PRECAST CRACK

INVESTIGATION
MEETING AGENDA 14 MARCH 2013
1. CRACK ON PRECAST BEFORE REVISED REBAR
2. RESULT OF WORK AFTER REVISED REBAR AROUND
OPENING
3. DR. SONGPOL PRESENT ANALYSIS RESULT
4. FURTHER INVESTIGATION PROGRAM OF PRECAST
PRODUCTION, TRANSPORTATION, ERECTION
By Mr.Narate Meksook 14 March 2013

1. CRACK ON PRECAST BEFORE REVISED REBAR

PS32 NAVAMIN 06 March 2013

PS27

13 March 2013

PS24 .12 13 March 2013

PS32
40

PS24

185

PS27

0.1

!!!
173, 204, 205, 203

PS27

143

PC53

PS27

144

PC53(R)

PS27

145

PC53(L)

PS27

168

PC53(L)

PS27

173

PC53(R)

PS27

203

PC53(R)

PS27

204

PC53(L)

PS27

205

PC53(R)

PS27
0.1

PS27

143

PC53

PS27

144

PC53(R)

!!!

PS27

145

PC53(L)

PS27

168

PC53(L)

PS27

173

PC53(R)

173, 204, 205

PS27

203

PC53(R)

PS27

204

PC53(L)

PS27

205

PC53(R)

PS27

!!!

PS24

!!!

PS24

250

BPmo53-R

PS24

251

BPmo53-L

PS24

252

BP53(R-L)

PS24

0.2

PS24

1-2

1-2

1-2

1-2

1-2

1 10

PS32

By Mr.Narate Meksook 14 March 2013

1-2

0.5

2. RESULT OF WORK AFTER REVISED REBAR


AROUND OPENING
%

()

4.167

0.2

13 . 2013

1.923

0.4

13 . 2013

156

5.13

0.2

13 . 2013

PC53(R)

156

17

10.9

0.3

13 . 2013

203

PC53(R)

156

1.92

0.4

13 . 2013

PS27

204

PC53(L)

156

3.21

0.4

13 . 2013

PS27

205

PC53(R)

156

2.56

0.3

13 . 2013

173.1

6.4

4.26

0.31

Type

PS27

143

PC53

120

PS27

144

PC53(R)

156

PS27

145

PC53(L)

156

PS27

168

PC53(L)

PS27

173

PS27

1
1

AVERAGE
2

PS32

68

BVP53a (R)

56

12

21.43

0.3

4 . 2013

PS32

71

BVP53a (L)

56

12

21.43

0.2

4 . 2013

PS32

69

BPmo54 (L)

64

10

15.63

0.3

4 . 2013

PS32

96

BPmo54 (R)

64

14.06

0.3

4 . 2013

PS32

70

BPmo54 (R)

64

13

20.31

0.2

4 . 2013

60.8

11.2

18.6

0.3

AVERAGE

PS24

250

BPmo53-R

132

3.0

0.4

13 . 2013

PS24

251

BPmo53-L

132

6.8

0.4

13 . 2013

PS24

252

BP53(R-L)

145

19

13.1

0.3

13 . 2013

136

11

7.7

0.4

PS30

134

BVP-53a (R)

PS34

242

BVP 53a-R

PS34

234

BVP 53a-L

PS34

230

BP 53a-L

88

25

26.67

AVERAGE

253

185

135.70

136

150

113

100

100

100

%
%
%
75

PS27
38
27
18.6

4.3

6.8

PS27 PC53

PS24 BPmo53

PS32 BVP53a BPmo54

30%-95%
By Mr.Narate Meksook 14 March 2013

4.2.

[9] 3
(Capillary Surface Tension) Capillary
3

(.)
ACI 224R.90 [10]

0.41
,
0.30

0.25

0.10
ACI 318-89 [11]

0.41

0.33
ACI 350R-89 [12]

0.27

0.22
CEB/FIP Modal Code 1990 [13]

0.30

4 Capillary

5 Capillary

2.1.2 (Restraint)
4.3.


[14]
2


0.3

4.4.

Villete Lite 32 6 . 2013

Villete Lite 32 6 . 2013

Villete Lite 32 . 2013


By Mr.Narate Meksook 14 March 2013

Villete Lite 32 6 . 2013

PVC!!!!


1.

2. 7% 135% PS32

3. 0.2-0.-3(90%)2-3
Crack Bridging
Membrane

5.

6. 2-3


By Mr.Narate Meksook 14 March 2013

4. FURTHER INVESTIGATION PROGRAM OF PRECAST PRODUCTION,


TRANSPORTATION, ERECTION

Rev 0.

March 3, 2556 BE

, ,
, , ,
2

1.
2.
3.
4.Kicker

1.

2.
- ,,
,,


- Shrinkage Strain

- ,
,
3.

Pruksa Real Estate (Public) Co., Ltd

Page 1of 4

Document No. DV002

4.

- , ,
, ,
-
5.

-
-
-
6.
2
1 3

- 1-6

- 1-6

-
2
:

Pruksa Real Estate (Public) Co., Ltd

Page 3of 4

Document No. DV002

By Mr.Narate Meksook 14 March 2013