Salaya Power
Project site area - 330 Ha Sea water used as cooling water Essars own jetty for importing coal 17 km of coal conveyer for transporting coal from jetty Power evacuation at 400 KV to state utility
2011
Phase I- 1200 MW
Plot Plan
Technology
BTG technology supplier Harbin Power, China 2 X 600 MW power plant Pulverized boiler Sub critical technology Sea water cooling Evacuation at 400 KV
Features
E-BOP Areva I-BOP ABB CW system Kirloskar Brothers Desalination plant IDE AHS - McNalley Bharat DM plant Thermax Ltd
Engineering Highlights
Engineering (100 %) completed. Reputed consultant (TCE) is engaged for BTG BOP is engineered by Essar Engineering (EESL) 17 KM long conveyor designed in house by EESL
Procurement Highlights
Overall procurement progress is 98.4 % All long delivery packages ordered to globally reputed companies & material is received for all packages.
All equipments for BTG received from HPE All BOP packages received at site
Construction Highlights
Overall construction progress is 93.7 % Concreting 98% completed Structural fabrication 100% completed
400 KV switchyard charged Plant UPS commissioned DM Plant commissioned CW system commissioned Plant air system commissioned Coal handling system commissioned Boiler -2 Hydro test completed Unit-2 ESP air leak test completed
10
Unit-2 Turbine box up in advance stage Unit-2 Condenser box up completed Unit-2 Boiler Insulation work in advance stage Unit-2 ID/FD/PA fan erection in advance stage Unit-2 Coal mill erection completed
13
14
Project Overview
CHIMNEY
BOILER #1
BOILER # 2
SWITCH YARD
COAL CONVEYOR
TG #1
TG #2
15
Unit #1 Synchronisation
UNIT #1 SYNCHRONISATION COMPLETED SUCCESSFULLY
16
17
400KV Switchyard
400 KV SWITCHYARD CHARGED
18
DM Plant Overview
DM PLANT COMMISSIONED & IN SERVICE DM PLANT
DM TANK #1
DM TANK #2
19
DM Plant
COMMISSIONED & IN SERVICE
20
CW System
UNIT-1 CW PUMPS COMMISSIONED & IN SERVICE
21
Cooling Tower # 1A
COMMISSIONED & IN SERVICE
22
23
24
25
26
27
TG #1 Overview
28
29
ESP #1 - Overview
30
TG #2
TRANFORMER YARD #2
32
33
34
TG #2 erection
LP #1 & LP #2 TRAIL BOX-UP COMPLETED
GENERATOR STATOR
LP #2 ROTOR LP #1 ROTOR
HIP ROTOR
35
36
ESP #2
37
Unit #2 ID Fan
38
39
40
41
42
2 X 660 MW Super critical PF Boilers Fuel - Imported Coal PPA signed for 800 MW with SEB
44
Overall
4 X 150 MW Sub critical CFBC Boilers Fuel - Pet coke/Imported Coal Entire capacity on Merchant Power
46
Overall
48