You are on page 1of 1

Bus Lane to be removed

Bus Lane to remain


KEY
Other existing waiting restrictions, including the urban
clearways and bus stop clearways, are not shown for clarity
RE
BT BT
El Sub Sta
PC
Pavilion
Bank
6
7
7
6
8
5
t o
6
9
3
6
9
5
7 0 5
7
1
7
1
6
1
3
1
4
7
3
7
7
3
9
RUSTLINGS ROAD
E
C
C
LE
S
A
LL R
O
A
D
HUNTERS BAR
TRAFFIC
A shared use cycle facility will be provided
from this point as far as the church. All signs
will be moved to the back of the footway.
The bus stop will be removed to help traffic
flow along Ecclesall Road. Double yellow
lines will replace the bus stop clearway
The footway will be levelled across
the access, with a new vehicular
crossing provided.
The bus stop will be moved slightly
uphill, and a new shelter provided
at the rear of the footway.
The shared use cycle facility ends
here, and cyclists will rejoin the
main carriageway
The bus lane will be removed to help
traffic flow for all vehicles but the parking
restrictions will not be changing. Two
lanes will be available at peak times.
DEVELOPMENT SERVICES
TRANSPORT & HIGHWAYS DIVISION
TRAFFIC SECTION
2-10 CARBROOK HALL ROAD
SHEFFIELD S9 2DB
E-mail Traffic.Management@Sheffield.gov.uk
A Service Area of Place
Sheffield City Council
DRAWN CHECKED
Any errors/omissions to be reported immediately
Do not scale from this drawing
SHEFFIELD CITY COUNCIL
Client
Scheme
Drawing Title
Drawing No.
Scale
A4
Date
This drawing is based upon Ordnance Survey material with the
permission of Ordnance Survey on behalf of the Controller of
Her Majesty's Stationery Office. Crown Copyright.
Unauthorised reproduction infringes Crown copyright and may
lead to prosecution or civil proceedings. 100018816. 2010
If in doubt, ask
Tel. 0114-273-6175. Fax. 0114-273-6182
Development Services
Director: L Sturch M.R.T.P.I.
J WB
J UNE 2013
ECCLESALL ROAD SMART ROUTE
Ecclesall Road - Hunters Bar to Rustlings Road
Proposed Bus Lane Removal
TM/BN727/C1
1 / 1000
J UNE 2013

You might also like