Professional Documents
Culture Documents
Program
: PENGEMBANGAN PELABUHAN
Kegiatan
Lokasi
Tahun Anggaran
: 2013
Sumber Dana
No.
URAIAN PEKERJAAN
UNIT
A.
PEKERJAAN PENDAHULUAN
Rp
22,500,000.00
B.
C.
PEKERJAAN STRUKTUR
Rp
Rp
4,378,632.12
105,196,764.83
D.
PEKERJAAN AKHIR
Rp
2,500,000.00
JUMLAH
Rp
134,575,396.94
PPN 10 % ( A )
Rp
13,457,539.69
IMB 3 % (A)
Rp
4,037,261.91
TOTAL ( A + B + C )
Rp
152,070,198.54
DIBULATKAN
Rp
152,070,000.00
TERBILANG :
SERATUS LIMA PULUH DUA JUTA
TUJUH PULUH RIBU RUPIAH
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Program
PENGEMBANGAN PELABUHAN
Kegiatan
Lokasi
Tahun Anggaran
2013
Sumber Dana
NO
URAIAN PEKERJAAN
HARGA SATUAN
JML.HARGA
(RP)
(RP)
SAT
VOL
ls
1.000
Rp 15,000,000.00
Rp
15,000,000.00
2 Pembersihan Lokasi
ls
1.000
Rp
2,500,000.00
Rp
2,500,000.00
ls
1.000
Rp
2,000,000.00
Rp
2,000,000.00
ls
1.000
Rp
2,500,000.00
Rp
2,500,000.00
bh
1.000
Rp
500,000.00
Rp
500,000.00
Rp
22,500,000.00
A PEKERJAAN PENDAHULUAN
JUMLAH TOTAL
B
ttk
11
Rp
68,050.00
Rp
748,550.00
bh
Rp
33,050.00
Rp
66,100.00
bh
Rp
28,050.00
Rp
84,150.00
bh
Rp
33,050.00
Rp
132,200.00
26
Rp
5,000.00
Rp
130,000.00
37
Rp
3,000.00
Rp
111,000.00
7 Sambungan
bh
10
Rp
1,500.00
Rp
15,000.00
psg
Rp
37,510.00
Rp
75,020.00
set
Rp
81,705.00
Rp
81,705.00
psg
Rp
28,364.00
Rp
113,456.00
bh
Rp
66,705.00
Rp
133,410.00
psg
Rp
27,512.00
Rp
110,048.00
m2
42
Rp
12,632.50
Rp
530,565.00
m3
58.402
Rp
35,057.50
Rp
2,047,428.12
Rp
4,378,632.12
Rp
3,479,130.00
PENGECATAN
1 Pengaecatan Plafond
2 Pengacatan kayu
JUMLAH TOTAL
C PEKERJAAN STRUKTUR
PEKERJAAN BANGUNAN DERMAGA
1 Pemasangan Bowplank
m2
186.000 Rp
18,705.00
ttk
129.000 Rp
102,570.00
Rp
13,231,530.00
129.000 Rp
48,344.00
Rp
6,236,376.00
365.500 Rp
52,760.00
Rp
19,283,780.00
1228.800 Rp
25,372.00
Rp
31,177,113.60
6 Lantai Ulin
m2
186.000 Rp
66,110.00
Rp
12,296,460.00
bh
729.000 Rp
2,500.00
Rp
1,822,500.00
m3
0.540
Rp
605,475.00
Rp
326,956.50
m3
0.360
Rp
208,779.00
Rp
75,160.44
m2
9.000
Rp
18,705.00
Rp
168,345.00
2 Galian Pondasi
m3
8.058
Rp
23,240.00
Rp
187,267.92
3 Urugan Tanah
m3
7.280
Rp
18,810.00
Rp
136,936.80
4 Pas.Batu Pondasi
m3
2.520
Rp
605,475.00
Rp
1,525,797.00
5 Pas,Batu Kosong
m3
1.116
Rp
208,779.00
Rp
232,997.36
6 Urugan Pasir
m3
0.662
Rp
105,810.00
Rp
70,046.22
7 Beton (1:2:3)
m3
0.864
Rp
698,880.00
Rp
603,832.32
m3
4.800
Rp
111,185.00
Rp
533,688.00
11.640
Rp
133,745.00
Rp
1,556,791.80
10 Penulangan
41.823
Rp
13,745.00
Rp
574,857.14
m2
36.040
Rp
83,490.00
Rp
3,008,979.60
m2
62.496
Rp
33,250.00
Rp
2,077,992.00
13 Acian Tembok
m2
62.496
Rp
6,033.00
Rp
377,038.37
m3
0.054
Rp
4,274,300.00
Rp
230,812.20
15 Pintu Panil
m2
1.500
Rp
359,300.00
Rp
538,950.00
16 Jendela Kaca
m2
1.140
Rp
340,740.00
Rp
388,443.60
17 Listplank (2/20)
m2
3.200
Rp
29,750.00
Rp
95,200.00
18 Keramik 30/30
m2
15.000
Rp
137,552.00
Rp
2,063,280.00
m2
7.200
Rp
78,681.00
Rp
566,503.20
16.480
Rp
33,402.00
Rp
550,464.96
m2
7.200
Rp
31,205.00
Rp
224,676.00
22 Rangka Plafond
m2
9.000
Rp
27,652.00
Rp
248,868.00
m2
9.000
Rp
34,484.00
Rp
310,356.00
m3
0.170
Rp
3,698,200.00
Rp
628,694.00
m2
16.440
Rp
22,320.00
Rp
366,940.80
Rp
105,196,764.83
Rp
2,500,000.00
Rp
2,500,000.00
25 Bongkar Bekisting
JUMLAH TOTAL
D PEKERJAAN AKHIR
1 Pek. Pembersihan Akhir
ls
JUMLAH TOTAL
1.000
Rp
2,500,000.00