Hydro Power Projects

2009/10 A. Operational:
I. Major Hydro projects S.N 1 2 3 4 5 6 Hydro projects Kali Gandaki "A" Middle Marsyandi Marsyangdi Kulekhani No. 1 Kulekhani No. 2 Trisuli Installed Capacity (kW) 144000 70000 69000 60000 32000 24000 S.N 7 8 9 10 11 Hydro projects Gandaki Modi Khola Devighat Sunkosi Puwa Khola Total Installed Capacity (kW) 15000 14800 14100 10050 6200 459150

II. Small Hydro Projects: a. Grid Connected S.N 1 2 3 4 5 6 7 8 Hydro projects Chatara Panauti Tatopani (Myagdi) (I + II) Seti (Pokhara) Phewa (Pokhara) Tinau (Butwal) Sundarijal Pharping*** Installed Capacity (kW) 3,200 2,400 2,000 1,500 1,000 1,024 640 500 Total b. Isolated S.N 1 2 3 4 5 6 7 8 9 10 11 12 Hydro projects Heldung (Humla) Kalikot Accham Jhupra (Surkhet)*** Darchula I and II ** Bhojpur** Dhankuta*** Jumla** Syarpudaha (Rukum) ** Bajura Bajhang** Dolpa Installed Capacity (kW) 500 500 400 345 300 250 240 200 200 200 200 200 S.N 13 14 15 16 17 18 19 20 21 22 23 Hydro projects Chaurjhari (Rukum) ** Aarughat (Gorkha) Taplejung ** Okhaldhunga ** Rupalgad(Dadeldhura) Syangja*** Manang Gorkhe (Ilam)*** Helambu Chame Dhading Total Installed Capacity (kW) 150 150 125 125 100 80 80 64 50 45 32 4536 S.N 9 10 11 12 13 14 15 16 Hydro projects Khandbari** Phidim Jomsom ** Baglung Surnaiyagad (Baitadi) Doti Ramechhap Terhathum** Installed Capacity (kW) 250 240 240 200 200 200 150 100 13844

III.

Private Sector Hydro Projects: Independent Power producers (IPPs) connected to INPs:

S.N 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.

Hydro projects Khimtikhola (HPL) Bhotekoshi (BKPC) Chilime (CPC) Jhimruk (BPC) Indrawati III (NHPC) Andhikhola (BPC) Khudi Khola (Khudi HP) Mardi Khola Piluwa Khola (AVHP) Sunkoshi Small (SHP) Ridi Khola Thoppal Khola (THP)

Installed Capacity (kW) 60,000 36,000 22,000 12,000 7,500 5,100 3,450 3,100 3,000 2,500 2,400 1,650

S.N 13. 14. 15. 16. 17. 18. 19. 20. 21. 22.

Hydro projects Chaku Khola (APCo) Patikhola Pheme Khola (KHP) Upper Hadi Khola Baramchi (UH) Seti-II Sisne Khola (GBHP) Rairang (RHPD) Salinadi (KSHPS) Sange Khola (SHP) Total

Installed Capacity (kW) 1,500 996 995 991 980 979 750 500 232 183 166806

B. Hydro Power Projects under Construction:


a. Major Hydro Projects:

1. 2. 3.

Upper Tamakoshi Chamelia Kulekhani-III

456,000 30,000 14,000

4.

Gamgadhi Total

400 500400

b. Independent Power producers (IPPs) 1. 2. 3. 4. Lower Modi I Sipring Khola Ankhu Khola-I Siuri Khola (NGPL) Total 9,900 9,658 8,400 4,950 5. 6. 7. 8. Lower Indrawati (SHP) Mai Khola Hewa Khola Lower Piluwa 4,500 4,455 4,455 990 47,308

C. Hydro Power Projects with PPA Concluded:


Private Sector Hydro Projects:

S.N

Hydro projects

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.

Upper Madi Lower Balephi Mai Khola Namarjun Madi Madkyu Khola Lower Sunkoshi-III Nau Gad Khola Upper Mailun A Tadi khola Radhi Khola Charanawati Khola Middle Gaddigad Upper Hugdi Khola Pikhuwa Khola Middle Chaku

Installed Capacity (kW) 19,008 18,514 15,600 11,880 9,968 9,900 8,500 5,000 5,000 4,400 3,520 2,970 2,599 2,475 1,800

S.N

Hydro projects

Installed Capacity (kW)

16 17 18 19 20 1. 2 3. 4. 5. 6. 7.

Jumdi Khola 1,750 Theule Khola 1,500 Jhyadi Khola 998 Dorkhu khola 990 Seti Khola 465 PPA Concluded for Capacity Upgradation 3,178 Baramchi Khola 2,055 Hewa Khola 1,500 Chaku Khola 1,210 Jiri Khola 1,150 Bhairab Kunda 198 Belkhu Khola 100 Narayani Shankar Biomass Total 136,228

Under Termination Proccess S.N Hydro projects Installed Capacity (kW) 14,000 10,000 S.N 3. 4. Hydro projects Daram Khola Lower Nyadi Installed Capacity (kW) 5,000 4,500 33,500

1. Upper Modi Khola 2. Langtang Khola Total

D. Hydro Power Projects Planned and Proposed:


a. Major Hydro Projects:

1. 2. 3. 4. 5.

Budhi Gandaki Nalsyagu Gad (Storage) Upper Seti (Storage) Seti Trishuli (Storage) Upper Trisuli 3 'A'

600,000 400,400 128,000 128,000 60,000

6. 7. 8.

Upper Modi A Upper Trisuli 3 'B' Rahughat Khola Total

42,000 37,000 27,000 14,22,000

iv) Diesel Power Stations 1. Duhabi Multifuel v) 1. Solar Power Stations Simikot

39,000

2.

Hetauda

14,410

50

2 .

Gamgadhi

50

Transmission Lines
a. Major Lines Existingi. 132 kV Transmission Lines:

S.N Transmission Lines 1. 3. 5. 7. 9. 11. 13. 15.


Anarmani-Duhabi Kusha-Katiya (India) Duhabi- Hetauda Hetauda KL2 P/S Bharatpur-Marsyangdi P/S Marsyangdi P/S Suichatar Suichatar -KL2 P/S Suichatar New Bhaktapur

Length (KM.)
85.0 19.0 282.0 8.0 25.0 84.0 34.0 26.9 48.0 46.0

Type of S.N CKts. Single 2. Single 4. Double 6. Single 8. Single 10 Single 12 Single 14 Single 16
Double Single

Transmission Lines

Length (KM.)
154.0 97.0 43.0 58.0 48.0 37.0 407.0 17.0 44.0 1562.9

Type of CKts.
Single Single Double Double Single Single Single Double Single

17. New Bhaktapur Lamosangu 19. Lamosangu Khimti P/S ii. 1. 3. 5. 7. 66 kV Transmission Lines:
Chilime P/S Devighat P/S Trisuli P/S Balaju Debighat P/S Balaju Debighat P/S New Chabel

Hetauda-Gandak P/S Bharatpur Pokhara Bardaghat-Butwal Butwal KGA P/S KGA P/S Lekhnath Pokhara-Modikhola P/S Butwal- Tanakpur P/S Pathalaiya New Parwanipur 18 Marsyangdi-M. Marsyangdi Total

43.56 29.0 30.0 33.0 2.3 36.0 72.0 4.1

Single Double Single Single Single Double Double Single

2. 4. 6. 8. 10 12 14 16

9. Balaju-Laincahur 11 Balaju KL1 P/S 13 KL 1 P/S Birgunj 15 Suichatar Teku

Suichatar New Patan Teku K3 (Underground ) Suichatar K3 New Patan New Baneshwor Bhaktapur New Chabel New Baneshwor Sunkoshi P/S Debighat Trisuli Indrawati-Panchkhal

4.0 3.5 6.9 2.8 12.0 61.0 4.56 10.0

Double Single core Single Single Single Single Single Single

Total b. Under Construction


i. 220 kV Transmission Lines Ii .132 kV Transmission Lines

354.72

1. Khimti-Dhalkebar 2. Hetauda-Bharatpur

75 72

Single Double

1. Thankot-Chapagaon 2. Chameliya-Attariya

28.5 129

Double Single

iii. NEA Joint Venture under Public Private Partnership Program


400 kV Transmission Lines 1. kV Dhalkebar-Muzzaffarpur Cross Border Line Length (KM.) 45.00 Type of CKts. Double

c. Planned and Proposed


S.N Transmission Lines 220 kV New MarsyangdiMatatirtha 132 kV Sangati-Lamosangu 132 kV Kabeli-Damak 132 kV Middle Marshyangdi - Dumre-Marshyandi 132 kV Dumree-Damauli 132 kV Butwal-Kohalpur Second circuit 220 kV Bharatpur-Bardghat Length (KM.) 85 40 90 44 18 208 73 Type of CKts. Double Double Double Double Single D/CTower Double S.N Transmission Lines 132 kV Hetauda-Kulekhani-IISiuchatar second circuit 9. 220 kV New HetaudaDhalkebar-Duhabi 10. 220 kV New HetaudaMatatirtha 11. 220 kV Bardaghat-New Butwal 12. 220 kV Trishuli- Thankot 13. 132 kV Kohalpur-Attariya second circuit Total 8. Length Type of (KM.) CKts. 44 D/C Tower 283 45 30 54 200 1214 Double Double Double Double D/C Tower

1. 2. 3. 4. 5. 6. 7.

Transmission Lines NEA Joint Venture under Public Private Partnership Program
1. 2. 400 kV Duhabi-Purnia Cross Border Line* 400 kV New Butwal- Gorakhpur Cross Border Line* 22 25 Double Double 3. 66 kV Sanjen-Chilime Total 12 59 Double

Transmission Line Sub-Station Existing


S.N 1. 2. 3 4. 5. Capacity 132/11 kV 132/66 kV 66/11 kV 132/33 kV 66/33 kV Total Under Construction 132/11 kV Matatirtha Unit MVA 186.00 248.40 485.20 470.50 25.00 1415.10 S.N 1. 2. 3. 4. 5. 6. 7. 8. 9.

Planned & Proposed


Capacity 132/33 kV Syangja 132/33 kV Anbukhaireni 132/33 kV Damak 132/11kV Chapali 132/33 kV Kusum 132/33 kV Matatirtha 132 kV Hapure 132 KV Hetauda (Kamane) 132 KV Pathlaiya Total Planned & Proposed New Butwal Switching Station New Bharatpur Switching Station Pathlaiya Switching Station Unit MVA 15.00 15.00 30.00 30.00 30.00 32.00 30.00 30.00 22.50 234.5

1.

22.50

1. 2. 3.

Overall Scenario of Power Projects in Nepal


Sectors Total Major Hydro Grid Connected Total Small Hydro Isolated Total Hydro NEA Total hydro IPP Total Hydro -Nepal Total thermal (NEA) Total Solar (NEA) Total Installed Capacity (including Private and Others) Capacity (kW) 472994 4536 477530 158315 635845 53410 100 689355

Note: * Line length within Nepal portion. ** Leased to the Private Sector. *** Not in Normal Operation. Source: Nepal Electricity Authority.