You are on page 1of 21

AGENCY:SAI SHREY INFRASTRUCTURE(GUJ) PVT LTD

BILL No:RA 07
S.No.

DESCRIPTION

9/13/2011
Payable
Billed Amount Amount in Rs/in Rs/-

Remarks

FABRICATION DETAILS
1

Packing Plant

159526.57

159521.2

5.37

Platform Airslide

33904.80

33904.8

0.00

RAW MILL

30189.65

30192

-2.35

Packing Plant

46627.60

46661.6

-34.00

Cement Silo

18602.13

18598

4.13

OTHER THAN

69902.96

87291.6

-17388.64

SUM =

33136.67

33612.4

-475.73

4093.60

4093.6

0.00

Cement Silo

Cement Silo (RA6 Hold)

52088.00

52088

0.00

10

CCR Building

17285.60

17285.6

0.00

11

Fab.of stru.Steel other than PPt & C Silo

41357.60

41357.60

188353.00

188353

0.00

ERECTION DETAILS
1

Packing Plant

Platform Airslide

27423.00

27423

0.00

11

Raw Mill House

33451.00

33451

0.00

12

CCR Building

13981.00

13981

0.00

13

Raw Mill Hopper

2777.50

2777.5

0.00

14

CCR & Raw Mill Hopper

10080.00

10080

0.00

28556.00

28556

0.00

5120.00

5120

0.00

17

14278.00

14278

0.00

18

2560.00

2560

0.00

833294.68

809828.30

23466.38

15
16

CCR Building

1
2
3
4

Packing Plant
Platform Airslide
Cement Silo
Other than Fly ash Silo, PP & Cement Silo

347879.57
156747.18
159221.23
169446.70

347874.20
156779.40
177085.60
128089.10

Sum =

833294.68

809828.30

426263.90
78389.7
255475.30

46308.5
504653.6
177085.6
81780.6
809828.3

AGENCY:SAI SHREY INFRASTRUCTURE(GUJ) PVT LTD


BILL No:RA 08
S.No.

Drg.No.

DESCRIPTION

Work Completed
Wt in MT
As per Bill As per Drg

Excess
Wt in
MT

Payable
Rate per
Billed
Amount
in
unit Amount in
Rs/in Rs/Rs/-

Excess
value

Fabrication
1
2
3
4
5
6
7
8
9
10
11
12

A1-0848-K2-1-13
Stair Case for Fly ash Silo at 51.0 to 65.67 Mtr Lvl
A1-0848-K2-1-16
A1-08148-59-1-14& A1-08148-K2-14
A1-08148-59-1-15
A1-08148-59-1-18
A1-08148-59-1-19 Cement Silo
A1-08148-59-1-20
A1-08148-59-1-22
A2-08148-E6-1-23
A1-08148-64-1-39 Packing Plant Conv. Platform at 5.8 to 8.3Lvl
A1-08148-64-1-10 PPT Side Runner for Column D-C to C-B.
1.790-003-80
Packer Holding Frame

1.896
1.147
10.767
5.790
0.704
7.536
3.933
5.759
1.039
16.508
9.735
2.379

1.896
1.147
10.767
5.790
0.704
7.536
3.933
0
1.039
16.508
9.735
2.379

0.000
0.000
0.000
0.000
0.000
0.000
0.000
5.759
0.000
0.000
0.000
0.000

6800 12893.83
6800
7797.83
6800 73213.03
6800 39372.00
6800
4787.20
6800 51244.80
6800 26742.51
6800 39161.20
6800
7067.56
6800 112252.55
6800 66198.00
6800 16176.19

12893.83
0.00
7797.83
0.00
73213.03
0.00
39372.00
0.00
4787.20
0.00
51244.80
0.00
26742.51
0.00
0.00 39161.20
7067.56
0.00
112252.55
0.00
66198.00
0.00
16176.19
0.00

35.621

35.621

0.000

5500 195913.58

195913.58

0.00

39011.50

952.00

Erection
13

A1-08148-64-1-39 Packing Plant

14

A1-08148-31-1-17 Hopper Site

7.266

7.093

0.173

5500

15

A1-08148-59-1-14 Cement Silo

22.129

15.884

6.245

5500 121709.50

16
17

A1-08148-59-1-15 RA 06 Bill Hold Qty


Red oxide paint

8.565
555.479
140.773

555.479
120.031

8.565
0.000
20.742

6800
50

39963.50

58242.00
27773.95
900509.23

As per Mech.Depot.Recommended Bill Amount in Rs/- 900509.23


As per Trusst Engineers Recommended Amount Rs/- 767806.53

Trusst Engineers

87362.00 34347.50
0.00 58242.00
27773.95
0.00
767806.53 132702.70

1
2
3
4

Trusst Engineers

Fly Ash Silo


Cement Silo
Packing Plant
Other than Fly ash Silo, PP & Cement Silo

20691.67
328800.60
390540.32
27773.95

sum =

767806.53

24-Nov-11
Remarks

Excess Qty raised

Excess value due to MB 400


beam 2 nos of 1.4 Mtr Long.
Hold due to not
erected(2.419MT 70% of 9.8Lvl
Structure and 4.517MT 100% of
Cheqrd Plates)
Excess qty,Ra 07 & 08 raised

Trusst Engineers

AGENCY:SAI SHREY INFRASTRUCTURE(GUJ) PVT LTD


BILL No:RA 09
Work Completed

S.No.

Drg.No.

DESCRIPTION

Excess Wt
in MT
As per Bill As per Drg

Packing Plant Erection


1

SC-7475 & SC-7476

BC1 - 8.3MLvl

3.839

2.687

1.152

SC-8038

BC3 - 8.3MLvl

0.264

0.185

0.079

SC-8036

BC1 to BC4 - 8.3MLvl

0.583

0.408

0.175

SC-7477 & SC-7478

BC2 - 8.3MLvl

4.058

2.840

1.217

SC-7479 & SC-7480

BC3 - 8.3MLvl

3.015

2.110

0.904

6
7
8

SC-8049
SC-7481 & SC-7482
SC-7475 & SC-7476

BC4Tail End Stringers


BC4 Conv
BC1 - 8.3MLvl

0.184
3.403
0.276

0.129
2.382
0.193

0.055
1.021
0.083

SB4739

0.090

0.090

10
11
12
13

SB4740
SB4736

0.230
0.325
1.889
49.200

0.230
0.325
1.889
19.680

29.520

14

RF11813 to 11816-D-101

BF Fan 17250 m/hr Cap Align


Works 24.8LVL

3.200

1.920

1.280

15

RF11813 to 11816-D-101

BF Fan 34500 m/hr Cap Align


Works 24.8LVL

4.800

2.880

1.920

BC1 - 8.3MLvl packing plates


BC2 - 8.3MLvl packing plates
BC3 - 8.3MLvl packing plates
BC4 Conv packing plates

0.276
0.090
0.230
0.325

0.276
0.090
0.230
0.325

A-00011891050-R2

BC2 - 8.3MLvl
BC3 - 8.3MLvl
BC4 Conv
Packing plates for B.F. & Fans
651 BF1 Align Works 24.8LVL

Packing Plant Fabrication


SC-7475 & SC-7476
SB4739
SB4740
SB4736

Trusst Engineers

Rate per
unit
in Rs/-

Billed
Amount
in Rs/-

Payable
Amount
in Rs/-

Excess value

11

Packing plates for B.F. & Fans

1.889

1.889

Plan at 5.3 M Lvl


Platform at 9.0 M Lvl
Platform at 9.0 M Lvl
Truss at 71.32 M Lvl
Platform at 61.2170 M Lvl
Platform at 65.670 M Lvl

2.554
9.237
2.548
2.455
3.571
1.049

2.554
9.237
2.548
2.455
3.571
1.049

Bottom Chord Plan at 71.32 M Lvl

4.147

4.147

view D-D, 5.8 CC,2.0CC,61.217


Lvl,65.67Lvl

4.125

4.125

2.455
3.571
1.049
4.147

2.455
3.571
1.049
4.147

4.125

4.125

11.163

11.163

2.483

2.483

Flyash Silo Fabrication


A1-08148-K2-1-12
A1-08148-K2-1-12
A1-08148-K2-1-12
A1-08148-K2-1-13
A1-08148-K2-1-13
A1-08148-K2-1-13
A1-08148-K2-1-13
A1-08148-K2-1-13

Flyash Silo Erection


22
23
24
25
26

A1-08148-K2-1-13
A1-08148-K2-1-13
A1-08148-K2-1-13
A1-08148-K2-1-13
A1-08148-K2-1-13
A1-08148-K2-1-13

27
28

A1-08148-K2-1-13

Truss at 71.32 M Lvl


Platform at 61.2170 M Lvl
Platform at 65.670 M Lvl
Bottom Chord Plan at 71.32 M Lvl

view D-D, 5.8 CC,2.0CC,61.217


Lvl,65.67Lvl
Columns,Stools,Box
Beam,Column Brasing View A-A
& B-B
Stair Case & Steps Gratings

Cement Silo Erection


29

A1-08148-59-1-21

Columns - 2 Nos

9.355

9.355

30

A1-08148-59-1-14

Insert Plates & Packing Plates

1.278

1.278

Insert Plates & Packing Plates

1.278

1.278

Packing plates for Fans

0.222

0.222

Cement Silo Fabrication


31

A1-08148-59-1-14

Raw Mill Cyc. Build. erection


PF-012456 to 012460-D-101

Trusst Engineers

PF-012456 to PF 012460-D-101

A00011071070-R3
Raw Mill Cyc.Build.Fabrication
36 A00011071070-R3
38 PF-012456 to PF 012460-D-101

391 Fans 1,4,5,6

1.410

0.846

Bag Filter 391BF1

3.800

2.280

0.943
0.222
155.352

0.943
0.222
115.861

391 Fans 1,4,5,6

1.Fab.of Structures
0.943
0.222

1.Fab.of Structure

1.Fab.of Structure

Trusst Engineers

3.200

1.920

9.355

4.800

2.880

1.410

3.B.F.Fans
0.846 Erection &
Alignment

9.410

5.646

2. erecion
of
Structures

49.200
3.800
53.000

29.520
2.280
31.800

2. erec of
Structure
s

3.839
0.264
0.583
4.058
3.015

2.687
0.185
0.408
2.840
2.110

2. erecion
of
1.278
Structures

1.278 1.Fab.of Structures

2.554
9.237
2.548
2.455
3.571
1.049
4.147
4.125
0.276
0.090
0.230

2. erecion
0.222 of
Structures

0.276
0.090
0.230
0.325

2.455
3.571
1.049
4.147
4.125
11.163
2.483
0.276
0.090
0.230
0.325

3.B.F.Fans
Erection &
Alignment

3
19.680 4.B.F. Erec. & Alignt.
1.520 4.B.F. Erec. & Alignt.
21.200
4
1.152
0.079
0.175
1.217
0.904

5.Belt
Conveyors
erection

2. erec of
Structure
s

1.Fab.of Structure
0.325
1.889
34.939

Trusst Engineers

1.889
1

1.889
42.658

5.Belt
Conveyors
erection
0.184
3.403
15.345

0.129
2.382
10.742

0.055
1.021
4.604

26-Dec-11
Remarks

Fab. of Stru.Steel Other than F.Silo,


Cement
Silo & P.P.Other than F.Silo,
Erec. of Stru.Steel
5.Belt Conveyors
erection

Cement Silo & P.P.


B.F. & Fan Erection & Alignment
Bag Filters Erection & Alignment (pp &
Cycl. Building)
Belt Conveyor Erection

2. erec of Structures

4.B.F. Erec. & Alignt.

2. erec of Structures of Packing Plates

3.B.F.Fans Erection &


Alignment

1.Fab.of Structure

Trusst Engineers

0.276
0.090
0.230
0.325

34.938
42.658
5.646
31.8
10.75

1.Fab.of Structure

2.554
9.237
2.548
2.455
3.571
1.049

1.Fab.of Structure

4.147
4.125
2. erecion of Structures

1.Fab.of Structures
2. erecion of
Structures

2. erecion of
Structures

1.Fab.of Structures
2. erecion of
Structures

Trusst Engineers

1.278

3.B.F.Fans Erection &


Alignment
4.B.F. Erec. & Alignt.
0.943
0.222
33.050

1.Fab.of Structures

& Alignt.
& Alignt.

Trusst Engineers

34.938
42.658
5.646
31.8
10.75
125.792

AGENCY:SAI SHREY INFRASTRUCTURE(GUJ) PVT LTD


BILL No:RA 09
S.No.
1
2
3
4
5

DESCRIPTION
Fab. of Stru.Steel Other than F.Silo,
Cement Silo & P.P.
Erec. of Stru.Steel Other than
F.Silo, Cement Silo & P.P.

Work Completed
As per Bill

Wt in MT

As per Drg

Excess Wt Rate per Billed Amount


Payable
in MT
unit
in Rs/Amount in Rs/-

Excess
value

34.938

34.938

0.000

6800

237578.00

237578.00

0.00

42.658

42.658

0.000

5500

234619.00

234619.00

0.00

5.646

5.646

0.000

6750

38110.50

38110.50

0.00

31.8

31.8

0.000

6900

219120.00

219120.00

0.00

10.75

10.75

0.000

7400

79550.00

79550.00

0.00

Total

125.792

125.792

0.000

Other than Fly Ash Silo, PP &


Cement Silo

472197.00

472197.00

B.F. Fan Erection & Alignment


Bag Filters Erection & Alignment
(pp & Cycl. Building)
Belt Conveyor Erection

Trusst Engineers

809277.50

808977.50 300.00

PP

336780.50

336780.50

sum

808977.50

808977.50

Trusst Engineers

26-Dec-11
Remarks

Trusst Engineers

AGENCY:SAI SHREY INFRASTRUCTURE(GUJ) PVT LTD


BILL No:RA 10
Work Completed
S.No.

DESCRIPTION

3
4
5
6

Fab. of Stru.Steel of F.Silo, Cement


Silo & P.P.
Erec. of Stru.Steel of F.Silo, Cement
Silo & P.P.
B.F. Fan Erection & Alignment
Belt Conveyor Erection
Erection of Packer
Erection of Bin with Load Shell

Erection of Bucket Elevator for PPT

1
2

Total

As per Bill

Wt in
As per Drg

Rate per
Billed Amount
Excess Wt in MT
unit
in Rs/in Rs/-

Payable Amount
in Rs/-

18.835

18.182

0.653

6800

128078.00

123640.25

107.432

95.416

12.016

5500

590876.00

524788.00

2.46
11.578
12.6
13.68

2.46
11.578
12.6
13.68

0.000
0.000
0.000
0.000

6750
7400
10000
7900

16605.50
85677.20
126000.00
108072.00

16605.00
85677.20
126000.00
108072.00

43.2

43.2

0.000

9000

388800.00

388800.00

209.785

127.636

12.669

1444108.70

1373582.45

As per Mech.Depot.Recommended Bill Amount in Rs/- 1444108.70


As per Trusst Engineers Recommended Amount Rs/- 1373582.45

TRUSST ENGINEERS

24-Jan-12
Excess value
Remarks
4437.75

Calculation
Mistake

66088.00 Excess Wt
0.50
0.00
0.00
0.00
0.00

70526.25

.70
.45

TRUSST ENGINEERS

A1-08148-59-1-21
A1-08148-59-1-22
A1-08148-59-1-23
A1-08148-59-1-24
A1-08148-59-1-25
A1-08148-59-1-14
A1-08148-59-1-15

RA 10 Billed
9.355
43.045
25.427
10.113
12.578
0.659
6.256

23.171

35.540

10.584
7.797

18.322
15.548
0.480

6
0
6.612
1.146

11.233

Total
A1-08148-59-1-23
A1-08148-59-1-24

1.954

25.427
35.54
10.113

As per Drg Wt

RA 10 Wt for Stools

Total Acc.Wt

23.171

1.324

24.495

A1-08148-59-1-2

View 1-1(4Nos)

A.Wt+10% of
A.Wt
7.612

View 2.-2 & 3-3


Bottom Chord
Detail X
Total

3.494
2.153
2.163
15.421

A1-08148-59-1-23

A1-08148-59-1-24
View 1-1(2Nos)
View 2.-2 & 3-3
Bottom Chord
Total

A.Wt+10% of
A.Wt
3.658
3.082
1.010
7.750

Description

View 1-1

Total
View 3-3
Bottom Chord
Unit Wt
view1-1 Wt
view3-3 Wt
Bottom Chord Wt
G.Total Wt

65L

50L
8

1.2

6.24

8.8
48
71.04
45.2
36

3
2
10.2

5.8
412.032
262.16
208.8

4.5
45.9
0
0

10.415

0.971

11.386

8
0
0
0.636
0.404
0

9
0
0
0
0
0

0.602

Total Acc.Wt

10 Total
Diffrence
9.355
9.355
0.000
7.527
43.045
0.000
0.259
25.386
0.041
1.065
2.551
7.563
0.889
12.122
0.456
0.144
0.144
0.515
6.256
6.256
0.000
98.858
8.575

Diffrence

24.495

11.045

12.016

A1-08148-59-1-24
mc200
mc150
15.2

21.496

mc125

mb250
23.2

15.2

22.3
338.96
0
0

Total

36

30
8

16.8
0
0
604.8

13.1
0
393
104.8

23.2
20

37.3
865.36
746
0

1662.252
1401.16
918.4
3981.812

3324.504
2802.32
918.4
7045.224

0.56864
13.515
1.794099
4.503602
0.180613
20.56195