In the Planning tab for the FG subinventory, specifies that the item DEV001 is Min-Max driven whenever it resides in FG. And whenever the quantity falls below the Min Qty of 20 in FG, it will be time for Min-Max to trigger replenishment.
The quantity of 400 is just the suggested quantity to maintain as the maximum on hand balance
In the Order Modifiers tab an opportunity is there to specify a Fixed Lot Multiple of 15. This implies that the quantity for replenishment will be suggested (calculated by the Min-Max algorithm) in multiples of 15. Minimum 30 items has to be ordered and maximum of 150 at a time. There can be multiple order lines to reach Max Qty 400 (say 150+150+100). But the Fixed lot Multiple is 15, so order cant be of 100 qty (100 is not a multiple of 15). Hence max level of 400 can be reached by orders of 150 +150+105 qty (Total 405).
Finally, in the Sourcing tab, mention that RM will be the sourcing subinventory.
Now
checkout
the
on-hand
for
DEV001
in
FG.
As the on-hand in FG for DEV001 is just 5 i.e. below minimum level of 20, its time to trigger replenishment. The only task that is left is to run the Min-Max Planning report. This report serves to highlight items that need replenishment and also suggests the replenishment quantity based on the setup. Unlike most reports, the Min-Max Planning report can also trigger the replenishment process. This means creating Pre-Approved Move Orders to fulfill the suggested replenishment quantity. To launch the replenishment process, run the Min-Max Planning report with the parameter Restock set to Yes
The O/P of this report shows that Reorder Quantity as 405. This figure matches with the calculation given above. That indicates we are on the right track so far. As the report has Restock=Yes it must have generated pre-approved Move Order.
Search
for
the
Move
order
created:
Here again above calculation proves it self. There lines got created to reach max qty level of 400.
Now just allocate (click on Allocate button) material for the lines and simply transact the same. If the item on line is serial/lot controlled the allocation must be done by clicking button View/Update Allocation button. After Transact Move Order material must have reached to destination i.e. in FG sub-inventory. Just checkout this:
Here the cycle gets completed. Now user can consume material form FG sub-inventory and the replenishment will keep happening whenever stock comes below the specified level. Similarly we can follow the cycle for the items which are purchased by selecting supply type as Supplier and so on. Keep practicing. Keep blogging.