NO.
URAIAN BAHAN
SATUAN
H
Pekanbaru
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
BAHAN PASANGAN
Batu Kali
Batu Pecah/ Split
Batu Gunung
Kerikil
Pasir Urug
Pasir Pasang
Pasir Cor
Sirtu
Tanah Urug
Tanah Urug Pilihan
Agregat Kasar
Agregat Halus
Semen Tipe I
Semen Putih
Batu Bata
Bataco
Paving Block
Con Block
Batu Alam
Batu Sikat
Kainsten
Batu Terawang
GRC Polos
GRC Ulir
Gorong-gorong dia. 20 cm
Gorong-gorong dia. 40 cm
Gorong-gorong dia. 60 cm
Gorong-gorong dia. 80 cm
Gorong-gorong dia. 100 cm
Aspal Curah
Aspal Drum
Material Agregat Kelas A
Material Agregat Kelas B
Material Agregat Kelas c
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
zak
zak
bh
bh
bh
bh
bh
bh
m2
m2
m1
bh
m2
m2
bh
bh
bh
bh
bh
kg
kg
m3
m3
m3
310,000
285,000
285,000
175,000
125,000
140,000
190,000
140,000
40,000
90,000
290,000
295,000
58,000
100,000
550
3,000
2,000
3,000
180,000
185,000
165,000
10,000
325,000
500,000
65,000
140,000
230,000
325,000
460,000
8,500
9,200
360,000
325,000
235,000
B
35
BAHAN KAYU
Balok Kayu Kelas I
m3
3,500,000
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
C
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
BAHAN BESI
Besi Beton Polos
Besi Beton Ulir
Paku Beton
Kawat Bronjong
Paku Beton
Paku Seng
Paku Tripleks
Paku Asbes
BAHAN ATAP
m3
m3
m3
m3
m3
m3
m3
m3
btg
btg
m3
btg
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
3,500,000
2,500,000
2,500,000
1,900,000
1,900,000
1,600,000
1,500,000
400,000
20,000
15,000
1,700,000
13,500
40,000
50,000
62,000
80,000
115,000
150,000
65,000
72,500
120,000
165,000
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
bh
kg
kg
m1
m2
m2
m2
m2
12,800
13,500
20,000
17,000
35,000
25,000
18,000
25,000
16,000
15,000
17,000
15,750
9,000
14,500
15,000
230,000
350,000
22,000
20,000
24,000
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m1
lbr
lbr
m1
bh
bh
bh
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
lbr
bh
bh
lbr
m2
m2
38,000
42,000
50,000
42,000
55,000
60,000
85,000
63,000
22,000
70,000
78,000
90,000
27,500
35,000
37,500
26,500
4,800
29,300
25,000
62,000
53,750
37,500
30,000
26,000
19,000
85,000
12,000
125,000
3,500
31,000
27,000
42,000
115,000
140,000
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
90,000
85,000
42,500
15,000
12,000
16,000
11,000
75,000
35,000
14,250
40,000
F BAHAN SANITAIR
124
Kloset Jongkok
125
Kloset Duduk
126
Bak Mandi Air Fiberglass
127
Bathtub
128
Shower
129
Wastafel
130
Pintu Fiber
131
Urinoir Lengkap
132
Tangki Air Kap 0.5 m3
133
Tangki Air Kap 0.75 m3
134
Tangki Air Kap 1 m3
135
Kran Air
136
Floor Drain
137
Pompa Air
bh
set
bh
set
set
bh
bh
set
bh
bh
bh
bh
bh
bh
225,000
1,300,000
300,000
1,400,000
145,000
550,000
230,000
1,300,000
750,000
850,000
1,250,000
23,000
50,000
372,500
G BAHAN LANTAI
138
Keramik Uk. 20x20 cm
139
Keramik Uk. 20x25 cm
140
Keramik Uk. 30x30 cm
141
Keramik Uk. 40x40 cm
Keramik ukuran 60 x 60 cm
142
Plin Keramik
143
Bon-bon Keramik
144
Vinyl
145
Karpet
146
Granit Uk. 20x20 cm
147
Granit Uk. 30x30 cm
148
Granit Uk. 40x40 cm
149
Granit Uk. 60x60 cm
150
Parquet Jati
151
Parquet Kelapa
152
Lem Vinyl
m2
m2
m2
m2
m2
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
kg
54,000
55,000
57,000
60,000
65,000
47,000
10,000
225,000
18,000
225,000
230,000
210,000
245,000
265,000
255,000
35,000
H BAHAN PLAFOND
153
Akustik
154
Gypsumboard 9mm
155
Calsiboard
156
Eternit
157
Asbes
158
List Gypsumboard
159
List Calsiboard
160
List Eternet
161
Profil Aluminium T
162
Paku Skrup
163
Paku Pancing
m2
lbr
lbr
m2
m2
m1
m1
m1
m1
kg
kg
41,000
70,000
65,000
27,000
36,000
26,000
24,000
6,000
13,000
15,000
30,000
I BAHAN KACA
164
Kaca Bening 3 mm
165
Kaca Bening 5 mm
166
Kaca Bening 10 mm
167
Kaca Rayben 3 mm
168
Kaca Rayben 5 mm
169
Kaca Rayben 10 mm
170
Kaca Burem 3 mm
171
Kaca Burem 5 mm
172
Kaca Nako + Bingkai
173
Kaca Block
174
Kaca Cermin
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m2
87,000
100,000
260,000
92,000
105,000
287,500
141,500
156,000
132,500
26,000
115,000
J BAHAN LISTRIK
175
Pemasangan Instalasi
176
Stop Kontak
177
Saklar Tunggal
178
Saklar Ganda
179
Saklar Triple
180
Lampu Pijar
181
Lampu TL
182
Lampu Downlight
tititk
bh
bh
bh
bh
bh
set
set
175,000
20,000
18,000
20,000
23,000
31,000
75,000
95,000
K BAHA[N PIPA
183
Pipa PVC dia 1/2"
184
Pipa PVC dia 3/4"
185
Pipa PVC dia 1"
186
Pipa PVC dia 1 1/2"
187
Pipa PVC dia 2"
188
Pipa PVC dia 2 1/2"
189
Pipa PVC dia 3"
190
Pipa PVC dia 4"
191
Pipa Galvanis dia 1/2"
192
Pipa Galvanis dia 3/4"
193
Pipa Galvanis dia 1"
194
Pipa Galvanis dia 1 1/2"
195
Pipa Galvanis dia 2"
196
Pipa Galvanis dia 2 1/2"
197
Pipa Galvanis dia 3"
198
Pipa Galvanis dia 4"
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
5,100
6,100
7,000
11,000
17,500
25,000
33,000
46,500
35,000
42,500
53,500
77,000
104,000
130,000
185,000
265,000
L BAHAN FINISHING
199
Plamir
200
Menie
201
Reside
202
dempul
kg
ltr
lte
kg
15,000
16,000
20,000
25,000
203
204
205
206
207
208
209
210
211
212
B.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Cat Minyak
Amplas
Kuas Golong
Kuas Biasa
Cat Dasar
Cat Minyak
Cat Air
Vernish
Cat Kayu Dasar
Spirtus
DAFTAR HARGA UPAH TUKANG DAN PEKERJA
Pekerja
Kepala Tukang Batu
Tukang Batu
Pembantu Tukang Batu
Kepala Tukang Kayu
Tukang Kayu
Pembantu Tukang Kayu
Kepala Tukang Cat
Tukang Cat
Pembantu Tukang Cat
Kepala Tukang Besi
Tukang Besi
Pembantu Tukang Besi
Mandor
Pekerja Galian dan Urug
Tukang Listrik
Tukang Pipa
Tukang Las
Pembantu Mekanik
Mekanik
Pembantu Operator
Operator Terlatih
Satpam
Pembantu Tukang
Tukang
Sopir Truk
ltr
lbr
bh
bh
kg
kg
kg
ltr
kg
ltr
17,000
4,000
15,000
7,000
17,000
41,000
22,500
26,000
25,000
12,000
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
50,000
80,000
70,000
60,000
80,000
70,000
60,000
80,000
70,000
60,000
80,000
70,000
60,000
85,000
55,000
70,000
70,000
70,000
60,000
85,000
60,000
85,000
60,000
60,000
70,000
80,000
Bodetabek
No.
I
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
PEKERJAAN PERSIAPAN
1 1 M PAGAR Seng Gelombang BJLS 18 TINGGI : 2 M
a Tiang Kayu Borneo 4/6
0.05 #N/A
#N/A
b Semen Tipe I
0.05
bh
58,000.00
1.20
lbr
38,000.00
d Pasir Cor
0.01
m3
190,000.00
0.01
m3
285,000.00
0.05 #N/A
#N/A
0.06 #N/A
#N/A
h Meni Besi
0.45 #N/A
#N/A
i Tukang Kayu
0.20
hr
70,000.00
j Pembantu Tukang
0.10
hr
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 M PAGAR KAWAT BERDURI TINGGI : 1,8 M
a Tiang dari Kayu Borneo 4/6
0.05 #N/A
#N/A
b Semen Tipe I
0.04
bh
58,000.00
c Kawat Berduri
2.50
m2
22,000.00
d Pasir Cor
0.01
m3
190,000.00
0.01
m3
285,000.00
0.06 #N/A
g Tukang Kayu
0.20
hr
70,000.00
h Pembantu Tukang
0.30
hr
60,000.00
0.02
m3
2,500,000.00
0.02 #N/A
#N/A
0.00 #N/A
#N/A
d Tukang Kayu
0.10
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 M1 PENGUKURAN & PEMASANGAN BOWPLANK
hr
70,000.00
No.
URAIAN
e Pembantu Tukang
KOEFISIEN
SAT
HARGA SATUAN
0.10
hr
60,000.00
0.02
m3
2,500,000.00
0.18
m3
2,500,000.00
0.85
kg
15,000.00
d Besi Strip
1.10
kg
15,750.00
e Semen Tipe I
35.00
bh
58,000.00
f Pasir Pasang
0.15
m3
140,000.00
g Pasir Cor
0.10
m3
190,000.00
0.15
m3
285,000.00
30.00
bh
550.00
1.20
lbr
38,000.00
1.00
lbr
60,000.00
l Kawat harmonika
2.00
m2
24,000.00
m Kaca Bening 3 mm
0.08
m2
87,000.00
n Kunci 1 Slaag
0.15
bh
85,000.00
o Tripleks tebal 4 mm
0.06
lbr
62,000.00
p Tukang Kayu
2.00
hr
70,000.00
q Tukang Batu
1.00
hr
70,000.00
r Pembantu Tukang
2.00
hr
60,000.00
0.02
m3
2,500,000.00
0.10
m3
2,500,000.00
0.30
kg
15,000.00
d Semen Tipe I
0.21
bh
58,000.00
e Pasir Cor
0.03
m3
190,000.00
0.05
m3
285,000.00
1.20
lbr
38,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 PEMBUATAN KANTOR DIREKSI
i Batu Bata
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PEMBUATAN GUDANG PROYEK
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
h Tukang Kayu
1.00
hr
70,000.00
i Pembantu Tukang
1.00
hr
60,000.00
0.10
hr
60,000.00
0.20
hr
60,000.00
2.00
hr
60,000.00
0.10
m3
285,000.00
b Sirtu
0.05
m3
140,000.00
c Pasir urug
0.01
m3
125,000.00
d Pembantu Tukang
1.00
hr
60,000.00
6.20
hr
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 MEMBERSIHKAN LOKASI ROYEK
a Pembantu Tukang
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 MEMBERSIHKAN PUING-PUING
a Pembantu Tukang
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 BH MEMBERSIHKAN TUNGGUL TANAMAN
a Pembantu Tukang
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1m2 PEMBUATAN JALAN MASUK PROYEK
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 PEMBONGKARAN BETON
a Pembantu Tukang
Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 PEMBONGKARAN DINDING BATA
a Pembantu Tukang
4.60
hr
60,000.00
0.02
m3
2,500,000.00
0.02
m3
2,500,000.00
c Pasir Cor
0.08
m3
190,000.00
0.15
m3
285,000.00
e Semen Tipe I
0.50
bh
58,000.00
f Tukang Kayu
0.13
hr
70,000.00
g Pembantu Tukang
0.38
hr
60,000.00
a Pembantu Tukang
0.40
hr
60,000.00
0.02
hr
55,000.00
a Pembantu Tukang
0.53
hr
60,000.00
0.02
hr
55,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 M2 PEKERJAAN PAGAR PAPAN RANGKA BALOK
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
II
PEKERJAAN TANAH
1 1 m3 GALIAN TANAH SEDALAM 1 M
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m3 GALIAN TANAH SEDALAM 2 M
Jumlah
Jasa 10%
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Total Jumlah
Dibulatkan
3 1 m3 GALIAN TANAH SEDALAM 3 M
a Pembantu Tukang
0.74
hr
60,000.00
0.02
hr
55,000.00
a Pembantu Tukang
0.45
hr
60,000.00
0.02
hr
55,000.00
a Pembantu Tukang
0.05
hr
60,000.00
0.02
hr
55,000.00
a Pembantu Tukang
0.42
hr
60,000.00
0.02
hr
55,000.00
a Pembantu Tukang
0.19
hr
60,000.00
0.02
hr
55,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m3 GALIAN TANAH KERAS SEDALAM 1 M
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m3 PEMBUANGAN TANAH SEJAUH 150 M
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m3 URUGAN TANAH KEMBALI
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
8 1 m3 PEMADATAN TANAH
a Pembantu Tukang
0.50
hr
60,000.00
0.02
hr
55,000.00
a Pasir Urug
1.20
m3
125,000.00
b Pembantu Tukang
0.30
hr
60,000.00
0.02
hr
55,000.00
a Tanah Urug
1.20
m3
40,000.00
b Pembantu Tukang
0.30
hr
60,000.00
0.02
hr
55,000.00
a Sirtu
1.20
m3
140,000.00
b Pembantu Tukang
0.25
hr
60,000.00
0.02
hr
55,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m3 URUGAN PASIR
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 URUGAN TANAH
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 URUGAN SIRTU
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
III
PEKERJAAN PONDASI
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.10
m3
285,000.00
b Semen Tipe I
4.04
bh
58,000.00
c Pasir Pasang
0.49
m3
140,000.00
d Pembantu Tukang
1.50
hr
60,000.00
e Tukang Batu
0.60
hr
70,000.00
1.10
m3
285,000.00
b Semen Tipe I
3.26
bh
58,000.00
c Pasir Pasang
0.52
m3
140,000.00
d Pembantu Tukang
1.50
hr
60,000.00
e Tukang Batu
0.60
hr
70,000.00
1.10
m3
285,000.00
b Semen Tipe I
2.72
bh
58,000.00
c Pasir Pasang
0.54
m3
140,000.00
d Pembantu Tukang
1.50
hr
60,000.00
e Tukang Batu
0.60
hr
70,000.00
1.20
m3
285,000.00
b Pasir Urug
0.30
m3
125,000.00
c Pembantu Tukang
0.78
hr
60,000.00
d Tukang Batu
0.39
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m3 PASANG PONDASI BT KALI , 1 Pc : 4 Ps
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m3 PASANG PONDASI BATU KOSONG ( AANSTAMPING )
Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr
a Semen Tipe I
6.72
bh
58,000.00
b Pasir Cor
0.54
m3
190,000.00
0.81
m3
285,000.00
d Pembantu Tukang
2.00
hr
60,000.00
e Tukang Batu
0.35
hr
70,000.00
1.05
kg
12,800.00
b Kawat Bronjong
0.02
kg
17,000.00
c Pembantu Tukang
0.01
hr
60,000.00
d Tukang Besi
0.01
hr
70,000.00
0.04
m3
2,500,000.00
0.30
kg
15,000.00
c Cat Minyak
0.10
ltr
17,000.00
d Pembantu Tukang
0.30
hr
60,000.00
e Tukang Kayu
0.26
hr
70,000.00
50.00
kg
12,800.00
b Semen Tipe I
4.04
bh
58,000.00
c Pasir Cor
0.32
m3
190,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 kg PENULANGAN BETON PONDASI
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 PEKERJAAN BEKISTING UNTUK PONDASI
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 m3 PASANG PONDASI CYCLOOP (60 %BETON : 40% BATU KALI)
a Besi Beton Polos
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.49
m3
285,000.00
e Kawat Bronjong
0.80
kg
17,000.00
0.40
m3
285,000.00
g Pembantu Tukang
2.00
hr
60,000.00
h Tukang Batu
0.85
hr
70,000.00
0.45
m3
285,000.00
b Semen Tipe I
5.60
bh
58,000.00
c Pasir Cor
0.45
m3
190,000.00
0.67
m3
285,000.00
e Pembantu Tukang
2.38
hr
60,000.00
f Tukang Batu
0.30
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m3 PASANG PONDASI SUMURAN DIAMETER 100 cm
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 M PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 40 X 40 Cm
a Pasir Cor
0.10
m3
190,000.00
0.15
m3
285,000.00
c Semen Tipe I
1.21
bh
58,000.00
45.00
kg
12,800.00
e Kawat Bronjong
0.90
kg
17,000.00
0.03
m3
2,500,000.00
0.01
m3
2,500,000.00
0.12
kg
15,000.00
i Cat Minyak
0.09
ltr
17,000.00
j Plamir
0.24
kg
15,000.00
k Pembantu Tukang
1.00
hr
60,000.00
l Tukang Batu
0.67
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
## 1 M PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 35 X 35 CM
a Pasir Cor
0.08
m3
190,000.00
0.13
m3
285,000.00
c Semen Tipe I
0.98
bh
58,000.00
34.50
kg
12,800.00
e Kawat Bronjong
0.70
kg
17,000.00
0.03
m3
2,500,000.00
0.01
m3
2,500,000.00
0.12
kg
15,000.00
i Cat Minyak
0.09
ltr
17,000.00
j Plamir
0.20
kg
15,000.00
k Pembantu Tukang
0.80
hr
60,000.00
l Tukang Batu
0.50
hr
70,000.00
a Pasir Cor
0.06
m3
190,000.00
0.11
m3
285,000.00
c Semen Tipe I
0.82
bh
58,000.00
34.50
kg
12,800.00
e Kawat Bronjong
0.60
kg
17,000.00
0.03
m3
2,500,000.00
0.01
m3
2,500,000.00
0.11
kg
15,000.00
i Cat Minyak
0.08
ltr
17,000.00
j Plamir
0.20
kg
15,000.00
k Pembantu Tukang
0.80
hr
60,000.00
l Tukang Batu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT PONDASI TIANG PANCANG UKURAN 25 X 25
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 125 kg + BEKISTING )
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.20
m3
2,500,000.00
1.50
kg
15,000.00
c Cat Minyak
0.40
ltr
17,000.00
125.00
kg
12,800.00
e Kawat Bronjong
2.25
kg
17,000.00
f Semen Tipe I
6.46
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
i Pembantu Tukang
3.90
hr
60,000.00
j Tukang Batu
0.35
hr
70,000.00
k Tukang Kayu
1.04
hr
70,000.00
l Tukang Besi
1.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 150 kg + BEKISTING )
a Balok Kayu Kelas II
0.20
m3
2,500,000.00
1.50
kg
15,000.00
c Cat Minyak
0.40
ltr
17,000.00
150.00
kg
12,800.00
e Kawat Bronjong
2.25
kg
17,000.00
f Semen Tipe I
6.46
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
i Pembantu Tukang
4.00
hr
60,000.00
j Tukang Batu
0.40
hr
70,000.00
k Tukang Kayu
1.00
hr
70,000.00
l Tukang Besi
1.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 125 kg + BEKISTING )
a Balok Kayu Kelas II
0.20
m3
2,500,000.00
1.50
kg
15,000.00
No.
URAIAN
c Cat Minyak
KOEFISIEN
SAT
HARGA SATUAN
0.40
ltr
17,000.00
125.00
kg
12,800.00
e Kawat Bronjong
2.10
kg
17,000.00
f Semen Tipe I
6.46
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
i Pembantu Tukang
3.90
hr
60,000.00
j Tukang Batu
0.40
hr
70,000.00
k Tukang Kayu
1.00
hr
70,000.00
l Tukang Besi
1.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 150 kg + BEKISTING )
a Balok Kayu Kelas II
0.20
m3
2,500,000.00
1.50
kg
15,000.00
c Cat Minyak
0.40
ltr
17,000.00
150.00
kg
12,800.00
e Kawat Bronjong
2.25
kg
17,000.00
f Semen Tipe I
6.46
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
i Pembantu Tukang
4.00
hr
60,000.00
j Tukang Batu
0.40
hr
70,000.00
k Tukang Kayu
1.00
hr
70,000.00
l Tukang Besi
1.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
No.
IV
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
A PEKERJAAN BETON
1 1 m3 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt
a Semen Tipe I
4.36
bh
58,000.00
b Pasir Cor
0.52
m3
190,000.00
0.87
m3
285,000.00
d Pembantu Tukang
2.00
hr
60,000.00
e Tukang Batu
0.35
hr
70,000.00
a Semen Tipe I
4.64
bh
58,000.00
b Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
d Pembantu Tukang
2.00
hr
60,000.00
e Tukang Batu
0.35
hr
70,000.00
a Semen Tipe I
6.72
bh
58,000.00
b Pasir Cor
0.54
m3
190,000.00
0.81
m3
285,000.00
d Pembantu Tukang
2.00
hr
60,000.00
e Tukang Batu
0.35
hr
70,000.00
a Semen Tipe I
7.76
bh
58,000.00
b Pasir Cor
0.65
m3
190,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 4 Splt
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.65
m3
285,000.00
d Pembantu Tukang
2.00
hr
60,000.00
e Tukang Batu
0.35
hr
70,000.00
a Semen Tipe I
8.00
bh
58,000.00
b Pasir Cor
0.55
m3
190,000.00
0.70
m3
285,000.00
d Pembantu Tukang
2.02
hr
60,000.00
e Tukang Batu
0.40
hr
70,000.00
1.05
kg
12,800.00
b Kawat Bronjong
0.02
kg
17,000.00
c Pembantu Tukang
0.01
hr
60,000.00
d Tukang Besi
0.01
hr
70,000.00
1.10
kg
13,500.00
b Kawat Bronjong
0.02
kg
17,000.00
c Pembantu Tukang
0.01
hr
60,000.00
d Tukang Besi
0.02
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
B PEKERJAAN PEMBESIAN
1 1 kg PENULANGAN BETON/BESI BETON POLOS
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 kg PENULANGAN BETON/BESI BETON ULIR
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
C PEKERJAAN BEGISTING
1 1 m2 PASANG BEKISTING UNTUK SLOOF
a Balok Kayu Kelas II
0.05
m3
2,500,000.00
0.30
kg
15,000.00
c Cat Minyak
0.10
ltr
17,000.00
d Pembantu Tukang
0.30
hr
60,000.00
e Tukang Kayu
0.26
hr
70,000.00
0.04
m3
2,500,000.00
0.40
kg
15,000.00
c Cat Minyak
0.20
ltr
17,000.00
0.04
m3
2,500,000.00
e Taekwood tebal 9 mm
0.35
lbr
165,000.00
f Pembantu Tukang
0.30
hr
60,000.00
g Tukang Kayu
0.33
hr
70,000.00
0.04
m3
2,500,000.00
0.40
kg
15,000.00
c Cat Minyak
0.20
ltr
17,000.00
0.04
m3
2,500,000.00
e Taekwood tebal 9 mm
0.35
lbr
165,000.00
f Pembantu Tukang
0.32
hr
60,000.00
g Tukang Kayu
0.33
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 PASANG BEKISTING UNTUK KOLOM
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m2 PASANG BEKISTING UNTUK BALOK
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 PASANG BEKISTING UNTUK PLAT LANTAI
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.04
m3
2,500,000.00
0.40
kg
15,000.00
c Cat Minyak
0.20
ltr
17,000.00
0.04
m3
2,500,000.00
e Taekwood tebal 9 mm
0.35
lbr
165,000.00
f Pembantu Tukang
0.32
hr
60,000.00
g Tukang Kayu
0.33
hr
70,000.00
0.03
m3
2,500,000.00
0.40
kg
15,000.00
c Cat Minyak
0.15
ltr
17,000.00
0.02
m3
2,500,000.00
e Taekwood tebal 9 mm
0.35
lbr
165,000.00
f Pembantu Tukang
0.32
hr
60,000.00
g Tukang Kayu
0.33
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PASANG BEKISTING UNTUK TANGGA
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
D PEKERJAAN BETON BERTULANG
1 1 m3 MEMBUAT SLOOF BETON BERTULANG ( 200 kg BESI + BEKISTING ) K225
a Balok Kayu Kelas II
0.27
m3
2,500,000.00
2.00
kg
15,000.00
c Cat Minyak
0.60
ltr
17,000.00
200.00
kg
12,800.00
e Kawat Bronjong
3.00
kg
17,000.00
f Semen Tipe I
8.00
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
i Pembantu Tukang
4.50
hr
60,000.00
j Tukang Batu
0.35
hr
70,000.00
k Tukang Kayu
1.56
hr
70,000.00
No.
URAIAN
l Tukang Besi
KOEFISIEN
1.40
SAT
hr
HARGA SATUAN
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 125 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.40
m3
2,500,000.00
4.00
kg
15,000.00
c Cat Minyak
2.00
ltr
17,000.00
125.00
kg
12,800.00
e Kawat Bronjong
4.50
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.30
m3
2,500,000.00
j Taekwood tebal 9 mm
3.50
lbr
165,000.00
k Pembantu Tukang
7.30
hr
60,000.00
l Tukang Batu
0.35
hr
70,000.00
m Tukang Kayu
3.30
hr
70,000.00
n Tukang Besi
2.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 150 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.40
m3
2,500,000.00
4.00
kg
15,000.00
c Cat Minyak
2.00
ltr
17,000.00
150.00
kg
12,800.00
e Kawat Bronjong
4.50
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.30
m3
2,500,000.00
j Taekwood tebal 9 mm
3.50
lbr
165,000.00
k Pembantu Tukang
7.30
hr
60,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
l Tukang Batu
0.35
hr
70,000.00
m Tukang Kayu
3.30
hr
70,000.00
n Tukang Besi
2.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 160 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.40
m3
2,500,000.00
4.00
kg
15,000.00
c Cat Minyak
2.00
ltr
17,000.00
160.00
kg
12,800.00
e Kawat Bronjong
4.50
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.30
m3
2,500,000.00
j Taekwood tebal 9 mm
3.50
lbr
165,000.00
k Pembantu Tukang
7.30
hr
60,000.00
l Tukang Batu
0.35
hr
70,000.00
m Tukang Kayu
3.30
hr
70,000.00
n Tukang Besi
2.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 175 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.40
m3
2,500,000.00
4.00
kg
15,000.00
c Cat Minyak
2.00
ltr
17,000.00
175.00
kg
12,800.00
e Kawat Bronjong
4.50
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.30
m3
2,500,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
j Taekwood tebal 9 mm
3.50
lbr
165,000.00
k Pembantu Tukang
7.30
hr
60,000.00
l Tukang Batu
0.35
hr
70,000.00
m Tukang Kayu
3.30
hr
70,000.00
n Tukang Besi
2.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 200 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.40
m3
2,500,000.00
4.00
kg
15,000.00
c Cat Minyak
2.00
ltr
17,000.00
200.00
kg
12,800.00
e Kawat Bronjong
4.50
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.30
m3
2,500,000.00
j Taekwood tebal 9 mm
3.50
lbr
165,000.00
k Pembantu Tukang
7.30
hr
60,000.00
l Tukang Batu
0.35
hr
70,000.00
m Tukang Kayu
3.30
hr
70,000.00
n Tukang Besi
2.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 250 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.40
m3
2,500,000.00
4.00
kg
15,000.00
c Cat Minyak
2.00
ltr
17,000.00
250.00
kg
12,800.00
e Kawat Bronjong
4.50
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.78
m3
285,000.00
0.30
m3
2,500,000.00
j Taekwood tebal 9 mm
3.50
lbr
165,000.00
k Pembantu Tukang
7.30
hr
60,000.00
l Tukang Batu
0.35
hr
70,000.00
m Tukang Kayu
3.30
hr
70,000.00
n Tukang Besi
2.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.40
m3
2,500,000.00
4.00
kg
15,000.00
c Cat Minyak
2.00
ltr
17,000.00
300.00
kg
12,800.00
e Kawat Bronjong
4.50
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.30
m3
2,500,000.00
j Taekwood tebal 9 mm
3.50
lbr
165,000.00
k Pembantu Tukang
7.30
hr
60,000.00
l Tukang Batu
0.35
hr
70,000.00
m Tukang Kayu
3.30
hr
70,000.00
n Tukang Besi
2.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m3 MEMBUAT BALOK BETON BERTULANG ( 125 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.32
m3
2,500,000.00
3.20
kg
15,000.00
c Cat Minyak
1.60
ltr
17,000.00
125.00
kg
12,800.00
2.25
kg
17,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.12
m3
2,500,000.00
j Taekwood tebal 9 mm
2.80
lbr
165,000.00
32.00
btg
15,000.00
5.80
hr
60,000.00
m Tukang Batu
0.35
hr
70,000.00
n Tukang Kayu
2.80
hr
70,000.00
o Tukang Besi
1.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT BALOK BETON BERTULANG ( 150 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.32
m3
2,500,000.00
3.20
kg
15,000.00
c Cat Minyak
1.60
ltr
17,000.00
150.00
kg
12,800.00
e Kawat Bronjong
2.25
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.12
m3
2,500,000.00
j Taekwood tebal 9 mm
2.80
lbr
165,000.00
32.00
btg
15,000.00
5.80
hr
60,000.00
m Tukang Batu
0.35
hr
70,000.00
n Tukang Kayu
2.80
hr
70,000.00
o Tukang Besi
1.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.32
m3
2,500,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
3.20
kg
15,000.00
c Cat Minyak
1.60
ltr
17,000.00
200.00
kg
12,800.00
e Kawat Bronjong
3.00
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
j Taekwood tebal 9 mm
2.80
lbr
165,000.00
16.00
btg
15,000.00
5.96
hr
60,000.00
m Tukang Batu
0.35
hr
70,000.00
n Tukang Kayu
2.80
hr
70,000.00
o Tukang Besi
1.40
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT BALOK BETON BERTULANG ( 250 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.32
m3
2,500,000.00
3.20
kg
15,000.00
c Cat Minyak
1.60
ltr
17,000.00
250.00
kg
12,800.00
e Kawat Bronjong
6.00
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.14
m3
2,500,000.00
j Taekwood tebal 9 mm
2.80
lbr
165,000.00
16.00
btg
15,000.00
5.96
hr
60,000.00
m Tukang Batu
0.35
hr
70,000.00
n Tukang Kayu
2.80
hr
70,000.00
o Tukang Besi
1.40
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
## 1 m3 MEMBUAT TANGGA BETON BERTULANG ( 200 kg BESI + BEKISTING )
a Balok Kayu Kelas II
0.25
m3
2,500,000.00
3.00
kg
15,000.00
c Cat Minyak
1.20
ltr
17,000.00
200.00
kg
12,800.00
e Kawat Bronjong
3.00
kg
17,000.00
f Semen Tipe I
6.45
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
0.30
m3
2,500,000.00
j Taekwood tebal 9 mm
2.50
lbr
165,000.00
k Pembantu Tukang
5.60
hr
60,000.00
l Tukang Batu
0.35
hr
70,000.00
m Tukang Kayu
2.30
hr
70,000.00
n Tukang Besi
1.40
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr
b Pasang Bekisting untuk lantai
c Besi Beton rakit
1.00 #N/A
#N/A
10.00 #N/A
#N/A
100.00 #N/A
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )
a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr
1.00 #N/A
#N/A
8.33 #N/A
#N/A
115.00 #N/A
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.00 #N/A
#N/A
8.33 #N/A
#N/A
125.00 #N/A
#N/A
1.00 #N/A
#N/A
6.67 #N/A
#N/A
100.00 #N/A
#N/A
1.00 #N/A
#N/A
7.50 #N/A
#N/A
115.00 #N/A
#N/A
0.27
m3
2,500,000.00
2.00
kg
15,000.00
c Cat Minyak
0.60
ltr
17,000.00
175.00
kg
12,800.00
e Kawat Bronjong
3.00
kg
17,000.00
f Semen Tipe I
8.00
bh
58,000.00
g Pasir Cor
0.52
m3
190,000.00
0.78
m3
285,000.00
i Pembantu Tukang
4.85
hr
60,000.00
j Tukang Batu
0.40
hr
70,000.00
k Tukang Kayu
1.75
hr
70,000.00
No.
URAIAN
l Tukang Besi
KOEFISIEN
1.45
SAT
HARGA SATUAN
hr
70,000.00
140.00
bh
550.00
b Semen Tipe I
0.65
bh
58,000.00
c Pasir Pasang
0.09
m3
140,000.00
d Pembantu Tukang
0.65
hr
60,000.00
e Tukang Batu
0.20
hr
70,000.00
140.00
bh
550.00
b Semen Tipe I
0.55
bh
58,000.00
c Pasir Pasang
0.09
m3
140,000.00
d Pembantu Tukang
0.65
hr
60,000.00
e Tukang Batu
0.20
hr
70,000.00
140.00
bh
550.00
b Semen Tipe I
0.45
bh
58,000.00
c Pasir Pasang
0.10
m3
140,000.00
d Pembantu Tukang
0.65
hr
60,000.00
e Tukang Batu
0.20
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
PEKERJAAN DINDING
1 1 m2 PASANGAN Batu BataTEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps
a Batu Bata
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 PASANGAN Batu BataTEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps
a Batu Bata
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m2 PASANGAN Batu BataTEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps
a Batu Bata
Jumlah
Jasa 10%
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Total Jumlah
Dibulatkan
4 1 m2 PASANGAN Batu BataTEBAL BATA, CAMPURAN 1 Pc : 3 Ps
a Batu Bata
70.00
bh
550.00
b Semen Tipe I
0.29
bh
58,000.00
c Pasir Pasang
0.04
m3
140,000.00
d Pembantu Tukang
0.32
hr
60,000.00
e Tukang Batu
0.10
hr
70,000.00
70.00
bh
550.00
b Semen Tipe I
0.25
bh
58,000.00
c Pasir Pasang
0.05
m3
140,000.00
d Pembantu Tukang
0.32
hr
60,000.00
e Tukang Batu
0.10
hr
70,000.00
70.00
bh
550.00
b Semen Tipe I
0.22
bh
58,000.00
c Pasir Pasang
0.05
m3
140,000.00
d Pembantu Tukang
0.32
hr
60,000.00
e Tukang Batu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PASANGAN Batu BataTEBAL BATA, CAMPURAN 1 Pc : 4 Ps
a Batu Bata
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 PASANGAN Batu BataTEBAL BATA, CAMPURAN 1 Pc : 5 Ps
a Batu Bata
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 PASANG DINDING BATA ROOSTER / BATA TERAWANG
a Rooster / Terawang ukuran 12 x 11 x 24
37.00 #N/A
#N/A
b Semen Tipe I
0.27
bh
58,000.00
c Pasir Pasang
0.04
m3
140,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
d Pembantu Tukang
0.30
hr
60,000.00
e Tukang Batu
0.10
hr
70,000.00
30.00
bh
26,000.00
b Semen Putih
0.27
bh
100,000.00
c Pembantu Tukang
0.30
hr
60,000.00
d Tukang Batu
0.10
hr
70,000.00
15.00
bh
3,000.00
b Semen Tipe I
0.25
bh
58,000.00
c Pasir Pasang
0.03
m3
140,000.00
d Pembantu Tukang
0.30
hr
60,000.00
e Tukang Batu
0.15
hr
70,000.00
15.00
bh
3,000.00
b Semen Tipe I
0.20
bh
58,000.00
c Pasir Pasang
0.02
m3
140,000.00
d Pembantu Tukang
0.30
hr
60,000.00
e Tukang Batu
0.15
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 m2 PASANG DINDING GLASSBLOCK
a Kaca Block
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m2 PASANGAN BATACO PUTIH, CAMPURAN 1 Pc : 5 Ps
a Bataco
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANGAN BATACO PRES SEMEN, CAMPURAN 1 Pc : 5 Ps
a Bataco
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANGAN BATA RINGAN ( HEBEL/CELCON ).
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
8.00 #N/A
#N/A
11.45 #N/A
#N/A
c Pembantu Tukang
0.30
hr
60,000.00
d Tukang Batu
0.20
hr
70,000.00
a Semen Tipe I
0.14
bh
58,000.00
b Pasir Pasang
0.02
m3
140,000.00
c Pembantu Tukang
0.20
hr
60,000.00
d Tukang Batu
0.15
hr
70,000.00
a Semen Tipe I
0.13
bh
58,000.00
b Pasir Pasang
0.02
m3
140,000.00
c Pembantu Tukang
0.20
hr
60,000.00
d Tukang Batu
0.15
hr
70,000.00
a Semen Tipe I
0.10
bh
58,000.00
b Pasir Pasang
0.02
m3
140,000.00
c Pembantu Tukang
0.20
hr
60,000.00
d Tukang Batu
0.15
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
VI
PEKERJAAN PLESTERAN/ACCI
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm
Jumlah
Jasa 10%
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Total Jumlah
Dibulatkan
4 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
a Semen Tipe I
0.09
bh
58,000.00
b Pasir Pasang
0.02
m3
140,000.00
c Pembantu Tukang
0.20
hr
60,000.00
d Tukang Batu
0.15
hr
70,000.00
a Semen Tipe I
0.17
bh
58,000.00
b Pasir Pasang
0.03
m3
140,000.00
c Pembantu Tukang
0.22
hr
60,000.00
d Tukang Batu
0.16
hr
70,000.00
a Semen Tipe I
0.15
bh
58,000.00
b Pasir Pasang
0.03
m3
140,000.00
c Pembantu Tukang
0.25
hr
60,000.00
d Tukang Batu
0.20
hr
70,000.00
a Semen Tipe I
0.11
bh
58,000.00
b Pasir Pasang
0.03
m3
140,000.00
c Pembantu Tukang
0.15
hr
60,000.00
d Tukang Batu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 2,0 cm
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 BERAPEN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
Jumlah
Jasa 10%
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Total Jumlah
Dibulatkan
8 1 m2 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm
a Semen Tipe I
0.19
bh
58,000.00
b Pasir Pasang
0.02
m3
140,000.00
c Pembantu Tukang
0.26
hr
60,000.00
d Tukang Batu
0.20
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m2 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm
a Semen Tipe I
0.15
bh
58,000.00
b Pasir Pasang
0.02
m3
140,000.00
c Pembantu Tukang
0.26
hr
60,000.00
d Tukang Batu
0.20
hr
70,000.00
a Semen Tipe I
0.01
bh
58,000.00
b Pasir Pasang
0.01
m3
140,000.00
c Pembantu Tukang
0.06
hr
60,000.00
d Tukang Batu
0.04
hr
70,000.00
a Semen Tipe I
0.08
bh
58,000.00
b Pembantu Tukang
0.14
hr
60,000.00
c Tukang batu
0.11
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 ACCIAN PLESTERAN
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
## 1 m2 PLESTERAN SIAR CAMPURAN 1 Pc : 2 Ps
a Semen Tipe I
0.09
bh
58,000.00
b Pasir Pasang
0.02
m3
140,000.00
c Pembantu Tukang
0.15
hr
60,000.00
d Tukang Batu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
VII
1.00
m2
60,000.00
b Semen Tipe I
0.16
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.25
hr
60,000.00
f Tukang batu
0.12
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm UNPOLISH
a Keramik Uk. 40x40 cm
1.00
m2
60,000.00
b Semen Tipe I
0.16
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.26
hr
60,000.00
f Tukang batu
0.13
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m2 PASANG LANTAI KERAMIK UKURAN 60 x 60 cm
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
a Keramik ukuran 60 x 60 cm
1.00
m2
65,000.00
b Semen Tipe I
0.18
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.01
bh
100,000.00
e Pembantu Tukang
0.25
hr
60,000.00
f Tukang batu
0.12
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 PASANG LANTAI KERAMIK UKURAN 60 x 90 cm
a Keramik ukuran 60 x 90 cm
1.00 #N/A
#N/A
b Semen Tipe I
0.17
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.26
hr
60,000.00
f Tukang batu
0.14
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PASANG LANTAI KERAMIK 10 x 20 cm
a Keramik lantai 10 x 20 cm
1.00 #N/A
#N/A
b Semen Tipe I
0.18
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.22
hr
60,000.00
f Tukang batu
0.40
hr
70,000.00
1.00
m2
54,000.00
b Semen Tipe I
0.17
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 PASANG LANTAI KERAMIK POLOS 20 x 20 cm
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.30
hr
60,000.00
f Tukang batu
0.15
hr
70,000.00
1.00
m2
54,000.00
b Semen Tipe I
0.17
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.30
hr
60,000.00
f Tukang batu
0.15
hr
70,000.00
1.00
m2
57,000.00
b Semen Tipe I
0.16
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.25
hr
60,000.00
f Tukang batu
0.12
hr
70,000.00
1.00
m2
57,000.00
b Semen Tipe I
0.16
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.25
hr
60,000.00
f Tukang batu
0.12
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 PASANG LANTAI KERAMIK MOTIF 20 x 20 cm
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 m2 PASANG LANTAI KERAMIK POLOS 30 x 30 cm
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m2 PASANG LANTAI KERAMIK MOTIF 30 x 30 cm
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
10 1 m2 PASANG LANTAI MARMER
a Marmer standart
1.00 #N/A
#N/A
b Semen Tipe I
0.48
bh
58,000.00
c Pasir pasang
0.10
m3
140,000.00
d Semen putih
0.20
bh
100,000.00
e Pembantu Tukang
0.62
hr
60,000.00
f Tukang batu
0.35
hr
70,000.00
a Parquet jati
1.05
m2
265,000.00
b Lem vinyl
0.60
kg
35,000.00
c Pembantu Tukang
0.65
hr
60,000.00
d Tukang
0.35
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
11 1 m2 PASANG LANTAI PARQUET JATI
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
12 1 m2 PASANG LANTAI GRANIT
a Granit Standart
1.00 #N/A
b Semen Tipe I
0.48
bh
58,000.00
c Pasir pasang
0.08
m3
140,000.00
d Semen putih
0.10
bh
100,000.00
e Pembantu Tukang
0.60
hr
60,000.00
f Tukang batu
0.48
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.00 #N/A
#N/A
b Semen Tipe I
0.18
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.22
hr
60,000.00
f Tukang batu
0.40
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 PASANG DINDING KERAMIK POLOS 10 x 20 cm
a Keramik polos 10 x 20 cm
1.00 #N/A
#N/A
b Semen Tipe I
0.18
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.22
hr
60,000.00
f Tukang batu
0.40
hr
70,000.00
1.00
m2
54,000.00
b Semen Tipe I
0.17
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.20
hr
60,000.00
f Tukang batu
0.39
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m2 PASANG DINDING KERAMIK MOTIF 20 x 20 cm
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
4 1 m2 PASANG DINDING KERAMIK POLOS 20 x 20 cm
a Keramik polos 20 x 20 cm
1.00 #N/A
#N/A
b Semen Tipe I
0.17
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.02
bh
100,000.00
e Pembantu Tukang
0.20
hr
60,000.00
f Tukang batu
0.39
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PASANG DINDING KERAMIK POLOS 20 x 25 cm
a Keramik polos 20 x 25 cm
1.00 #N/A
#N/A
b Semen Tipe I
0.16
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.01
bh
100,000.00
e Pembantu Tukang
0.19
hr
60,000.00
f Tukang batu
0.38
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 PASANG DINDING KERAMIK MOTIF 20 x 25 cm
a Keramik motif 20 x 25 cm
1.00 #N/A
#N/A
b Semen Tipe I
0.16
bh
58,000.00
c Pasir pasang
0.02
m3
140,000.00
d Semen putih
0.01
bh
100,000.00
e Pembantu Tukang
0.19
hr
60,000.00
f Tukang batu
0.38
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 PASANG DINDING MARMER
a Marmer Standart
1.00 #N/A
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
4.00 #N/A
#N/A
c Semen Tipe I
0.25
bh
58,000.00
d Pasir pasang
0.03
m3
140,000.00
e Semen putih
1.50
bh
100,000.00
f Kawat ikat
0.03 #N/A
0.03
kg
15,000.00
h Pembantu Tukang
0.72
hr
60,000.00
i Tukang batu
0.65
hr
70,000.00
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 m2 PASANG DINDING GRANIT
a Granit Standart
1.00 #N/A
#N/A
2.00 #N/A
#N/A
c Semen Tipe I
0.25
bh
58,000.00
d Pasir pasang
0.03
m3
140,000.00
e Semen putih
1.50
bh
100,000.00
f Kawat ikat
0.03 #N/A
0.03
kg
15,000.00
h Pembantu Tukang
0.72
hr
60,000.00
i Tukang batu
0.65
hr
70,000.00
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m2 PASANG DINDING BATU TEMPEL HITAM
a Batu tempel hitam
1.00 #N/A
b Semen Tipe I
0.24
bh
58,000.00
c Pasir pasang
0.04
m3
140,000.00
d Pembantu Tukang
0.32
hr
60,000.00
e Tukang batu
0.25
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.00
m2
180,000.00
b Semen Tipe I
0.25
bh
58,000.00
c Pasir pasang
0.04
m3
140,000.00
d Pembantu Tukang
0.32
hr
60,000.00
e Tukang batu
0.25
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
11 1 m PASANG PLINT KERAMIK UKURAN 10 x 40 cm
a Plint Keramik ukuran 10 x 40 cm
2.65 #N/A
#N/A
b Semen Tipe I
0.02
bh
58,000.00
c Pasir pasang
0.01
m3
140,000.00
d Semen putih
0.10
bh
100,000.00
e Pembantu Tukang
0.06
hr
60,000.00
f Tukang batu
0.03
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
12 1 m PASANG PLINT KERAMIK UKURAN 10 x 30 cm
a Plint Keramik ukuran 10 x 30 cm
3.30 #N/A
b Semen Tipe I
0.02
bh
58,000.00
c Pasir pasang
0.01
m3
140,000.00
d Semen putih
0.12
bh
100,000.00
e Pembantu Tukang
0.06
hr
60,000.00
f Tukang batu
0.03
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
#N/A
No.
IX
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.20 #N/A
b Pembantu Tukang
6.00
hr
60,000.00
15.00
hr
70,000.00
c Tukang Kayu
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER MEDAN / KRUING
a Balok kayu Kamper Medan
1.20 #N/A
b Pembantu Tukang
6.00
hr
60,000.00
15.00
hr
70,000.00
c Tukang Kayu
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m3 PASANG KUSEN PINTU & JENDELA KAYU BORNEO SUPER
a Kayu Balok Borneo Super
1.20 #N/A
b Pembantu Tukang
6.00
hr
60,000.00
15.00
hr
70,000.00
c Tukang Kayu
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 PASANG PINTU PANEL KAYU KAMPER SAMARINDA
a Papan kayu Kamper Samarinda
0.04 #N/A
#N/A
b Pembantu Tukang
1.00
hr
60,000.00
c Tukang Kayu
2.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PASANG PINTU PANEL KAYU KAMPER MEDAN / KRUING
a Papan kayu Kamper Medan
0.04 #N/A
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
b Pembantu Tukang
1.00
hr
60,000.00
c Tukang Kayu
2.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan
0.04 #N/A
#N/A
b Pembantu Tukang
0.80
hr
60,000.00
c Tukang Kayu
2.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO
a Papan kayu Borneo Super
0.04 #N/A
#N/A
b Pembantu Tukang
0.80
hr
60,000.00
c Tukang Kayu
2.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 m2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER MEDAN
a Papan kayu Kamper Medan
0.06 #N/A
#N/A
b Pembantu Tukang
1.00
hr
60,000.00
c Tukang Kayu
3.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan
0.02 #N/A
#N/A
0.03 #N/A
#N/A
c Lem Kayu
0.30 #N/A
#N/A
1.00 #N/A
#N/A
e Pembantu Tukang
0.60
hr
60,000.00
No.
URAIAN
KOEFISIEN
f Tukang Kayu
2.00
SAT
HARGA SATUAN
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANG JALUSI MATI KUSEN KAYU KAMPER MEDAN
a Papan kayu Kamper Medan
0.06 #N/A
#N/A
0.15 #N/A
#N/A
c Pembantu Tukang
0.50
hr
60,000.00
d Tukang Kayu
2.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU BORNEO SUPER
a Papan kayu Borneo Super
0.02 #N/A
#N/A
0.03 #N/A
#N/A
c Lem Kayu
0.30 #N/A
#N/A
1.00 #N/A
#N/A
e Pembantu Tukang
0.60
hr
60,000.00
f Tukang Kayu
2.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANG PINTU TEAKWOOD RANGKAP , RANGKA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan
0.02 #N/A
#N/A
0.30 #N/A
#N/A
c Lem Kayu
0.30 #N/A
#N/A
1.00 #N/A
#N/A
e Pembantu Tukang
0.60
hr
60,000.00
f Tukang Kayu
2.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.02 #N/A
#N/A
0.30 #N/A
#N/A
c Lem Kayu
0.80 #N/A
#N/A
1.00 #N/A
#N/A
0.50 #N/A
#N/A
f Pembantu Tukang
0.80
hr
60,000.00
g Tukang Kayu
2.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER MEDAN
a Papan kayu Kamper Medan
0.02 #N/A
#N/A
0.30 #N/A
#N/A
c Lem Kayu
0.80 #N/A
#N/A
0.50 #N/A
#N/A
e Vernis
0.50 #N/A
#N/A
0.50 #N/A
#N/A
b Pembantu Tukang
0.80
hr
60,000.00
c Tukang Kayu
2.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANG DINDING PEMISAH DOUBLE TEAKWOOD, RANGKA KAYU KAMPER MEDAN
a Balok kayu Kamper Medan
0.02 #N/A
#N/A
0.01 #N/A
#N/A
0.10
d Lem Kayu
0.56 #N/A
#N/A
1.00 #N/A
#N/A
f Pembantu Tukang
0.15
hr
60,000.00
g Tukang Kayu
0.45
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
kg
15,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
## 1 m2 PASANG DINDING PEMISAH DOUBLE GRC, RANGKA KAYU KAMPER MEDAN
a Balok kayu Kamper Medan
0.02 #N/A
#N/A
0.01 #N/A
#N/A
0.10
d Lem Kayu
0.56 #N/A
#N/A
1.00 #N/A
#N/A
f Pembantu Tukang
0.20
hr
60,000.00
g Tukang Kayu
0.60
hr
70,000.00
kg
15,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 Bh PASANG PINTU ALUMINIUM / PINTU PVC
a Pintu Aluminium / Pintu PVC
1.00 #N/A
#N/A
1.00 #N/A
#N/A
c Tukang Kayu
0.02
hr
70,000.00
0.11
m3
2,500,000.00
5.00 #N/A
#N/A
2.00 #N/A
#N/A
d Ampelas
2.00 #N/A
#N/A
e Engsel
4.00 #N/A
#N/A
f Grendel / Slot
4.00 #N/A
#N/A
g Pembantu Tukang
0.30 #N/A
#N/A
1.30 #N/A
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANG KUSEN PARTISI DOUBLE TRIPLEK
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
## 1 m2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYU
a Balok Kayu Kelas II
0.11
m3
2,500,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.72 #N/A
#N/A
2.00 #N/A
#N/A
d Ampelas
2.00 #N/A
#N/A
e Engsel
4.00 #N/A
#N/A
f Grendel / Slot
4.00 #N/A
#N/A
g Pembantu Tukang
0.30 #N/A
#N/A
h Tukang Kayu
1.30 #N/A
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
20 1 m2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOW
a Hollow 4/4 Zincromate
0.42 #N/A
#N/A
0.15 #N/A
#N/A
0.72 #N/A
#N/A
25.00 #N/A
#N/A
4.00 #N/A
#N/A
f Cotton plaster
0.10 #N/A
#N/A
g Compoun
0.13 #N/A
#N/A
h Pembantu Tukang
0.10
hr
60,000.00
i Tukang kayu
0.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
1.10 #N/A
#N/A
15.00 #N/A
#N/A
0.80 #N/A
#N/A
d Meni kayu
0.40 #N/A
#N/A
b Besi Strip
No.
URAIAN
e Pembantu Tukang
f Tukang Kayu
KOEFISIEN
SAT
HARGA SATUAN
4.00
hr
60,000.00
12.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU BORNEO SUPER
a Balok Kayu Kelas II
1.10 #N/A
#N/A
15.00 #N/A
#N/A
0.80 #N/A
#N/A
d Meni kayu
0.40 #N/A
#N/A
e Pembantu Tukang
4.00
hr
60,000.00
12.00
hr
70,000.00
b Besi Strip
f Tukang Kayu
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
0.01 #N/A
#N/A
0.15 #N/A
#N/A
c Pembantu Tukang
0.10
hr
60,000.00
d Tukang Kayu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 PASANG KASO + RENG GENTENG BETON KAYU BORNEO SUPER
a Balok Kayu Kelas II
0.01 #N/A
#N/A
0.15 #N/A
#N/A
c Pembantu Tukang
0.10
hr
60,000.00
d Tukang Kayu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 M1 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 20 cm
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.01 #N/A
#N/A
0.05 #N/A
#N/A
c Pembantu Tukang
0.10
hr
60,000.00
d Tukang Kayu
0.20
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 30 cm
a Papan kayu Kamper Medan
0.01 #N/A
#N/A
0.05 #N/A
#N/A
c Pembantu Tukang
0.11
hr
60,000.00
d Tukang Kayu
0.22
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m3 PEKERJAAN NOK/GORDING/JURAY KAYU BORNEO SUPER
a Balok Kayu Kelas II
1.05 #N/A
#N/A
0.20 #N/A
#N/A
c Pembantu Tukang
2.00
hr
60,000.00
d Tukang Kayu
2.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
B
25.00 #N/A
#N/A
b Pembantu Tukang
0.15
hr
60,000.00
c Tukang kayu
0.08
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 PASANG NOK/BUBUNGAN GENTENG KERAMIK GLAZUR
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
5.00 #N/A
#N/A
b Semen Tipe I
0.16
bh
58,000.00
c Pasir pasang
0.03
m3
140,000.00
d Pembantu Tukang
0.30
hr
60,000.00
e Tukang kayu
0.20
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m2 PASANG ATAP FIBREGLASS UKURAN 180 X 90 cm
a Atap fibreglass
0.60 #N/A
#N/A
0.05 #N/A
#N/A
c Pembantu Tukang
0.14
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,05 m TEBAL 4 mm
a Asbes gelombang
0.35 #N/A
#N/A
0.12 #N/A
#N/A
c Pembantu Tukang
0.14
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,05 m TEBAL 4 mm
a Asbes gelombang
0.42 #N/A
#N/A
0.12 #N/A
#N/A
c Pembantu Tukang
0.14
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.44 #N/A
#N/A
0.12 #N/A
#N/A
c Pembantu Tukang
0.14
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,02 m TEBAL 5 mm
a Asbes gelombang
0.51 #N/A
#N/A
0.12 #N/A
#N/A
c Pembantu Tukang
0.14
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 m2 PASANG ATAP ASBES GELOMBANG ( 1,50 x 1,02 m ) x 5 mm
a Asbes gelombang
0.80 #N/A
#N/A
0.12 #N/A
#N/A
c Pembantu Tukang
0.14
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m PASANG ATAP SIRAP
a Genteng Sirap
80.00 #N/A
#N/A
0.20
kg
15,000.00
c Pembantu Tukang
0.10
hr
60,000.00
d Tukang kayu
0.20
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.10 #N/A
#N/A
0.03
kg
15,000.00
c Pembantu Tukang
0.20
hr
60,000.00
d Tukang kayu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
11 1 m2 PASANG ATAP GENTENG METAL + C301
a Genteng metal
1.02 #N/A
#N/A
0.20
kg
15,000.00
c Pembantu Tukang
0.20
hr
60,000.00
d Tukang kayu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
12 1 m PASANG NOK GENTENG BETON
a Nok genteng beton
3.50 #N/A
#N/A
0.05
kg
15,000.00
c Semen Tipe I
0.22
bh
58,000.00
d Pasir pasang
0.03
m3
140,000.00
e Semen putih
1.00
bh
100,000.00
f Pembantu Tukang
0.40
hr
60,000.00
g Tukang kayu
0.20
hr
70,000.00
1.10
lbr
19,000.00
0.05 #N/A
c Pembantu Tukang
0.25
hr
60,000.00
d Tukang kayu
0.15
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
13 1 m PASANG NOK GENTENG METAL
Jumlah
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jasa 10%
Total Jumlah
Dibulatkan
14 1 m2 PASANG ATAP Seng Gelombang BJLS 18
a Seng Gelombang BJLS 18
0.70 #N/A
#N/A
0.02 #N/A
#N/A
c Pembantu Tukang
0.12
hr
60,000.00
d Tukang kayu
0.06
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
15 1 m2 PASANG NOK SENG UNTUK ATAP Seng Gelombang BJLS 18
a Seng plat BJLS
1.05 #N/A
#N/A
0.04 #N/A
#N/A
c Pembantu Tukang
0.15
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
16 1 m2 PASANG ATAP POLYCARBONATE
a Polycarbonate
1.05 #N/A
#N/A
b Besi Hollow
1.50 #N/A
#N/A
1.00 #N/A
#N/A
d Pembantu Tukang
0.15
hr
60,000.00
e Tukang kayu
0.05
hr
70,000.00
a Aluminium foil
1.05
m2
12,000.00
1.00 #N/A
c Pembantu Tukang
0.15
hr
60,000.00
d Tukang kayu
0.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
17 1 m2 PASANG ALUMINIUM FOIL
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
XI
0.01 #N/A
#N/A
0.10
kg
15,000.00
c Pembantu Tukang
0.15
hr
60,000.00
d Tukang Kayu
0.25
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 Plafond GRC ( 60 x 1,20 ) m, tebal 4 mm
a Pelat GRC tebal 4 mm
1.10 #N/A
#N/A
0.01 #N/A
#N/A
c Pembantu Tukang
0.03
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 m2 Plafond Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
a Pelat asbes tebal 5 mm
1.10 #N/A
#N/A
0.01 #N/A
#N/A
c Pembantu Tukang
0.03
hr
60,000.00
d Tukang kayu
0.07
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 Plafond Akustik ( 60 x 120 ) cm
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.50 #N/A
#N/A
0.05 #N/A
#N/A
c Pembantu Tukang
0.06
hr
60,000.00
d Tukang kayu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 Plafond Akustik ( 60 x 120 ) cm + Rangka Alluminium
a Profil Alluminium "T"
3.60 #N/A
#N/A
0.15 #N/A
#N/A
1.00 #N/A
#N/A
1.50 #N/A
#N/A
e Pembantu Tukang
0.15
hr
60,000.00
f Tukang kayu
0.20
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 M List Plafond Profil kayu
a List Profil kayu
1.10 #N/A
#N/A
0.01 #N/A
#N/A
c Pembantu Tukang
0.05
hr
60,000.00
d Tukang kayu
0.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 M List Plafond kayu 1/4
a List kayu 1/4
1.10 #N/A
#N/A
0.01 #N/A
#N/A
c Pembantu Tukang
0.05
hr
60,000.00
d Tukang kayu
0.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
8 1 m2 Plafond Triplek 4 mm + Rangka Kayu Borneo Super
a Balok Kayu Kelas II
0.02
m3
2,500,000.00
0.06 #N/A
#N/A
0.39 #N/A
#N/A
d Pembantu Tukang
0.27
hr
60,000.00
e Tukang kayu
0.40
hr
70,000.00
0.02
m3
2,500,000.00
0.06 #N/A
#N/A
0.39 #N/A
#N/A
d Pembantu Tukang
0.27
hr
60,000.00
e Tukang kayu
0.40
hr
70,000.00
m3
2,500,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m2 Plafond Teakwood 4 mm + Rangka Kayu Borneo Super
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
10 1 m2 Plafond Papan 10 cm, tebal 1 cm + Rangka Kayu Borneo Super
a Balok Kayu Kelas II
0.02
0.20 #N/A
#N/A
0.02 #N/A
#N/A
d Pembantu Tukang
0.35
hr
60,000.00
e Tukang kayu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
11 1 m2 plafond Gypsum Board, tebal 9 mm + rangka besi hollow
a Hollow 4/4 Zincromate
0.42 #N/A
#N/A
0.15 #N/A
#N/A
0.36 #N/A
#N/A
25.00 #N/A
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
4.00 #N/A
#N/A
f Cotton plaster
0.07 #N/A
#N/A
g Compoun
0.13 #N/A
#N/A
h Pembantu Tukang
0.10
hr
60,000.00
i Tukang kayu
0.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
XII
PEKERJAAN SANITAIR
1.00 #N/A
#N/A
#N/A
#N/A
3.30
hr
60,000.00
d Tukang batu
1.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 Memasang 1 buah kloset jongkok porselen
a Kloset jongkok porselen
1.00 #N/A
#N/A
b Semen Tipe I
0.12
bh
58,000.00
c Pasir pasang
0.01
m3
140,000.00
d Pembantu Tukang
1.00
hr
60,000.00
e Tukang batu
1.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 Memasang 1 buah urinoir
a Urinoir
1.00 #N/A
#N/A
#N/A
#N/A
0.12
bh
58,000.00
d Pasir pasang
0.01
m3
140,000.00
e Pembantu Tukang
1.00
hr
60,000.00
No.
URAIAN
f Tukang batu
KOEFISIEN
SAT
HARGA SATUAN
1.00
hr
70,000.00
1.00
bh
550,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 Memasang 1 buah wastafel dinding
a Wastafel
b Perlengkapan ( 12% hrg kloset )
#N/A
#N/A
c Semen Tipe I
0.12
bh
58,000.00
d Pasir pasang
0.01
m3
140,000.00
e Pembantu Tukang
1.20
hr
60,000.00
f Tukang batu
1.45
hr
70,000.00
1.00
bh
550,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 Memasang 1 buah wastafel kaki
a Wastafel
b Perlengkapan ( 12% hrg kloset )
#N/A
#N/A
c Semen Tipe I
0.12
bh
58,000.00
d Pasir pasang
0.01
m3
140,000.00
e Pembantu Tukang
1.20
hr
60,000.00
f Tukang batu
1.45
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 Memasang 1 bh shower dinding
a Shower dinding
1.00 #N/A
b Pembantu Tukang
0.01
hr
60,000.00
c Tukang batu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 Memasang bak mandi Fiberglass ukuran sedang
#N/A
No.
URAIAN
a Bak fibreglass
KOEFISIEN
SAT
HARGA SATUAN
1.00 #N/A
#N/A
#N/A
#N/A
1.80
hr
60,000.00
d Tukang batu
2.70
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 Memasang bak kontrol pasangan Batu Bataukuran 30 x 30 cm, tinggi 35 cm
a Batu bata
0.15
bh
550.00
b Semen Tipe I
0.88
bh
58,000.00
c Pasir pasang
0.07
m3
140,000.00
d Batu kerikil
0.07 #N/A
#N/A
e Besi beton
1.60 #N/A
#N/A
f Pasir Cor
0.06
m3
190,000.00
g Pembantu Tukang
3.20
hr
60,000.00
h Tukang batu
1.02
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 Memasang Kichen Zink/bak cuci piring stainless steel
a Bak cuci stainless steel
1.00 #N/A
#N/A
1.00 #N/A
#N/A
c Pembantu Tukang
0.03
hr
60,000.00
d Tukang batu
0.30
hr
70,000.00
a Kran air
1.00
bh
23,000.00
1.00 #N/A
c Pembantu Tukang
0.01
hr
60,000.00
d Tukang batu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
10 Memasang 1 bh kran diameter 3/4 " atau 1/2 "
Jumlah
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jasa 10%
Total Jumlah
Dibulatkan
11 Memasang 1 bh kran air angsa
a Kran air angsa
1.00 #N/A
#N/A
1.00 #N/A
#N/A
c Pembantu Tukang
0.01
hr
60,000.00
d Tukang batu
0.10
hr
70,000.00
a Floor drain
1.00
bh
50,000.00
b Pembantu Tukang
0.01
hr
60,000.00
c Tukang batu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
12 Memasang 1 bh Floor drain
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
13 Memasang 1 bh tempat sabun
a Tempat Sabun
1.00 #N/A
#N/A
b Pembantu Tukang
0.01
hr
60,000.00
c Tukang batu
0.10
hr
70,000.00
1.10
m1
35,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
#N/A
#N/A
c Pembantu Tukang
0.05
hr
60,000.00
d Tukang pipa
0.09
hr
70,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 Memasang 1 M pipa galvanis diameter "
a Pipa galvanis
1.10 #N/A
#N/A
#N/A
#N/A
0.05
hr
60,000.00
d Tukang pipa
0.09
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 Memasang 1 M pipa galvanis diameter 1"
a Pipa galvanis
1.10 #N/A
#N/A
#N/A
#N/A
0.05
hr
60,000.00
d Tukang pipa
0.09
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 Memasang 1 M pipa galvanis diameter 1"
a Pipa galvanis
1.10 #N/A
#N/A
#N/A
#N/A
0.11
hr
60,000.00
d Tukang pipa
0.18
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 Memasang 1 M pipa PVC type D diameter 3"
a Pipa PVC type D
1.10 #N/A
#N/A
#N/A
#N/A
0.10
hr
60,000.00
d Tukang pipa
0.18
hr
70,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 Memasang 1 M pipa PVC type D diameter 4"
a Pipa PVC type D
1.10 #N/A
#N/A
#N/A
#N/A
0.13
hr
60,000.00
d Tukang pipa
0.22
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 Memasang 1 M PVC tipe AW diameter "
a Pipa PVC
1.10 #N/A
#N/A
#N/A
#N/A
0.04
hr
60,000.00
d Tukang pipa
0.06
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 Memasang 1 M PVC tipe AW diameter "
a Pipa PVC
1.10 #N/A
#N/A
#N/A
#N/A
0.03
hr
60,000.00
d Tukang pipa
0.06
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 Memasang 1 M PVC tipe AW diameter 1"
a Pipa PVC
1.10 #N/A
#N/A
#N/A
#N/A
0.04
hr
60,000.00
d Tukang pipa
0.06
hr
70,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
10 Memasang 1 M PVC tipe AW diameter 2"
a Pipa PVC
1.10 #N/A
#N/A
#N/A
#N/A
0.05
hr
60,000.00
d Tukang pipa
0.09
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
11 Memasang 1 M PVC tipe AW diameter 4"
a Pipa PVC
1.10 #N/A
#N/A
#N/A
#N/A
0.08
hr
60,000.00
d Tukang pipa
0.14
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
12 Membuat 1 bh Septictank pasangan Batu Batadan Rembesan
Galian tanah Septictank & rembesan
Pasir urug
Lantai kerja
7.5 #N/A
0.21
m3
#N/A
125,000.00
2.25 #N/A
#N/A
15.00 #N/A
#N/A
0.30 #N/A
#N/A
5.40 #N/A
#N/A
30.00 #N/A
#N/A
Pasangan ijuk
5.00 #N/A
#N/A
1.05 #N/A
#N/A
9.00 #N/A
#N/A
Urugan kembali
1.13 #N/A
#N/A
Pembantu Tukang
4.00
hr
60,000.00
Tukang batu
3.00
hr
70,000.00
Plesteran 1 Pc : 3 Psr
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
13 Memasang 1 bh Pompa Air
a Pompa Air 100 Watt
1.00 #N/A
#N/A
#N/A
#N/A
0.08
hr
60,000.00
d Tukang Pipa
0.14
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
1.10 #N/A
#N/A
b Meni besi
0.08 #N/A
#N/A
1.00 #N/A
#N/A
d Elektroda
0.20 #N/A
#N/A
e Tukang besi
0.04
hr
70,000.00
f Pembantu Tukang
0.06
hr
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 kg Pasang Rangka Atap besi siku
a Besi Siku
1.10 #N/A
#N/A
b Meni besi
0.10 #N/A
#N/A
1.00 #N/A
#N/A
d Elektroda
0.15 #N/A
#N/A
e Baud
0.20 #N/A
#N/A
f Tukang besi
0.04
hr
70,000.00
No.
URAIAN
g Pembantu Tukang
KOEFISIEN
0.06
SAT
hr
HARGA SATUAN
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 kg Pasang Gording besi C
a Besi C
1.10 #N/A
#N/A
b Meni besi
0.10 #N/A
#N/A
1.00 #N/A
#N/A
d Elektroda
0.15 #N/A
#N/A
e Baud
0.20 #N/A
#N/A
f Tukang besi
0.04
hr
70,000.00
g Pembantu Tukang
0.06
hr
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 Pasang Pintu Rolling Door besi
a Rolling door besi
1.00 #N/A
#N/A
b Tukang besi
1.50 #N/A
#N/A
c Pembantu Tukang
1.05
hr
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 bh Pasang Pintu besi ukuran 0,8 x 2 m
a Pintu besi jadi
1.00 #N/A
#N/A
b Tukang besi
1.05 #N/A
#N/A
c Pembantu Tukang
1.05
hr
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 Pasang Teralis Besi
a Besi strip 2 mm x 3 cm
b Tukang las
11.50 #N/A
1.20
hr
#N/A
70,000.00
No.
URAIAN
c Pembantu Tukang
KOEFISIEN
SAT
HARGA SATUAN
1.20
hr
60,000.00
a Kawat harmonika
1.10
m2
24,000.00
0.02 #N/A
#N/A
0.00 #N/A
#N/A
d Pembantu Tukang
0.10
hr
60,000.00
e Tukang kayu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 Pasang Kawat Harmonika
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 M1 Pasang Talang Datar, Seng plat BJLS
a Seng plat BJLS
1.00 #N/A
#N/A
0.02 #N/A
#N/A
0.01 #N/A
#N/A
0.25 #N/A
#N/A
e Pembantu Tukang
0.15
hr
60,000.00
f Tukang kayu
0.40
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 M1 Pasang Talang Miring, Seng plat BJLS
a Seng plat BJLS
0.50 #N/A
#N/A
0.02 #N/A
#N/A
0.02 #N/A
#N/A
0.30 #N/A
#N/A
e Pembantu Tukang
0.04
hr
60,000.00
f Tukang kayu
0.40
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
XV PEKERJAAN ALUMINIUM
1 1 m2 Pasang Pintu Rolling Door aluminium
a Rolling door aluminium
1.00 #N/A
#N/A
1.50 #N/A
#N/A
c Pembantu Tukang
1.05
hr
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 Pasang Pintu Aluminium pabrikan
a Pintu alluminium
1.00 #N/A
#N/A
b Tukang batu
1.05
hr
70,000.00
c Pembantu Tukang
1.05
hr
60,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 Unit Kusen Jendela Aluminium 2 lubang dgn 2 daun jendela ( ukuran 1,6 x 1,5 m )
a Profil aluminium 4" natural (+ spare 20 %)
b Profil daun jendela alm.( + spare 20%)
9.24 #N/A
#N/A
11.04 #N/A
#N/A
c Kaca Bening 3 mm
2.40
m2
87,000.00
d Engsel jendela
4.00
bh
12,000.00
e Grendel jendela
2.00
bh
11,000.00
f Kait angin
2.00 #N/A
#N/A
1.00 #N/A
#N/A
1.00 #N/A
#N/A
1.00 #N/A
#N/A
Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jasa 10%
Total Jumlah
Dibulatkan
4 1 Unit Kusen Jendela Aluminium 3 lubang dgn 2 daun jendela dan 1 kaca mati (ukuran 2 x 1,5 m)
a Profil aluminium 4" natural (+ spare 20 %)
12.00 #N/A
#N/A
11.04 #N/A
#N/A
c Kaca Bening 3 mm
3.00
m2
87,000.00
d Engsel jendela
4.00
bh
12,000.00
e Grendel jendela
2.00
bh
11,000.00
f Kait angin
2.00 #N/A
#N/A
1.00 #N/A
#N/A
1.00 #N/A
#N/A
1.00 #N/A
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 Unit Kusen Pintu Jendela gendong Aluminium dgn 2 jndl dan 1 pnt teakwood (ukr 2,2 x 2,7 m)
a Profil aluminium 4" natural (+ spare 20 %)
17.04 #N/A
#N/A
14.88 #N/A
#N/A
c Kaca Bening 3 mm
3.96
1.80 #N/A
e Engsel jendela
4.00
bh
12,000.00
f Grendel jendela
2.00
bh
11,000.00
g Kait angin
4.00 #N/A
h Engsel pintu
3.00
bh
15,000.00
i Grendel pintu
1.00
bh
16,000.00
j Kunci tanam
1.00 #N/A
#N/A
1.00 #N/A
#N/A
1.00 #N/A
#N/A
1.00 #N/A
#N/A
m2
87,000.00
#N/A
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
7.56 #N/A
#N/A
0.45 #N/A
#N/A
1.68 #N/A
#N/A
d Engsel pintu
3.00
bh
15,000.00
e Grendel pintu
1.00
bh
16,000.00
f Kunci tanam
1.00 #N/A
#N/A
g Acesories ( 6 % )
1.00 #N/A
#N/A
1.00 #N/A
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 bh Bovenlight Almunium dengan kisi-kisi almunium plat (ukuran 0,5 x 1 m)
a Profil Aluminium 4" natural + upah 20%
3.60 #N/A
#N/A
5.00 #N/A
#N/A
c Acesories ( 6 % )
1.00 #N/A
#N/A
1.00 #N/A
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 bh Bovenlight Almunium ukuran 0,5 x 1 m dengan bagian dalam kaca
a Profil Aluminium 4" natural + upah 20%
3.60 #N/A
b Kaca Bening 3 mm
0.50
c Acesories ( 6 % )
1.00 #N/A
#N/A
1.00 #N/A
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
m2
#N/A
87,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.00 #N/A
#N/A
b Pembantu Tukang
0.06
hr
60,000.00
c Tukang kayu
0.60
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 Buah Pasang Kunci Tanam sedang
a Kunci tanam sedang
1.00 #N/A
#N/A
b Pembantu Tukang
0.01
hr
60,000.00
c Tukang kayu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 1 Buah Pasang Kunci bulat putar Kamar Mandi
a Kunci bulat putar kamar mandi
1.00 #N/A
#N/A
b Pembantu Tukang
0.01
hr
60,000.00
c Tukang kayu
0.50
hr
70,000.00
a Engsel pintu
1.00
bh
15,000.00
b Pembantu Tukang
0.02
hr
60,000.00
c Tukang kayu
0.15
hr
70,000.00
a Engsel jendela
1.00
bh
12,000.00
b Pembantu Tukang
0.01
hr
60,000.00
c Tukang kayu
0.10
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 Buah Pasang Engsel Pintu
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 Buah Pasang Engsel Jendela Kupu-kupu
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 Buah Pasang Kait Angin
a Kait angin
1.00 #N/A
#N/A
b Pembantu Tukang
0.02
hr
60,000.00
c Tukang kayu
0.15
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 Buah Pasang Door Closer
a Door closer
1.00 #N/A
#N/A
b Pembantu Tukang
0.05
hr
60,000.00
c Tukang kayu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 Buah Pasang Pegangan Pintu / Door Holder
a Door holder
1.00 #N/A
#N/A
b Pembantu Tukang
0.05
hr
60,000.00
c Tukang kayu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 Buah Pasang Penahan Pintu / Door stoper
a Door stoper
1.00 #N/A
b Pembantu Tukang
0.05
hr
60,000.00
c Tukang kayu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
1.00 #N/A
#N/A
b Pembantu Tukang
0.05
hr
60,000.00
c Tukang kayu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
11 1 Buah Pasang Grendel / Sloot jendela
a Grendel / sloot jendela
1.00 #N/A
#N/A
b Pembantu Tukang
0.05
hr
60,000.00
c Tukang kayu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
12 1 Buah Pasang tarikan jendela
a Tarikan jendela
1.00 #N/A
#N/A
b Pembantu Tukang
0.05
hr
60,000.00
c Tukang kayu
0.50
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
13 1 m2 Pasang Kaca polos, tebal 3 mm
a Kaca polos
1.10 #N/A
#N/A
b Pembantu Tukang
0.02
hr
60,000.00
c Tukang kayu
0.15
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
14 1 m2 Pasang Kaca polos, tebal 5 mm
a Kaca polos
1.10 #N/A
#N/A
b Pembantu Tukang
0.02
hr
60,000.00
c Tukang kayu
0.15
hr
70,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
15 1 m2 Pasang Kaca Ray band, tebal 5 mm
a Kaca
1.10 #N/A
#N/A
b Pembantu Tukang
0.02
hr
60,000.00
c Tukang kayu
0.15
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
XVIIPEKERJAAN PENGECATAN
1 1 m2 Mengikis / Mengerok / mengelupas Permukaan Cat Tembok Lama
a Soda api
0.05 #N/A
#N/A
b Pembantu Tukang
0.05
hr
60,000.00
c Tukang cat
0.02
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 1 m2 Mendempul Dan Menggosok Kayu
a Dempul jadi
0.10 #N/A
#N/A
b Minyak cat
0.03 #N/A
#N/A
c Ampelas kasar
0.30 #N/A
#N/A
d Pembantu Tukang
0.04
hr
60,000.00
e Tukang cat
0.05
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
3 1 m2 Pengecatan Kayu Lama
a Cat meni
0.25 #N/A
b Plamir
0.15
c Ampelas
1.00 #N/A
d Cat dasar
0.15
0.60 #N/A
f Pembantu Tukang
0.05
hr
60,000.00
g Tukang cat
0.15
hr
70,000.00
kg
kg
#N/A
15,000.00
#N/A
17,000.00
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 1 m2 Pengecatan Kayu Baru
a Cat meni
0.50 #N/A
b Plamir
0.15
c Ampelas
1.00 #N/A
d Cat dasar
0.15
0.35 #N/A
f Pembantu Tukang
0.05
hr
60,000.00
g Tukang cat
0.15
hr
70,000.00
kg
kg
#N/A
15,000.00
#N/A
17,000.00
#N/A
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 1 m2 Pengecatan Kayu dengan Politur
a Politur
0.15 #N/A
#N/A
b Dempul jadi
0.25 #N/A
#N/A
c Ampelas
2.00 #N/A
#N/A
d Pembantu Tukang
0.05
hr
60,000.00
e Tukang cat
0.15
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 1 m2 Pengecatan Kayu dengan Melamik
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
a Melamik
0.15 #N/A
#N/A
b Dempul jadi
0.25 #N/A
#N/A
c Ampelas
2.00 #N/A
#N/A
d Pembantu Tukang
0.05
hr
60,000.00
e Tukang cat
0.15
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 1 m2 Pengecatan Kayu dengan Cat Residu/Ter
a Residu atau ter
0.35 #N/A
#N/A
b Pembantu Tukang
0.15
hr
60,000.00
c Tukang cat
0.02
hr
70,000.00
a Plamir
0.10
kg
15,000.00
b Rol cat
0.01 #N/A
#N/A
0.45 #N/A
#N/A
0.01 #N/A
#N/A
e Ampelas
0.50 #N/A
#N/A
f Pembantu Tukang
0.06
hr
60,000.00
g Tukang cat
0.20
hr
70,000.00
a Plamir
0.10
kg
15,000.00
b Rol cat
0.01 #N/A
#N/A
0.50 #N/A
#N/A
0.01 #N/A
#N/A
e Ampelas
0.50 #N/A
#N/A
f Pembantu Tukang
0.06
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 1 m2 Pengecatan Tembok/plafond Baru kwalitas sedang
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
9 1 m2 Pengecatan Tembok/plafond Baru kwalitas baik
hr
60,000.00
No.
URAIAN
g Tukang cat
KOEFISIEN
0.20
SAT
hr
HARGA SATUAN
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
10 1 m2 Pengecatan Tembok Lama
a Cat penutup kwalitas baik
0.40 #N/A
#N/A
b Rol cat
0.01 #N/A
#N/A
0.01 #N/A
#N/A
d Ampelas
0.50 #N/A
#N/A
e Pembantu Tukang
0.06
hr
60,000.00
f Tukang cat
0.20
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
11 1 m2 Pengecatan exterior
a Cat tembok
0.36 #N/A
b Plamir
0.16
c Rol cat
0.01 #N/A
#N/A
0.01 #N/A
#N/A
e Ampelas
0.50 #N/A
#N/A
f Pembantu Tukang
0.20 #N/A
#N/A
g Tukang cat
0.30 #N/A
#N/A
a Wallpaper
1.20 #N/A
#N/A
b Lem Perekat
0.20 #N/A
#N/A
c Pembantu Tukang
0.02
hr
60,000.00
d Tukang cat
0.15
hr
70,000.00
kg
#N/A
15,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
12 1 m2 Memasang Wallpaper
Jumlah
Jasa 10%
Total Jumlah
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Dibulatkan
13 1 m2 Pengecatan Permukaan Baja dengan Meni Besi
a Meni besi
0.10 #N/A
#N/A
b Kuas
0.01 #N/A
#N/A
c Pembantu Tukang
0.02
hr
60,000.00
d Tukang cat
0.20
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
14 1 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Cat
a Meni besi
0.10 #N/A
#N/A
b Cat besi
0.13 #N/A
#N/A
c Kuas
0.01 #N/A
#N/A
d Ampelas
0.50 #N/A
#N/A
e Perancah kayu
0.01 #N/A
#N/A
f Pembantu Tukang
0.20
hr
60,000.00
g Tukang cat
0.20
hr
70,000.00
a Stop Kontak
1.00
bh
20,000.00
0.25 #N/A
#N/A
c Accecories ( 20 % material )
1.00 #N/A
#N/A
d Pembantu Tukang
0.20
hr
60,000.00
e Tukang listrik
0.60
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 Pasang 1 Titik lampu
a Saklar
1.00 #N/A
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
0.25 #N/A
#N/A
c Accecories ( 20 % material )
1.00 #N/A
#N/A
d Pembantu Tukang
0.20
hr
60,000.00
e Tukang listrik
0.60
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 Pasang 1 Buah Lampu SL
a Lampu SL
1.00 #N/A
#N/A
b Accecories ( 1 % alat )
1.00 #N/A
#N/A
c Tukang listrik
0.10
hr
70,000.00
a Lampu TL
1.00
set
75,000.00
b Accecories ( 1 % alat )
1.00 #N/A
c Tukang listrik
0.12
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
4 Pasang 1 Buah Lampu TL
hr
#N/A
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
5 Pasang 1 Buah Lampu Baret
a Lampu Baret
1.00 #N/A
#N/A
b Accecories ( 1 % alat )
1.00 #N/A
#N/A
c Tukang listrik
0.15
hr
70,000.00
a Lampu Pijar
1.00
bh
31,000.00
b Accecories ( 1 % alat )
1.00 #N/A
c Tukang listrik
0.10
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
6 Pasang 1 Buah Lampu Pijar
hr
#N/A
70,000.00
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
7 Pasang 1 Buah Lampu Taman
a Lampu Taman
1.00 #N/A
#N/A
b Accecories ( 1 % alat )
1.00 #N/A
#N/A
c Tukang listrik
0.35
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
8 Pasang 1 Buah Panel
a Panel Listrik standart untuk Rumah
1.00 #N/A
#N/A
b Accecories ( 10 % alat )
1.00 #N/A
#N/A
c Tukang listrik
1.00
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
XIXPEKERJAAN WATERPROOFING
1 Pasang 1 m2 Waterproofing Membran
a Material Primer
2.50 #N/A
#N/A
b Waterproofing Membrane
1.10 #N/A
#N/A
c Pengetesan ( 10 % material )
1.00 #N/A
#N/A
d Pembantu Tukang
0.20
hr
60,000.00
e Tukang Batu
0.60
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
2 Pasang 1 m2 Waterproofing Coating
a Pre treatment / Cleaning ( 10 % material )
1.00 #N/A
#N/A
1.00 #N/A
#N/A
c Kuas 3 "
0.25 #N/A
#N/A
No.
URAIAN
KOEFISIEN
SAT
HARGA SATUAN
d Pembantu Tukang
0.20
hr
60,000.00
e Tukang Batu
0.60
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
3 Pasang 1 m2 Floor Harderner
a Material Natural non Metalic
1.10 #N/A
#N/A
b Accecories ( 10 % alat )
1.00 #N/A
#N/A
c Pembantu Tukang
0.20
hr
60,000.00
d Tukang Batu
0.60
hr
70,000.00
Jumlah
Jasa 10%
Total Jumlah
Dibulatkan
JUMLAH (RP)
#N/A
2,900.00
45,600.00
950.00
2,565.00
#N/A
#N/A
#N/A
14,000.00
6,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
2,320.00
55,000.00
950.00
2,565.00
#N/A
14,000.00
18,000.00
#N/A
#N/A
#N/A
#N/A
50,000.00
#N/A
#N/A
7,000.00
JUMLAH (RP)
6,000.00
#N/A
#N/A
#N/A
#N/A
50,000.00
450,000.00
12,750.00
17,325.00
2,030,000.00
21,000.00
19,000.00
42,750.00
16,500.00
45,600.00
60,000.00
48,000.00
6,960.00
12,750.00
3,720.00
140,000.00
70,000.00
120,000.00
3,166,355.00
316,635.50
3,482,990.50
3,482,990.00
50,000.00
250,000.00
4,500.00
12,180.00
5,700.00
14,250.00
45,600.00
JUMLAH (RP)
70,000.00
60,000.00
512,230.00
51,223.00
563,453.00
563,450.00
6,000.00
6,000.00
600.00
6,600.00
6,600.00
12,000.00
12,000.00
1,200.00
13,200.00
13,200.00
120,000.00
120,000.00
12,000.00
132,000.00
132,000.00
28,500.00
7,000.00
1,250.00
60,000.00
96,750.00
9,675.00
106,425.00
106,420.00
372,000.00
372,000.00
JUMLAH (RP)
37,200.00
409,200.00
409,200.00
276,000.00
276,000.00
27,600.00
303,600.00
303,600.00
50,000.00
50,000.00
15,200.00
42,750.00
29,000.00
9,100.00
22,800.00
218,850.00
21,885.00
240,735.00
240,730.00
24,000.00
1,100.00
25,100.00
2,510.00
27,610.00
27,610.00
31,800.00
1,100.00
32,900.00
3,290.00
JUMLAH (RP)
36,190.00
36,190.00
44,400.00
1,100.00
45,500.00
4,550.00
50,050.00
50,050.00
27,000.00
1,100.00
28,100.00
2,810.00
30,910.00
30,910.00
1,500.00
825.00
2,325.00
232.50
2,557.50
2,550.00
25,200.00
1,100.00
26,300.00
2,630.00
28,930.00
28,930.00
11,400.00
1,100.00
12,500.00
1,250.00
13,750.00
JUMLAH (RP)
13,750.00
30,000.00
1,100.00
31,100.00
3,110.00
34,210.00
34,210.00
150,000.00
18,000.00
1,100.00
169,100.00
16,910.00
186,010.00
186,010.00
48,000.00
18,000.00
1,100.00
67,100.00
6,710.00
73,810.00
73,810.00
168,000.00
15,000.00
1,100.00
184,100.00
18,410.00
202,510.00
202,510.00
JUMLAH (RP)
313,500.00
234,320.00
67,900.00
90,000.00
42,000.00
747,720.00
74,772.00
822,492.00
822,490.00
313,500.00
189,080.00
72,800.00
90,000.00
42,000.00
707,380.00
70,738.00
778,118.00
778,110.00
313,500.00
157,760.00
76,160.00
90,000.00
42,000.00
679,420.00
67,942.00
747,362.00
747,360.00
342,000.00
37,500.00
46,800.00
27,300.00
453,600.00
JUMLAH (RP)
45,360.00
498,960.00
498,960.00
389,760.00
102,600.00
230,850.00
120,000.00
24,500.00
867,710.00
86,771.00
954,481.00
954,480.00
13,440.00
255.00
420.00
490.00
14,605.00
1,460.50
16,065.50
16,060.00
100,000.00
4,500.00
1,700.00
18,000.00
18,200.00
142,400.00
14,240.00
156,640.00
156,640.00
640,000.00
234,320.00
60,800.00
JUMLAH (RP)
139,650.00
13,600.00
114,000.00
120,000.00
59,500.00
1,381,870.00
138,187.00
1,520,057.00
1,520,050.00
128,250.00
324,800.00
85,500.00
190,950.00
142,800.00
21,000.00
893,300.00
89,330.00
982,630.00
982,630.00
19,000.00
42,750.00
70,180.00
576,000.00
15,300.00
80,000.00
25,000.00
1,800.00
1,530.00
3,600.00
60,000.00
46,900.00
942,060.00
94,206.00
1,036,266.00
JUMLAH (RP)
1,036,260.00
15,200.00
37,050.00
56,840.00
441,600.00
11,900.00
75,000.00
25,000.00
1,800.00
1,530.00
3,000.00
48,000.00
35,000.00
751,920.00
75,192.00
827,112.00
827,110.00
11,400.00
31,350.00
47,560.00
441,600.00
10,200.00
75,000.00
25,000.00
1,650.00
1,360.00
3,000.00
48,000.00
35,000.00
731,120.00
73,112.00
804,232.00
804,230.00
JUMLAH (RP)
500,000.00
22,500.00
6,800.00
1,600,000.00
38,250.00
374,680.00
98,800.00
222,300.00
234,000.00
24,500.00
72,800.00
73,500.00
3,268,130.00
326,813.00
3,594,943.00
3,594,940.00
500,000.00
22,500.00
6,800.00
1,920,000.00
38,250.00
374,680.00
98,800.00
222,300.00
240,000.00
28,000.00
70,000.00
70,000.00
3,591,330.00
359,133.00
3,950,463.00
3,950,460.00
500,000.00
22,500.00
JUMLAH (RP)
6,800.00
1,600,000.00
35,700.00
374,680.00
98,800.00
222,300.00
234,000.00
28,000.00
70,000.00
70,000.00
3,262,780.00
326,278.00
3,589,058.00
3,589,050.00
500,000.00
22,500.00
6,800.00
1,920,000.00
38,250.00
374,680.00
98,800.00
222,300.00
240,000.00
28,000.00
70,000.00
70,000.00
3,591,330.00
359,133.00
3,950,463.00
3,950,460.00
JUMLAH (RP)
252,880.00
98,800.00
247,950.00
120,000.00
24,500.00
744,130.00
74,413.00
818,543.00
818,540.00
269,120.00
98,800.00
222,300.00
120,000.00
24,500.00
734,720.00
73,472.00
808,192.00
808,190.00
389,760.00
102,600.00
230,850.00
120,000.00
24,500.00
867,710.00
86,771.00
954,481.00
954,480.00
450,080.00
123,500.00
JUMLAH (RP)
185,250.00
120,000.00
24,500.00
903,330.00
90,333.00
993,663.00
993,660.00
464,000.00
104,500.00
199,500.00
121,200.00
28,000.00
917,200.00
91,720.00
1,008,920.00
1,008,920.00
13,440.00
340.00
600.00
700.00
15,080.00
1,508.00
16,588.00
16,580.00
14,850.00
255.00
600.00
1,400.00
17,105.00
1,710.50
18,815.50
18,810.00
JUMLAH (RP)
112,500.00
4,500.00
1,700.00
18,000.00
18,200.00
154,900.00
15,490.00
170,390.00
170,390.00
100,000.00
6,000.00
3,400.00
100,000.00
57,750.00
18,000.00
23,100.00
308,250.00
30,825.00
339,075.00
339,070.00
100,000.00
6,000.00
3,400.00
100,000.00
57,750.00
19,200.00
23,100.00
309,450.00
30,945.00
340,395.00
340,390.00
JUMLAH (RP)
100,000.00
6,000.00
3,400.00
100,000.00
57,750.00
19,200.00
23,100.00
309,450.00
30,945.00
340,395.00
340,390.00
75,000.00
6,000.00
2,550.00
50,000.00
57,750.00
19,200.00
23,100.00
233,600.00
23,360.00
256,960.00
256,960.00
675,000.00
30,000.00
10,200.00
2,560,000.00
51,000.00
464,000.00
98,800.00
222,300.00
270,000.00
24,500.00
109,200.00
JUMLAH (RP)
98,000.00
4,613,000.00
461,300.00
5,074,300.00
5,074,300.00
1,000,000.00
60,000.00
34,000.00
1,600,000.00
76,500.00
374,100.00
98,800.00
222,300.00
750,000.00
577,500.00
438,000.00
24,500.00
231,000.00
147,000.00
5,633,700.00
563,370.00
6,197,070.00
6,197,070.00
1,000,000.00
60,000.00
34,000.00
1,920,000.00
76,500.00
374,100.00
98,800.00
222,300.00
750,000.00
577,500.00
438,000.00
JUMLAH (RP)
24,500.00
231,000.00
147,000.00
5,953,700.00
595,370.00
6,549,070.00
6,549,070.00
1,000,000.00
60,000.00
34,000.00
2,048,000.00
76,500.00
374,100.00
98,800.00
222,300.00
750,000.00
577,500.00
438,000.00
24,500.00
231,000.00
147,000.00
6,081,700.00
608,170.00
6,689,870.00
6,689,870.00
1,000,000.00
60,000.00
34,000.00
2,240,000.00
76,500.00
374,100.00
98,800.00
222,300.00
750,000.00
JUMLAH (RP)
577,500.00
438,000.00
24,500.00
231,000.00
147,000.00
6,273,700.00
627,370.00
6,901,070.00
6,901,070.00
1,000,000.00
60,000.00
34,000.00
2,560,000.00
76,500.00
374,100.00
98,800.00
222,300.00
750,000.00
577,500.00
438,000.00
24,500.00
231,000.00
147,000.00
6,593,700.00
659,370.00
7,253,070.00
7,253,070.00
1,000,000.00
60,000.00
34,000.00
3,200,000.00
76,500.00
374,100.00
98,800.00
JUMLAH (RP)
222,300.00
750,000.00
577,500.00
438,000.00
24,500.00
231,000.00
147,000.00
7,233,700.00
723,370.00
7,957,070.00
7,957,070.00
1,000,000.00
60,000.00
34,000.00
3,840,000.00
76,500.00
374,100.00
98,800.00
222,300.00
750,000.00
577,500.00
438,000.00
24,500.00
231,000.00
147,000.00
7,873,700.00
787,370.00
8,661,070.00
8,661,070.00
800,000.00
48,000.00
27,200.00
1,600,000.00
38,250.00
JUMLAH (RP)
374,100.00
98,800.00
222,300.00
300,000.00
462,000.00
480,000.00
348,000.00
24,500.00
196,000.00
73,500.00
5,092,650.00
509,265.00
5,601,915.00
5,601,910.00
800,000.00
48,000.00
27,200.00
1,920,000.00
38,250.00
374,100.00
98,800.00
222,300.00
300,000.00
462,000.00
480,000.00
348,000.00
24,500.00
196,000.00
73,500.00
5,412,650.00
541,265.00
5,953,915.00
5,953,910.00
800,000.00
JUMLAH (RP)
48,000.00
27,200.00
2,560,000.00
51,000.00
374,100.00
98,800.00
222,300.00
462,000.00
240,000.00
357,600.00
24,500.00
196,000.00
98,000.00
1,378,100.00
137,810.00
1,515,910.00
1,515,910.00
800,000.00
48,000.00
27,200.00
3,200,000.00
102,000.00
374,100.00
98,800.00
222,300.00
350,000.00
462,000.00
240,000.00
357,600.00
24,500.00
196,000.00
98,000.00
6,600,500.00
660,050.00
7,260,550.00
JUMLAH (RP)
7,260,550.00
625,000.00
45,000.00
20,400.00
2,560,000.00
51,000.00
374,100.00
98,800.00
222,300.00
750,000.00
412,500.00
336,000.00
24,500.00
161,000.00
98,000.00
5,778,600.00
577,860.00
6,356,460.00
6,356,460.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
675,000.00
30,000.00
10,200.00
2,240,000.00
51,000.00
464,000.00
98,800.00
222,300.00
291,000.00
28,000.00
122,500.00
JUMLAH (RP)
101,500.00
4,334,300.00
433,430.00
4,767,730.00
4,767,730.00
77,000.00
37,700.00
12,600.00
39,000.00
14,000.00
180,300.00
18,030.00
198,330.00
198,330.00
77,000.00
31,900.00
12,600.00
39,000.00
14,000.00
174,500.00
17,450.00
191,950.00
191,950.00
77,000.00
26,100.00
14,000.00
39,000.00
14,000.00
170,100.00
17,010.00
JUMLAH (RP)
187,110.00
187,110.00
38,500.00
16,820.00
5,600.00
19,200.00
7,000.00
87,120.00
8,712.00
95,832.00
95,830.00
38,500.00
14,500.00
7,000.00
19,200.00
7,000.00
86,200.00
8,620.00
94,820.00
94,820.00
38,500.00
12,760.00
7,000.00
19,200.00
7,000.00
84,460.00
8,446.00
92,906.00
92,900.00
#N/A
15,660.00
5,600.00
JUMLAH (RP)
18,000.00
7,000.00
#N/A
#N/A
#N/A
#N/A
780,000.00
27,000.00
18,000.00
7,000.00
832,000.00
83,200.00
915,200.00
915,200.00
45,000.00
14,500.00
4,200.00
18,000.00
10,500.00
92,200.00
9,220.00
101,420.00
101,420.00
45,000.00
11,600.00
2,800.00
18,000.00
10,500.00
87,900.00
8,790.00
96,690.00
96,690.00
JUMLAH (RP)
#N/A
#N/A
18,000.00
14,000.00
#N/A
#N/A
#N/A
#N/A
8,120.00
2,800.00
12,000.00
10,500.00
33,420.00
3,342.00
36,762.00
36,760.00
7,540.00
2,800.00
12,000.00
10,500.00
32,840.00
3,284.00
36,124.00
36,120.00
5,800.00
2,800.00
12,000.00
10,500.00
31,100.00
3,110.00
JUMLAH (RP)
34,210.00
34,210.00
5,220.00
2,800.00
12,000.00
10,500.00
30,520.00
3,052.00
33,572.00
33,570.00
9,860.00
4,200.00
13,200.00
11,200.00
38,460.00
3,846.00
42,306.00
42,300.00
8,700.00
4,200.00
15,000.00
14,000.00
41,900.00
4,190.00
46,090.00
46,090.00
6,380.00
3,500.00
9,000.00
4,900.00
23,780.00
2,378.00
JUMLAH (RP)
26,158.00
26,150.00
11,020.00
2,800.00
15,600.00
14,000.00
43,420.00
4,342.00
47,762.00
47,760.00
8,700.00
2,800.00
15,600.00
14,000.00
41,100.00
4,110.00
45,210.00
45,210.00
580.00
1,400.00
3,600.00
2,800.00
8,380.00
838.00
9,218.00
9,210.00
4,640.00
8,400.00
7,700.00
20,740.00
2,074.00
22,814.00
JUMLAH (RP)
22,810.00
5,220.00
2,800.00
9,000.00
4,900.00
21,920.00
2,192.00
24,112.00
24,110.00
60,000.00
9,280.00
3,010.00
2,000.00
15,000.00
8,400.00
97,690.00
9,769.00
107,459.00
107,450.00
60,000.00
9,280.00
2,800.00
2,000.00
15,600.00
8,750.00
98,430.00
9,843.00
108,273.00
108,270.00
JUMLAH (RP)
65,000.00
10,440.00
3,010.00
1,300.00
15,000.00
8,400.00
103,150.00
10,315.00
113,465.00
113,460.00
#N/A
9,860.00
3,010.00
2,000.00
15,600.00
9,800.00
#N/A
#N/A
#N/A
#N/A
#N/A
10,440.00
2,800.00
2,000.00
13,200.00
28,000.00
#N/A
#N/A
#N/A
#N/A
54,000.00
9,860.00
3,010.00
JUMLAH (RP)
2,000.00
18,000.00
10,500.00
97,370.00
9,737.00
107,107.00
107,100.00
54,000.00
9,860.00
3,010.00
2,000.00
18,000.00
10,500.00
97,370.00
9,737.00
107,107.00
107,100.00
57,000.00
9,280.00
2,800.00
2,000.00
15,000.00
8,400.00
94,480.00
9,448.00
103,928.00
103,920.00
57,000.00
9,280.00
2,800.00
2,000.00
15,000.00
8,400.00
JUMLAH (RP)
94,480.00
9,448.00
103,928.00
103,920.00
#N/A
27,840.00
14,000.00
20,000.00
37,200.00
24,500.00
#N/A
#N/A
#N/A
#N/A
278,250.00
21,000.00
39,000.00
24,500.00
362,750.00
36,275.00
399,025.00
399,020.00
#N/A
27,840.00
11,200.00
10,000.00
36,000.00
33,600.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
10,440.00
2,800.00
2,000.00
13,200.00
28,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
10,440.00
2,800.00
2,000.00
13,200.00
28,000.00
#N/A
#N/A
#N/A
#N/A
54,000.00
9,860.00
2,800.00
2,000.00
12,000.00
27,300.00
107,960.00
10,796.00
118,756.00
JUMLAH (RP)
118,750.00
#N/A
9,860.00
2,800.00
2,000.00
12,000.00
27,300.00
#N/A
#N/A
#N/A
#N/A
#N/A
9,280.00
2,520.00
1,300.00
11,250.00
26,250.00
#N/A
#N/A
#N/A
#N/A
#N/A
9,280.00
2,520.00
1,300.00
11,250.00
26,250.00
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
14,500.00
3,500.00
150,000.00
#N/A
375.00
43,200.00
45,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
14,500.00
3,500.00
150,000.00
#N/A
375.00
43,200.00
45,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
13,920.00
4,900.00
19,200.00
17,500.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
180,000.00
14,500.00
4,900.00
19,200.00
17,500.00
236,100.00
23,610.00
259,710.00
259,710.00
#N/A
1,160.00
1,400.00
10,000.00
3,600.00
2,100.00
#N/A
#N/A
#N/A
#N/A
#N/A
1,160.00
1,400.00
12,000.00
3,600.00
2,100.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
360,000.00
1,050,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
360,000.00
1,050,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
360,000.00
1,050,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
60,000.00
175,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
60,000.00
175,000.00
#N/A
#N/A
#N/A
#N/A
196,000.00
73,500.00
196,000.00
465,500.00
46,550.00
512,050.00
512,050.00
48,000.00
27,200.00
140,000.00
215,200.00
21,520.00
236,720.00
236,720.00
#N/A
60,000.00
210,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
36,000.00
JUMLAH (RP)
140,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
30,000.00
140,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
36,000.00
140,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
36,000.00
140,000.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
48,000.00
175,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
48,000.00
175,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1,500.00
#N/A
#N/A
9,000.00
31,500.00
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
1,500.00
#N/A
#N/A
12,000.00
42,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1,470.00
#N/A
#N/A
#N/A
#N/A
262,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
262,500.00
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
6,000.00
3,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
240,000.00
840,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
240,000.00
840,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
6,000.00
7,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
6,000.00
7,000.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
6,000.00
14,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
6,600.00
15,400.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
120,000.00
140,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
9,000.00
5,250.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
9,280.00
4,480.00
18,000.00
14,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
8,400.00
4,690.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
8,400.00
4,900.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
8,400.00
4,900.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
8,400.00
4,690.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
8,400.00
4,690.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
8,400.00
4,900.00
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
6,000.00
14,000.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
450.00
12,000.00
7,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
12,000.00
7,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
750.00
12,528.00
4,480.00
100,000.00
24,000.00
14,000.00
#N/A
#N/A
#N/A
#N/A
20,900.00
#N/A
15,000.00
10,500.00
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
7,200.00
4,200.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
9,000.00
4,900.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
9,000.00
3,500.00
#N/A
#N/A
#N/A
#N/A
12,600.00
#N/A
9,000.00
3,500.00
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
1,500.00
9,000.00
17,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1,800.00
4,900.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1,800.00
4,900.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
3,600.00
7,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
9,000.00
14,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
3,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
3,500.00
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
57,500.00
#N/A
#N/A
16,200.00
28,000.00
#N/A
#N/A
#N/A
#N/A
57,500.00
#N/A
#N/A
16,200.00
28,000.00
#N/A
#N/A
#N/A
#N/A
57,500.00
#N/A
#N/A
21,000.00
35,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
6,000.00
3,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
198,000.00
77,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
6,960.00
1,400.00
60,000.00
105,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
6,960.00
1,400.00
60,000.00
JUMLAH (RP)
70,000.00
#N/A
#N/A
#N/A
#N/A
550,000.00
#N/A
6,960.00
1,400.00
72,000.00
101,500.00
#N/A
#N/A
#N/A
#N/A
550,000.00
#N/A
6,960.00
1,400.00
72,000.00
101,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
600.00
7,000.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
108,000.00
189,000.00
#N/A
#N/A
#N/A
#N/A
82.50
51,040.00
9,800.00
#N/A
#N/A
11,400.00
192,000.00
71,400.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1,800.00
21,000.00
#N/A
#N/A
#N/A
#N/A
23,000.00
#N/A
600.00
7,000.00
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
600.00
7,000.00
#N/A
#N/A
#N/A
#N/A
50,000.00
600.00
7,000.00
57,600.00
5,760.00
63,360.00
63,360.00
#N/A
600.00
7,000.00
#N/A
#N/A
#N/A
#N/A
38,500.00
#N/A
3,240.00
6,300.00
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
3,240.00
6,300.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
3,240.00
6,300.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
6,480.00
12,600.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
6,000.00
12,600.00
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
7,800.00
15,400.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
2,160.00
4,200.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1,800.00
4,200.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
2,160.00
4,200.00
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
3,240.00
6,300.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
4,860.00
9,450.00
#N/A
#N/A
#N/A
#N/A
#N/A
26,250.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
240,000.00
210,000.00
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
4,860.00
9,450.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
2,800.00
3,600.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
2,800.00
JUMLAH (RP)
3,600.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
2,800.00
3,600.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
63,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
63,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
84,000.00
JUMLAH (RP)
72,000.00
#N/A
#N/A
#N/A
#N/A
26,400.00
#N/A
#N/A
6,000.00
7,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
9,000.00
28,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
2,400.00
28,000.00
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
63,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
73,500.00
63,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
208,800.00
48,000.00
22,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
261,000.00
48,000.00
22,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
344,520.00
#N/A
48,000.00
22,000.00
#N/A
45,000.00
16,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
45,000.00
16,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
43,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
3,600.00
42,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
600.00
35,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
300.00
35,000.00
#N/A
#N/A
#N/A
#N/A
15,000.00
900.00
10,500.00
26,400.00
2,640.00
29,040.00
29,040.00
12,000.00
600.00
7,000.00
JUMLAH (RP)
19,600.00
1,960.00
21,560.00
21,560.00
#N/A
900.00
10,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
35,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
35,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
35,000.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
3,000.00
35,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
35,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
35,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
900.00
10,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
900.00
10,500.00
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
900.00
10,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
1,400.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
2,400.00
3,500.00
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
2,250.00
#N/A
2,550.00
#N/A
3,000.00
10,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
2,250.00
#N/A
2,550.00
#N/A
3,000.00
10,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
3,000.00
10,500.00
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
3,000.00
10,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
9,000.00
1,400.00
#N/A
#N/A
#N/A
#N/A
1,500.00
#N/A
#N/A
#N/A
#N/A
3,600.00
14,000.00
#N/A
#N/A
#N/A
#N/A
1,500.00
#N/A
#N/A
#N/A
#N/A
3,600.00
JUMLAH (RP)
14,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
3,600.00
14,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
2,400.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1,200.00
10,500.00
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
#N/A
1,200.00
14,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
12,000.00
14,000.00
#N/A
#N/A
#N/A
#N/A
20,000.00
#N/A
#N/A
12,000.00
42,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
#N/A
#N/A
12,000.00
42,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
7,000.00
#N/A
#N/A
#N/A
#N/A
75,000.00
#N/A
8,400.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
10,500.00
#N/A
#N/A
#N/A
#N/A
31,000.00
#N/A
7,000.00
JUMLAH (RP)
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
24,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
70,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
12,000.00
42,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
JUMLAH (RP)
12,000.00
42,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
12,000.00
42,000.00
#N/A
#N/A
#N/A
#N/A
I. PEKERJAAN PERSIAPAN
URAIAN
NO
SATUAN
BIAYA (Rp.)
1 M1
435,800.00
1 M1
601,790.00
1 M2
89,560.00
1 M2
2,875,900.00
1 M2
517,880.00
1 M2
3,850.00
Membersihkan Puing-puing
1 M2
7,700.00
1 M2
77,000.00
1 M2
65,120.00
10
1 M3
238,700.00
11
1 M3
177,100.00
12
1 M2
235,670.00
KETERANGAN
NO
SATUAN
BIAYA (Rp.)
1 M3
16,190.00
1 M3
21,190.00
1 M3
29,280.00
1 M3
18,110.00
1 M2
1,550.00
1 M3
16,960.00
1 M3
8,100.00
Pemadatan Tanah
1 M3
20,040.00
Urugan pasir
1 M3
203,740.00
10
Urugan tanah
1 M3
160,180.00
11
Urugan sirtu
1 M3
228,210.00
KETERANGAN
URAIAN
SATUAN
BIAYA (Rp.)
1 M3
564,230.00
1 M3
529,400.00
1 M3
505,250.00
1 M3
288,580.00
714,650.00
1 Kg
10,610.00
1 M2
128,350.00
1 M3
1,032,840.00
1 M3
694,220.00
10
1 M1
773,150.00
11
1 M1
628,500.00
12
1 M1
13
2,593,600.00
14
2,829,220.00
15
2,589,770.00
16
2,829,220.00
KETERANGAN
610,690.00
URAIAN
SATUAN
BIAYA (Rp.)
PEKERJAAN BETON
1 M3
597,830.00
1 M3
595,000.00
1 M3
714,650.00
1 M3
760,020.00
1 M3
765,930.00
PEKERJAAN PEMBESIAN
1 KG
10,940.00
1 KG
12,320.00
KETERANGAN
PEKERJAAN BEKISTING
1 M2
143,220.00
1 M2
317,790.00
1 M2
318,560.00
1 M2
318,560.00
1 M2
222,200.00
3,637,350.00
5,166,900.00
5,400,650.00
6,101,900.00
4,493,870.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
4,933,150.00
5,260,400.00
5,634,400.00
6,569,400.00
4,727,620.00
0.00
#REF!
5,475,340.00
M3 + Bekisting )
Membuat Plat Lantai tebal 10 Cm Beton Bertulang ( 100 Kg1Besi
M3 + Bekisting )
Membuat Plat Lantai tebal 12 Cm Beton Bertulang ( 115 Kg1Besi
5,225,270.00
M3 + Bekisting )
Membuat Plat Lantai tebal 12 Cm Beton Bertulang ( 125 Kg1Besi
M3 + Bekisting )
Membuat Plat Lantai tebal 15 Cm Beton Bertulang ( 100 Kg1Besi
5,209,330.00
M3 + Bekisting )
Membuat Plat Lantai tebal 20 Cm Beton Bertulang ( 115 Kg1Besi
1 M3)
Membuat Ring Balk Beton Bertulang ( 175 Kg Besi + Bekisting
4,798,140.00
4,948,660.00
5,088,990.00
4,326,780.00
3,431,430.00
V. PEKERJAAN DINDING
URAIAN
NO
1
SATUAN
BIAYA (Rp.)
170,280.00
161,530.00
81,890.00
1 M2
180,460.00
1 M2
595,240.00
1 M2
70,620.00
10
1 M2
70,290.00
11
1 M2
125,310.00
2
3
4
5
KETERANGAN
165,000.00
74,720.00
80,310.00
NO
SATUAN
BIAYA (Rp.)
1 M2
26,140.00
1 M2
25,610.00
1 M2
24,030.00
1 M2
23,500.00
1 M2
30,810.00
1 M2
32,890.00
1 M2
19,580.00
1 M2
33,570.00
1 M2
31,460.00
10
1 M1
6,630.00
11
Accian Plesteran
1 M2
15,050.00
12
1 M2
17,620.00
KETERANGAN
NO
SATUAN
BIAYA (Rp.)
1 M2
253,500.00
1 M2
242,860.00
1 M2
320,530.00
1 M2
351,110.00
1 M2
79,990.00
1 M2
73,740.00
1 M2
74,290.00
1 M2
70,630.00
1 M2
72,830.00
10
1 M2
231,910.00
11
1 M2
351,420.00
12
1 M2
747,180.00
SATUAN
BIAYA (Rp.)
1 M2
81,640.00
1 M2
81,090.00
1 M2
82,050.00
1 M2
81,500.00
1 M2
79,350.00
1 M2
79,900.00
1 M2
233,930.00
1 M2
746,400.00
1 M2
123,460.00
10
1 M2
115,740.00
11
1 M1
28,990.00
12
1 M1
30,810.00
KETERANGAN
KETERANGAN
URAIAN
SATUAN
BIAYA (Rp.)
1 M3
7,837,500.00
6,385,500.00
5,197,500.00
KETERANGAN
1 M2
397,650.00
1 M2
351,450.00
1 M2
329,170.00
1 M2
158,840.00
1 M2
489,720.00
1 M2
Pasang Pintu Triplek Rangkap , Rangka Kayu Kamper Medan
1 M2
Pasang Jalusi Mati Kusen Kayu Kamper Medan
263,210.00
241,650.00
1 M2
Pasang Pintu Triplek & Formika Rangka Kayu Kamper Medan
1 M2
Pasang Pintu Teakwood & Formika Rangka Kayu Kamper Medan
381,760.00
269,480.00
16
1 M2 Medan
Pasang Dinding Pemisah Double Teakwood, Rangka Kayu Kamper
1 M2
Pasang Dinding Pemisah Double GRC, Rangka Kayu Kamper
Medan
17
1 bh
454,780.00
18
1 M2
902,000.00
19
1 M2
749,220.00
20
114,070.00
10
11
12
13
14
15
403,860.00
330,280.00
413,110.00
215,030.00
NO
SATUAN
BIAYA (Rp.)
1 M3
5,882,030.00
1 M3
4,793,030.00
52,850.00
1 M2
59,890.00
1 M2
48,410.00
1 M2
67,760.00
1 M3
3,874,420.00
1 M2
39,730.00
1 M1
126,450.00
1 M2
50,230.00
36,670.00
38,020.00
52,500.00
54,020.00
50,780.00
1 M2
95,370.00
10
1 M2
100,130.00
11
1 M2
163,170.00
12
1 M1
107,410.00
13
1 M1
81,780.00
14
1 M2
40,940.00
15
1 M1
45,520.00
16
1 M2
356,920.00
17
1 M2
14,070.00
18
1 M2
160,000.00
KETERANGAN
NO
SATUAN
BIAYA (Rp.)
61,600.00
1 M2
59,910.00
1 M2
21,680.00
1 M2
126,660.00
1 M2
257,870.00
1 M1
20,850.00
1 M2
127,320.00
1 M2
152,200.00
239,300.00
10
89,610.00
11
1 M1
KETERANGAN
9,720.00
NO
SATUAN
BIAYA (Rp.)
1 BH
2,922,150.00
1 BH
281,500.00
Memasang Urinoir
1 BH
635,260.00
1 BH
374,990.00
1 BH
427,960.00
1 BH
142,830.00
1 BH
397,650.00
265,490.00
1 BH
282,750.00
10
1 BH
66,930.00
11
1 BH
179,240.00
12
1 BH
70,230.00
13
1 BH
38,330.00
14
1 BH
1,500,000.00
15
1UNIT
6,439,990.00
KETERANGAN
URAIAN
NO
SATUAN
BIAYA (Rp.)
1 M1
22,700.00
1 M1
33,480.00
1 M1
45,030.00
1 M1
59,260.00
1 M1
22,770.00
1 M1
28,980.00
1 M1
10,820.00
1 M1
11,820.00
1 M1
14,360.00
10
1 M1
19,620.00
11
1 M1
35,980.00
12
1 BH
1,041,050.00
13
1LS
750,000.00
KETERANGAN
NO
SATUAN
BIAYA (Rp.)
1 KG
20,560.00
1 KG
22,270.00
1 KG
21,890.00
1 M2
296,170.00
1 M2
504,900.00
1 M2
225,770.00
1 M2
30,860.00
1 M1
98,690.00
1 M1
112,320.00
SATUAN
1 M2
BIAYA (Rp.)
2,490,360.00
4,176,730.00
1,617,400.00
1 UNIT
Kusen Pintu Aluminium ukr 0.9 x 2,7 m
Bovenlight Aluminium 0,5 x 1 m dengan kisi-kisi aluminium1plat
BH
1 M2
1 UNIT
296,170.00
504,900.00
2,551,460.00
316,760.00
376,050.00
KETERANGAN
KETERANGAN
NO
SATUAN
BIAYA (Rp.)
1 BH
263,010.00
1 BH
74,630.00
1 BH
78,840.00
1 BH
32,750.00
1 BH
28,430.00
1 BH
19,990.00
1 BH
409,470.00
1 BH
76,170.00
1 BH
87,170.00
10
1 BH
58,570.00
11
1 BH
47,570.00
12
1 BH
43,830.00
13
1 M2
66,080.00
14
1 M2
87,860.00
15
1 M2
159,250.00
KETERANGAN
NO
SATUAN
BIAYA (Rp.)
1 M2
7,980.00
1 M2
49,770.00
1 M2
44,270.00
1 M2
28,020.00
1 M2
27,440.00
1 M2
7,840.00
1 M2
23,440.00
40,220.00
1 M2
10
1 M2
1,750.00
11
Pengecatan exterior
1 M2
55,180.00
12
Memasang Wallpaper
1 M2
34,730.00
13
1 M2
11,470.00
14
1 M2
25,940.00
SATUAN
1 TTK
1 TTK
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1LS
KETERANGAN
5,060.00
BIAYA (Rp.)
KETERANGAN
191,400.00
174,900.00
66,050.00
67,040.00
101,860.00
10,500.00
172,860.00
352,000.00
2,000,000.00
URAIAN PEKERJAAN
VOLUME
SATUAN
Rp
3,850.00
490,875.00
m1
89,560.00
4,925,800.00
53.96
16,190.00
873,612.40
19.29
m
m
8,100.00
156,249.00
8.27
160,180.00
1,324,688.60
3.46
203,740.00
704,940.40
3.3
203,740.00
672,342.00
Jumlah
9,148,507.40
Dibulatkan
9,148,500.00
31.21 m
Membuat
Sloof
Beton
Bertulang
(
200
KG
Besi
+
Bekisting
2
2.37 ) m
3 Membuat Kolom Beton Bertulang ( 150 KG Besi + Bekisting
2.23 )m
505,250.00
15,768,852.50
3,637,350.00
8,620,519.50
5,166,900.00
11,522,187.00
m )
Bekisting
4 Membuat Ring Balok Beton Bertulang ( 150 KG Besi +2.90
4,493,870.00
m ) 5,088,990.00
+ Bekisting
5 Membuat Plat dak topi Beton Bertulang ( 115 KG Besi0.15
m
)5,209,330.00
6 Membuat Meja dapur plat Beton Bertulang ( 125 KG Besi
0.14+ Bekisting
13,032,223.00
m
7 Membuat Beton lantai kerja dibawah lantai 1 PC : 3 Splt:
2.405 Psr
597,830.00
763,348.50
729,306.20
1,434,792.00
Jumlah
51,871,228.70
Dibulatkan
51,871,220.00
22.65
199.70
74,720.00
1,692,408.00
80,310.00
16,037,907.00
170,280.00
119,196.00
180,460.00
541,380.00
45.30
25,610.00
1,160,133.00
400.12
23,500.00
9,402,820.00
7 Accian
445.42
15,050.00
6,703,571.00
31,460.00
94,380.00
24
m1
NO.
URAIAN PEKERJAAN
6,630.00
159,120.00
Jumlah
35,910,915.00
Dibulatkan
35,910,910.00
HARGA SATUAN
VOLUME
SATUAN
Rp
42.37
72,830.00
3,085,807.10
73,740.00
193,936.20
70,630.00
211,890.00
73,740.00
221,220.00
65,890.00
757,735.00
65,890.00
593,010.00
m
m1
123,460.00
222,228.00
30,810.00
1,848,600.00
1.80
60
Jumlah
7,134,426.30
Dibulatkan
7,134,420.00
V PEKERJAAN ATAP
1 Pasangan kuda-kuda kayu borneo super 8/12
1.92
4,793,030.00
9,202,617.60
0.65
3,874,420.00
2,518,373.00
3 Pasangan rangka atap kaso 5/7 dan reng 3/4 kayu 100.00
borneo super
m
4 Pasangan jurai luar dan dalam kayu 8/12
0.18 m
59,890.00
5,989,000.00
3,874,420.00
697,395.60
23.00
m1
67,760.00
1,558,480.00
m1
112,320.00
1,460,160.00
100.00
10,013,000.00
17.00
m
m1
100,130.00
107,410.00
1,825,970.00
356,920.00
3,426,432.00
Jumlah
36,691,428.20
Dibulatkan
36,691,420.00
VI PEKERJAAN PLAFON
1 Pasangan plafon triplek + rangka plafon kayu borneo70.20
super 4/6
m
127,320.00
8,937,864.00
m
239,300.00
1
m
3 Pasangan lis plafon kayu profil 5 cm ( yg menempel dinding
60.00 )
20,850.00
m1
4 Pasangan lis plafon kayu 1 cm x 4 cm ( yg menempel
26.00
pada listplank
)
9,720.00
717,900.00
NO.
URAIAN PEKERJAAN
3.00
1,251,000.00
252,720.00
Jumlah
11,159,484.00
Dibulatkan
11,159,480.00
HARGA SATUAN
VOLUME
SATUAN
Rp
JUMLAH HARGA
0.88
7,837,500.00
6,897,000.00
7,837,500.00
940,500.00
330,280.00
2,378,016.00
1.00
Bh
504,900.00
504,900.00
1.00
Bh
454,780.00
454,780.00
8.45
158,840.00
1,342,198.00
2,188,921.20
Jumlah
14,706,315.20
Dibulatkan
14,706,310.00
1,315,050.00
1.00
Bh
78,840.00
78,840.00
12.00
Bh
32,750.00
393,000.00
24.00
Bh
28,430.00
682,320.00
4.00
Bh
58,570.00
234,280.00
12.00
Bh
47,570.00
570,840.00
12.00
Bh
19,990.00
239,880.00
12.00
Bh
43,830.00
525,960.00
10.29
66,080.00
679,963.20
10.19
87,860.00
895,293.40
Jumlah
5,615,426.60
Dibulatkan
5,615,420.00
IX PEKERJAAN SANITAIR
1 Pasangan bak mandi fiber glass
1.00
Bh
397,650.00
397,650.00
1.00
Bh
281,500.00
281,500.00
1.00
Bh
66,930.00
66,930.00
3.00
Bh
66,930.00
200,790.00
1.00
Bh
179,240.00
179,240.00
1.00
Bh
70,230.00
70,230.00
1.00
Bh
282,750.00
282,750.00
Jumlah
1,479,090.00
Dibulatkan
1,479,090.00
HARGA SATUAN
NO.
URAIAN PEKERJAAN
VOLUME
SATUAN
Rp
JUMLAH HARGA
20.00
m1
33,480.00
669,600.00
10.50
m1
19,620.00
206,010.00
7.50
m1
35,980.00
269,850.00
114,546.00
114,546.00
6,439,990.00
6,439,990.00
1.00
Unit
1.00
Ls
750,000.00
750,000.00
Jumlah
8,449,996.00
Dibulatkan
8,449,990.00
191,400.00
2,488,200.00
174,900.00
524,700.00
1.00
Bh
101,860.00
101,860.00
4.00
Bh
66,050.00
264,200.00
6.00
Bh
67,040.00
402,240.00
345,720.00
1.00
Bh
352,000.00
352,000.00
1.00
Ls
2,000,000.00
2,000,000.00
Jumlah
6,478,920.00
Dibulatkan
6,478,920.00
40,220.00
18,035,452.40
23,440.00
1,645,488.00
3.00
27,440.00
82,320.00
9.20
44,270.00
407,284.00
6.02
44,270.00
266,505.40
41.16
44,270.00
1,822,153.20
5.13
44,270.00
227,105.10
10.84
44,270.00
479,886.80
14.40
44,270.00
637,488.00
16.90
44,270.00
748,163.00
NO.
URAIAN PEKERJAAN
Jumlah
24,351,845.90
Dibulatkan
24,351,840.00
HARGA SATUAN
VOLUME
SATUAN
Rp
JUMLAH HARGA
127.50
7,700.00
981,750.00
Jumlah
981,750.00
Dibulatkan
981,750.00
NO.
URAIAN PEKERJAAN
II
III
PEKERJAAN
PASANGAN
DAN
PLESTERAN
PEKERJAAN LANTAI DAN DINDING
35,910,910.00
PEKERJAAN ATAP
PEKERJAAN PLAFON
PEKERJAAN KUSEN PINTU DAN
JENDELA
VIII PEKERJAAN
PERLENGKAPAN
PINTU DAN JENDELA
IX PEKERJAAN SANITAIR
X PEKERJAAN INSTALASI AIR
XI PEKERJAAN INSTALASI LISTRIK
XII PEKERJAAN PENGECATAN
XIII PEKERJAAN PEMBERSIHAN
JUMLAH
DIBULATKAN
36,691,420.00
11,159,480.00
14,706,310.00
IV
V
VI
VII
7,134,420.00
5,615,420.00
1,479,090.00
8,449,990.00
6,478,920.00
24,351,840.00
981,750.00
213,979,270.00
213,979,000.00
NO.
MACAM ALAT
SATUAN
HARGA
KETERANGAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
7,500,000,000.00
715,000,000.00
145,000,000.00
700,000,000.00
175,000,000.00
45,000,000.00
300,000,000.00
100,000,000.00
145,000,000.00
250,000,000.00
250,000,000.00
440,000,000.00
880,000,000.00
300,000,000.00
840,000,000.00
125,000,000.00
460,000,000.00
510,000,000.00
500,000,000.00
12,000,000.00
491,500,000.00
5,000,000.00
50,000,000.00
3,000,000.00
3,500,000.00
100,000,000.00
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
27
28
29
30
31
Mesin penyaring 8 HP
Chip Spreader
Mesin penghampar 1820 MM 30 HP
Thriller gandeng 1 ton
Dump Truck 3,5 ton 44 HP
jam
jam
jam
jam
jam
50,000.00
50,000.00
181,000.00
184,000.00
118,000.00
Sewa
Sewa
Sewa
Sewa
Sewa
32
33
34
35
36
37
38
39
40
41
42
43
jam
jam
jam
jam
jam
jam
bh
jam
jam
jam
jam
ls
11,000.00
15,000.00
15,000.00
150,000.00
75,000.00
25,000.00
1,000,000.00
60,000.00
20,000.00
75,000.00
48,000.00
500.00
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
baru
Sewa
Sewa
Sewa
Sewa