Cac Loai Bien Ban Nghiem Thu Bang Tieng Anh
Cac Loai Bien Ban Nghiem Thu Bang Tieng Anh
Project/ D n; Department/ hng mc DWWG.No./ S bn v Description / Tn cng vic Contractor / Nh thu Level/ Cao Date of insp./ Ngy nghim thu Description / Ni dung cng vic Inspected by / Nghim thu bi Contractor Consultant Nh thu T- vn gim st Description / Ni dung cng vic B. Re-bar work/ Ct thp B1. Size/ Kch th-c B2. Quantity/ S l-ng B3. Spacing/ Khong cch B4. Lap & hk/ C.di mi ni B5. Position/ V tr B6. Cov / Lp bo v D. Othes/ Cng vic khc D1. Constn.Jint/ Mch dng D2. Expan.Joint/ Khe gin D3. Opening/ kn kht a.Location/ V tr b. Dimension/ .knh D4. Cleaning/ V sinh Remarks / Ghi ch Inspected by / Nghim thu bi Contractor Nh thu
A. Formwork/ Vn khun A1. posistion/ V tr A2. Dimension/ .knh A3. Elevation/ Cao A4. Plumness/ Di A5. Bracing/ Ging chng A6. Surface/ B mt C. Embedded items/ Chi tit t sn C1. Anchor bolt/ Bulng neo a. Projection/ Chiu di ch b. Length/ Chiu di c. Diameter/ .knh d. Position/ V tr C2. Embedded plate/ Bn m C3. Water stop/ thanh cn n-c C4. Sleevese/ ng ch C5. Piping/ ng C6. Conduit/ Cp in Result of inspection/ Kt qu nghim thu Acceptable/ Chp nhn Not acceptable/ Khng chp nhn Contraction/ Nh thu thi cng Acceptable/ Chp nhn Acceptable/ Chp nhn Not accptable Khng chp nhn Main contraction/ Tng thu Not accptable Khng chp nhn
Acceptable/ Chp nhn Not accptable Khng chp nhn Consultant/ T- vn gim st Owner/ Ch u t-
ceptable/
wner/ Ch u t-
Contractor / Nh thu Project/ Cng trnh Department/ hng mc Item/ Mc Inspectinon requets no. / Yu cu ln th: Request for inspection / phiu yu cu nghim thu Content of inspections/ Ni dung ng k nghim thu: Time of requetst Thi gian ng k Requested by Ng-i ng k To: . -Technical Department Gi: Phng k thut Inviting time Thi gian mi Received by Ng-i nhn Hour Gi Date Ngy Month Year Thng Nm Signature Ch k 2007 Hour Gi Date Ngy Month Year Thng Nm Signature Ch k 2007
After checking of documents for inspection Sau khi kim tra h s nghim thu Agreed to handover these documents to Consultant for inspection ng chuyn h s cho i din ch u t- (TVGS) nghim thu To: Supervision Consultant Gi: T- vn gim st Receipt time Thi gian nhn Inviting time Thi gian TC nghim thu Received by Ng-i nhn Hour Gi Hour Gi Date Ngy Date Ngy Month Year Thng Nm Month Year Thng Nm Signature Ch k
Notes/ Ghi ch: Inspection request have to submit in two sets/ Phiu mi -c lp thnh 2 t One of set for the file of HLCC/ T s 1 cho HCC One of set for handover to conultant (after agree for inspection)/ T s 2 cho T- vn gim st (sau khi kim tra iu kin nghim thu) Inspection request have to submit 6 hour before inspection, Contractor have to handover these requests Phiu mi nghim thu phi gi tr-c 6h, nh thu phi m s giao nhn phiu mi nghim thu
Tn Cty
cng ho x hi ch ngha vit nam c lp - t do - hnh phc H Ni, ngy thng nm Ha Noi, date
Bin bn s: Nghim thu ni b cng vic xy dng Acceptance minutes no: internal inspetion repots of civil works of contractor
Cng trnh: Project: Hng mc/ Department: Mc: Tn cng vic nghim thu/ Decsription of inspected works: a im/ Location: 1. Thnh phn trc tip nghim thu/ Participants from: i din tng thu xy lp (Ban iu hnh) : Cn b k thut thi cng trc tip: Thi gian tin hnh nghim thu/ Time of inspection: Bt u: H Ni, ngy thng nm Start: Ha Noi, date Kt thc: H Ni, ngy thng nm Finish: Ha Noi, date Ti: At: 2. nh gi cng vic xy dng thc hin/ Evaluation of completed civil works: 2.1 Ti liu lm cn c nghim thu/ Reference documentation for inspection: a) H s thit k k thut thi cng -c ch u t- ph duyt v nhng thay i thit k -c chp nhn / Approved execution technical document of The Owner and agree design modifications: b) Quy chun, tiu chun k thut p dng khi thi cng, kim tra, nghim thu Applicable standards, codes during execution, checking and inspection: c) Ti liu ch dn k thut: d) Nht k thi cng/ Execution diary 2.2 Kt lun/ Conclusion: Chp nhn nghim thu, ng lp phiu yu cu mi nghim thu.
GS thi cng tng thu management board Nh thu thi cng Contractor
Tn Cty
Bin bn s: Nghim thu cng vic xy dng Acceptance minutes no: inspetion of civil works
1.Cng trnh: Project: a) Hng mc/ Department: b) Mc: c) Tn cng vic nghim thu/ Decsription of inspected works: d) a im/ Location: 2. Thnh phn trc tip nghim thu/ Participants from: Cng ty t- vn / Consultant Supervisor. Ban iu hnh d n . / Management Board of . Nh thu thi cng: 3. Thi gian tin hnh nghim thu/ Time of inspection: Bt u: H Ni, ngy thng nm Start: Ha Noi, date Kt thc: H Ni, ngy thng nm Finish: Ha Noi, date Ti: At: 4. nh gi cng vic xy dng thc hin/ Evaluation of completed civil works: 4.1 Ti liu lm cn c nghim thu/ Reference documentation for inspection: a) Phiu yu cu nghim thu ca nh thu ngy thng nm Inspection request of contractor dated b) H s thit k k thut thi cng -c ch u t- ph duyt v nhng thay i thit k -c chp nhn/ Approved execution technical document of The Owner and agree design modifications: c) Quy chun, tiu chun k thut p dng khi thi cng, kim tra, nghim thu: Applicable standards, codes during execution, checking and inspection: d) Ti liu ch dn k thut km theo hp ng xy dng: Technical specification enclosed with economical contract e) Cc kt qu kim tra, th nghm cht l-ng vt liu, thit b -c thc hin trong qu trnh xy dng Inspection results and quality testing reports of mater and equipments during contruction works. f) Nht k thi cng v cc vn bn khc c lin quan n i t-ng nghim thu: Execution diary and other documents related to inspected works: g) Bin bn nghim thu ni b cng vic xy dng ca nh thu thi cng xy dng: Internal inspection reports of civil works of contractor 4.2 Cht l-ng cng vic xy dng/ Quality of civil works Kim tra kt qu th nghim, o l-ng thc t xc nh cht l-ng, nh gi s ph hp ca cng vic xy dng v ti liu ch d Checking test result, actual measurement in order to determine quality and evaluate confomity of civil works compared to design, contr
4.4 kin ca gim st thi cng xy dng cng trnh ca ch u t-: Comments of Consultant Supervisor of The Owner
5 Kt lun/ Conclusion:
Chp nhn nghim thu, ng cho trin khai cc cng vic tip theo/ Agree to accept for follwing works Yu cu sa cha, hon thin cng vic xy dng thc hin v cc yu cu khc/ Requirement for repair, completion of completed civil works and other suggestions.
-c chp nhn/
a cng vic xy dng v ti liu ch dn k thut/ of civil works compared to design, contruction standards, technical specification: