You are on page 1of 2

Control & Instrumentation Quiz No.

2 Name:________________________ Date:________________

1.0 _________________ measures how the turbine rotor expands. 2.0 _________________ is the measure of turbine casing in relation to a fix location. 3.0 In turbine Supervisory Instruments, mm/sec, mm/sec2 & mm are units of _________. 4.0 _________ is the gap setting for differential expansion. 5.0 Turbine and generator train, misalignment can cause a high reading in________ 6.0 A sudden change in turbine temperature can cause turbine bowing or sagging this will result in Very high 6.1_____________ 6.2_____________ 7.0 Axial Movement of Rotor is being monitored by___________________. 8.0 Vibration Probe are spaced by _________degrees from the vertical. 9.0 Span adjustment will correct the ___________error. 10. Zero adjustment will correct the ___________error 11.0 Vibration amplitude of _______ will trip the turbine. 12.0 Compute for the speed of turbine, Turbine speed is _____________ RPM.

-10 V

VDC GAP

Key phasor signal

SHAFT REVOULUTION 0.50 second

13, _________mm -Air gap required in setting eccentricity.

14 Enumerate at least 5 sources of calibration error 14.1 14.2 14.3 14.4 14.5 15 Draw the diagram of the following: 15.1 Zero Error 15.2 Range Error 15.3 Hysterisis 15.4 Linearity Error

You might also like