Excavation

DESCRIPTION OF ITEM

Pipe Rack ext 5 Trestle footing level +0 to +1500

Pipe Rack ext 5 Trestle footing level -1500 to -3100

2
3
4

BACK FILLING
EXT PIPE RACK 5 EARTH WORK EXCVATION-3100 TO 150 tower foundation
EXT PIPE RACK 5 EARTH WORK EXCVATION-500 TO 150 tower foundation
PCC FOR PIPE RACK 5 tower foundation
RCC RAFT tower foundation
PEDRATAL tower foundation

II

Pipe Rack ext 5 Trestle footing level -3100 to +200

I
1

1
2
3
4
5
6
C
I
II

EXT PIPE RACK 5 EARTH WORK EXCVATION-500 TO 150 TRASUL


PCC FOR PIPE RACK 5
RCC RAFT
PEDRATAL
DRAIN CUTING RCC
DRAIN CUTING PCC
PCC
DRAIN NEAR Trestle
Pipe Rack ext 5 Trestle footing level -3100 to +200
FOR PCC

II
1
2
3
III

RCC
Pipe Rack ext 5 Trestle footing level -3000 to -2500
for raft
Pipe Rack ext 5 Trestle footing level -3000 to -2500
for pedestal
Drain raft near pipe rack ext 5 Trestle footing
Drain wall near pipe rack ext 5Trestle footing
Apron flooring
flooring
EXT pipe rack 5 RCC -1250 TO -250 tower

IV

CT - DCW SLAB at LEVEL+4000 TO +4400MM

I
1

NOS

LENGTH

WIDTH

HIGHT

QTY M3

7.000

4.000

1.500

42.000

7.000

4.000

1.600

44.800

6.000

5.500

2.950

97.350

-1
-1
-1
-4

6.000
5.200
5.000
1.050

5.500
4.700
4.000
0.750

0.350
0.100
0.500
2.000
Cu.M

-11.550
-2.444
-10.000
-6.300
67.056

7.000

4.000

3.300

92.400

-1
-1
-1
-2
-1
-1

6.000
5.200
5.000
1.050
6.400
6.400

5.500
2.200
2.000
0.750
1.100
1.300

0.350
0.100
0.500
2.000
1.300
0.100
Cu.M

-11.550
-1.144
-5.000
-3.150
-9.152
-0.832
61.572

6.600

1.300

0.100

0.858

5.200

2.200

0.100

1.144

5.000

2.000

0.500

5.000

2
1
2
1
1
4

1.050
6.400
6.400
1.850
1.850
1.050

0.750
0.900
0.200
0.350
1.250
0.750

2.300
0.200
1.000
0.250
0.150
1.000

3.623
1.152
2.560
0.162
0.347
3.150
12.496

1
2
3
4
5
6
7

CT CHANNEL 1 EAST FACE


SLAB
CT CHANNEL 2 WEST FACE
DEDUCATION 2 OPENING
BEAM WEST CT CHANNEL 2
BEAM
BEAM EAST CT CHANNEL 1

1
1
1
-2
1
5
1

3.15
21.35
3.15
1.00
3.15
1.00
3.15

0.90
1.60
1.26
1.00
0.35
0.35
0.35

0.20
0.10
0.20
0.10
0.25
0.25
0.25
Cu.M

0.567
3.416
0.794
-0.200
0.276
0.438
0.276
5.566

E
1
2
3
4
5

FOOTING GP2 GROUTING


Pockets near sandfiltration
Fan desk foundation
Pockets
Fan desk motor foundation
Pockets

30
3
6
3
8

0.200
0.900
0.500
1.250
0.500

0.150
0.900
0.350
0.750
0.350

0.250
0.075
0.300
0.050
0.300
Cu.M

0.225
0.182
0.315
0.141
0.420
1.283

S.NO
DESCRIPTION OF ITEM
F
SHUTTERING
I
EXT PIPE RACK 5 EARTH WORK TRASUL FOR PCC
1

HIGHT

QTY M3

14.80

0.10

1.480

14.00

0.50

7.000

3.60

2.30

16.560

4
2
2
4

3.60
6.60
6.40
6.40

1.30
0.10
0.20
1.00
Sq.m

18.720
1.320
2.560
25.600
73.240

NOS

LENGTH

WIDTH

3
4
5
6

EXT PIPE RACK 5 EARTH WORK TRASUL FOR RCC RAFT


EXT PIPE RACK 5 EARTH WORK TRASUL FOR RCC
PEDESTAL
EXT PIPE RACK 5 EARTH WORK TOWER FOR RCC
PEDESTAL
DRAIN PCC
DRAIN RAFT RCC
DRAIN WALL

II
1
2
3
4
5
6
7

CT - DCW SLAB INSIDE at LEVEL+4400 TO


+4500MM
Connecting Channel 1 EAST FACE
SLAB
Connecting Channel 2 WEST FACE
DEDUCATION 2 OPENING
BEAM WEST Connecting Channel 2
BEAM
BEAM EAST Connecting Channel 2

1
1
1
-2
2
10
2

3.15
21.35
0.40
0.80
2.65
1.00
2.45

2.65
1.00
1.60
0.80
0.25
0.25
0.25
Sq.m

8.348
21.350
0.640
-1.280
1.325
2.500
1.225
34.108

III
1
2
3
4
5
6
7
8
9
10
11
12

CT - DCW SLAB OUTSIDE at LEVEL+4400 TO


+4500MM
Connecting Channel 1 north face
East face
Connecting Channel 2 West face
Column offset north face
rcph to words east side wall
near rcph to words east side wall
Column offset north face
west face
Column offset south face
south face
Connecting Channel 1 West east face
Beam east Connecting Channel 2

1
1
1
10
1
1
2
1
6
1
1
2

3.15
2.50
17.70
0.10
1.70
1.95
0.10
2.50
0.10
14.85
1.05
0.80

0.20
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.25
Sq.m

0.630
0.250
1.770
0.100
0.170
0.195
0.020
0.250
0.060
1.485
0.105
0.400
5.435

IV
1
2
3
4
5
6
7
8
9
10
11
12

CT - DCW LOUVER OUTSIDE LEVEL+4500 MM


louver I shuttering slab
louver I shuttering top
louver I shuttering bottom
Louver II Shuttering salb
beam side face south face
beam side face south face
beam bottom
beam inside
beam inside
nib beam bottom
nib beam sides
end slab

1
1
5
5
5
10
1
5
5
5
10
5

22.15
22.15
4.15
4.15
3.40
1.10
22.15
3.40
1.10
1.75
1.50
4.15

1.50
0.20
0.25
1.50
0.30
0.25
0.25
0.19
0.14
0.35
0.31
0.10
Sq.m

33.225
4.430
5.188
31.125
5.100
2.750
5.538
3.230
0.770
3.063
4.710
2.075
101.203

SCREED CONCRETED Paving M-15 with 100 mm


CT -ICW FLOORING SCREED CONCRETED at LEVEL
+350 TO +450 MM
Connecting Channel 1
beam
east to west
Connecting Channel 2
east to west
beam
rcph

1
3
1
1
1
1
1

2.800
0.350
4.260
2.450
3.920
1.000
1.650

1.000
0.950
1.000
2.750
1.000
0.350
1.300

0.100
0.100
0.100
0.100
0.100
0.100
0.100
Cu.M

0.280
0.100
0.426
0.674
0.392
0.035
0.215
2.121

CT - DCW WALL at LEVEL+1700 TO +1800MM


SCREED CONCRETED 100 mm THICK
Connecting Channel 1
Connecting Channel 1 to Connecting Channel 2
Connecting Channel 2

1
1
1

2.550
20.650
2.650

1.000
1.000
1.100

0.100
0.100
0.100
Cu.M

0.255
2.065
0.292
2.612

I
1
2
3
4
5
6
7
II
1
2
3

S.NO
H
1
2
3
4
5
6
7
8
9
10
I
I
1
2
3
4
5
6
7
8
9
10
II
1
2
3

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
H
1
2
3

HIGHT

QTY M3

1.300
0.150
0.150
0.250
0.250
0.250
0.250
0.250
0.250
0.300
Cu.M

9.009
0.037
0.044
0.481
0.162
0.490
0.214
0.490
0.254
0.019
11.200

1.800
17.660
1.850
1.950
2.650
1.175
15.650
0.100
1.000
2.550

2.700
2.700
2.700
2.700
2.700
2.700
2.700
2.700
2.700
2.700
Sq.m

4.860
47.682
4.995
5.265
7.155
3.173
42.255
0.540
2.700
6.885
125.510

8
8
-4

12.000
8.500
1.150

2.725
2.725
2.000
Sq.m

261.600
185.300
-9.200
446.900

Connecting channel 1 East face


north face
rcph east wall
rcph west wall
south wall
column offset c2
CT Channel 2 west wall
CT Channel 2 south wall
CT Channel 2 east wall
column offset c2
south wall
column offset c2
CT Channel 1 west wall
CT Channel 1 south wall
channel opening -1
openig
channel opening -1
openig
openig

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
-4

2.800
11.380
1.650
2.650
3.920
0.500
1.900
2.450
1.900
0.500
4.260
0.500
1.900
1.000
4.000
5.000
4.200
5.200
0.650

4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
4.050
0.650
Sq.M

11.340
46.089
6.683
10.733
15.876
2.025
7.695
9.923
7.695
2.025
17.253
2.025
7.695
4.050
16.200
20.250
34.020
42.120
-1.690
262.006

Painting for Cooling Tower DCW Cement Wash


Short beam
column
long beam

10
8
5

15.200
12.000
18.000

1.400
1.400
1.400
Sq.M

212.800
134.400
126.000
473.200

NOS

LENGTH

WIDTH

CHIPPING
Drain cutting length 6.5m pipe rack ext -5Trestle
RCPH FOOTING PCC
RCPH FOOTING PCC
conecting channel DCW Rcph wall chiping east and west
conecting channel DCW -Rcph wall chiping slab
connecting channel -ii ,Icw wall chipping
connecting channel -ii ,Icw slab chipping
connecting channel -i ,Icw wall chipping
connecting channel -i ,Icw slab chipping
louver chipping

1
1
1
2
1
2
1
2
1
1

6.300
0.550
0.650
2.750
1.850
2.800
2.450
2.800
2.900
0.250

1.100
0.450
0.450
0.350
0.350
0.350
0.350
0.350
0.350
0.250

PLASTER OF INTERNAL FACE 3% WATERPROOFING


CT - DCW WALL PLASTERING INSIDE at LEVEL+1700
TO +4400MM
Connecting Channel 1 East face
North face
Near rcph North wall
West face
Connecting Channel 2 South face
Connecting Channel 2 West face
SOUTH WALL
Column offset
Connecting Channel 1 West face
Connecting Channel 1 South face

1
1
1
1
1
1
1
2
1
1

COOLING TOWER - DCW WALL PLASTERING INSIDE


at LEVEL+2000 TO +4500MM
SHORT SPAN
LONG SPAN
Deduction

DESCRIPTION OF ITEM

CT - ICW AT PLASTING LEVEL +1700 TO +4400MM

S.NO

DESCRIPTION OF ITEM

I
1
2
3
4
5

BITUMEN PAINT
Pipe Rack ext 5 Trestle footing level raft
Top area
Deduction
Pedestal
Drain wall

LOUVER CONCRETED RCC M25


COOLING TOWER - DCW FOR RCC M25 LOUVER 4.5
LEVEL - I
COOLING TOWER - DCW FOR RCC M25 LOUVER 4.5
LEVEL - I
COOLING TOWER - DCW FOR RCC M25 LOUVER
6.635 LEVEL - II
COOLING TOWER - DCW FOR RCC M25 LOUVER
6.635 LEVEL - ii
Beam B-1
Beam B-1
slope beam

1
2
3
4
5
6
K
L

ROD CUTING
ER building floor for electrical earth plate SCREED
CONCRETED 100 mm THICK
First Line

second line

HIGHT

QTY M3

0.500
2.000
0.750
2.800
1.200
Sq.m

7.000
10.000
-1.575
20.160
15.360
50.945

1.50

0.25

8.306

4.15

0.25

0.20

1.038

22.15

1.25

0.12

3.323

5
9
5
5

4.15
0.50
3.50
1.75

0.35
0.25
0.25
0.35

0.20
0.25
0.30
0.43
Cu.M

1.453
0.281
1.31
1.302
17.014

nos

20.000

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

13.100
5.500
1.200
1.300
1.300
1.100
1.200
1.200
7.600
0.700
1.300
13.500
1.100
1.100
0.700
7.000

0.700
0.700
0.600
0.600
0.600
0.500
0.450
0.450
0.700
0.600
0.700
0.700
0.700
0.700
0.700
0.700

0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
Cu.M

0.917
0.385
0.072
0.078
0.078
0.055
0.054
0.054
0.532
0.042
0.091
0.945
0.077
0.077
0.049
0.490
3.996

NOS

LENGTH

1
1
-2
2
2

14.000
5.000
1.050
3.600
6.400

22.15

WIDTH

S.NO

DESCRIPTION OF ITEM

Steel Wight

Steel 0.00 to +4.00


1
2
3

Connecting channel DCW


Drain at trestle ext -5
pipe rack ext -2

MT
MT
MT
total

0.911
0.797
2.254

3.962

Steel +4.00 to +8.00


1
2

louver level - I ,22.15 m


louver level - II ,22.15 m

MT
MT
total

0.777
0.641

1.418