Top truss wind column moved

Additional dead load deleted


Loads Added to the top slab of the staircase core
Bottom slab moved +0.50m soil fill & 1.5m thickness of the slab
1.4 kN/m2 is deleted from the top slab of the staircase core
SOE Panel Change and created a offset

Errors
2122 20495 20516 20708 20728 20729 20823 20835 20843 20866to20868 20887 20890 20911 20912
20945 20959 20977 20978 21020 21034 21041 21054 21055 21058 21104to21106 21109 21142 21143
21161 21164 21203 21235 Rx
13904 Rz

2nd Run with repair Mode and Linear elastic Release


22111 Rz
To Do
Dead load of the crane girder should be deleted?....
Calculation of the staircase element load
Correction of the wind load on the tower

RX
RZ
Truss

108896 109150
108873 108865 108885
1027to1033By2 1041to1047By2 1051 1052 1026 1030 1040 1044