Slovenia

Evolution and Prospects of Relay Protection, Control and Automation Systems


Presented by: Janez Zakonjek

Actual Trends in Development of Power System Protection and Automation Russia, Yekaterinburg, 3 7 June 2013

About Myself
M.Sc. degree in Power Engineering 1977 from University in Ljubljana, Slovenia 15 years with ISKRA Slovenia on relay protection, substation automation and power line carrier eq. From 1991 to 2005 in ABB Relays, Sweden as product manager and senior application specialist From 2006 to 2009 responsible for business and technology development in ABS Holdings, Russia
Copyright 2010 Relarte Ltd.- 2 -

Since Sept. 2009 founder and director of RELARTE Ltd. consulting company in Slovenia All professional career with CIGRE

What shall I Talk About?


A bit about relay history (and expressions used) Why do we strive so strongly towards new solutions in secondary power systems Something about the possibility of going back to the future CIGRE WG B5.24 on Current and Voltage Digital Acquisition Chain
Copyright 2010 Relarte Ltd.- 3 -

Some views on education of young specialists and Something about modern developing and testing methods

Relay Development Hardware and Methods

Copyright 2010 Relarte Ltd.- 4 -

Relay Development Hardware and Methods

Copyright 2010 Relarte Ltd.- 5 -

Relay Development Hardware and Methods

Copyright 2010 Relarte Ltd.- 6 -

Relay Development Hardware and Methods

Copyright 2010 Relarte Ltd.- 7 -

Continuous development of relay protection

Copyright 2010 Relarte Ltd.- 8 -

Continuous development of relay protection

Copyright 2010 Relarte Ltd.- 9 -

Continuous development of relay protection

Copyright 2010 Relarte Ltd.- 10 -

World CO2 Producers - Burning of Fossil Fuels

Copyright 2010 Relarte Ltd.- 11 -

29.888.121.000 metric tones of Carbon Dioxide in 2008

Source: Wikipedia

CO2 Development Through the History

Copyright 2010 Relarte Ltd.- 12 -

Copyright 2010 Relarte Ltd.- 13 -

Future HVAC and HVDC Super Grid

Copyright 2010 Relarte Ltd.- 14 -

Wind Mills Against Wind Farms

To Be Replaced by Renewable Resources?

Copyright 2010 Relarte Ltd.- 15 -

Functional and Hardware integration - 19 1975 75


1 - Distance protection 2 - Three-phase power swing unit 3 - Directional earth fault protection 4 - AC supervision circuits 5 - DC supervision circuits 6 - STUB protection 7 - Auxiliary relays 8 - Fault locator 9 - (Printer for fault locator) 10 - Disturbance recorder 11 - Signaling unit 12 - Parts of event recorder 13 - Breaker failure protection - 1 CB 14 - Tripping relays 15 - Autoreclosing for one CB 16 - Synchrocheck for one CB 17 - Auxiliary transformers for disturbance recorder

10

2 3 4 6 8 9 5 7

Copyright 2010 Relarte Ltd.- 16 -

11 12 13 14 15 16 17

Two relay panels 600 mm x 650 mm x 2250 mm

Functional and Hardware Integration - 19 1994 94


1 - Distance protection 2 - Three-phase power swing unit 3 - Directional earth fault protection 4 - AC supervision circuits 5 - DC supervision circuits 6 - STUB protection 7 - Auxiliary relays 8 - Fault locator 9 - (Printer for fault locator) 10 - Disturbance recorder 11 - Signaling unit 12 - Parts of event recorder 13 - Breaker failure protection - 1 CB 14 - Tripping relays 15 - Autoreclosing for one CB 16 - Synchrocheck for one CB 17 - Auxiliary transformers for disturbance recorder

10

2 3 4 6 8 9 5 7

Copyright 2010 Relarte Ltd.- 17 -

11 12 13 14 15 16 17

Two relay panels 600 mm x 650 mm x 2250 mm

Functional and Hardware integration - 19 1994 94

Copyright 2010 Relarte Ltd.- 18 -

+ SELF SUPERVISION + COMMUNICATION +++++


1 10 2 3 4 6 8 5 7 9 11 12 13 14 15 16 17 Two relay panels 600 mm x 650 mm x 2250 mm

1 - Distance protection 2 - Three-phase power swing unit 3 - Directional earth fault protection 4 - AC supervision circuits 5 - DC supervision circuits 6 - STUB protection 7 - Auxiliary relays 8 - Fault locator 9 - (Printer for fault locator) 10 - Disturbance recorder 11 - Signaling unit 12 - Parts of event recorder 13 - Breaker failure protection - 1 CB 14 - Tripping relays 15 - Autoreclosing for one CB 16 - Synchrocheck for one CB 17 - Auxiliary transformers for disturbance recorder

No Need to Invent the Wheel Again


THE DESIGN IS CHANGING BUT THE BASIC IDEA REMAINS

BC 1000

1000

1993

AC

Copyright 2010 Relarte Ltd.- 19 -

PERFORMANCES ARE IN GENERAL IMPROVED

Copyright 2010 Relarte Ltd.- 20 -

Modern Substation (Yesterday ?)


RCC

Modern Substation (Today)


RCC

IEC 61850

Copyright 2010 Relarte Ltd.- 21 -

Modern Substation (Today)


RCC

IEC 61850

Copyright 2010 Relarte Ltd.- 22 -

GOOSE Messaging

Modern Substation (Today ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 23 -

Modern Substation (Today ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 24 -

Modern Substation (Today ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 25 -

IEC 61850-9-SV

MU

SAMU

SAMU

MU

Modern Substation (Today ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 26 -

IEC 61850-9-SV

MU

SAMU

SAMU

MU

Modern Substation (Tomorrow ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 27 -

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 28 -

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 29 -

Intelligent Primary Equipment

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 30 -

Intelligent Primary Equipment

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 31 -

Intelligent Primary Equipment

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 32 -

Intelligent Primary Equipment

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 33 -

Intelligent Primary Equipment

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow ?)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 34 -

Intelligent Primary Equipment

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow !)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 35 -

Intelligent Primary Equipment

IEC 61850-9-SV

NCIT

NCIT
MU SAMU SAMU MU

Modern Substation (Tomorrow !)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 36 -

Intelligent Primary Equipment

IEC 61850-9-xy

NCIT

NCIT
MU SAMU SAMU MU

Copyright 2010 Relarte Ltd.- 37 -

Is It Distributed or Centralized

Modern Integrated Substation (Tomorrow !)


RCC

GOOSE Messaging

IEC 61850

Copyright 2010 Relarte Ltd.- 38 -

Intelligent Primary Equipment

IEC 61850-9-xy

NCIT

NCIT
MU SAMU SAMU MU

But! Is It Really So Simple?


CIGRE WG B5.24 is working on different protection requirements related to Transient Response of Voltage and Current Digital Acquisition Chain

Copyright 2010 Relarte Ltd.- 39 -

Copyright 2010 Relarte Ltd.- 40 -

Primary Conductor

Digital signal adjustment

Digital signal adjustment

Digital s signal adjustm ment

Ethernet switch process bus IEC 61850-9-2 Digital signal processing

What Are We Really Doing in I and U Circuits


Logic and communication

But! Is It Really So Simple?


CIGRE WG B5.24 is working on different protection requirements related to Transient Response of Voltage and Current Digital Acquisition Chain
3,0 2,5 2,0 Secondary current [A] 1,5 1,0 0,5 0,0 -0,5 -1,0 -1,5 -2,0 0 20 40 60 80 100 120 140 160 180 200 Time [ms] TPX Ts = 3000 ms TPZ Ts = 60 ms Diff current Primary time constant Tp = 120 ms

Copyright 2010 Relarte Ltd.- 41 -

Generator Reverse Power Protection


P/SN

-1

+1 Q/SN
z.B: -0,005

The angle error influence is larger at sensitive settings. For generator protection application the assumed angle error of 0.5 - 1 is too high. The angle error must be lower than 0.1.

Copyright 2010 Relarte Ltd.- 42 -

Earth Faults Isolated or Compensated Systems

Minimum primary earth fault currents in dependence of system voltage


Copyright 2010 Relarte Ltd.- 43 -

Voltage level Primary fault current

6 kV

10 kV

20 kV 2,31 A

0,69 A 1,15 A

Earth Faults Isolated or Compensated Systems

The healthy line

Operation

Imeas.
Copyright 2010 Relarte Ltd.- 44 -

IC

Phase angle error can cause unwanted operation

Earth Fault

Normal Operating Condition

Necessary to Present a Bode Diagram for MU


Magnitude
0 3

dB

H dB ( f)

10

15 0.01

0.1

10 f in Hz

100

1 .10

1 .10

H ( 50 ) = 1 Phase
0 degree
Copyright 2010 Relarte Ltd.- 45 -

Ph ( f)

50 0.01

0.1

Ph ( 50 ) = 3.624

10 f in Hz

100

1 .10

1 .10

Educate young Protection Engineers


Why transformer can not transform DC current? Y, Z and Delta connected CTs Investigate distance protection on double fed line What is mutual coupling?
Copyright 2010 Relarte Ltd.- 46 -

How is defined DC time constant of short circuit current Etc

Copyright 2010 Relarte Ltd.- 47 -

Educate Young Protection Engineers

Educate young Protection Engineers


Young Engineer should have deep knowledge on power system and its elements updated according to their development His knowledge should be excellent from the abnormal conditions point of view He should know what is a power and what is a point what is a power system and what a tool (screw driver or computer) Must be able to judge what computer is telling him HW and SW play the same role as moving discs, coils, transistors and logic circuits long ago Vendors should stop training them pressing buttons They should be paid according to their responsibility We, teachers and mentors must change our approach

Copyright 2010 Relarte Ltd.- 48 -

Testing According to System Requirements (1994)

Copyright 2010 Relarte Ltd.- 49 -

Modern Technologies Modern Testing Methods

Copyright 2010 Relarte Ltd.- 50 -

Multi Modular Converters

Copyright 2010 Relarte Ltd.- 51 -

Conclusion ?