2009/10 A. Operational:
I. Major Hydro projects S.N 1 2 3 4 5 6 Hydro projects Kali Gandaki "A" Middle Marsyandi Marsyangdi Kulekhani No. 1 Kulekhani No. 2 Trisuli Installed Capacity (kW) 144000 70000 69000 60000 32000 24000 S.N 7 8 9 10 11 Hydro projects Gandaki Modi Khola Devighat Sunkosi Puwa Khola Total Installed Capacity (kW) 15000 14800 14100 10050 6200 459150
II. Small Hydro Projects: a. Grid Connected S.N 1 2 3 4 5 6 7 8 Hydro projects Chatara Panauti Tatopani (Myagdi) (I + II) Seti (Pokhara) Phewa (Pokhara) Tinau (Butwal) Sundarijal Pharping*** Installed Capacity (kW) 3,200 2,400 2,000 1,500 1,000 1,024 640 500 Total b. Isolated S.N 1 2 3 4 5 6 7 8 9 10 11 12 Hydro projects Heldung (Humla) Kalikot Accham Jhupra (Surkhet)*** Darchula I and II ** Bhojpur** Dhankuta*** Jumla** Syarpudaha (Rukum) ** Bajura Bajhang** Dolpa Installed Capacity (kW) 500 500 400 345 300 250 240 200 200 200 200 200 S.N 13 14 15 16 17 18 19 20 21 22 23 Hydro projects Chaurjhari (Rukum) ** Aarughat (Gorkha) Taplejung ** Okhaldhunga ** Rupalgad(Dadeldhura) Syangja*** Manang Gorkhe (Ilam)*** Helambu Chame Dhading Total Installed Capacity (kW) 150 150 125 125 100 80 80 64 50 45 32 4536 S.N 9 10 11 12 13 14 15 16 Hydro projects Khandbari** Phidim Jomsom ** Baglung Surnaiyagad (Baitadi) Doti Ramechhap Terhathum** Installed Capacity (kW) 250 240 240 200 200 200 150 100 13844
III.
Private Sector Hydro Projects: Independent Power producers (IPPs) connected to INPs:
Hydro projects Khimtikhola (HPL) Bhotekoshi (BKPC) Chilime (CPC) Jhimruk (BPC) Indrawati III (NHPC) Andhikhola (BPC) Khudi Khola (Khudi HP) Mardi Khola Piluwa Khola (AVHP) Sunkoshi Small (SHP) Ridi Khola Thoppal Khola (THP)
Installed Capacity (kW) 60,000 36,000 22,000 12,000 7,500 5,100 3,450 3,100 3,000 2,500 2,400 1,650
S.N 13. 14. 15. 16. 17. 18. 19. 20. 21. 22.
Hydro projects Chaku Khola (APCo) Patikhola Pheme Khola (KHP) Upper Hadi Khola Baramchi (UH) Seti-II Sisne Khola (GBHP) Rairang (RHPD) Salinadi (KSHPS) Sange Khola (SHP) Total
Installed Capacity (kW) 1,500 996 995 991 980 979 750 500 232 183 166806
1. 2. 3.
4.
Gamgadhi Total
400 500400
b. Independent Power producers (IPPs) 1. 2. 3. 4. Lower Modi I Sipring Khola Ankhu Khola-I Siuri Khola (NGPL) Total 9,900 9,658 8,400 4,950 5. 6. 7. 8. Lower Indrawati (SHP) Mai Khola Hewa Khola Lower Piluwa 4,500 4,455 4,455 990 47,308
S.N
Hydro projects
Upper Madi Lower Balephi Mai Khola Namarjun Madi Madkyu Khola Lower Sunkoshi-III Nau Gad Khola Upper Mailun A Tadi khola Radhi Khola Charanawati Khola Middle Gaddigad Upper Hugdi Khola Pikhuwa Khola Middle Chaku
Installed Capacity (kW) 19,008 18,514 15,600 11,880 9,968 9,900 8,500 5,000 5,000 4,400 3,520 2,970 2,599 2,475 1,800
S.N
Hydro projects
16 17 18 19 20 1. 2 3. 4. 5. 6. 7.
Jumdi Khola 1,750 Theule Khola 1,500 Jhyadi Khola 998 Dorkhu khola 990 Seti Khola 465 PPA Concluded for Capacity Upgradation 3,178 Baramchi Khola 2,055 Hewa Khola 1,500 Chaku Khola 1,210 Jiri Khola 1,150 Bhairab Kunda 198 Belkhu Khola 100 Narayani Shankar Biomass Total 136,228
Under Termination Proccess S.N Hydro projects Installed Capacity (kW) 14,000 10,000 S.N 3. 4. Hydro projects Daram Khola Lower Nyadi Installed Capacity (kW) 5,000 4,500 33,500
1. 2. 3. 4. 5.
Budhi Gandaki Nalsyagu Gad (Storage) Upper Seti (Storage) Seti Trishuli (Storage) Upper Trisuli 3 'A'
6. 7. 8.
iv) Diesel Power Stations 1. Duhabi Multifuel v) 1. Solar Power Stations Simikot
39,000
2.
Hetauda
14,410
50
2 .
Gamgadhi
50
Transmission Lines
a. Major Lines Existingi. 132 kV Transmission Lines:
Length (KM.)
85.0 19.0 282.0 8.0 25.0 84.0 34.0 26.9 48.0 46.0
Type of S.N CKts. Single 2. Single 4. Double 6. Single 8. Single 10 Single 12 Single 14 Single 16
Double Single
Transmission Lines
Length (KM.)
154.0 97.0 43.0 58.0 48.0 37.0 407.0 17.0 44.0 1562.9
Type of CKts.
Single Single Double Double Single Single Single Double Single
17. New Bhaktapur Lamosangu 19. Lamosangu Khimti P/S ii. 1. 3. 5. 7. 66 kV Transmission Lines:
Chilime P/S Devighat P/S Trisuli P/S Balaju Debighat P/S Balaju Debighat P/S New Chabel
Hetauda-Gandak P/S Bharatpur Pokhara Bardaghat-Butwal Butwal KGA P/S KGA P/S Lekhnath Pokhara-Modikhola P/S Butwal- Tanakpur P/S Pathalaiya New Parwanipur 18 Marsyangdi-M. Marsyangdi Total
2. 4. 6. 8. 10 12 14 16
Suichatar New Patan Teku K3 (Underground ) Suichatar K3 New Patan New Baneshwor Bhaktapur New Chabel New Baneshwor Sunkoshi P/S Debighat Trisuli Indrawati-Panchkhal
354.72
1. Khimti-Dhalkebar 2. Hetauda-Bharatpur
75 72
Single Double
1. Thankot-Chapagaon 2. Chameliya-Attariya
28.5 129
Double Single
1. 2. 3. 4. 5. 6. 7.
Transmission Lines NEA Joint Venture under Public Private Partnership Program
1. 2. 400 kV Duhabi-Purnia Cross Border Line* 400 kV New Butwal- Gorakhpur Cross Border Line* 22 25 Double Double 3. 66 kV Sanjen-Chilime Total 12 59 Double
1.
22.50
1. 2. 3.
Note: * Line length within Nepal portion. ** Leased to the Private Sector. *** Not in Normal Operation. Source: Nepal Electricity Authority.