You are on page 1of 5

AIR COILS

The English language version prevails. u tin ting Anh khi c tranh ci.
Centrepoint Page 1 of 5 of B.26 18 September 2007
AIR COILS THIT B DN COIL
1 GENERAL 1 TNG QUT
1.1 FUNCTIONAL DESCRIPTION 1.1 M T
The air coils scope of work covers the
cooling coils which are a sub-component
of the air conditioning equipment.
Phm vi cng vic h thng dn coil
bao gm nhng dn coil lnh l cc
thit b bn trong ca h thng iu ho
khng kh.
1.2 CROSS REFERENCES 1.2 THAM CHIU CHO
General
Comply with the General services
requirements worksection.
Tng qut
Ph hp vi chng Nhng yu cu
chung.
Related worksections
Refer to the following worksections:

Mechanical General Requirements, Air
Handling Plant, Ductwork, Mechanical
Piping.
Nhng chng lin quan
Tham chiu n cc chng sau:
Nhng yu cu chung v c kh, Thit
b x l khng kh, H thng ng
ng c kh, ng gi.
1.3 STANDARD 1.3 TIU CHUN
Rating
To ARI 410
Cp
Theo ARI 410
1.4 DESIGN 1.4 THIT K
Maximum face velocity
Cooling coils: 2.5 m/s
Heating coils: 3.5 m/s
Tc gi b mt ti a
Coil lnh: 2.5 m/s
Coil nng: 3.5 m/s
Maximum water velocity
2.0 m/s.
Tc nc ti a
2.0 m/s
Maximum fin pitch
400 fins/m
Mt l tn nhit ti a
400 fins/m
Maximum water pressure drop
35 kPa
st p nc ti a
35 kPa
Maximum air pressure drop
120 Pa
st p gi ti a
120 Pa
Corrosive atmospheres
Where air quality is corrosive, copper
fins, solder coated and bonded, to be
used.
Kh n mn
Ni no m khng kh c tnh n mn,
phi s dng loi l tn nhit lm bng
ng, c ph v hn hp kim.
Capacities
Coil capacities, pressure drops and
selection procedures shall be in
accordance with ARI standard
procedures or equal.
Cng sut
Cng sut dn coil, st p v cch
chn phi tun theo cc yu cu trong
tiu chun ARI hoc tiu chun tng
ng.
Coil Depth
Maximum chilled water coil depth shall
not exceed 6 staggered rows. Where
deeper coils are required, they shall be
selected in multiples of 4 rows with 60
cm minimum space provided between
coils, and installed in a primary and
Chiu su ca dn coil
Chiu su ti a ca dn coil nc
khng c vt qu 6 hng ng t so
le nhau. Khi yu cu dn coil c chiu
su ln hn, phi chn dn coil c
nhiu dy mi dy 4 hng vi khong
cch ti thiu 60cm gia cc dy, v

AIR COILS
The English language version prevails. u tin ting Anh khi c tranh ci.
Centrepoint Page 2 of 5 of B.26 18 September 2007
secondary arrangement.

c lp t tch ring thnh s cp v
th cp.
2 QUALITY 2 CHT LNG
2.1 PRE-COMPLETION TESTS 2.1 TH NGHIM TRC KHI
HON TT
Production tests
Pneumatic leak test: Pneumatically test
coils for leakage by submerging in warm
water and applying the test pressure, or
by static water pressure for at least 1
hour.
- Minimum test pressure: 2 MPa.
Refrigerant coils: After testing,
dehydrate, charge with dry nitrogen to
7 kPa (minimum), and seal.
Th nghim sn xut
Th nghim r r kh: th nghim kh
cho cc dn coil v r r bng cch
nhng vo nc m v cho bm n p
lc th nghim, hoc bng p lc nc
tnh trong vng ti thiu 1 gi.
- p sut th nghim ti thiu: 2 MPa
Dn coil gas lnh: Sau khi th nghim,
kh nc, np kh nitrogen kh n p
sut 7 kPa (ti thiu), v nim kn.
3 MATERIALS 3 VT LIU
3.1 FABRICATION 3.1 CH TO
Arrangement
Arrange pipes with uniform spacing in a
staggered pattern.
B tr
B tr cc ng vi khong cch ng
nht theo kiu so le nhau.
Fins
General: Provide plate fins to pipes.
Spacing: Space equally, perpendicular to
the pipes.
Fin collars: Provide adequate control of
fin spacing and provide a permanent
mechanical bond between the pipes and
the plate fins, by expanding pipes into
fin collars, so that fin collars completely
cover the pipes.
Material:
- Heating coils, condenser coils and
non-sprayed cooling coils: aluminium
alloy. Sprayed cooling coils: copper.
Minimum thickness:
- Aluminium alloy: 0.12 mm
- Copper: 0.15 mm
L tn nhit
Tng qut: s dng l tn nhit dng
tm cho cc ng.
Khong cch: cch u nhau, vung
gc vi ng.
Vng c m: nhm kim sot ph hp
khong cch gia cc l tn nhit v
cung cp mt mi dn c hc thng
trc gia ng v cc l tn nhit, ko
di ng lun vng c m vo ng ,
cho vng c m ph hon ton ng.
Vt liu:
Coil nng, coil ca dn ngng v coil
lnh khng phun: hp kim nhm. Coil
lnh c phun: ng
Chiu dy ti thiu:
- hp kim nhm: 0.12 mm
- ng: 0.15 mm
Frames
General: Form rigid frames, from
channel-type pipe sheets and top and
bottom channels and intermediate pipe
sheets as necessary.
Minimum flange height (to provide for
duct connections): 25 mm.
Drain holes: Provide drain holes in
cooling coil frames where water may
collect.
Material:
- For aluminium fins: Aluminium alloy
- For copper fins: Heavy gauge brass,
designation 260.

Khung
Tng qut: Khung cng vng, bng
tm ng hnh rnh, c tm ng cho
nh, y v trung gian nu cn thit.
Chiu cao mt bch ti thiu ( ni vi
ng gi): 25mm
L thot nc: cung cp l thot nc
cho khung dn coil ni c nc.
Vt liu:
- i vi l tn nhit nhm: hp kim
nhm.
- i vi l tn nhit ng: ng thau
loi chu lc mc 260.

AIR COILS
The English language version prevails. u tin ting Anh khi c tranh ci.
Centrepoint Page 3 of 5 of B.26 18 September 2007
Air leakage
General: Minimise air leakage through
gaps between the fin ends and frames.
Deemed-to-satisfy: Recess fin ends into
the top and bottom channels, close gaps
with sealing strips, or gaps to a
maximum clearance of 1.5 mm
R r gi
Tng qut: Gim thiu r r gi qua cc
khe h gia l tn nhit v khung.
Bin php: Gn m u l tn nhit vo
rnh bn trn v bn di, lm kn khe
h bng cc dy bng m, hoc khe
h ti a cho php l 1.5mm
Coil protection
Coils with aluminium fins: Provide a
proprietary corrosion protection coating
for coils.
Coils with copper fins: Electro-tin the
coil assemblies after manufacture.
Bo v dn coil
Dn coil s dng l tn nhit nhm:
thc hin lp ph bo v chng n mn
nguyn b ch to sn cho dn coil.
Dn coil c l tn nhit ng: m thic
in ln cc chi tit ca dn coil sau khi
sn xut.
3.2 WATER COILS 3.2 COIL NC
Chilled & hot water coils < 100C
Pipe material: Copper to AS/NZS 1571
or to AS 1572, designation C12200.
Header material: Copper to AS 1432.
Coil nc lnh & nc nng < 100C
Vt liu ng: theo tiu chun
AS/NZS 1571 hoc AS 1572, phn
C12200.
Vt liu ng gp: ng theo tiu chun
AS 1432.
High temperature water coils 100C
Pipe and header material < 160C:
Copper to AS/NZS 1571.
Pipe and header material 160C: Cupro
nickel to AS 1572, designation C70610.

Fin core: Free to move within coil
frames in the direction of the pipe axis.
Coil nc nhit cao 100C
Vt liu ng v ng gp < 160C: ng
theo tiu chun AS/NZS 1571.
Vt liu ng v 160C: hp kim ng
v nickel theo tiu chun AS 1572,
phn C70610.
Li ca l tn nhit: dch chuyn t do
trong khung dn coil theo phng truc
ng.
Headers
Fluid flow: Arrange headers for even
cooling and heating fluid flow to pipe
circuits.
Header/pipe joints: Braze.
- Pipe holes: Provide intruded or
extruded pipe holes in headers.
Vents: Provide vent plugs to top of
headers.
Drains: Provide drain plugs to bottom of
headers, arranged to fully drain coils.
Piping connections: Provide inlet
connections at the bottom of supply
headers at the air-off face of coils and
outlet connections at the top of return
headers at the air-on face of coils.
ng gp
Dng cht lng: b tr ng gp cho c
hai dng cht lng nng v lnh chy
vo tuyn ng.
Ni ng/ ng gp: ng thau
L cho ng: to cc l ni ng m vo
hoc li ra trn ng gp.
Thng gi: cung cp mt nt thng gi
trn nh ca ng gp.
L thot: cung cp l thot cho y ng
gp, t v tr c th x hon ton
cht lng trong dn coil.
Ni ng: cung cp l ni ng cp vo
y ng gp cp mt gi ra ca dn
coil v l ni ng ra nh ca ng gp
hi mt n gi vo ca dn coil.
3.3 REFRIGERANT COILS 3.3 COIL GAS LNH
Direct expansion coils
Piping connections: Provide pressure
type liquid distributors and suction
headers, with brazed joints.
Pipe arrangement: For multiple circuits,
provide interleaving.
Pipe material: Copper to AS/NZS 1571
or AS 1572 designation C12200.
Header material: Copper to AS 1432 or
Dn coil gin n trc tip
Ni ng: thc hin mi hn ng thau
cho ng gp ht v ng phn b cht
lng chu p sut.
B tr ng: i vi h thng a tuyn,
thc hin bng cch chen vo.
Vt liu ng: theo tiu chun
AS/NZS 1571 hoc AS 1572 phn
C12200.

AIR COILS
The English language version prevails. u tin ting Anh khi c tranh ci.
Centrepoint Page 4 of 5 of B.26 18 September 2007
AS/NZS 1571. Vt liu ng gp: ng theo tiu chun
AS 1432 hoc AS/NZS 1571.
Condensing coils
Piping connections: Factory fit copper
pipe connection stubs to refrigerant hot
gas inlet and liquid outlet headers using
brazing or braze welding. Pressurise with
dry nitrogen, then seal.
Pipe arrangement: So that liquid
refrigerant can gravitate to the outlet
header without being trapped in the coil.
Pipe material: Copper to AS/NZS 1571
or AS 1572 designation C12200.
Header material: Copper to AS 1432 or
AS/NZS 1571.
Dn coil ngng t
Ni ng: s dng hn thau lp u ni
ng bng ng ti nh my cho ng gas
nng vo v ng gp ra ca cht lng.
Bm p lc bng nitrogen kh v nim
kn.
B tr ng: cho mi cht lng c th
b ht v ng gp ra m khng b gi
li dn coil.
Vt liu ng: ng theo AS/NZS 1571
hoc AS 1572 phn C12200.
Vt liu ng gp: ng theo AS 1432
hoc AS/NZS 1571.
3.4 MARKING 3.4 GHI NHN
Labels
Provide labels showing the following:
- Manufacturers name.
- Model.
- Serial number.
Nhn
Cung cp nhn th hin cc thng tin
sau:
- Tn nh sn xut
- Model
- S sri.
4 INSTALLATION 4 LP T
4.1 PROTECTION 4.1 BO V
General
General: Prevent ingress of foreign
matter and moisture during transport and
storage.
Deemed-to-satisfy: Temporary sealing of
end connections as follows:
- Water coils: Plastic end caps.
- Refrigerant coils: Seal connections.
Mechanical damage: Prevent damage to
fins, piping and connections during
transport, storage and installation.
Deemed-to-satisfy:
- Fins: Cover with double corrugated
cardboard or hardboard fixed securely.
Tng qut
Tng qut: ngn nga vt l hoc hi
m xm nhp vo trong qu trnh vn
chuyn v lu kho.
Bin php: nim kn tm thi cho cc
u ni nh sau:
- Dn coil nc: nt nha.
- Dn coil gas lnh: ni kn.
Cc h hng c hc: ngn nga cc h
hng cho l tn nhit, ng ng v
u ni trong qu trnh vn chuyn, lu
kho v lp t.
Bin php:
- L tn nhit: che bng tm carton
hoc tm cng bt cht vo.
4.2 COILS 4.2 DN COIL
Configuration
Install coils so that fluid and air flow
directions are counter flow.
Cu hnh
Lp t coil sao cho cht lng v khng
kh dch chuyn theo chiu ngc nhau.
Heating coils in ductwork
Provide coils with flanged frames, for
connection to ductwork. Support coils
from above on drop rods or from the
floor on frames fabricated from hot
rolled mild steel angles.
Dn coil nng trong ng gi
S dng dn coil c mt bch, ni
vo ng gi. Treo dn coil t pha
trn bng thanh ty treo hoc t bn
di trn khung ch to bng thp gc
mm cn nng.
Fin damage
Comb straight damaged fins.
L tn nhit b h
Chi thng cc l tn nhit b dp.

AIR COILS
The English language version prevails. u tin ting Anh khi c tranh ci.
Centrepoint Page 5 of 5 of B.26 18 September 2007
4.3 PIPING 4.3 NG NG
General
Access and removal: Install piping to
coils to allow access to equipment, and
to minimise disturbance to piping when
coils are removed. Arrange piping and
isolating valves to minimise drain-down
if coil is removed. Provide unions on
connections DN 50 and flanges on
connections > DN 50.
Support: Prevent stress on coils by
supporting piping to coils independently.
Drain system: Extend a DN 40 drain
pipe from the lowest drip tray or drip pan
to a drain point outside the conditioner.
Incorporate the following:
- Air break.
- Sealing: Seal drain pipes to the casing
with rubber grommets.
- Water seal: Provide a trapped water
seal against double the static pressure
of the air handling unit.
Tng qut
Tip cn v tho ri: Lp t ng
ng cho dn coil sao cho c th tip cn
thit b v gim thiu nh hng n
ng ng khi tho dn coil. B tr
ng ng v van kho gim thiu
tht thot nc khi tho dn coil. Lp
t rc co ni cho ng DN 50 v mt
bch cho ng > DN 50.
Chi tit coil: Ngn nga ng sut
trn dn coil bng cch ng ni n
dn coil ring ra.
H thng thot: lp t ng DN40 t
mng hng thp nht hoc b hng n
im thot bn ngoi thit b iu ho.
Tch hp vi:
- Mt ch ngt qung ng thng ra
khng kh.
- Lm kn: Lm kn ng thot vi v
my bng vng m lt cao su.
- m nc: lp t m bng by
nc (xiphon) chu c 2 ln p
sut tnh ca thit b x l khng kh.

You might also like