You are on page 1of 2

SAP PP QUESTIONS 1 .

In SOP, Sales Planning plans future requirements without considering stocks and available capacities a) True b) False 2. a) b) c) d) 3. a) b) c) d) MPS is Material Process Schedule Master Production Schedule Material Production Schedule Master Process Schedule The highest organizational level for material master record in PP is Company Code Storage Location Client Plant

4. Long term planning is a simulation of which of the following a) MRP b) MPS c) Forecast based planning d) Reorder point planning 5. Which of the following are resulted as output after an MRP run a) Production Order b) Simulation Order c) Process Order d) Planned Order 6. Which of the following is found in a Work Center master data? a) Scheduling Formula b) Capacity Formula c) Costing data d) All 7. Consider a product scenario where there is high product stability, high repetition rates, and low product complexity. What type of manufacturing do you suggest? a) Mass manufacturing b) Bulk manufacturing c) Repetitive manufacturing d) Order based manufacturing 8. In which master data we will define operations and in which order to produce material or product a) Bill of material b) Work center c) Routing d) Material

9. Which production strategy will use if the production is specifically for an individual sales order a) make to stock b) make to order c) Planning with final assembly d) Planning without assembly 10. Which one of the step in production planning will do the planning for materials required for production and their availability a) sales and operation planning b)Demand planning c)Material requirement Planning d)Capacity requirement planning 11. Consider you are working in an industry where demand and sales fluctuates but production may kept in full capacity and fluctuation in demand is smoothed by warehouse stock. Which planning strategy is suits for this scenario a)make to stock b)make to order c)Planning with final assembly d) planning without assembly 12. Which master data in PP specifies the components and quantity for production of a material a) Routing b) BOM c) Work Center d) Material Master

You might also like