07/05/2004
Matterhorn Project
Agenda
General Project Overview Development architecture Key challenges Execution highlights Conclusions
Matterhorn Project
General overview
0 25 50 Miles
West Cameron East Galveston Brazos EW
200 m
100
Louisiana
MO
VK
New Orleans
BS
a Tex
Houston
SP
High Island
Cam.
Matterhorn GI
South Timbalier
Mississippi Canyon
Aconcagua
MU
1000 m
East Breaks
Garden Banks
Green Canyon
Atwater
Alaminos Canyon
2000 m
Keathley Canyon
Lund
3000 m
Walker Ridge
Total Properties
Exploration Production
Matterhorn Project
Discovery early 1999: 2800 ft water-depth, Multi-layered reservoir Decision to develop: July 2001 Start development drilling: December 2001 Installation: August 2003 Start well completion: September 2003 First oil: November 2003
Matterhorn Project
Matterhorn Project
Matterhorn Project
Matterhorn Project
130 0' S T
RAK E
LEN GTH
ft.
ft.
324 8
ft.
ate nar y=
Lc
Lc
ate n
ary =
35 08
ca t
1499' HORIZONTAL DISTANCE TO TDP (NEAR) 1955' HORIZONTAL DISTANCE TO TDP (MEAN) 2464'
8
MATTERHORN
en ar
y=
MUDLINE @ CL TLP
38 23
Matterhorn Project
PHASE V: PROJECT
Matterhorn Project
Dry Tree
Atlantia Modec ABB Spars Kvaerner Technip Mustang Hutton TLP Sea Star Moses TLP and Mini-TLP Classic Spar and Truss Spar DDF TPG 3300 Compliant Tower
Sub-Sea
Atlantia Sea Star Cal Dive EGB Semi-Submersible Oceaneering Converted Semi-Submersible Intec Remote Subsea ( Taylor MC 20 Platform)
C.Van der Linden
07/05/2004
10
Matterhorn Project
11
Matterhorn Project
Biggest mono-hull TLP and first with dry risers Met-Ocean: consideration of Cold core current profile Production risers with Surface Xmas trees: Keel joint development Reeled SCRs
12
Matterhorn Project
13
Matterhorn Project
MC199#1
1,000
A6 A5
2,000
3,000
A2
4,000
5,000
6,000
7,000
A2 A5
A6
A9
6000'
8,000 A1
A4
A9
A3
MC243#3
9,000
10,000 A7 11,000
14
Matterhorn Project
1000
FU TU RE
SC R
#3 #2
Water Depth (ft)
S LICAL UMBI
#4 #5
#6
#7
#8
#1
1500
2000
QTY - 1 OIL EXPORT 8" SCR QTY - 1 GAS EXPORT 10" SCR QTY - 1 WATER INJECTION 6" SCR QTY - 1 FUTURE WATER INJECTION 6" SCR QTY - 4 FUTURE PRODUCTION 6" SCRs
6" WATER
INJECTIO N SCR
Before
FUTURE SCR
FUTURE SCR
SCR FUTURE
10" G AS E
8" OIL RT PO EX
R TU FU E R SC
RT XPO
After
3000
RISER
FUTURE FLEXIBLE
design life at 10 x recorded event Need fairings to 1500 Platform offset Riser/tendon interference
C.Van der Linden
07/05/2004 15
#3 #2
#4
#5 #6 #7
FUTURE
Fatigue:
FLEXIB LE RISE
FUTURE UMB
ILICAL
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
RT XPO AS E 10" G
SCR FUTURE
#8
A-6 WATER
INJECTION
RISER
#1
FUTURE WATER
ION UMBILICAL
INJECTION RISER
Matterhorn Project
16
Matterhorn Project
Project Highlights
17
Matterhorn Project
18
Matterhorn Project
19
Matterhorn Project
20
Matterhorn Project
Bottom connector
C.Van der Linden
07/05/2004 21
Matterhorn Project
22
Matterhorn Project
23
Matterhorn Project
Installed piles in March 03. Tendon Installation started on June 3, 03. Went on Stand by during tendon installation on June 10
due to high current (Eddie Current >1.5 knts) and two tropical storms. Resumed work on July 16 after 34 days stand-by Deck was set on August 3. Platform was habitable on Aug 5.
24
Matterhorn Project
Eddy Currents
25
Matterhorn Project
Tendon spacer
Buoyancy cans
C.Van der Linden
07/05/2004 26
Hull Installation
Matterhorn Project
27
Matterhorn Project
28
Matterhorn Project
Production risers
Well bay
C.Van der Linden
07/05/2004
29
Matterhorn Project
30
Matterhorn Project
SCR Results
31
Matterhorn Project
Conclusions
32