You are on page 1of 10

[Type a quote from the document or the summary of an interesting point.

You can position the text box anywhere in the document. Use the Text Box Tools tab to change the formatting of the pull quote text box.]

Approved capacity Installed Capacity Location Coal Source Water Source

2600 MW 2600 MW Korba ( Chattisgarh) Kusmundha Block, Gevra Mines Hasdeo River Madhya Pradesh,Chattisgarh, Maharashtra, Gujarat,

Beneficiary States Goa, Daman, Diu & Nagar Haveli Approved Investment Rs. 2448.49 Crore Stage - I: 3x 200 MW Unit Sizes Stage -II: 3x 500 MW Stage -III: 1x500 MW Unit -I 200 MW March 1983 Unit -II 200 MW October 1983 Unit -III 200 MW March 1984 Unit -IV 500 MW May 1987 Units Commissioned Unit -V 500 MW March 1988 Unit -VI 500 MW March 1989 Unit -VII 500 MW December 2010

Presently, NTPC generates power from Coal and Gas. With an installed capacity of 34,854 MW, NTPC is the largest power generating major in the country

Nine - times winner of Prime Minister's Trophy for best Integrated Steel Plant in the country, Bhilai Steel Plant (BSP) is India's sole producer of rails and heavy steel plates and major producer of structural. The plant is the sole supplier of the country's longest rail tracks of 260 metres. With an annual production capacity of 3.153 MT of saleable steel, the plant also specializes in other products such as wire rods and merchant products. Since BSP is accredited with ISO 9001:2000 Quality Management System Standard, all saleable products of Bhilai Steel Plant come under the ISO umbrella. At Bhilai IS0:14001 has been awarded for Environment Management System in the Plant, Township and Dalli Mines. It is the only steel plant to get certification in all these areas. The Plant is accredited with SA: 8000 certification for social accountability and the OHSAS-18001 certification for Occupational health and safety. These internationally recognised certifications add value to Bhilai's products and helps create a place among the best organisations in the steel industry. Among the long list of national awards it has won, Bhilai has bagged the CII-ITC Sustainability award for three consecutive years..

[Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Text Box Tools tab to change the formatting of the pull quote text box.]

Tip of the week -Average of square of first n natural numbers= [(n+1) (2n+1)]/ 6 -Average of cube of natural numbers toll n = n [(n+1)/2]2 -Average of odd numbers from 1 to n = (Last odd number+1)/2 -Average of even numbers from 1 to n = (Last even number+2)/ 2 -Average of squares of first n consecutive even numbers = [2 (n+1) (2n+1)]/ 3

[Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Text Box Tools tab to change the formatting of the pull quote text box.]

You might also like