You are on page 1of 2

http://digilib.its.ac.

id

SUMMARY PENERAPAN LEAN DAN METODOLOGI SIX SIGMA PADA DUPLEX CARTON BOX DI PT MITRA CITRA MANDIRI OFFSET UNTUK MENINGKATKAN KETEPATAN PENGIRIMAN PESANAN
APPLICATION OF LEAN AND SIX SIGMA METHODOLOGY TO DUPLEX CARTON BOX IN PT MITRA CITRA MANDIRI OFFSET DELIVERY ORDER TO IMPROVE ACCURACY Created by MASSORA, FLORENSIUS JAMSIPERMANA Subject Subject Alt Keyword : : Manajemen kualitas total : Quality management : Waste; Quality products; Big Picture Mapping; AHP; RCA; FMEA

Description :
PT MitraCitra Mandiri Offset telah berdiri lebih dari 10 tahun, seiring dengan ketatnya persaingan, maka perusahaan ini berusaha untuk berkembang dan bisa menjadi yang terdepan untuk industri produk kemasan khususnya di pasar Jawa Timur dan sekitarnya. Penelitian ini akan memberikan rekomendasi perbaikan dalam mengatasi permasalahan keterlambatan dalam pengiriman dengan cara mengidentifikasi waste yang terjadi. Untuk memberikan gambaran jelas mengenai perusahaan digunakan Big Picture Mapping. Langkah selanjutnya adalah pengidentifikasian waste berdasar 9 jenis waste (E-Downtime) yang dikemukakan oleh Shiego Singo, untuk mengetahui waste yang dominan terjadi saat pengiriman. Waste yang terjadi dipetakan dengan tools berdasarkan Big Picture Mapping, kemudian akan dilakukan pembobotan dengan menggunakan AHP. Saran perbaikan untuk mengurangi waste diharapkan dapat memperbaiki kinerja perusahaan dengan menggunakan FMEA. Khususnya untuk mengurangi lead time, yang berpengaruh pada waktu penyelesaian produk kemasan. Sehingga, pelayanan kepada customer akan lebih memuaskan.

Description Alt:
PT Mitra Citra Mandiri Offset has existed for more than 10 years, along with intense competition, these companies seek to grow and could become the leader for industrial packaging products, especially in East Java market and surrounding areas. This study will provide recommendations for improvement in addressing the issue of delay in delivery by identifying the waste that occurs. To give picture about the company used the Big Picture Mapping. The next step is to identify the waste by 9 types of waste (E-Downtime) put forward by Shiego Singo, to determine the dominant waste that occurs during shipping. Waste happens mapped with mapping tools based on the Big Picture, and then will be weighted using the AHP. Suggested improvements to reduce waste is expected to improve the performance of companies using the FMEA. Particularly to reduce lead times, which affect the completion time of packaging products. Thus, service to the customer will be more satisfying.

Contributor Date Create Type Format Language Identifier

: H.Hari Supriyanto, Ir.,M.S.I.E : 01/02/2012 : Text : pdf : Indonesian : ITS-paper-250021120000717

Page 1

Collection Call Number Source COverage Right

: 250021120000717 : RSI 658.562 Mas p : Paper and Presentation of Industrial Engineering, RSI 658.562 Mas p, 2012 : ITS Community : Copyright @2012 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library

Full file - Member Only


If You want to view FullText...Please Register as MEMBER

Contact Person :
Taufik Rachmanu (taujack@its.ac.id) Dewi Eka Agustina (dee@its.ac.id) Ansi Aflacha Putri (ansi@its.ac.id) Tondo Indra Nyata (tondoindra@gmail.com)

Thank You,

Nur Hasan ( hassane@its.ac.id ) Supervisor

Page 2

You might also like