EVRSaia in Chennai at
eparaton of DPR fr the constuction
4. SITE CLEARANCE AND DISMANTLING
coat Entimate
item No.[ Description Unit ‘Quantity Rato ‘Amount
oF ‘Sqm 41,638.00 180 74,948.00
be used or auctioned, up to a lead of 1000 metres including removal and
disposal of top organic soil not exceeding 150 mm in thickness as per
Technical specifications and as directed by the Engineer-in-charge,
[102 [Dismantling of Kerb Stone ‘cum 593.00 1,893.65 1,122,934.00
1-03 [Dismantling Brick J Tile work a cum 1496.00 | 7,893.65 2,832,900.00
[Total a 4,030,782.00
‘Wibor Sth Astocines Private Lite.
1s Highways DepartmentCost Estimate
2. EARTH WORK
item No. Description ~ Ref. to ‘Quantity “Amount
MoRTH
Spec.
12.01 [Earth work excavation in all classes of soils with an average lead of 1Km for| 307 ~ 9,408.00 41.00 385,728.00
forming embankments to to required level as per drawings with lead and
its forming in layers of thickness ot exceeding 200. mm compacted
hiciness, watring, compaction by 80-100 KN power ro
ho required manu Gry da
“305 ~ 578200 200 858 268 00
the site, spreading layers of thickness|
ickness. Sectioning, reaming and water]
95% of the maximum dry density of the|
ads for water and compaction by power]
1@ requiring traverses and longitudin
incidental charges, labour charges
ry charges for power roller,water
es etc., complete. for Si
sr and finishing be surface
Jcamber profile and including al
complete including hire and
sprinkler in all other too's and pl
1062
‘wiby Sin Associates Private Litod “Tominad Highways Department2. EARTH WORK
Cost Estimate
Item No. Description Ref. to ‘Quantity Rato ‘Amount
MoRTH
Spec.
203 [Construction of Median and Island with approved material deposited at site| 407 374.00 274.00 702,476.00
lirom roadway cutting and excavation for drain and foundation of other
structures, spread, graded and compacted as per Technical specifications}
land as directed by the Engineer-in-charge
Total 2,346,472.00
2012
Wibur Smith Associates Private Limited
“Tamla Highways Deparment