Project Earned Value Analysis 290712
Project Earned Value Analysis 290712
Metric Budget at Completion Actual Cost Earned Value Planned Value Cost Variance
Abbrev. Description BAC Baseline cost for 100% of project. Total costs actually incurred so far. AC Amount of budget earned so far based on physical work accomplished, without reference to actual costs. EV The budget for the physical work scheduled to be completed by the end of the time period. PV Measure of cost overrun. The difference between the budget for the work actually done so far and the actual costs so far. CV Cost efficiency ratio. A CPI of 1.00 means that the costs so far are exactly the same as the budget for work actually done so far. CPI Measure of schedule slippage. The difference between the budget for the work actually done so far and the budgeted cost of work scheduled. SV The schedule efficiency ratio. An SPI of 1.0 means that the project is exactly on schedule. SPI ETC The expected additional cost to complete.
Formula/Value N/A N/A N/A N/A Earned ValueActual Cost EVAC Earned Value/ Actual Cost EV/AC Earned ValuePlanned Value EVPV Earned Value/Planned Value EV/PV Estimate at CompletionActual Cost EACAC Budget at Completion/Cost Performance Index BAC/CPI Budget at CompletionEstimate at Completion BACEAC (Cost Performance Index+Schedule Performance Index)/2 (CPI+SPI)/2 >1.0 >0.85 >0.65 <0.65
Estimate at Completion
EAC
Variance at Completion
VAC
Status
Average of CPI & SPI. GREEN = On track YELLOW = Slightly behind schedule or budget RED = Needs immediate attention BLACK = Killed or Restore
Page 1 of 7
Source Data
Page 2 of 7
Trend Analysis
Period
Budget at Completion (BAC) Earned Value (EV) Actual Cost (AC) Planned Value (PV)
Performance Index
1
1 1 Efficiency 1 1 1 1 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Period
Cost Performance Index (CPI) Schedule Performance Index (SPI)
Page 3 of 7
Trend Analysis
Variance Analysis
100 (100) (200) $ (000)
(300)
Jun-11
Jul-11
Estimate at Completion
3,400 3,300 3,200 3,100 3,000 2,900 2,800 2,700 2,600 2,500 2,400 2,300 2,200 2,100 2,000 1,900 1,800 1,700 1,600 1,500 1,400 1,300 1,200 1,100 1,000
$(000)
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Period
Page 4 of 7
Earned Value Analysis Item Feb'12 Excavation PCC Laying Mar'12 Footing Footing, Pedestal, column Reinforcement Shuttering Concreting Retaining wall Reinforcement Shuttering Concreting Apr'12 Footing Shuttering Concreting Pedestal Shuttering & Cncreteing Column Shuttering & Concreting Retaining wall Plinth Beam Shuttering Concreting Reinforcement & Shuttering Concreting May'12 Plinth Beam Reinforcement & Shuttering Concreting Basement roof Column Reinforcement Column Shuttering Column Concreting June'12 Plinth Beam July'12 PCC flooring Ramp Work Back fill Block Work PCC Staircase Shuttering Reinforcement Concreting 55% Concreting 50% 50% 50% 100% 100% 50% 50% 50% 50% 100% 50% 80% 80% 80% 100% 50% 50% 100% 50% 50% Block 1 100% 100% Block 2 100% 100%
Retaining wall
Block 3
Block 4
Block 5