Any Issue 3-indoor LPB(RRU power) installed with LLVD2 and Fiber routing nok
Remarks
4624 Shadara
C1
Amir Fareed
5/10/2012
2nd E1 up now
C1
Amir Fareed
4026 Shadbagh
C1
Amir Fareed
3-ATS not Ground, At 4026 11kva jumper broken ,WAPDA phase looped ,Aircon not working (few days before hub site got down due to temperatur e issue ), power cable of AIR con has joint which can cause fire hazard, Drainage issue (already emailed for Escalated this) DG to ZTE for module not earliest fixed , rectificatio 4/10/2012 EASS not n 1+1 link nok, e1 PATHING NOK, BB weak , DG not OK At 4635 main Grounding disconnect Escalated ed 1+1 link to ZTE for between earliest 4635 to rectificatio 4/10/2012 4018 NOK n
C1
Amir Fareed
Region
Visited by
Visit Date
Any Issue
Remarks
1-EASS notok
2- Weak BB
4619 Thokkar
C1
Hassan Raza
3-Loose battery connection 19/10/2012 s 4-Tower grounding missing 5- Shelter floor broken 6- Tower and outdoor lights faulty 7- Ducting and silicon Indoor required lights made ok 3- AC not 19/10/2012 working 4- M/W critical alarms need to be removed 5- Earth Pit cover needs to be installed 3- Rectifier Surge arrestor 19/10/2012 burnt 4- DG Silencer insulation fabric missing 5-Fire extinguishe r spray pipe Transforme missing r repaired 3Tower and outdoor 19/10/2012 lights notok 21Wapda phase missing
4618 Satokatla
C1
Hassan Raza
C1
Hassan Raza
4065
C1
Hassan Raza
4- Door shades required 5- Extra power cable ACs made present operational Mr Zeeshan Site Name and Location
Region
Visited by
Visit Date
Any Issue ATS issue DG in wrost condition Roxtec open Smoke sencer not installed,Ca ble routing,site area not clean
Remarks
1-EASS notok
2- Weak BB
C1
Mr Zeeshan
4023
C1
Mr Salman
DG PM was not proper, DG self cable found loose DG main load breaker neutral cable loose, DG control cables routing not proper
Main power cables has joints, MCB box rusty, cable connector not fixed properly in ATS
Media patching and routing not proper, Temperatur e sensor placed on rectifier rack Shelter light power cable has joint, Aircon I/D pipes insulation not proper Aircon alarm relays box not fixed at proper place, Faulty Aircon I/D units placed in guard room
4011
C1
Mr Salman
Aircon O/D power cable connection s not proper, Grounding cable not connected with bar General site cleaning is not good, smoke sensor faulty, indoor room roof cracked/ damaged DG PM not proper, radiator support nut bolts missing Aircon O/D power cable connection s not proper, Grounding cable not connected with bar Fire extinguishe r spray pipe missing, Fiber cable grounding missing
4037
C1
Mr Salman
4463
C1
Mr Salman
Aircon O/D pipes insulation not proper, DG radiator support nut bolts missing Aircon power sockets not bypassed, media patching not proper , shelter lights faulty