From: Sent: To:
(b) (6)
Thursday, October 02, 2008 11:59 AM (b) (6) FLOSSMAN, LOREN W; (b) (6)
Cc: Subject:
(b) (6)
RE: Updated: Weekly meeting with IBWC
Attachments: 10_01_08_IBWC_Issues.ppt Attached is an updated briefing for today's conference call Thanks From: (b) (6) Sent: Tuesday, September 30, 2008 2:57 PM Required: (b) (6) FLOSSMAN, LOREN W; (b) (6) Optional: (b) (6) Subject: Updated: Weekly meeting with IBWC When: Thursday, October 02, 2008 1:00 PM-2:00 PM. Where: 1 (800) 238-0210, Passcode #342193
4/9/2009
009226
009227
Major Issues
Fence in Floodplain Fence on Levees Hidalgo County Miscellaneous Items
009228
Fence in Floodplain
Segments O-1 (3.8 miles), O-2 (8.8 miles) & O-3 (1.9 miles)
DHS likely to drop fence segments from PF225
(b) (7)(E)
009229
Fence in Floodplain
Segment O-21 (0.53 miles)
CBP would now like IBWC to design and construct levee wall similar to Hidalgo using CBP funds
Segment CV-1A
CBP to install permanent fencing along canal, outside of the spillway and weir footprints for the dam. CBP still desires to locate temporary barriers across the weir until such time de-silting has been accomplished. USIBWC requires letter from CBP Commissioner prior to placement of temporary barriers. Draft letter forwarded to DHS??
009230
The minimum 15 ft buffer Contractor to stake out fence alignment prior to construction IBWC review/approval of staked-out alignment prior to construction Station 35+00 to Station 40+00 USIBWC concurs with location closer than 15 ft from toe. Contractor must stake out area prior to construction and obtain USIBWC review/no issues. Station 220+00 to Station 224+00 USIBWC will coordinate with owner of unauthorized structures to have them removed. DHS to maintain 15 ft offset. Station 236+00 to Station 259+00 USIBWC concurs with less than 15 ft offset at station 236, if required to avoid tower. USIBWC currently surveying our right-of-way between stations 236 & 259 to determine if existing fencing is within right-of-way and 15 ft offset could be obtained within our right-of-way (OPEN ITEM). Station 369+37.50 to Station 397+77.50 Nye Plantation segment; CBP terminated this work for FY 2008. No further action required. USIBWC understands that all other fence segments will provide a 15 ft offset from toe of levee. USIBWC will provide CBP with letter regarding our decision on abovementioned segments.
009231
Hidalgo County
SBI has decided to provide Hidalgo County additional funding to complete segments O-4A, O-4C, O-6A, O-6B/C, O-8 and O-9 Phase II SBI evaluating the feasibility of constructing pedestrian fence on either side of the HCWD#1 pump station (O-4B) SBI owes IBWC: Draft letter from CBP on coordination efforts with property owners potentially directly impacted by the levee wall project is being routed for Mr. Giddens signature
009232
Miscellaneous Items
Tracking of IBWC Design Approvals On-going; both CBP/Corps & IBWC tracking status Segment K-1A (1.1 mile) CBP moving forward with design assuming floating fence (PV-3) in TXDOT right of way Proposed alignment/draft RFP submitted to IBWC Need to discuss IBWC requested gate Laredo Cane Control Project CBP submitted letter to IBWC on June 22nd describing the proposed project US IBWC has informed MX IBWC of proposed pilot project (1.7 miles) Cane removal activities scheduled to begin on October 1st