

12.2.12 REJILLAS PISO 30 CM.

ML

162,428.20

12.2.13 VENTANAS LAMINA C.R. CAL 18. C/ INST

M2

121,308.50

AGUA

12.2.14 VENTANA EN LMINA C.R. CAL. 20 TIPO PERSIANA PVENTILACIN

M2

151,841.00

12.2.15 RECONSTRUCCIN DE REJAS DE PROTECCIN

M2

8,145.00

12.2.16 RECONSTRUCCIN DE VENTANAS EN LMINA C.R. CAL. 18

M2

8,145.00

13

13 CARPINTERIA DE MADERA

13.1

13.1 MARCOS Y PUERTAS

13.1.1

HOJA PUERTA TRIPLEX 0.61

UN

72,646.67

13.1.2

HOJA PUERTA TRIPLEX 0.81

UN

80,746.67

13.1.3

HOJA PUERTA TRIPLEX 1.01

UN

58,546.67

13.1.4

HOJA PUERTA FORTEC 0.70

UN

52,196.67

13.1.5

HOJA PUERTA FORTEC 1.00

UN

59,896.67

13.1.6

HOJA PUERTA FORTEC 1.50

UN

72,046.67

13.1.7

PUERTA FLORMORADO (MARCO Y HOJA)

UN

95,967.86

13.1.8

PUERTAS DE 0.80 (MARCO Y HOJA)

UN

131,057.86

13.1.9

PUERTAS DE 1.00 (MARCO Y HOJA)

UN

148,057.86

13.3

13.3 OTROS - CARP. MADERA

13.3.1

ENCHAPES MUROS EN TRIPLEX

M2

52,877.24

13.3.2

ENCHAPES MUROS FLORMORADO

M2

25,932.50

13.3.3

PASAMANOS FLORM. 15x.02

ML

16,500.00

13.3.4

PIRLANES DE MADERA DE 0.10

ML

15,157.22

13.3.5

PIRLANES DE MADERA DE 0.15

ML

17,257.22

13.3.6

PIRLANES DE MADERA DE 0.25

ML

18,307.22

13.3.7

VENTANERIA EN MADERA

M2

49,863.74

14

14 ENCHAPES

14.2

ENCHAPE SOBRE MESONES

14.2.1

ENCHAPE MESONES EN CERAMICA

ML

32,079.58

14.2.2

GRANITO PULIDO MESONES LABORATORIOS DE 0.60

ML

95,919.40

14.2.3

GRANITO PULIDO MESONES LAVAMANOS DE 0.40

ML

49,669.40

14.2.4

GRANITO PULIDO MESONES LAVAMANOS DE 0.60

ML

49,669.40

14.1

ENCHAPE SOBRE MUROS

14.1.1

ENCHAPE CERAMICA 20 x 20

M2

35,165.87

14.1.2

ENCHAPE CERAMICA 30 x 30

M2

27,988.87

14.1.3

ENCHAPE CRISTANAC

M2

50,510.87

14.3

VARIOS - ENCHAPES

14.3.1

DUCHA CRISTANAC 1.20 x 0.90

UN

940,416.00

14.3.2

ENCHAPE BORDILLO ASEO. H = 0.40

ML

14,977.17

14.3.3

ENCHAPE BORDILLO DUCHA. H = 0.20

ML

12,355.77

14.3.4

GRANITO POCETA ASEO DE 0.55 x 0.90

UN

76,609.79

14.3.5

LAVADERO PORCELANA BLANCA

UN

295,582.73

14.3.6

TUBO CORTINA DUCHA

UN

13,202.23

14.3.7

WIN DE ALUMINIO

ML

14,423.82

15

15 ILUMINACION

15.2

BALAS Y APLIQUES

15.2.1

BALA FLUORESCENTE

UN

98,732.53

15.2.2

BALA INCANDESCENTE 60 W

UN

28,890.00

15.2.3

BALA INCANDESCENTE 150W

UN

28,890.00

15.3

LAMPARAS DE DESCARGA

15.3.1

LUMINARIA MERCURIO 125 W

UN

245,430.76

15.3.2

LUMINARIA MERCURIO 250 W

UN

143,181.00

15.3.3

LUMINARIA MERCURIO 400 W

UN

326,181.00

15.3.4

LUMINARIA SODIO

150 W

UN

216,181.00

15.3.5

LUMINARIA SODIO

250 W

UN

338,181.00

15.3.6

LUMINARIA SODIO

400 W

UN

319,181.00

15.3.7

PROYECTOR SNF-011/400W

UN

445,790.05

15.3.8

PROYECTOR PHLC-720 MERCUR

UN

607,790.05

15.3.9

PROYECTOR SNF-011T/T1000

UN

932,790.05

15.3.10 REFLECTOR DE PISO 250 W

UN

361,981.89

15.3.11 REFLECTOR DE PISO 400 W

UN

403,312.00

15.3.12 SOPORTE PROYECTORES

UN

98,897.18

15.1

LAMPARAS FLUORESCENTES

15.1.1

CORAZA PARA INSTALAR FLUORESCENTES

UN

14,591.92

15.1.2

INSTALACION FLUORESCENTE (6P) PLACA

UN

9,235.86

15.1.3

INSTALACION FLUORESCENTE (4P) PLACA

UN

6,100.33

15.1.4

LAMPARA 2x40" BAJO PLACA

UN

128,025.50

15.1.6

LAMPARA 2x48" BAJO PLACA

UN

135,025.50

15.1.7

LAMPARA 2x96" BAJO PLACA

UN

157,125.50

15.1.9

LAMPARA 4x20" BAJO PLACA

UN

128,025.50

15.1.10 LAMPARA 4x48" BAJO PLACA

UN

183,625.50

15.1.11 SOCKETS + BALASTO P/40 W

UN

67,201.00

15.1.12 SOCKETS + BALASTO P/48 W

UN

48,551.00

15.1.13 TIROS P/INST.FLCTE.

UN

2,280.15

15.1.14 SUM. INST. TUBO FLUORESCENTE PLMPARA 2x96'

UN

6,922.40

UN

15.4

15.4 VARIOS - ILUMINACION

15.4.1

LUMINARIA

214,690.57

15.4.2

LUMINARIA PARA POSTE

UN

239,690.57

15.4.3

LUMINARIA PEDESTAL

UN

361,690.57

DJK 125 W

15.4.4

RIEL ELECTRICO 2.34 m

UN

62,052.86

15.4.5

ROSETA BAKELITA

UN

3,310.57

15.4.6

ROSETA PORCELANA

UN

4,615.50

16

16 APARATOS SANITARIOS Y ACCESORIOS

16.2

ACCESORIOS

16.2.1

BARRAS AYUDA MINUSVALIDOS. C/I

UN

83,825.50

16.2.2

DISPENSADOR JABON ACERO INOX. C/I

UN

69,854.44

16.2.3

DISPENSADOR TOALLAS ACERO INOX. C/I

UN

92,054.44

16.2.4

JUEGO DE INCRUSTAR ACUACER. C/I

UN

53,002.83

16.2.5

JUEGO DE INCRUSTAR NOVA. C/I

UN

72,853.25

16.2.6

JUEGO DE INCRUSTAR ROYAL. C/I

UN

79,677.00

16.2.7

PAPELERA ACERO INOX. 400 MS. C/I

UN

29,440.42

16.2.8

PAPELERA ACUACER. C/I

UN

18,809.33

16.2.9

REJILLA CON SOSCO 3 x 2". C/I

UN

5,196.28

16.2.10 REJILLA PLASTICA 3 x 2". C/I

UN

17,316.28

16.2.11 REJILLA SIFON 20 x 20". C/I

UN

10,016.28

16.2.12 REJILLA SIFON S 4.5 x 3.5". C/I

UN

7,516.28

16.2.13 REJILLA VENTILACION 15 x 15. C/I

UN

5,696.28

16.2.14 REJILLA VENTILACION 20 x 20. C/I

UN

9,696.28

16.2.15 TAPARREGISTRO 15 x 15. C/I

UN

5,696.28

16.2.16 TAPARREGISTRO 20 x 20. C/I

UN

133,701.84

16.2.17 SECADOR ELCTRICO PMANOS

UN

771,463.00

16.1

APARATOS SANITARIOS

16.1.1

DESMONTE APARATOS SANITARIOS

UN

20,113.85

16.1.2

DUCHA ANTIVANDALICA DOCOL. S/I

UN

90,457.65

16.1.3

DUCHA CALYPSO MEZCLADOR. S/I

UN

44,094.33

16.1.4

DUCHA CALYPSO SENCILLA. S/I

UN

23,944.33

16.1.5

GRIFERIA ANTIVANDALICA LAVAMANOS. S/I

UN

136,123.89

16.1.6

GRIFERIA ANTIVANDALICA ORINAL. S/I

UN

111,494.33

16.1.7

GRIFERIA ANTIVANDALICA SANITARIO. S/I

UN

257,999.89

16.1.8

GRIFERIA LAVAMANOS TIPO GRIVAL SIMIL.

UN

82,455.42

16.1.9

GRIFERIA LAVAMANOS PRISMA 8". S/I

UN

79,560.97

16.1.10 GRIFERIA LAVAMANOS URANO 8" CR. S/I

UN

178,255.42

16.1.11 GRIFERIA LAVAPLATOS IRIS HALCON. S/I

UN

64,355.42

16.1.12 GRIFERIA LAVAPLATOS PRISMA SOBRP. S/I

UN

105,360.97

16.1.13 GRIFERIA PARA ORINAL. S/I

UN

72,255.42

16.1.14 INST. FLOTADOR PARA SANITARIOS

UN

10,258.13

16.1.15 INST. GRIFERIA LAVAMANOS

UN

12,810.16

16.1.16 INST. GRIFERIA LAVAPLATOS

UN

12,810.16

16.1.17 INST. GRIFERIA ORINAL

UN

12,810.16

16.1.18 INST. GRIFERIA SANITARIOS

UN

12,810.16

16.1.19 INST. LLAVES INDIVIDUALES

UN

10,258.13

16.1.20 INSTALACION APARATO SANITARIO

UN

21,371.81

16.1.21 LAVAMANOS ACUACER 732 + GRIF. 50110. S/I

UN

78,558.13

16.1.22 LAVAMANOS ACUACER 732. S/I

UN

53,458.13

16.1.23 LAVAMANOS NOVA 734 + GRIF. 47110. S/I

UN

145,258.13

16.1.24 LAVAMANOS NOVA 734. S/I

UN

105,258.13

16.1.26 LAVAMANOS NOVA 738 + GRIF. 47110. S/I

UN

93,508.13

16.1.28 ORINAL 06102 GRIF. 70700. S/I

UN

192,358.13

16.1.29 ORINAL CON FLUXOMETRO. S/I

UN

218,758.13

16.1.30 ORINAL CON GRIFERIA ANTIVANDALICA. S/I

UN

460,258.13

16.1.31 ORINAL MEDIANO

UN

75,658.13

16.1.32 POCETA ACERO INOX. 35x40 + GRIFERIA. S/I

UN

54,458.13

16.1.34 SANITARIO CON GRIF. ANTIVANDALICA. S/I

UN

14,058.13

16.1.35 SANITARIO INFANTIL MANCESA 2634. S/I

UN

273,466.25

16.1.36 SANITARIO INSTITUCIONAL FLUXMETRO. S/I

UN

239,036.25

16.1.37 SANITARIO MINUSV. FLUXMETRO. S/I

UN

317,036.25

16.1.38 SANITARIO NOVA 30351 BLANCO. S/I

UN

225,566.25

16.1.39 SANITARIO ACUACER S/I

UN

218,866.25

16.3

OTROS - APARATOS SANIT. Y ACCES.

16.3.1

LLAVE INDIVIDUAL LAVAMANOS. C/I

UN

14,065.42

16.3.2

LLAVE MANGUERA 1/2". C/I

UN

8,994.33

16.3.3

LLAVE TERMINAL CROMADA 1/2". C/I

UN

15,094.33

16.3.4

TANQUE PLASTICO 1000 LTS. S/I

UN

301,582.50

16.3.5

TANQUE PLASTICO 5000 LTS. S/I

UN

1,216,382.50

16.3.6

VALVULA LAVADERO 2". C/I

UN

8,716.28

17

CIELOS RASOS Y DIVISIONES

17.1

CIELOS RASOS

17.1.1

ARMADURA MADERA Y MALLA

M2

17,488.03

17.1.2

C. RASO BOVEDAS DRYWALL

M2

40,117.16

17.1.3

C. RASO PLANO DRYWALL

M2

35,373.60

17.1.4

C.RASO YESO (OCULTO)

M2

43,416.50

17.1.5

C.RASO YESO SEMI OCULTO

M2

52,582.06

17.1.6

CIELO RASO DURACUSTIC 5/8"

M2

21,657.80

17.1.7

LAMINA PLANA

M2

69,326.50

17.1.8

LISTON M.H. PINO ROMERON

M2

80,912.03

17.1.9

LISTON M.H. VIROLA

ETERNIT

M2

43,112.03

17.1.10 LUXACELL ACERO

M2

221,408.13

17.1.11 LUXALON ACERO ACUST.P 80

M2

105,636.13

17.1.12 LUXALON ACERO DECOR P 130

M2

228,618.13

17.1.13 LUXALON ALUMINIO P 80

M2

126,008.13

17.1.14 LUXALON GALV.ACUST. P 130

M2

221,881.93

17.1.15 MALLA

M2

8,298.33

M2

48,915.23

M2

39,613.33

PARA

PAETAR

17.1.16 CIELO RASO TABLEX

19 mm

17.1.17 CIELO RASO TRIPLEX PIZANO

9 mm

17.2

DIVISIONES

17.2.1

DIVISIONES BAOS EN ACERO INOX.

M2

95,050.00

17.2.2

DIVISIONES BAOS EN LAMINA. PINT HORNO

M2

123,050.00

18

18 PINTURA

18.3

PINTURA SOBRE MADERA

18.3.1

BARNIZ SOBRE MUEBLES

M2

33,416.20

18.3.2

ESMALTE SOBRE MADERA LLENA

M2

9,307.18

18.3.3

ML

2,362.68

18.3.4

ESMALTE SOBRE MARCOS MADERA

M2

4,557.92

18.3.5

ESMALTE SOBRE MUEBLES

M2

39,866.81

18.3.6

LACA PISOS MADERA

M2

16,298.54

18.3.7

TINTILLA SOBRE MUEBLES

M2

30,877.54

18.3.8

TINTILLA SOBRE MADERA LLENA

M2

7,447.74

18.3.9

TINTILLA SOBRE MADERA LINEAL

ML

2,054.25

M2

3,212.04

18.1

PINTURA SOBRE MAMPOSTERIA

18.1.1

CARBURO

18.1.2

ESMALTE SOBRE LAMINA LLENA

M2

6,931.64

18.1.3

ESTUCO

M2

3,087.33

18.1.4

VINILO MUROS INTERIORES 3 MANOS

M2

4,284.85

18.1.5

FILOS Y DILATACIONES

ML

2,171.35

18.1.6

MARMOLINA

M2

6,397.92

18.1.7

VINILO S/PAETE 2 MANOS

M2

3,531.87

18.1.8

VINILO BAJO PLACA - 2 MANOS

M2

4,383.03

18.2

PINTURA SOBRE METAL

18.2.1

ANTICORR. S/LAMINA LLENA

M2

6,063.50

18.2.2

ANTICORR. S/LAMINA LINEAL

ML

3,947.52

18.2.3

ESMALTE S/ LAMINA LLENA

M2

8,810.74

18.2.4

ESMALTE S/ LAMINA LINEAL

ML

3,564.46

18.2.5

ESMALTE S/ MARCOS LAMINA

ML

4,819.76

18.2.6

WASH-PRIMER

M2

21,694.88

18.4

VARIOS - PINTURA

18.4.1

ANTIHUMEDAD FACHADA

M2

4,931.53

S/PAETE

S/PAETE

S/ALUMINIO

18.4.2

COLORPLAST

M2

15,234.20

18.4.3
18.4.4

DEMARCACION CANCHA MULTIPLE

UN

15,987.89

DEMARCACION CON MARMOLINA

ML

2,133.27

18.4.5

ESGRAFIADO

M2

12,128.74

18.4.6

ESTUCO Y PINTURA TABLEROS

M2

7,278.84

18.4.7

LINEAS TRAFICO

ML

12,338.76

18.4.8

MARMOPLAST

M2

9,320.00

18.4.9

SILCOPLAST

M2

7,466.00

19

19 CERRADURAS Y VIDRIOS

19.1

CERRADURAS

19.1.1

CERRADURA SAFE ALCOBA 5141

UN

40,917.44

19.1.2

CERRADURA SAFE BAO REF 152

UN

30,417.44

19.1.3

CERRADURA SAFE ENTRADA 142A

UN

36,917.44

19.1.4

CERRADURA SAFE ENTRADA PRINCIPAL

UN

45,395.90

19.1.5

CERRADURA SCHLAGE BAO A 40 S

UN

23,817.44

19.1.6

CERRADURA SCHLAGE ENTRADA A 80 PD

UN

22,517.44

19.1.7

CERRADURA SOBREPONER PUERTA METALICA

UN

44,076.57

19.1.8

INSTALACION POMA

UN

10,781.43

19.1.9

INSTALACION PORTON MADERA

UN

4,557.00

19.2

HERRAJES

19.2.1

CIERRAPUERTAS

UN

34,341.28

19.2.2

SOPORTE PARA PUERTA VIDRIO

UN

51,366.84

19.3

VIDRIOS Y ESPEJOS

19.3.1

ESPEJO BISELADO 4 MM

M2

57,561.28

19.3.2

INSTALACION ESPEJOS

M2

4,561.78

19.3.3

VIDRIO CRUDO TRANSPARENTE 4 MM

M2

30,556.22

19.3.4

VIDRIO CRUDO TRANSPARENTE 5 MM

M2

35,061.78

20

20 OBRAS EXTERIORES

20.3

CERRAMIENTOS

20.3.1

CERRAMIENTO TIPICO S. E. D.

ML

212,126.74

20.3.2

CERRAMIENTO TUBO Y MALLA ONDULADA

M2

212,100.74

20.3.3

CONCRETO DADOS. 3000 PSI

M3

398,970.67

20.3.4

CONCRETO POBRE DE LIMPIEZA 2000 PSI

M3

385,846.67

20.3.5

CONCRETO VIGAS DE CIMENTACION

M3

395,285.23

20.3.6

MUROS DE CONTENCION EN CONCRETO

M3

408,529.89

20.3.7

PILOTES HINCADOS DE 25 x 25

ML

94,233.00

20.3.8

CERRAMIENTO EN MAMPOSTERIA H=2,4 m.

M2

239,028.30

FACHADA

FACHADA

0.10
FACHADA

FACHADA

20.3.9

PORTON EN TUBO Y MALLA ONDULADA

M2

86,661.10

20.1

MOVIMIENTO DE TIERRAS Y REEMPLAZOS

20.1.1

EXCAVACION MANUAL TIERRA. H=2.50 MS

M3

2,481.71

20.1.2

EXCAVACION MECANICA EN MATERIAL COMUN

M3

17,888.89

20.1.3

RECEBO COMPACTADO COMUN

M3

43,608.15

20.1.4

RELLENOS MATERIAL COMUN

M3

32,710.33

20.1.5

RELLENOS MATERIAL SELECCIONADO

M3

3,710.33

20.5

OTROS - ZONAS EXTERIORES

20.5.1

ACERO DE REFUERZO 34000 PSI

KG

20.5.2

ACERO DE REFUERZO 60000 PSI

KG

20.5.3

MALLAS ELECTROSOLDADAS

KG

59,222.21

20.5.4

CUNETA TRAPEZOIDAL 3000 PSI RFZO. H:20 - B:30 - b:20 (INC. BASE EN
RECEBO)

ML

43,444.31

20.5.5

CANAL EN CONCRETO CON LADRILLO REJILLA

ML

52,184.10

20.2

ZONAS DURAS Y PLAZOLETAS

20.2.1

ADOQUIN CONCRETO PEATONAL. 6 CMS

M2

28,840.50

20.2.2

ADOQUIN CONCRETO VEHICULAR. 8 CMS

M2

28,840.50

20.2.3

ADOQUIN DE GRES

M2

22,213.00

20.2.4

BASE ASFALTO 1350. 7 CMS

M2

348,206.12

20.2.5

CONCRETO BASE GRADAS DE 0.30

ML

31,080.43

20.2.6

CONCRETO ESCOBEADO. H = 0.10

M2

35,255.87

20.2.7

CONCRETO ESTAMPADO O IMPRESO

M2

38,119.33

20.2.8

DILATACIONES EN LADRILLO DE 0.25

ML

13,889.33

20.2.9

JUNTAS DILATACION ASFALTO

ML

1,390.32

20.2.10 LOSETAS DE CONCRETO DE 40 x 40 x 4.5

M2

636,044.17

20.2.11 LOSETAS DE CONCRETO DE 50 x 50 x 6

M2

637,444.17

20.2.12 PAVIMENTO EN CONCR.e=.017

M2

428,572.38

20.2.13 PAVIMENTO EN CONCR.e=.018

M2

431,672.38

20.2.14 RECUBRIMIENTO SINTETICO PLEXIPAVE

M2

29,216.50

20.2.15 RODADURA B-1350. 2.5 CMS

M2

14,172.08

20.2.16 SARDINEL EN CONCRETO

ML

22,483.58

20.2.17 BASE ESTABILIZADA B-600 - CEMENTO 5%

M3

70,106.32

20.2.18 RODADURA B-1350 - E= 10 CMS

M2

38,666.50

20.4

ZONAS VERDES

20.4.1

ARBOLES

UN

21,554.70

20.4.2

JARDINERAS

M2

38,249.01

20.4.4

PRADIZACION

M2

4,432.68

20.4.5

TIERRA NEGRA PARA EMPRADIZACIN

M3

43,073.57

21

ASEO Y VARIOS

21.1

ASEO Y LIMPIEZA

21.1.1

ASEO GENERAL

M2

2,920.67

21.1.2

LIMPIEZA DE FACHADAS

M2

6,049.45

21.1.3

LIMPIEZA MUROS INTERIORES

M2

5,698.45

21.1.4

RETIRO DE ESCOMBROS

M3

17,004.80

21.1.5

LIMPIEZA DE CANALES Y BAJANTES

ML

2,336.53

21.1.6

SONDEO Y REVISIN DE DESAGUES

ML

5,777.67

21.1.7

LIMPIEZA DE CAJAS DE INSPECCIN

UN

8,487.01

25

25 GENERICOS Y OTROS

25.3

CONCRETOS

25.3.1

CONCRETO 1:2:2 (3500 PSI)

M3

280,724.75

25.3.2

CONCRETO 1:2:2,5 (3000 PSI)

M3

262,123.62

25.3.3

CONCRETO 1:2:3 (2500 PSI)

M3

246,132.20

25.3.4

CONCRETO 1:2:4 (2000 PSI)

M3

231,662.20

25.3.5

CONCRETO 1:3:3 (1500 PSI)

M3

202,694.20

25.6

FORMALETAS

25.6.1

CASETON DE GUADUA DE 0.70 x 0.13

M2

5,653.07

25.6.2

CASETON DE GUADUA DE 0.70 x 0.18

M2

6,555.63

25.6.3

CASETON DE GUADUA DE 0.70 x 0.28

M2

9,354.92

25.6.4

CASETON DE GUADUA DE 0.70 x 0.30

M2

7,874.42

25.6.5

CASETON DE LONA DE 0.70 x 0.35

M2

20,336.04

25.6.6

CASETON DE LONA DE 0.70 x 0.60

M2

35,634.42

25.6.7

FORMALETA COLUMNAS EN LISTON

M2

5,813.33

25.6.8

FORMALETA ENTREPISOS

MS

6,668.20

25.6.9

FORMALETA ESCALERAS

M2

17,988.45

25.6.10 FORMALETA MUROS Y TANQUES

M2

15,988.45

25.6.11 FORMALETA PREFABRICADOS

M2

10,466.60

25.6.12 FORMALETA VIGAS AEREAS

M2

11,966.60

25.6.13 FORMALETA ZAPATAS Y VIGAS

M2

13,488.45

25.6.14 USO FORMALETA COLUMNAS

M2

1,386.23

25.6.15 USO FORMALETA ENTREPISOS

M2

951.65

25.6.16 USO FORMALETA ESCALERA

M2

18,054.13

25.6.17 USO FORMALETA MUROS Y TANQUES

M2

15,988.45

25.6.18 USO FORMALETA PREFABRICADOS

M2

9,988.45

25.6.19 USO FORMALETA VIGAS AEREAS

M2

12,439.32

25.6.20 USO FORMALETA ZAPATAS

M2

34,434.72

25.4

25.4 HERRAMIENTAS

25.4.1

ANDAMIO TUBULAR

HR

8.75

25.4.2

HERRAMIENTA ACABADOS

HR

185.19

25.4.3

HERRAMIENTA CARGUE Y RETIRO

HR

200.00

25.4.4

HERRAMIENTA CICLOPEO

HR

277.78

25.4.5

HERRAMIENTA CIMIENTOS

HR

277.78

25.4.6

HERRAMIENTA ESTRUCTURA

HR

357.14

25.4.7

HERRAMIENTA EXCAVACION

HR

227.27

25.4.8

HERRAMIENTA MAMPOSTERIA

HR

172.41

25.4.9

HERRAMIENTA MORTEROS

HR

208.33

HR

250.00

25.4.10 HERRAMIENTA PAETES

25.1

25.1 MANO DE OBRA

25.1.1

CUADRILLA A (1 AY)

HR

3,756.00

25.1.2

CUADRILLA B (1 OF)

HR

6,452.13

25.1.3

CUADRILLA C (1 OF + 1 AY)

HR

10,208.13

25.1.4

CUADRILLA D (1 OF + 2 AY)

HR

13,964.13

25.1.5

CUADRILLA E (1 OF + 3 AY)

HR

17,720.13

25.1.6

CUADRILLA F (1 OF + 4 AY)

HR

21,476.13

25.1.7

CUADRILLA G (2 OF + 3 AY)

HR

24,172.25

25.1.8

CUADRILLA H (2 OF + 5 AY)

HR

11,175.94

25.1.9

CUADRILLA I (1 OF ESP + 1 AY)

HR

7,419.94

HR

27,221.67

25.1.10 CUADRILLA J (1 OF ESP)

25.2

MORTEROS

25.2.1

MORTERO 1:1:10 CAL - ARENA DE PEA

M3

148,959.53

25.2.2

MORTERO 1:1:3 CAL-ARENA SEMILAVADA

M3

262,290.67

25.2.3

MORTERO 1:1:4 CAL- ARENA SEMILAVADA

M3

218,530.67

25.2.4

MORTERO 1:10 ARENA DE PEA

M3

103,742.67

25.2.5

MORTERO 1:11 ARENA DE PEA

M3

114,166.67

25.2.6

MORTERO 1:12 ARENA DE PEA

M3

106,886.67

25.2.7

MORTERO 1:2 ARENA LAVADA

M3

363,902.67

25.2.8

MORTERO 1:3 ARENA LAVADA

M3

291,015.47

25.2.9

MORTERO 1:3 IMPERMEAB. ARENA LAVADA

M3

299,151.47

25.2.10 MORTERO 1:4 ARENA DE PEA

M3

198,130.67

25.2.11 MORTERO 1:4 IMPERMEAB. ARENA LAVADA

M3

268,210.67

25.2.12 MORTERO 1:5 ARENA DE PEA

M3

170,906.67

25.2.13 MORTERO 1:5 ARENA LAVADA

M3

239,606.67

25.2.14 MORTERO 1:6 ARENA DE PEA

M3

153,483.47

25.2.15 MORTERO 1:6 ARENA LAVADA

M3

223,083.47

25.2.16 MORTERO 1:7 ARENA DE PEA

M3

141,078.67

25.2.17 MORTERO 1:8 ARENA DE PEA

M3

131,618.67

25.2.18 MORTERO 1:9 ARENA DE PEA

M3

116,737.07

25.7

PODA DE RBOLES

25.7.1

PODA DE RBOLES DE 1.00 m. A 5.00 m.

UN

52,411.46

25.7.2

PODA DE RBOLES DE 5.10 m. A 10.00 m.

UN

58,403.95

25.7.3

PODA DE RBOLES DE 10.10 m. A 15.00 m.

UN

63,680.33

25.7.4

PODA DE RBOLES DE 15.10 m. A 20.00 m.

UN

112,122.44

25.7.5

PODA DE RBOLES MAYORES DE 20.00 m.

UN

108,862.43

25.8

TALA DE RBOLES

25.8.1

TALA DE RBOLES DE 1.00 m. A 5.00 m.

UN

122,638.33

25.8.2

TALA DE RBOLES DE 5.10 m. A 10.00 m.

UN

188,678.48

25.8.3

TALA DE RBOLES DE 10.10 m. A 15.00 m.

UN

240,570.66

25.8.4

TALA DE RBOLES DE 15.10 m. A 20.00 m.

UN

181,189.52

25.8.5

TALA DE RBOLES MAYORES DE 20.00 m.

UN

165,985.53

BOGOT D.C.

UCACIN

TAS FSICAS

_______________________________________

OBSERVACIONES

2,247,190.08

25,000.00

RECONSIDERAR LA UNIDAD POR ML

6,573.90

RECONSIDERAR LA UNIDAD POR ML

26,506.04

RECONSIDERAR LA UNIDAD POR ML

5,493.42

CUNTOS HILOS Y QU CLASE DE POSTE ?


QU TIPO DE LMINA Y POSTES ?
QU TIPO DE MADERA Y POSTES ?
QU TIPO DE LMINA Y POSTES ?

VALOR MXIMO A APLICAR $320 / M2 COSTO


DIRECTO (RECONSIDERAR)

NO SE DEDEN
MATERIALES !!!

TENER

EN

CUENTA

LOS

VER ITEM 1.3.35

SIN LA CIMENTACIN

REVISAR ANLISIS

CONFRONTAR CON VALOR DE VIAJE DE 6 M3

DEFINIR DISTANCIA MXIMA

DEFINIR
ESPESOR
MX
RECONSIDERAR LA UN POR M2
DEFINIR
ESPESOR
MX
RECONSIDERAR LA UN POR M2
DEFINIR
ESPESOR
MX
RECONSIDERAR LA UN POR M2

DE

CAPAS

DE

CAPAS

DE

CAPAS

RECONSIDERAR LA UN POR M2
PRECIO DEMASIADO ALTO
PRECIO DEMASIADO ALTO
PREC IO DEMASIADO ALTO - DEBE SER MS
BARATO QUE EL RECEBO
PRECIO DEMASIADO ALTO

PRECIO DEMASIADO ALTO !!!

REVISAR SI CORRESPONDE A M2 DE E=5 CM

ANOTAR LA CALIDAD DEL CONCRETO Y DEL RFZO.


ANOTAR LA CALIDAD DEL CONCRETO Y DEL RFZO.
ANOTAR LA CALIDAD DEL CONCRETO Y DEL RFZO.

PRECIO DIFERENTE DEL KG y TON


PRECIO DIFERENTE DEL KG y TON

PRECIO DEMASIADO ALTO - DESCRIBIR LA REF. Y P. EJ. CONCREMALLA REF. Q3 6,00 x 2,50 m.
CALIDAD DE LA MALLA
4,5 mm. - C/15 cm. AMBOS SENTIDOS

DESCRIBIR LA CALIDAD DEL MORTERO

PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)

ALTO !!! (VER VINCULO - VER


ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER

PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)
PRECIO DEMASIADO
FRMULA)

ALTO !!! (VER VINCULO - VER


ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER
ALTO !!! (VER VINCULO - VER

SE DEBE REFERENCIAR CON LA TIPOLOGA E.A.A.B.


SE DEBE REFERENCIAR CON LA TIPOLOGA E.A.A.B.

PRECIO DEMASIADO ALTO !!!


PRECIO DEMASIADO ALTO !!!
PRECIO DEMASIADO ALTO !!!
PRECIO DEMASIADO ALTO !!!
PRECIO DEMASIADO ALTO !!!
PRECIO DEMASIADO ALTO !!!

SE DEBE DEFINIR MEDIDOR S/TIPOLOGA E.A.A.B.


ESTE ELEMENTO ELCTRICO DEBE UBICARSE EN
EL CAPTULO RESPECTIVO
ESTE ELEMENTO ELCTRICO DEBE UBICARSE EN
EL CAPTULO RESPECTIVO
ESTE ELEMENTO ELCTRICO DEBE UBICARSE EN
EL CAPTULO RESPECTIVO
ESTE ELEMENTO ELCTRICO DEBE UBICARSE EN
EL CAPTULO RESPECTIVO

PRECIO DIFERENTE DEL KG y TON


PRECIO DIFERENTE DEL KG y TON

PRECIO DEMASIADO BAJO - DESCRIBIR LA REF. Y P. EJ. CONCREMALLA REF. Q3 6,00 x 2,50 m.
CALIDAD DE LA MALLA
4,5 mm. - C/15 cm. AMBOS SENTIDOS

PRECIOS IGUALES EN TODO EL CAPTULO ???


PRECIOS IGUALES EN TODO EL CAPTULO ???
PRECIOS IGUALES EN TODO EL CAPTULO ???

NO HAY COHERENCIA DE PRECIO CON EL BLOQUE


No. 5
NO HAY COHERENCIA DE PRECIO CON EL BLOQUE
No. 4

PRECIO "IGUAL" AL TOLETE PRENSADO ???


PRECIO "IGUAL" AL TOLETE PRENSADO ???
PRECIO "IGUAL" AL TOLETE PRENSADO ???
PRECIO "IGUAL" AL SOBRECIMIENTO DE 25 ???
PRECIO "IGUAL" AL SOBRECIMIENTO DE 12 ???

PRECIO "IGUAL" AL DINTEL # 5 ???

PRECIO "IGUAL" AL DINTEL # 4 ???

PRECIO "IGUAL" AL LADRILLO PRENSADO ???


PRECIO "IGUAL" AL LADRILLO COMUN ???

PRECIO "IGUAL" AL 3/8" ???


PRECIO "IGUAL" AL 3/4" ???

????
????
????
????

PRECIO "IGUAL" A MODULARES ???


PRECIO "IGUAL" A CARP. MET. ???

PRECIOS IGUALES
PRECIOS IGUALES
PRECIOS IGUALES
PRECIOS IGUALES

DESCRIBIR CALIDAD DEL PREFABRICADO


DESCRIBIR CALIDAD DEL PREFABRICADO

REFERIR A TIPOLOGA DEL I.D.R.D.

DESCRIBIR ESPESOR
DESCRIBIR ESPESOR

????
????
5 MT. 3/4" MS BARATO QUE 5 MT 1/2" ???

???
3/4" MS BARATO QUE 1/2" ???

PRECIO MUY BARATO

PRECIO DEMASIADO ALTO !!!

ACTIVIDAD REPETIDA

SALIDA PARA QU ?
SALIDA PARA QU ?
SALIDA PARA QU ?

ACTIVIDAD REPETIDA

PRECIO "IGUAL" !!!


PRECIO "IGUAL" !!!
PRECIO "IGUAL" !!!

PRECIO "IGUAL" Y DEMASIADO ALTO !!!


PRECIO "IGUAL" Y DEMASIADO ALTO !!!
PRECIO "IGUAL" Y DEMASIADO ALTO !!!

PRECIO "IGUAL" !!!


PRECIO "IGUAL" !!!
PRECIO "IGUAL" !!!
PRECIO "IGUAL" !!!
PRECIO "IGUAL" !!!

PRECIO "IGUAL" !!!


PRECIO "IGUAL" !!!
PRECIO "IGUAL" !!!

ACTIVIDAD REPETIDA

PRECIOS IGUALES CON REF. DIFERENTE


PRECIOS IGUALES CON REF. DIFERENTE

PRECIOS IGUALES CON REF. DIFERENTE


PRECIOS IGUALES CON REF. DIFERENTE

PRECIOS IGUALES CON REF. DIFERENTE


PRECIOS IGUALES CON REF. DIFERENTE

$ 599,895,833.33