You are on page 1of 8
Description ofthe Building Elements 26 January 2007 HOUSING FOR YOUNG PEOPLE, DELIVERY DESCRIPTION vrinu. Koduenaia.ee of the Building Elements 1. FOUNDATION Delivery fom Purchaser, ‘+The building ofthe foundation and installing of dcep impregnated wooden board on tp of the founstio, 1+ Vertical tolerances of support forthe Building Elements +3 mm. 2. STRUCTURE OF THE MODULAR SECTIONS AND OTHER BUILDINGS. 2.1, Structure of house ‘Dever fiom Contactor + Stati caleuatons * Calculations ofthe U-valucs ofthe constructions Load besring solid wood suture according to the static exleulations. Wooden beams in module eos “+ Insulation in externa walls 2000. {Inside walls in wood srastre, Mineral wool in shaft and bathroom wall ‘Inside beiht ofthe rooms i according tothe drawings. Deelver ftom Purchaser ‘+ Energy caleulations foe the building ‘+ Ficeamalyzes to the buildings whole, 3. EXTERNAL SURFACES Dedivry fiom Contactor Si. Paint System ‘Wooden surfaces All ouside wooden surfices stung with oil base stain and pained with il base paint in 2 layer: Boards ae painted according to the Paint Sysem ffor thee sides. Last layer must be painted ale the insulation of the claddingroerdefamings Exoet colors wil be agreed in » SPECIFIC EX-ERNAL FINISHING OF THE HOUSE. £42, Surface material + Outside horizontal wood cating 19 mm thick and 145 mm wide boards. Wood boards round windows and extemal doers. Metal tings over and under the windows - metal covered with PV Description of the Building Elements 26 Januaey 2007 HOUSING FOR YOUNG PEOPLE 4.ROOF Delivery from Constr: ‘Static calculations Solid wood structure avonting tothe tate calculations ‘Wood boards installed in eaves Final roo covering (dene or similar aiemative) Installation ofan gutters nd pipes, every ftom Purchaser ‘+ Rain gutters and pipes and completed materials (ails, screws lams te) belong to ter, 5 OPENINGS Exact description of an openings sn Appel 5 Delivery ffom Contactor: 5.1. Windows, baleony-and external doors of apartments ‘Painted white wooden fame windows, alcony- and extemal doors. Windows and baleony dors with tivo glasses where one is “super energy” las, U-alue of glass packet 1,1. No laminated or ober ssrenghed las incaded ino Contatr's delivery, ied or outward open able type {Balcony dooe must have possibilty o lock inthe opened poston. Fire rated windows and dooes aren fn nto Contactor’ standard delivery. 5 Internal doors of apartment White pressed plain doors, + Frame and dor let ee pintod white ery Bn Pacha + Fre analyzes to the building os whole, 6. WATER, SEWAGE, VENTILATION, ELECTRICAL, HEATING 6.1. Water and sewage Delivery fiom Contactor ‘Sewage pipes plastic pipes inside oF module structure, Main pipe in sat + Water stpply = pineinpipe system with posic pipes or sllematve syslem inside of module structure. Main pipe in shat “ara giver RS5-095 ——TVorsoon 1 197 Description ofthe Bullding Elements 26 January 2007 HOUSING FOR YOUNG PEOPLE ‘+ White, "080" RBEX 120 or similar alkerative bt water boiler installed, ‘Water pige lor heating system in all oom. evry ftom Purchases 4 Delivery and instalation of water and sewage pipes under the modules of fist floor module Connecting of main water and sewage pipes wih pipes from shaft on bottom level of fist Noor ‘ule 62. Ventilation Delivery fiom Comet ‘Ducts —metal ducts inside the Building Elements, Main duets in shat ‘Simple mechanical ventilation from kitchen and bathroom, 3 Airvaves in frm ofthe windows 1 White ltehon hood with an, Delivery fom Purchaser ‘+ Delivry and instalation of ventilation “hat 0 cover te ventilation pipes from shaft over therooE 63. Bet allaion, lighting and eleetreal heating i cs '+ Scheme with locations of the sockets, switches lights and other electra outlets ‘Design of the eletical instalation inside the modules *Allcables end ducts installed and connected to main cableiduts from the sha. Hidden letra Aistbation in module suture + White sockets and switches from “ELKO”. Amount of socketslswitches is according tothe stundard + Flecirial distribution boa fram “Stansefabrkken” or simi altemative, without sutowatie fuses, ath - ea curenrlayalam panel curen ceut beaker, electric mctrs and 50 on + Door bell builtin transformer. Buton installed exterally next to he extemal door of parte Light fixtures from *Lival™ type Partout 249 W or similar are installed inthe bathroom ané kitchen Inthe siting roar ony sookets (2 pe) for lights. ‘+ Light tube above the worktop of kitchen fumitue from “Lival™ type Practical 18. Wo similar altemative. 4+ Light fixture fom “Thor” type Puma 2x9 W or sil Light above the mitre oF bathroom wal erative installed next othe extra door Delivery fiom Purchaser “General design ofthe electrical systom ofthe spartmants (one-line leetical scheme and lywut ofthe Alistrbation Doe), ‘+ Installation of the min cables nto the shat an from the sha tothe electrical distribution boar and installation ofthe stoma fase, cath» leak cure relayalanm panel, current eit bese, ‘leet meters and 0 on inside ofthe electric distribution boar

You might also like