Professional Documents
Culture Documents
By
R. Harry Eddyarso
PT. SARIPARI PERTIWI ABADI
25 November 2006
STATEMENT of APPRECIATION
WE DO APPRECIATE HALLIBURTON AND POWER
c.i =25
Cased Hole
Barefoot
STE
Exploration
Clean Ups
Production
PACKER PACKER Will safely separate well in two sections. Will safely separate well in two sections. Will protect formation Will protect formation Allow flowing the well inside Tubing while Isolating Allow flowing the well inside Tubing while Isolating the Annulus the Annulus
Drill Collars Drill Collars Will provide a SAFE separation between Ball Valves. Will provide a SAFE separation between Ball Valves. Will add weight to packer protecting the Tubing. Will add weight to packer protecting the Tubing.
Tester Valve Pressure / Temperature Recorders and Carriers Packer Bypass Packer
To provide a mean to circulate if the primary To provide a mean to circulate if the primary circulating valve fails. (Before or after the DST, and circulating valve fails. (Before or after the DST, and with NO manipulation of the Tubing) with NO manipulation of the Tubing) Could be re-closable, or a one shot. Could be re-closable, or a one shot. Can isolate formation during circulation, adding Can isolate formation during circulation, adding safety to the operation. safety to the operation.
DRILL PIPE IMPACT SUB REV. CIRC. VLV. DRILL COLLARS DUAL CIP VALVE HYDROSPRING TESTER VLV. PRESSURE RECORDER BIG JOHN JAR VR SAFETY JOINT NR PACKER ANCHOR PIPE SAFETY JT. FLUSH JOINT ANCHOR TEMPERATURE RECORDER PRESSURE RECORDER
PREMIUM THREADED TUBING R/A TAG SUB RD SAFETY CIRCULATING VLV. DRILL COLLARS EXPRESS CIRCULATING VLV. WORK STRING SURFACE READOUT SYSTEM SELECT TESTER VLV. MPV VALVE RADIAL SHOCK ABSORBER PRESSURE / TEMPERATURE REC. BIG JOHN JAR RTTS SAFETY JOINT CHAMP IV PACKER BELOW PKR. HYD. SAFETY JOINT VERTICAL SHOCK ABSORBER TIME DELAY FIRING HEAD VANN GUNS
Data Header
Choke Manifold
Separator
Test Tank
Transfer Pump
Burner Boom
Burner Head
Nozzle
Igniter Connections
Oil Inlet
Air Compressor
Data Acquisition
16000 15000
260
240 14000 13000 12000 11000 10000 Pressure (psi) 9000 8000 7000 6000 5000 4000 3000 2000 80 1000 0 10/27 12:00:00 10/28 00:00:00 10/28 12:00:00 10/29 00:00:00 10/29 12:00:00 10/30 00:00:00 10/30 12:00:00 10/31 00:00:00 10/31 12:00:00 11/01 00:00:00 11/01 12:00:00 11/02 00:00:00 11/02 12:00:00 11/03 00:00:00 11/03 12:00:00 11/04 00:00:00 11/04 12:00:00 11/05 00:00:00 11/05 12:00:00 11/06 00:00:00 60
Pre-stimulation flow period for formation cleanup. Shut in at the choke manifold and cycle the OMNI to spot diesel to lower the hydrostatic head Steady flow on a small choke Pressure up tubing to fire the guns
220
Acidising the formation by bullheading from surface Second flow period for sample catching
200
180
Temperature (F)
160
Pressure buildup
140
120
Post-Stimulation flowback and cleanup
100
Reporting Formats
The Software Gives The Operator The Ability To Create Custom Report Formats And Save Them For Later Use
Fusible Plug
Hydraulic Return
DS Pilot
DS Pilot
DS Pilot
DS Pilot
Hydraulic
Separator
Test Tank
Pump
Burner