Professional Documents
Culture Documents
2 bowl
Elkay#EELUH311810
PO Total: $554.00
Fwguson Xprea Not t!263
IHOEcutSlstStrMri Deliver To:
Austin, TX 78723-3CQ« From: xibort
Commante:
; BI68301
Bid Date....: 10/27/08 Oust Phone: 5)2-463-5495
Quoted By.: AC Terms. ; MET IOTH PROX
"'t^^jm^^m^™*''
wv^~f'ergu^.co^Mles-terr™lhtrnr
. SPECiAL OR CON^Ql/ENTIAPbAMAGES ARBING"
LLER'S LIABLITY, IF ANY, SHALL BE Llf/lfTED TO THE NET
Ton ffie web crl
Purchase Order
2009 DP016434
Vendor Information: Ship To:
SEARS COMMERCIAL ONE Receiving
PO BOX 689131 Gary Richter - House Receiver
House of Representatives Receiving
1 05 W15TH STREET
Rm - G-34
DES MOINES IA 50368-9131
Austin TX 78701
Phone:(512)463-8151 Fax: (512)463-6337
Invoice To:
Vendor: 13617506806 005
House Accounting
FOB Point:
P.O. Box 2910
Blanket PO Number:
Buyer:
Discount Terms: TX 78768
Austin
Sharp LC42D64U
SALESCHECK #
O13571036369
PURCHASER:
TEXAS HOUSE OF REPRESENTATIVES
ADDRESS: 105 W 15TH ST
fe|TY/STATE: AUSTIN, TX
§P CODE: 78701
SiONE: 512-463-8151
EXPECTED DATE: 10/21/08
TRANI PG/STORE REGK ASSOC*
6369 99 01357 103 760
RINGING ASSOC II /m
^MERCHANDISE HOLDING
1 CUSTOMER P/CKUP
1 2057 71195 QTY:2/
SHA LCD 42", SALE 2199.98T
SALE CREDIT 10X 220.001-
SUBTOTAL 1979.98
TAX EXEMPT .00
CARD TYPE: COMMERCIAL 1
ACCT *: W6596/4
toAUTH CODE: 121777/M
9.0. NUMBER: DP016434
11/21/08 COMMERCIAL 1 TOTAL 1979.98
RC: 4717-2288-4652-3176
THE FOLLOWING ITEM(S) MAY BE SUBJECI
TO A CANCELLATION/RESTOCJUNTI FEE
CARDHOLDEi
OF GOODS
PICKUP NUMBER
O1 3571036369
SEARS VALUES
YOUR FEEDBACK!
SEARS VALUES
YOUR FEEDBACK!
* ****** ******* ****:**
TELL US ABOUT YOUR EXPERIENCE AND YOU
J.COULD WIN A $4,000 SEARS GIFT CARD.
PLEASE VISIT OUR WEBSITE WITHIN 7 DAYS
| OF THE DATE
WWW.SEARSFEEDBACK.COM
TO COMPLETE THE SURVEY YOU WILL NEED
THE 12 DIGIT SALESCHECK NUMBER ON
YOUR RECEIPT.
jjP POR FAVOR TOMATE EL TIEMPO PARA
I PROPORCIONARNOS TU INFORHACION Y
« PARTICPA EN UN SORTED CON LA
OPORTUNIDAD DE GANAR UNA TARJETA
DE REGALO SEARS DE $4000.
VISITA LA PAGINA DE INTERNET
WWW.SEARSFEEDBACK.COM
SATISFACTION GUARANTEED
to OR YOUR MONEY BACK
« A RECEIPT DATED WITHIN 90 DAYS
i IS REQUIRED FOR A RETURN OR EXCHANGI
M WHICH WOULD BE 01/19/09. OTHER RULES
APPLY. SEE BACK OF RECEIPT FOR DETAILS.
RETURNED MERCHANDISE MUST INCLUDE ALL
COMPONENT PARTS. REFUND WILL BE ISSUED
IN THE ORIGINAL TENDER.
, RETURNED MERCHANDISE MUST INCLUDE
K ALL COMPONENT PARTS.
PO Total: $3.379.08
Presented By:
Created: 10/14/2008
Capitol House of Representatives
Congress Ave
AUDI
alii!} Austin Texas
Ed
DATE:
Owner: Chris Currens
DATE:
Contractor: Audio Video Designs
[406]
16.00
THE INFORMATION AND DESIGNS CONTAINED CHIEF,HANUFACTUKINO. INC
CHIEF |j^
IK1 CHIEF MANUFACTURING INC.
[MILLIMETERS)
INCHES
IN THIS DRAWING ARE CONFIDENTIAL AND THE
PROPRIETARY PROPERTY OF CHIEF MFG., INC.
NEITHER THIS DESIGN NOR ANY INFORMATION
CONTAINED IN THIS DRAWING MAY BE
REPRODUCED OR DISCLOSED TO OTHERS
TITLE
CUSTOMER PRINT
AUSTIN TX 78702
Accounting:
Bill To Ship To
1 Request for 50% advance deposit for drawings/engineering work, material procurement 30,600.00 30,600.00
and project mobilization
Payments/Credits so.oo
Balance Due $?o,6oo.oo
10709/2008 Texas House of Representatives Page 1 of 1
PO Total: $61.200.00
rage i 01i
Steven Adrian •
Steve, I wrote Lizette back and said that Dec 1. was too late as we have to carpet and install equipment.
She came back with the completion of the granite on November 26 which I think should work fine. We
will carpet the space tentatively Thanksgiving weekend and set equipment on Monday. It should be on
site. So I think the purchase order is ready to cut detailing the milestones below and changing the
installation date of the countertops and backsplash to November 26. If you can get a purchase order cut
so I can turn them loose that would be great. They hope to have the glass wall done too assuming we
can get a design approved. I should get the first draft today or tomorrow and will get it to you as soon as
I have it. Do you know of any reason that the dates won't work listed below? There should be minimal
drilling noise but they will need to come through the Chamber at times with some of the cabinets.
Thanks Lee
Hi Lee, as we discussed today Gerry and I have developed a timeline for this project.
Thanks, Lizette
10/0/2008