Professional Documents
Culture Documents
Break Up
Basic Rate
Rapid Loading Charge
Crushing
Transportation
Royalty
SADA
SED
MP Transit
CEC
ED @ 6.18%
MPGSTVA @ 5%
Sub Total
CST
VAT
ET
Rounded off
G. Total
Khadia
By MGR
By Road
Rate before 10 th May
Rate after 10 th May
Rate before 10 th May Rate after 10 th May
1140.00
1140.00
1140.00
1254.00
20.00
20.00
Not Applicable
Not Applicable
39.00
39.00
39.00
39.00
Not Applicable
Not Applicable
Not Applicable
117.00
159.60
117.00
175.56
10.00
10.00
Not Applicable
10.00
10.00
10.00
10.00
7.00
7.00
7.00
50.00
50.00
50.00
50.00
74.10
74.10
72.86
79.91
57.00
57.00
57.00
62.70
1524.10
1549.70
1502.86
1678.17
Not Applicable
Not Applicable
Not Applicable
Not Applicable
60.96
61.99
60.11
67.13
30.48
30.99
30.06
33.56
1615.54
1642.68
1593.03
1778.86
Jayant
By Rail
Rate before 10 th May
Rate after 10 th May
Rate from 28.05.2013
1270.00
1270.00
1400.00
0.00
0.00
0.00
39.00
39.00
39.00
44.00
44.00
44.00
153.50
177.80
196.00
0.00
0.00
10.00
10.00
10.00
7.00
7.00
7.00
50.00
50.00
50.00
83.62
95.22
104.38
63.50
63.50
70.00
1720.62
1756.52
1920.38
34.41
35.13
38.41
0.00
Not Applicable
Not Applicable
0.00
Not Applicable
Not Applicable
0.97
0.35
0.21
1756.00
1792.00
1959.00
Dudhichua
By Rail
Rate after 10 th May
1270.00
20.00
39.00
44.00
177.80
0.00
10.00
7.00
50.00
96.46
63.50
1777.76
Not Applicable
71.11
35.56
0.58
1885.00
Rate on 28.05.2013
1400.00
20.00
39.00
44.00
196.00
0.00
10.00
7.00
50.00
105.62
70.00
1941.62
Not Applicable
77.66
38.83
0.89
2059.00
MGR
Road
Basic Rate
Rapid Loading Charge
Crushing Charge
Surface Transportation Charge
Royalty
SADA
SED
MP Transit Fee
CEC
ED @ 6.18%
MPGSTVA @ 5%
Sub Total
CST
VAT
ET
Rounded off
G. Total
Note:
1140.00
20.00
39.00
0.00
117.00
10.00
10.00
7.00
50.00
74.10
0.00
1467.10
0.00
58.68
0.00
1140.00
20.00
39.00
0.00
159.60
0.00
10.00
7.00
50.00
74.10
0.00
1499.70
0.00
59.99
0.00
1254.00
20.00
39.00
0.00
175.56
0.00
10.00
7.00
50.00
81.14
0.00
1636.70
0.00
65.47
0.00
1254.00
20.00
39.00
44.00
175.56
0.00
10.00
1525.78
1559.69
1702.17
Rate after
Revised ED
parameter
50.00
95.33
0.00
1687.89
0.00
67.52
0.00
1140.00
20.00
39.00
44.00
117.00
10.00
10.00
7.00
50.00
76.82
57.00
1570.82
0.00
62.83
31.42
1140.00
20.00
39.00
0.00
159.60
0.00
10.00
7.00
50.00
74.10
57.00
1556.70
0.00
62.27
31.13
1254.00
20.00
39.00
44.00
175.56
0.00
10.00
7.00
50.00
83.86
62.70
1746.12
0.00
69.84
34.92
1254.00
20.00
39.00
44.00
175.56
0.00
10.00
7.00
50.00
95.33
62.70
1757.59
0.00
70.30
35.15
1755.41
1665.07
1650.10
1850.89
1863.05
Rate after
Revision in
basic rate
28.05.2013
1375.00
20.00
39.00
44.00
192.50
0.00
10.00
7.00
50.00
103.85
68.75
1910.10
0.00
76.40
38.20
0.29
2025.00
when coal is su
1140.00
0.00
39.00
0.00
117.00
10.00
10.00
0.00
50.00
72.86
0.00
1438.86
0.00
57.55
0.00
1140.00
0.00
39.00
0.00
159.60
0.00
10.00
0.00
50.00
72.86
0.00
1471.46
0.00
58.86
0.00
1254.00
0.00
39.00
0.00
175.56
0.00
10.00
0.00
50.00
91.38
0.00
1619.94
0.00
64.80
0.00
1140.00
0.00
39.00
0.00
117.00
10.00
10.00
1496.42
1530.32
1684.73
1585.61
MP transit fee though is paid as an component for coal value but is not included in bills. Reason being coal is not supplied from Forest land of MP state. But as a precautionary measure NCL instructed
all consumer to deposit.
Old rate
New rate
Do released as per
old rate
Difference Amount to be
paid
RTGS Detail
58500000.00
31500000.00
30000000.00
1850.89
1850.89
1778.86
1863.05
1863.05
1791.01
31606.42
17018.84
16864.73
383788.30
206798.55
204175.14
SBI, Morwa
SBI, Morwa
SBI, Morwa
NOTE: Three Seperate RTGS to be made & kindly arrange three debit advices respectively.
50.00
72.86
57.00
1495.86
0.00
59.83
29.92
Road
when coal is supplied from MP area
Rate After Royalty
was revised i.e.
From 10.05.12
1140.00
0.00
39.00
0.00
159.60
0.00
10.00
7.00
50.00
72.86
57.00
1535.46
0.00
61.42
30.71
1254.00
0.00
39.00
0.00
175.56
0.00
10.00
7.00
50.00
79.91
62.70
1678.17
0.00
67.13
33.56
1254.00
0.00
39.00
0.00
175.56
0.00
10.00
7.00
50.00
91.38
62.70
1689.64
0.00
67.59
33.79
1627.59
1778.86
1791.01
1375.00
0.00
39.00
0.00
192.50
0.00
10.00
7.00
50.00
99.90
68.75
1842.15
0.00
73.69
36.84
0.32
1953.00
DO No.
12130001
12130002
12130003
DO issued
Qty
40,000
30,000
35,000
Lifted Qty
39727.94
30000
35000
12130004
30,000
30000
12130005
12130006
12130007
12130008
12130009
12130010
12130012
12130013
12130014
12130015
12130016
12130017
20,000
25,345
25,000
20,000
24,655
20,000
40,000
35,000
34,898
13,000
14,898
22,000
20000
25345
25000
20000
24655
20000
40000
35000
34898
13000
14898
22000
12130018
40,000
39995.8
12130019
12130020
12130021
12130023
12130024
20,000
28,738
31,262
35,000
20,000
12130025
11,102
12130026
5,621
20000
28738
31262
35000
20000
8936.44
2164.1
5621
Lifting
MP
Lifting
UP
39727.94
30000
35000
10887.82
6624.54
5019.07
7468.57
20000
15253.24
20628.67
16666.76
14646.84
6780.85
27000
6559.16
1898.32
9778.3
30217.5
20000
28738
31262
34994.8
20000
8936.44
2164.1
5621
10091.76
25000
20000
4026.33
3333.24
25353.16
28219.15
7898
6440.84
14898
20101.68
Billed
Amount
65,685,716.34
45,909,620.64
53,561,224.08
17,965,992.78
10,931,154.06
8,168,987.80
11,429,307.18
32,551,798.64
40,269,648.96
38,258,017.20
30,606,413.76
39,736,591.70
32,227,576.91
62,637,514.57
54,220,792.23
56,031,400.96
20,532,173.48
22,798,717.61
33,851,703.29
18,098,557.26
39,059,973.64
50,907,569.27
55,378,677.37
64,771,523.83
39,059,973.64
16,540,367.04
10,977,805.59
Supplementary
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Supplementary (NCL)
for RPC
5,914,615.27
4,274,562.24
4,986,989.28
4,472,438.00
3,025,350.24
3,745,249.83
3,562,135.20
2,849,708.16
3,694,143.05
2,996,079.15
5,828,047.05
5,046,540.20
5,209,575.45
917,725.72
2,122,747.61
2,864,196.08
61,510,102.53
Supplementary
for STC
1,930,299.88
1,094,756.40
Dudhichua
Rate after inclusion of Roylatyfor
Assessing Excise Duty
1270.00
20.00
39.00
44.00
177.80
0.00
10.00
7.00
50.00
96.46
63.50
1777.76
Not Applicable
71.11
35.56
0.58
1885.00
Jayant
Rate after inclusion of
Roylatyfor Assessing Excise
Duty
1270.00
0.00
39.00
44.00
177.80
0.00
10.00
7.00
50.00
95.22
63.50
1756.52
35.13
Not Applicable
Not Applicable
0.35
1792.00
MGR
Rate of Coal submitted as advnace coal value
Rate Component Break Up
Basic Rate
Rapid Loading Charge
Crushing Charge
Surface Transportation Charge
Royalty
SADA
SED
MP Transit Fee
CEC
ED @ 6.18%
MPGSTVA @ 5%
1140.00
20.00
39.00
44.00
117.00
10.00
10.00
7.00
50.00
76.82
57.00
1140.00
20.00
39.00
44.00
159.60
0.00
10.00
7.00
50.00
76.82
57.00
Sub Total
CST
VAT
ET
Rounded off
G. Total
1570.82
0.00
62.83
31.42
0.93
1666.00
1603.42
0.00
64.14
32.07
0.38
1700.00
Note:
KHADIA
MGR
f Coal submitted as advnace coal value
Rate After
inclusion of
Risk Premium
charge
Rate after
Revised ED
parameter
ROAD
Rate of Coal submitted as advnace coal va
Rate after
Revision in
basic rate
28.05.2013
1254.00
20.00
39.00
44.00
175.56
0.00
10.00
7.00
50.00
83.86
62.70
1254.00
20.00
39.00
44.00
175.56
0.00
10.00
7.00
50.00
95.33
62.70
1375.00
20.00
39.00
44.00
192.50
0.00
10.00
7.00
50.00
103.85
68.75
1140.00
0.00
39.00
0.00
117.00
10.00
10.00
7.00
50.00
72.86
57.00
1140.00
0.00
39.00
0.00
159.60
0.00
10.00
7.00
50.00
72.86
57.00
1746.12
0.00
69.84
34.92
0.11
1851.00
1757.59
0.00
70.30
35.15
0.95
1864.00
1910.10
0.00
76.40
38.20
0.29
2025.00
1502.86
0.00
60.11
30.06
0.39
1593.42
1535.46
0.00
61.42
30.71
0.41
1628.00
Old rate
New rate
1850.89
1850.89
1778.86
1863.05
1863.05
1791.01
Seperate RTGS to be made & kindly arrange three debit advices respectively.
ROAD
Rate of Coal submitted as advnace coal value
Rate After inclusion
Rate after Revision Rate after Revision
of Risk Premium
in ED parameter
dated 28.05.203
charge
1254.00
0.00
39.00
0.00
175.56
0.00
10.00
7.00
50.00
79.91
62.70
1254.00
0.00
39.00
0.00
175.56
0.00
10.00
7.00
50.00
91.38
62.70
1375.00 1270.00
0.00
39.00
39.00
0.00
192.50
177.80
0.00
0.00
10.00
10.00
7.00
7.00
50.00
50.00
99.90 92.50224
68.75
63.50
1678.17
0.00
67.13
33.56
0.14
1779.00
1689.64
0.00
67.59
33.79
0.99
1792.00
1842.15 1709.80
0.00 34.19604
73.69 1744.00
36.84
0.32 3625.09
1953.00 26374.91
4603864.30
141378.51
644541.00
36250.90
25375.63
181254.50
335328.95
230193.22
6198187.00
123963.74
6322150.74
Block B
Rate Component Break Up
Rs/MT
Basic Rate
Rapid Loading Charge
Crushing Charge
Surface Transportation Charge
Royalty
SADA
SED
MP Transit Fee
CEC
ED @ 6.18%
MPGSTVA @ 5%
Sub Total
CST
Billed Amount
1400.00
0
39.00
0
196.00
0.00
10.00
7.00
50.00
101.661
70.00
1873.66
37.47322
Qty in
MT
3625.09
Rs
5075126.00
141378.51
710517.64
36250.90
25375.63
181254.50
368530.27
253756.30
6792189.75
135843.80
6928033.55