Solar hot water applications King Fahd University of Petroleum & Minerals Dhahran April 2010
Solar Thermal
What do we do?
We supply & install solar heating systems for:
Homes (Retro-fit) Housing developments Community Housing Health Centres Swimming pools
Residential Commercial
Hotels/catering Care Homes Sports facilities Public eg schools/pools Prisons and Fire stations Businesses
6 Levels Code 3 minimum standard 2008 Code 4 from 2009-10 Code 5 from 2012 Code 6 from 2016
Solar Thermal
Renewable Technologies
Fuel Availability
North Sea oil & gas are running out and world oil stocks are falling
2005 = 90/10 2015 = 10/90
Framework conditions: macro economic stability, education and skills development, business climate, provision of public goods, etc.
Wind Turbines
Location Propeller size
Policy environment
Heat Pumps
Ground source Air Source
Policy Interventions
Supply
Academia
Market Pull
Demand
Research centres
Consumers
Biomass
Supply chain Local
Business
Basic R&D
Development
Demonstration
Exports
Government
Solar PV
Efficiency
1/3 of UK generating capacity gone by 2015 Storage issues (OFGEM) Prices will continue to rise.
Investments
Fuel Prices
Why Solar?
Enough energy is absorbed by the earth every 30 minutes to power the entire planet for a year UK - 60% as much solar radiation as equator & similar to Spain Works with other renewables
Ground source heat pump/geothermal Biomass
Biomass
8,000/10 years (rural location/type of fuel)
Wind Turbine
Vladimir Putin, Dec 2008
The time of cheap energy resources, cheap gas, is surely coming to an end.
Contract value increasing Current orders over 11.5 million Sales pipeline value 90.6 million Market leader in flat roof sector
Heat pumps
8,000 - 15,000/15 years (ground works)
Solar heating
4,000/5 -10 years
Barcelona
Vacuum collectors
Indirect solar heating system to swimming pool using existing filtration plant
Payback/savings
Depends on:
Cost/type of fuel displaced Efficiency of energy source Fuel inflation assumption Usage
Design Options
Vented/unvented/thermal store Heat exchange via an external heat exchange unit or heat exchange coil internal to the cylinder Using a separate electronic controller or linked to the Building Management System (BMS)
Hydraulics Plumbing Electrical Solar
System Design
Feasibility studies Complete design service CAD drawings Health & Safety Technical
Business case
Cost of running facility Cost of solar installation Payback.environmental Payback fiscal
Scale..
Examples of design
Sizing Approach
No panels Gross Collector Area M
2
Business case
For building services:
kWh Produced (pa) Recommended Storage Vessel Size (L) Recommended Flow Rate (L/m) Expansion Vessel Capacity (L) Pipe Size (mm) Pump Size
1 2 3 4 6 8
2 3.5 5 7 10 14
18 35 50 60 80 120
15 15 22 22 22 22
Delivers 10% or Code for Sustainable Homes Involvement in design Integration with services
For architect/developer:
Creates eco homes for quick sales at maximum prices Exemplar projects
For businesses:
10 12 24.61 29.532 15000 18000 2000 2500 17 20 150 200 28 28 25/80 25/80
For communities:
20 50 49.22 123.05 30000 75000 4000 10000 35 85 500 1200 35 54 25/80 See eco2solar
For all of us
100 246.1 150000 20000 170 2000 67 See eco2solar
Maidstone Kent
Windsor Castle
Church in Kidderminster
West Wales
Two panel system linking to wood burner at a farmhouse near Malvern Hills, Worcestershire
Northampton
Brilliant! Our solar panel is doing everything we expected of it and more! We have used no gas for water heating in our house since May and have recently had, for the first time ever, a quarterly gas bill for 00.00. Mr Coppock, Oct 08
New Build
Oxford
Tomorrow
Cramlington, Dental Practice
News Release from the Office of the Deputy Prime-Minister SEVERN CENTRE GIVEN SPECIAL RECOGNITION IN NATIONAL AWARD
The Severn Centre has been selected for special recognition within The Deputy Prime Ministers Award for Sustainable Communities 2005. The Deputy Prime Minister's Award for Sustainable Communities recognises projects and initiatives that contribute to making towns, cities and communities, including those in rural areas, better places in which to live and work. They pay tribute to those people whose commitment and enthusiasm are making a significant contribution towards the building of thriving and successful communities. The Severn Centre is a multi-use community building and outside sports and play facility in Highley, one of the most deprived parts of Shropshire. Bridgnorth District Council lead the project to build the new, fully-accessible Centre with the support of the local community and in partnership with other stakeholders. The Centre provides a variety of community and leisure functions including a library, 58-place childcare suite, police station, fitness suite, community hall, social area/bar, IT suite, Multi-Use Games Area, childrens play area, crown green bowling green, tanning suite, football/cricket pitches, outdoor swimming pool heated by a solar-powered hot-water system and sports hall.
Dorking Surrey
Siena Italy
Islington London
Malaga
Siena Italy
Shoreham by Sea
Tiverton Devon
Hailsham Sussex
Islington London
O.D.C.O. Wallingford
Belfast
O.D.C.O. Wallingford
Habinteg, Belfast
Brill School
Habinteg Belfast
Habinteg, Belfast
HMP Prescoed
Brill School
Brill School
Habinteg, Belfast
HMP Prescoed
HMP Prescoed
Brill School
HMP Prescoed
HMP Prescoed
London Gatwick
London Gatwick
H.M.P. Cardiff
Ropetackle
Shoreham
Shoreham
Ropetackle
Shoreham
Ibuki Spa
.Aberdeen
Ramslade Totnes
at Eastbourne
Highley,
Shropshire
Highley,
Shropshire
IV 15 IV 150 PRIMARY BOILER RETURN IV 80 SPARE IV 80 SPARE 80 SPARE CONNECTIONS ON F&R HEADERS MANIFOLD SHALL BE ALLOWED FOR FUTURE 6TH BOILER CONNECTIONS TO DRAIN OVER GULLEY HEADER MANIFOLD 15
IV IV 80 80 80 80 80 80 80 80 80 80 IV IV 80 80
CS IV IV
CS
CS
CS
CS
CS
NRV NRV AAV TP TP SV PURGE TO DRAIN PURGE ANTI IV IV GC LOOP 1000L 1000L PACKAGED HTG FILL & PRESS'N UNIT 1000L 1000L 500L GC IV IV GC GRAVITY PURGE IV IV GC IV IV GC GC IV IV GC IV IV GC GC GC GC SV PURGE TO DRAIN SV PURGE TO DRAIN SV PURGE TO DRAIN SV TO DRAIN TP TP TP TP 200 MS NG TO GAS HEADER GC GC TO DRAIN SV HTG EXPANSION VESSEL HTG EXPANSION VESSEL HTG EXPANSION VESSEL HTG EXPANSION VESSEL HTG EXPANSION VESSEL NRV NRV NRV NRV
50 NG TO EACH BOILER SECTION (10 + 2No SPARE) 80 HTG R TO EACH BOILER SECTION (12 No) NB: 2nd OPTIONAL HTG R BLANKED ON EACH BOILER SECTION (12 No) ETL ETL ETL IV IV LSV DC DC 22 IV 110 SOLAR THERMAL PANELS LOCATED ON THE ROOF 33 SOLAR THERMAL PANELS LOCATED ON THE ROOF 32 SOLAR THERMAL PANELS LOCATED ON THE ROOF IV 22 SC ADDITIONAL 6TH BOILER (B/06). ALL READY TO BE CONNECTED TO SPARE CONNECTIONS ON HEADERS MANIFOLD (TO BE CONFIRMED) QUICK FILL CONNECTION TO DRAIN TO DRAIN OVER GULLEY AV 200 FLOW HEADER DCV IV IV 22 MCW LSV DC 20 20 20 DC 20 22 MCW TO HTG FILL 22 MCW DC LSV LSV DC LSV FLUSHING BYPASS 200 MS NG IV IV IV IV FLUSHING BYPASS FLUSHING BYPASS FLUSHING BYPASS 100 SPARE IV IV IV DC 22 MCW 1000L 1000L 1000L 1000L SC IV IV IV IV IV IV TO DRAIN TO DRAIN NB: SPARE CONNECTIONS SHALL BE ALLOWED FOR GAS AND EMERGENCY SAFETY SYSTEM. SOLAR HTG EXPANSION VESSEL SOLAR HTG EXPANSION VESSEL SOLAR HTG EXPANSION VESSEL SOLAR HTG EXPANSION VESSEL 22 22 22 LSV DC DC DC IV 22 80 HTG F TO EACH BOILER SECTION (12 No) 22 HEATING FILL LSV LSV LSV IV IV IV IV IV IV IV IV ETL ETL ETL ETL ETL ETL IV IV ETL ETL ETL
*
TP TP 125 100 200 HTG DISTRIBUTION FLOW IV IV IV IV 1800L 1800L TP AAV STR STR LTHW EAST BLOCK PUMPS DC ANTI GRAVITY 100 LOOP LSV LSV 54 42 CS FC 150 BOILER FLOW 150 BOILER FLOW 150 BOILER FLOW NRV TP IV SV SC IV 150 HTG F 150 HTG F IV IV IV 150 HTG R SV SV 80 80 SC TO DRAIN 65 DCV HOT WATER THERMAL STORES 8000L CS DPS CS HOT WATER THERMAL STORES 8000L 65 67 67 80 80 80 80 TO DRAIN 65 HOT WATER THERMAL STORES 8000L CS DPS TO DRAIN TO DRAIN 65 HOT WATER THERMAL STORES 8000L CS DPS 65 HOT WATER THERMAL STORES 8000L CS DPS 80 80 80 IV SV SV IV IV IV 150 HTG R IV IV 150 HTG R 150 HTG R IV SV 80 80 TO DRAIN 65 HOT WATER THERMAL STORES 8000L CS CS DPS DPS HOT WATER THERMAL STORES 8000L IV SV SV 80 65 TO DRAIN 80 SOUTH BLOCK TO DRAIN IV 100 SPARE DIRT SEPARATOR IV CS DPS 200 MS NG 200 RETURN HEADER DC CS CS DC DC 42 150 PRIMARY BOILER RETURN DC 42 25 DC IV CS FV FV 100 100 100 SOLAR HTG F 100 SOLAR HTG F 54 FV FV FV FV FV FV FV FV CS CS CS CS FV IV IV IV IV IV IV CS IV IV IV IV CS CS CS CS DC DC DC DC DC DC DC DC DC 25 42 25 25 25 25 25 25 25 25 42 42 42 42 DC CS FV 100 CS 42 42 42 42 42 25 DC IV CS FV FV IV CS IV DC DC 25 42 25 25 42 42 DC DC DC DC DC DC 54 54 DC DC DC DC CS CS DC DC CS CS CS IV IV IV IV IV IV IV IV WEST BLOCK NORTH BLOCK EAST BLOCK 80 IV IV IV 150 HTG F 150 HTG F TO DRAIN TO DRAIN IV 65 SOLAR THERMAL PANELS LOCATED ON THE ROOF TP NRV TP IV SV TO DRAIN IV TP NRV 20 20 DC
DPS
TP 100
STR
STR
FC
DPS
CS
CS
65 CHP R 65 CHP R 65 DC 65 65 65
CS
CHP PLANT
CHP EXPANSION VESSEL ANTI GRAVITY
AAV
*
LOOP 500L PACKAGED HTG FILL & PRESS'N UNIT GC GAS SOLENOID VALVE TO BOILERS & CHP UNIT DC IV IV 22 GC SC GC QUICK FILL CONNECTION 22 MCW TO HTG FILL TO DRAIN OVER GULLEY SC LSV IV
IV
IV WATER METER M IV
28 MCW SUPPLY TO ENERGY CENTRE 76 MCW TO SERVE SOUTH BLOCK TANK ROOM 90 BURIED MDPE MCW CONVERT TO 76 MCW GAS METER M GC M IV 250 PE BURIED NG TO SERVE ENERGY CENTRE PLANT ROOM IV WATER METER GC 250 PE NG TO SERVE ENERGY CENTRE CONVERT TO 225 MS NG
90 BURIED MDPE MCW TO SERVE SOUTH BLOCK TANK ROOM & ENERGY CENTRE PLANT ROOM
Components
HYDRO-RADIO
Heat meter
Bluetooth Receiver
HYDRO-POCKET
HYDRO-RADIO Software
HYDRO-POCKET
configuring of the modules via optical interface generating of installation tours and transmission into HYDRO-RADIO Software download and memorising of Tours upload of the read tours into HYDRO-RADIO docking station with USB-Connection for data transmission and battery charging manipulation display
Walk By
HYDRO-RADIO 868
A SYSTEM OF METERING Solar Thermal Air conditioning
reading cycle 3 minutes sending cycle 8 to 16 sec. battery / 12 years life time optical interface for configuration power supply provided by the meter
Business case
Cost of running facility Cost of solar installation Payback.environmental Payback fiscal
Business case
For building services:
Delivers 10% or Code for Sustainable Homes Involvement in design Integration with services
For architect/developer:
Creates eco homes for quick sales at maximum prices Exemplar projects
For businesses:
Lower costs CSR/Good for business
For communities:
Educational resource on tap Addresses fuel poverty
For all of us
Climate change Cost saving Security & availability of supply