Professional Documents
Culture Documents
Agenda:
1. Introduction 2. Instrumentation of a Subsea Pumping System 3. Requirements to SPCS 4. Pump System Layout 5. System Integration Test (SIT) 6. Operation / FRIEND 7. Summary
X Pumps
X Subsea Control
X Multiport Manifold
X Umbilicals
YEAR
1987 1993 1997 1998 1998 2002 2003 2004
FIELD/PROJECT
Oseberg Subsea System Lillefrigg Lufeng 22/1 Subsea Boosting System Zafiro Producer Development Project Troll Subsea Processing Pilot Ceiba C3/C4 Ceiba Full-Field Development Mutineer/Exeter
CONTROL SYSTEM
Subsea Production System E/H Mux. System Subsea Production System E/H Mux. System Pump Control Monitoring via SPS Control Pump Control Monitoring via SPS Control Pump Control Monitoring via Subsea Process Control System Subsea Pump Control System DH/DI System Subsea Pump Control System DH/Subsea Monitoring Mux. Subsea Pump Control System DH/Subsea Monitoring Mux. Subsea Pump and XT Control System - E/H.Mux/FO System Subsea Pump and XT Control System - E/H.Mux/FO System Subsea Pump and XT Control System E/H.Mux/FO System Pump Control Monitoring via Subsea Processing Control System
APPLICATION
2 + 1 satellite wells 3 gas wells 5 subsea booster pump system 2 subsea multiphase pump system 1 subsea water injection pump 2 subsea single-pump stations (FSS) 3 subsea dual-pump stations (FDS) 2 subsea single-pump, production and metering stations 1 subsea dual-pump seawater injection system 2 subsea dual-pump and metering stations 1 subsea multi-manifold station (boosting, production and metering) and satellite well 1 subsea multiphase pump and 1 subsea water injection pump
9 10 11
12
2006
16
2008
Ptarmigan
17
2008
Shelly New
18 19 20
PCM (VSD)
PCC, MCC/LV
HPU
TDH, EPU
VX
MSM
SCM DHPT
MPP
FDS
Subsea Pump Transmitter Well head type transmitters Combined Pressure and Temperature Single or Dual Redundant Retrievable with Pump
TT PT TT PT M PT
The Challenge
Pump Controller
VSD
M
PT
TT PT
t3
SAS
t2
SCU
t4
PCU
PCU
t1
SCM
t5
SCM
SPCS Requirements
Technical requirements
Fast response High resolution Noise immunity
Functional requirements
Seamless interaction TS - SS Designed to perform Closed Loop Control High availability redundant system
Other requirements
Open system offering expandability through industry standard interfaces Transparent communication
SPCS Interfaces
Platform supplies
UPS Power Small Power High Voltage
HPU
VSD
TS
Process Values
SS
Unprocessed wellstream
Mixer
Boosted wellstream
VSD
Pump Speed
HPU
Suction Pressure
Pump Speed
M
PT
SS
Barrier Pressure
P to Process
Mixer
Topside
PT
MPP
Subsea Disturbances +
Minimum Flow
Choke %Open
Setpoint -
Controller
VSD
Process value
TT PT PT
TT PT
TT PT PT
TT PT
To Topside
HMI
PCM
VSD
HVAC
Hang Off
FRIEND (R)
Vx Data Server
Pump Controller
Remote IO
RTAC
Process Network
SCM
Serial Devices
Test Hierarchy
Easy Hook up & Commissioning!
SIT Total System EFAT Sub Systems FAT Component Level Qualified Products
SIT System Integration Test SIT Setup Topside PCM Dynamic umbilical simulators
HV Power LV Power Hydraulics Fibre Optic
SIT Activities
Loop tests Function tests System tests Flow loop tests
Test dock
All wetted parts submerged in test dock
System verification under field like conditions!
Production reporting
Automated reports Production optimization
FRIEND
Framo Remote Operations Centre
RT-Data
TCP/ TCP/ IP IP
Benefits of SPCS
System
Well defined system boundaries Limited interface engineering Clear responsibilities
Functionality
Fast response and high resolution Closed loop control Open system
Specific requirements apply to control of subsea rotating machinery Seamlessly integrated control system from subsea to control room FRIEND Remote Interactive Diagnostics SIT Test under field like conditions