You are on page 1of 5

mei first week logo proposal story board basic tutorial on videography review all heritage videos second

week proposal logo 2 tshirt design detail up story board (with time line) consult proposal with seniors finalize logo third week refine story board teaser video angle study software studies photoshoot practice

since we have 2 building that need to be covered. The working plan at site we are not configure it yet because it m

jun refine story board teaser video angle study software studies photoshoot practice fourth week final story board (with suggested scnene) checklist equipments videography (practical) check for any cultural event first week buffer zone (touch up everthing)

e not configure it yet because it may different between these 2 buildings. But the planning before and after staying at Cirebon are same.

nusantara heritage fiesta!..oh 11-Jun start to recce the best spots for video n pic urban trail. go to any local culture occasion n places. time lapse for sunset.

6 jun 2012 - 24 jun 2012 time lapse sunrise to be determine after disccuss with report team on inte to be determine after disccuss with cataloging team to be determine after disccuss with technical team every day collect all pictures related to heritage.

after staying at Cirebon are same.

disccuss with report team on interview session disccuss with cataloging team disccuss with technical team ctures related to heritage.

julai working time! first week review all the datas photo and video editing start doing teaser for promotion

second week present to lectures on teaser. keep editing photos n videos

You might also like