NO 1 2 3 4 5 6

SITE MUZNUB-1 M2,BATRA,OKALA,MAKHRAM M2,BATRA,OKALA,MAKHRAM M2,BATRA,OKALA,MAKHRAM MOKARAM M2,BATRA,OKALA,MAKHRAM

SUB:ALL NCR REPORT DESCRIPTION FCU ISOLATORS DEISEL PUMP FCU INDOOR INSTALATION FLOOR DRAIN DRAINAGE PIPE WATER HEATER

DATE STATUS 4/11/2012 OPEN 3/14/2012 OPEN 3/14/2012 OPEN 3/14/2012 OPEN 2/13/2012 OPEN 3/14/2012 OPEN

REF 35 32 29 28 33