Mr Amir Fareed Site Name and Location

Region

Visited by

Visit Date

Any Issue 3-indoor LPB(RRU power) installed with LLVD2 and Fiber routing nok

Issue Resolution done

Remarks

1-One Air 2-Fire con not Extinguishe working rs empty

4624 Shadara

C1

Amir Fareed

5/10/2012

2nd E1 up now

1-E1 cable 3-Tower Routing Grounding Missing

4063 Shalimar Link Road

C1

Amir Fareed

Escalated 4-Battery to ZTE for Backup 40 earliest mints rectificatio 4/10/2012 n

1- Joint in Air con cable

2-only one Air con is working other faulty

4026 Shadbagh

C1

Amir Fareed

3-ATS not Ground, At 4026 11kva jumper broken ,WAPDA phase looped ,Aircon not working (few days before hub site got down due to temperatur e issue ), power cable of AIR con has joint which can cause fire hazard, Drainage issue (already emailed for Escalated this) DG to ZTE for module not earliest fixed , rectificatio 4/10/2012 EASS not n 1+1 link nok, e1 PATHING NOK, BB weak , DG not OK At 4635 main Grounding disconnect Escalated ed 1+1 link to ZTE for between earliest 4635 to rectificatio 4/10/2012 4018 NOK n

1-One Air con not working

Extra matrial at site

4635 Mr Hassan Raza Site Name and Location

C1

Amir Fareed

Region

Visited by

Visit Date

Any Issue

Issue Resolution done

Remarks

1-EASS notok

2- Weak BB

4619 Thokkar

C1

Hassan Raza

3-Loose battery connection 19/10/2012 s 4-Tower grounding missing 5- Shelter floor broken 6- Tower and outdoor lights faulty 7- Ducting and silicon Indoor required lights made ok 3- AC not 19/10/2012 working 4- M/W critical alarms need to be removed 5- Earth Pit cover needs to be installed 3- Rectifier Surge arrestor 19/10/2012 burnt 4- DG Silencer insulation fabric missing 5-Fire extinguishe r spray pipe Transforme missing r repaired 3Tower and outdoor 19/10/2012 lights notok 21Wapda phase missing

1-EASS not 2- SMR ok faulty

4618 Satokatla

C1

Hassan Raza

5434 Sheraz Town

C1

Hassan Raza

1DG not on Auto

4065

C1

Hassan Raza

4- Door shades required 5- Extra power cable ACs made present operational Mr Zeeshan Site Name and Location

Region

Visited by

Visit Date

Any Issue ATS issue DG in wrost condition Roxtec open Smoke sencer not installed,Ca ble routing,site area not clean

Issue Resolution done

Remarks

1-EASS notok

2- Weak BB

6211 Mr Salman Haider

C1

Mr Zeeshan

4023

C1

Mr Salman

DG PM was not proper, DG self cable found loose DG main load breaker neutral cable loose, DG control cables routing not proper

Main power cables has joints, MCB box rusty, cable connector not fixed properly in ATS

Media patching and routing not proper, Temperatur e sensor placed on rectifier rack Shelter light power cable has joint, Aircon I/D pipes insulation not proper Aircon alarm relays box not fixed at proper place, Faulty Aircon I/D units placed in guard room

4011

C1

Mr Salman

Aircon O/D power cable connection s not proper, Grounding cable not connected with bar General site cleaning is not good, smoke sensor faulty, indoor room roof cracked/ damaged DG PM not proper, radiator support nut bolts missing Aircon O/D power cable connection s not proper, Grounding cable not connected with bar Fire extinguishe r spray pipe missing, Fiber cable grounding missing

4037

C1

Mr Salman

4463

C1

Mr Salman

DG PM not proper, radiator support nut bolts missing

Aircon O/D pipes insulation not proper, DG radiator support nut bolts missing Aircon power sockets not bypassed, media patching not proper , shelter lights faulty