The document describes requirements of site utilities for engine set ups purchased from Apex Innovations
Following are the space/layout diagrams and photographs of Engine test setups. Note photos are clicked from working front. Dynamometer is on working front side and engine is on the back side.
Space/Layout diagram
Space/Layout diagram
Photograph
Photograph
19 June 2012
SiteUtilities
Anti-vibration mounts instead of foundation block are not recommended. Foundation bolts of size M16 or 5/8 BSW, 250 mm long (8 nos) 50 mm threading length are required. Dig a pit as suitable to for size of the foundation block. Engine setup Foundation Block size LxW mm Depth (Black soil /rocky soil) mm Single cylinder 1700 X 700 800-900 / 600-700 Multi cylinder 1900 X 850 600-700 / 500-600
Put a rectangular grid mesh box in the pit using 6 mm ms rods with 150 mm pitch or 8 mm ms rods with 200 mm pitch.
Foundation bolt
19 June 2012
19 June 2012
SiteUtilities
Put vertical round/square/rectangular pieces at a pitch distance of foundations bolts. The size of the pocket should be about 125-150 mm.
for 3-4 days curing. Do not tighten the nuts of the foundation bolts before curing period is over.
19 June 2012
SiteUtilities
Following picture shows Engine panel box with support block due to extra
19 June 2012
SiteUtilities
19 June 2012
SiteUtilities
Computer
Provide computer of standard configuration with DVD drive (for computerized engine test set up). The computer should have minimum 2GB RAM and USB port for communication. The computer may need to be formatted before installing engine testing software. Separate cabin for computer is not recommended. The computer needs to be near Engine panel Box.
19 June 2012
SiteUtilities
Water supply from overhead tank with positive head is preferred. Avoid water recirculation as the inlet water will continuously heat up and steady state shall not be achieved Engine set up is supplied with water pump. If water supply is from existing pump, for avoiding flow fluctuations, the pump supplied with the set up shall be bypassed.
Drain Water
The Dynamometer cooling outlet water, Engine cooling outlet water and Calorimeter cooling outlet water is collected in a 75 mm PVC pipe. The institute has to arrange 75 mm PVC pipe for taking this drain water outside the lab.