curva granulomtrica

Ingeniero Civil
Bolvar # 414 y Buenavista
P.O. Box 07-01-918, Machala, El Oro

07.2920664 - 09.7210469
email: hc3ap@hotmail.com

100.0%

ANALISIS GRANULOMETRICO
90.0%

PESO ANTES DEL ENSAYO :


PESO DESPUES DEL ENSAYO :
MATERIAL PASANTE TAMIZ No. 200 :

12793.0
12793.0

0.0%
0.0%

100.0%
100.0%

0.0

0.0

12793.0

0.0%

100.0%

100

896.0

896.0

11897.0

7.0%

93.0%

70-100

70.0%

60.0%

0
0
0
0
0
0
0
0
0
0
0
0
0

50.0%

40.0%

100.00%
70.00%
30.00%
20.0% 15.00%
0.00%
30.0%

100%
100%
70%
40%
20%

100.0%
75
100%
50
50
93% 37.5 37.5
48.8% 4.75 4.75
21.2% 0.425 0.425
9.8% 0.075 0.075

10.0%

6544.0

6249.0

51.2%

48.8%

1405.60

7949.6

4843.4

62.1%

37.9%

30-70

0.0%
0.425

5648.00

100
75
50
25
12.5
9.5
4.75
2.36
2
1
0.425
0.15
0.075

tamao de particulas en milmetros

OBSERVACIONES:

2134.30

10083.9

2709.1

78.8%

21.2%

15-40

1457.50
1251.60
12793.00

11541.4
12793.0

1251.6
0.0

90.2%
100.0%

9.8%
0.0%

0-20

12793.00 g
12793.00 g
1251.60 g

75

0.0
0.0

100

Pasante
acumulado

0.0
0.0

80.0%

50

Retenido
acumulado

SUB BASE
CLASE 2

25

Operador:
JS
PORCENTAJE

9.5

Milimetros

4
100
3
75
2 1/2
63
2
50
1 3/4
45.3
1 1/2
37.5
1 1/4
31.5
1
25
3/4
19
5/8
16
1/2
12.5
7/16
11.2
3/8
9.5
5/16
8
1/4
6.3
0.223
5.66
0.187
4.75
0.157
4
0.132
3.36
0.111
2.8
0.0937
2.36
0.0787
2
0.0661
1.7
0.0555
1.4
0.0469
1.19
0.0394
1
0.0331
850 micron
0.028
710 "
0.0234
600 "
0.0197
500 "
0.0165
425 "
0.0139
354 "
0.0117
300 "
0.0098
250 "
0.0083
210 "
0.0070
180 "
0.0059
150 "
0.0029
75 "
FONDO
TOTAL

Cantidad que
pasa acumulada

0.15

4
5
6
7
8
10
12
14
16
18
20
25
30
35
40
45
50
60
70
80
100
200

Pulgadas

Cantidad
retenida
acumulada

0.075

No.

Cantidad
retenida parcial

Munucipio de Santa Rosa

12.5

Abril del 2010


TAMIZ

mezcla de laborartorio

Solicia:

4.75

Fecha:

Fuente:

2
2.36

Grava, arena y finos para mezcla para sub base 2

Ampliacion de la via Santa Rosa - La Avanzada

Descrpcn del material:

porcentaje pasante acumulado

Proyecto:

Ingeniero Civil
Bolvar # 414 y Buenavista

07.2920664 - 09.7210469

P.O. Box 07-01-918, Machala, El Oro

email: hc3ap@hotmail.com

DETERMINACION DE LOS LIMITES DE CONSISTENCIA


Proyecto:

Ampliacion de la via Santa Rosa - La Avanzada

Descripcin del material:

Grava, arena y finos para mezcla de sub base 2

Fecha:

Abril del 2010

Solicita:

Municipio de Machala

Uso: Sub Base 2


Fuente: Mezcla en laboratorio

Operador: CP

LIMITE LIQUIDO
PRUEBA No Capsula No

Peso de la
capsula

Peso cap. +
suelo hmedo

Peso cap. +
suelo seco

Peso del
agua

Peso del Contenido de Nmero de


suelo seco Humedad %
golpes

1
2
3
4
5
6
LIMITE PLASTICO
1
2
3
4
5
CONTENDO DE HUMEDAD NATURAL
1

R79

12.820

51.53

49.36

2.170

36.540

5.94%

2
3

Determinacin del Lmite Lquido


27%

RESUMEN DE DATOS

Contenido de humedad

Humedad natural = 5.94 %


26%

Lmite lquido =
Lmite plstico =
Indice plstico =

25%

24%

23%
10

20

25

30

Nmero de golpes
OBSERVACIONES:

40

50

Ingeniero Civil
Bolvar # 414 y Buenavista

07.2920664 - 09.7210469

P.O. Box 07-01-918, Machala, El Oro

email: hc3ap@hotmail.com

ENSAYO DE COMPACTACION PROCTOR MODIFICADO T-180

Proyecto:

Ampliacion de la via Santa Rosa - La Avanzada

Material:

Grava, arena y finos de calichana SUB BASE 2

Fecha:

Abril del 2010

Fuente:

Mezcla de laboratorio

Peso del martillo:

10 lbs

Solicita:

Municipo de Santa Rosa

Altura de caida:

18"

Volumen:

957.00

cm3

# de capas:

Peso:

3320.00

Golpes por capa:

25

Molde #

Operador:

JS

DATOS PARA LA CURVA


Muestra #

Peso del molde + suelo hmedo

5379.00

5470.00

5520.00

5512.00

Peso del suelo hmedo

2059.00

2150.00

2200.00

2192.00

Humedad calculada

3.15

5.21

7.65

9.54

Densidad Hmeda

Kg/m3

2.152

2.247

2.299

2.290

Densidad seca

Kg/m3

2.086

2.135

2.135

2.091

Contenidos de humedad
Muestra #

Recipiente #

R51

R84

R58

R59

R68

R53

R50

R82

Rec + suelo hmedo

108.52 106.43 108.78 110.44 122.62 119.91 119.06 119.82

Rec + suelo seco

105.59 103.56 103.92 105.66 114.69 112.35 109.47 110.81

Peso del recipiente

12.740 12.530 12.420 12.240 12.070 12.610 12.700 12.650

Peso del suelo seco

92.85

91.03

91.50

93.42

102.62

99.74

96.77

98.16

Peso del agua

2.93

2.87

4.86

4.78

7.93

7.56

9.59

9.01

Contenido de Humedad

3.16

3.15

5.31

5.12

7.73

7.58

9.91

Humedad promedio

3.15

5.21

7.65

9.18
9.54

GRAFICO DE DENSIDADES VS. HUMEDADES

2.09
2.135
2.135
2.091

2.160
2.150

3.15
5.21
7.65
9.54

2.140

Densidad Mxima:
2.144 kg/m3

2.130
2.120

Humedad ptima:
2.110

6.40 %

2.100
2.090
2.080
2.070
2.060
3

Observaciones:

10

Ingeniero Civil
Bolvar # 414 y Buenavista

07.2920664 - 09.7210469

P.O. Box 07-01-918, Machala, El Oro

email: hc3ap@hotmail.com

ENSAYO DE CAPACIDAD DE SOPORTE


PROYECTO:

ampliacion de la via Santa Rosa - La Avanzada

MATERIAL.

Mezcla de grava triturada, arena y finos para sub base 2

Fuente:

mezcla de laboratorio

Calicata:

Fecha:

Abril del 2010

Operador:

JS

C.B.R.
4

MOLDE No.

56

# GOLPES POR CAPA


CONDICION DE MUESTRA
PESOMUEST.HUM~MOLDE gr

25

ANTES SATURAR

DESPUES SATURAR

12003.0

12088.0

PESO MOLDE

PESO MUESTRA HUMEDA

5393.0

5478.0

VOLUMEN MUESTRA

cm3

2337.0

2373.8

DENSIDAD HUMEDA

Kg/m3

2.308

HUMEDAD

12
DESPUES SATURAR

ANTES SATURAR

DESPUES SATURAR

6610.0

2.308

ARRIBA

ABAJO

ARRIBA

ABAJO

R67

R83

R60

R78

RECIPIENTE No.
PESO RECIPIENTE

12.370

12.760

12.430 12.620

PESO MUEST.HUM+RECIP

94.88

91.93

103.77 104.43

PESO MUEST.SECA+RECIP

89.17

86.89

97.97

PESODEAGUA

5.71

5.04

5.80

7.08

PESO SUELO SECO

76.80

74.13

85.54

84.73

CONT. HUMEDAD

7.43

6.80

6.78

8.36

Kg/m3

ARRIBA

ABAJO

ARRIBA

ABAJO

ARRIBA

ABAJO

ARRIBA

ABAJO

97.35

7.12

7.57

2.154

2.145

HUMEDAD PROMEDIO
DENSIDAD SECA

ANTES SATURAR

PORCENTAJE DE AGUA ABSORBIDA

MOLDE No.
PESO MUESTRA HUM. + MOLDE DESPUES DE SATURAR

12088

PESO MUESTRA HUM. + MOLDE ANTES DE SATURAR

12003

85

PESO AGUA ABSORBIDA

1.58

PORCENTAJE DE AGUA ABSORBIDA


ESPONJAMENTO

MOLDE No. 1
LI:

FECHA Y HORA

TIEMPO EN DIAS

MOLDE No. 2
mm x 10

Lect. Dial
mm x 10

Cambio de
longitud

ESPONJAMIENTO
%

LI:

MOLDE No. 3
mm x 10

Lect. Dial Cambio de


mm x 10
longitud

ESPONJAMIENTO
%

LI:

mm x 10

Lect. Dial Cambio de


mm x 10
longitud

ESPONJAMIENTO
%

1
2
3
4

Cte. Anillo de carga =

PENETRACION
PENETRACION
EN mm

CARGAS TIPO
Kg/cm2

MOLDE No. 1
Lect. Dial
mm x 10

PRESION

0.64

20.0

5.34

1.27

72.0

16.77

130.0

29.52

188.0

42.27

281.0

62.71

1.91
2.54

70

3.81

kg/cm2

5.08

105

353.0

78.53

7.62

133

475.0

105.34

10.16

161

578.0

127.98

12.70

182

680.0

150.40

(Lect*.04184352)+0.18012 KN

MOLDE No. 2
CBR
corregido

74.8%

Lect. Dial
mm x 10

PRESION
kg/cm2

MOLDE No. 3
CBR
corregido

Lect. Dial
mm x 10

PRESION
kg/cm2

CBR
corregido