Professional Documents
Culture Documents
Please no decimals in the water cut or oil rate values round them to the first per cent or barrel respectively! 3. Please no percentage - only numbers (i.e. 45.234% = 45; 3456.789 BOPD = 3457)! 4. Please name the completed file as Haggis_WF_SURNAME_Mon_YY.xls (where SURNAME - you surname, Mon and YY exam you are sitting, and leave Haggis and WF as they are, e.g. Haggis_WF_SMITH_Mar_09.xls) and send to your local tuto
PRes.
2800
Option
Scenario
C2.a1
400ft Horiz.
2800
7
Maximum Economic Water Cut
51 54 56 60 71 81
75
ues round them to the first per cent or barrel respectively! % = 45; 3456.789 BOPD = 3457)! URNAME_Mon_YY.xls (where SURNAME - you surname, Mon and YY - month and year respectively of the Prod Tech hey are, e.g. Haggis_WF_SMITH_Mar_09.xls) and send to your local tutor along witht your report and models
2700
2600
2500
psia
BOPD
55
6924
2200
psia
6.5
Production Rate @ 30% Water Cut
5.5
8090
, ft 2500 12057 140.7 3000 12504 122.4 3500 12877 114.6 4000 13198 102
Psia
MMSCF/D