Professional Documents
Culture Documents
APPENDIX A INFORMATION REQUIRED FOR BARGE STABILITY ANALYSIS / BALLASTING / MOTION ANALYSIS (1) BARGE RELATED INFORMATION - Barge General Arrangement Drawings and Ballast Tank Plan Arrangement - Barge construction plan drawings showing all structural frame, deck plates & bulkhead details - Barge stability booklet/Calculations - Barge G.A AutoCadd Drawings for preparation of stowage plan & sea fastening drawings (2) BALLASTING CALCULATION - Tidal Information for intended load out window - Quay Height, Chart Datum / reference level - Water Depth / Bathymetric Survey Information - Pumps Details / Specification, if any (3) TOW ROUTE WEATHER DATA (FOR BARGE MOTION ANALYSIS ONLY) - MWS approved tow route weather data - Significant wave height, peak wave period
Page 1 of 5
Page 2 of 5
Additional Information For Load out analysis: - Load out arrangement drawings - Load out design criteria For Transportation analysis: - Sea fastening layout drawings - Transportation design criteria For Lifting Analysis: - Lifting configuration For Mudmat / On bottom Analysis: - Pile Installation / Stabbing Sequence - Installation wave height / period
Page 3 of 5
(13) (14)
(15)
(16)
Page 4 of 5
Page 5 of 5