GENERAL REQUIREMENTS

The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 1 of 30 of A4 18 September 2007
GENERAL REQUIREMENTS NHNG YU CU CHUNG
1 GENERAL 1 TNG QUAN
1.1 GENERAL 1.1 TNG QUAN
Precedence
Requirements of individual technical
worksections of the specification
override conflicting requirements in
this worksection.

Quyn u tin
Nhng yu cu ca tng chng k
thut trong ti liu qui nh k thut
ny, quan trng hn v c xem l u
tin hn khi c mu thun vi cc yu
cu trong chng ny
1.2 REFERENCED
DOCUMENTS
1.2 TI LIU THAM CHIU
Current editions
Use referenced documents which are
editions, with amendments, current 3
months before the closing date for
tenders, except where other editions or
amendments are required by statutory
authorities.
Site copies: Keep 1 original copy on
site and 1 original copy in the
contractors design office of the
standards mentioned below (all parts
unless otherwise stated). Standards are
available for online purchase at
www.Standards.com.au.
Cc phin bn hin hu
S dng cc ti liu tham chiu l cc
phin bn c sa i, trong khong 3
thng t ngy kt thc np h s thu,
ngoi tr cc phin bn hay chnh sa
c yu cu bi c quan nh nc.
Cc phin bn cho cng trng: Lu
01 b gc ti cng trng v 01 b gc
ti vn phng thit k ca nh thu i
vi cc b tiu chun c cp di
y (ton b, tr khi c nu r). Cc
tiu chun c th mua trn mng ti a
ch www.Standards.com.au
Contractual relationships
Responsibilities and duties of the
Owner, Engineer and Contractor are
not altered by requirements in
referenced documents.
Mi quan h hp ng
Trch nhim v nhim v ca Ch u
t, Nh t vn v Nh thu khng b
thay i bi cc yu cu trong cc ti
liu tham chiu.
General standards
Degree of electrical protection: To
AS 1939.
Electrical work: To AS/NZS 3000.
Emergency evacuation lighting: AS
2293
Fire Alarm & Detection: AS 1670
Fire hosereels: AS 2441 & TCVN
Fire hydrants: AS 2419 and TCVN
Mechanical ventilation and
airconditioning: To AS/NZS 1668.1
and AS 1668.2, as required by the
Building Code of Australia
Ductwork: AS 4524
Plumbing and drainage, water supply,
storm drainage: To AS/NZS 3500
Microbial infection: AS 3666
Pipework: AS 4041
Fixed access ways: To AS 1657.
Maintenance: AS 1851
Structural design actions: To
AS/NZS 1170.0

Cc b tiu chun
Cp bo v in: AS 1939.
Cng tc in: To AS/NZS 3000.
Chiu sng s tn khn cp: AS 2293

Pht hin v Bo ng chy: AS 1670
Cun vi cu ha: AS 2441 & TCVN
Hng cha chy: AS 2419 and TCVN

Thng gi v iu ha khng kh:
AS/NZS 1668.1 v AS 1668.2, theo
yu cu ca Lut xy dng c
ng gi: AS 4524
H thng ng nc cp v thot nc
thi, thot nc ma: AS/NZS 3500
Nhim khun: AS 3666
Cng tc ng ng: AS 4041
Cc li vo c nh: To AS 1657.
Cng tc bo tr: AS 1851
Cng tc thit k kt cu: AS/NZS
1170.0


GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 2 of 30 of A4 18 September 2007
1.3 INTERPRETATION 1.3 CC GII THCH
General
Unless the context otherwise requires,
the following definitions apply:
- Supply: Supply, furnish and
similar expressions mean supply
only.
- Provide: Provide and similar
expressions mean supply and
install.
- Approved: Approved, reviewed,
directed, rejected, endorsed
and similar expressions mean
approved (reviewed, directed,
rejected, endorsed) in writing by the
Engineer. Approval is to be
interpreted as having permission to
use, though does not relieve the
contractor of their contractual
responsibilities.
- Give notice: Give notice,
submit, advise, inform and
similar expressions mean give
notice (submit, advise, inform) in
writing to the Engineer.
- Obtain: Obtain, seek and similar
expressions mean obtain (seek) in
writing from the Engineer.
- Proprietary: Proprietary mean
identifiable by naming manufacturer,
supplier, installer, trade name, brand
name, catalogue or reference
number.

- Samples: Includes samples,
prototypes and sample panels.
Tng quan
Tr khi ng cnh c ngha khc i, cc
nh ngha sau c p dng:
- Cung cp: cung cp, trang b, v
cc thnh ng tng t mang ngha
ch c cung cp.
- Chu cp: chu cp v cc thnh ng
tng t c ngha l cung cp v lp
t.
- ph chun: ph chun,
xem xt, ch o, bc b,
tn thnh, v cc thnh ng c
ngha l c ph chun (xem
xt, ch o, bc b, tn thnh) bng
vn bn bi nh t vn . S ph
chun c hiu l c php s
dng, mc d khng gii phng trch
nhim ca nh thu khi trch nhim
hp ng.
- Thng bo: thng bo, trnh,
hi kin, thng tin v cc
thnh ng c ngha thng bo (
trnh, hi kin, thng tin) bng vn
bn cho nh t vn.
- t c: t c, tm c v
cc thnh ng tng t c ngha t
c bng vn bn t nh t vn
- Thit b nguyn b ch to sn:
Ngha l nhn bit c bng tn nh
sn xut, nh cung cp, nh lp t,
tn thng mi, nhn hiu, m s
tham chiu, catal.
- Hng mu: bao gm cc mu vt,
hng lm mu u tin, cc bng
nh cc hng mu.
Technical
Zinc-coated steel: Includes zinc-coated
steel, zinc/iron alloy-coated steel, and
aluminium/zinc-coated steel.
Pipe: Includes pipe and tube.
K thut
Thp trng km: bao gm thp trng
km, thp m hp kim st-km, v thp
m hp kim km-nhm.
ng: bao gm tt c cc loi ng m
tinh Anh gi l pipe hay tube
Tests
Except where otherwise defined in
referenced documents, the following
definitions apply:
- Pre-completion tests: Tests carried
out before completion tests.

. Type tests: Tests carried out on an
item identical with a production
item, before delivery to the site.

. Production tests: Tests carried out
on the purchased equipment,
before delivery to the site.


Th nghim
Tr khi c nh ngha khc i trong cc
ti liu tham chiu, cc nh ngha sau
c p dng:
- Th nghim trc khi hon tt: L
cc th nghim c thc hin
truc cc cng tc th nghim cui
cng.
. Th nghim mu: l cc th
nghim c thc hin trn mt
mu xc nh vi 1 n v sn
xut, trc khi giao hng ti
cng trng.
. Th nghim sn phm: l cc
th nghim c thc hin trn
thit b mua sm, trc khi giao
n cng trng.

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 3 of 30 of A4 18 September 2007
. Site tests: Tests carried out on
site.

- Completion tests: Acceptance tests
and final tests.
. Acceptance tests: Tests carried
out on completed installations or
systems and, except for final tests,
before the date for practical
completion, to demonstrate that
the installation or system,
including components, controls
and equipment, operates correctly,
safely and efficiently, and meets
performance and other
requirements.

. Final tests: Acceptance tests
carried out before completion of
the maintenance period.
. Th nghim ti cng trng: l
cc th nghim c thc hin
ti cng trng.
- Th nghim hon thin: bao gm 2
cng tc: th nghim chp thun v
cui cng.
. Th nghim chp thun: cc th
nghim c thc hin khi hon
tt cng tc lp t hay hon tt
h thng v, trc ngy hon tt
thc t, ngoi tr th nghim
cui cng, minh ha rng s
lp t hay h thng, bao gm
cc ph kin, h iu khin v
thit b, hot ng ng, an ton
v hiu qu, v p ng c
cc c tnh v yu cu khc.
. Th nghim cui cng: l cc
th nghim chp thun c
thc hin trc khi hon tt giai
on bo tr.
Maintenance period
Co-extensive with the defects liability
period.
Giai on bo tr
Thc hin cng lc giai on trch
nhim sa cha khuyt tt.
Abbreviations
ABS: Acrylonitrile-butadiene-styrene.
EPDM: Ethylene-propylene diene
monomer.
FRP or GRP: Glass-fibre reinforced
polyester.
NATA: National Association of
Testing Authorities.
PTFE: Polytetrafluoroethylene.
SSL: Scientific Services Laboratory.
NFPA: National Fire Protection
Association
AS: Australian Standards
BS: British Standards
ICE: Ice
CFCs: Chloroflourocarbons.
NEBB: National Environmental
Balancing Bureau.
UV: Ultra violet light.
BMS: Building management system.
MIMS: Mineral-insulated metal-
sheathed.
UPVC: Unplasticised polyvinyl
chloride.
Cc ch vit tt:
ABS: Acrylonitrile-butadiene-styrene.
EPDM: Ethylene-propylene diene
monomer.
FRP or GRP: Glass-fibre reinforced
polyester.
NATA: National Association of
Testing Authorities.
PTFE: Polytetrafluoroethylene.
SSL: Scientific Services Laboratory.
NFPA: National Fire Protection
Association
AS: Australian Standards
BS: British Standards
ICE: Ice
CFCs: Chloroflourocarbons.
NEBB: National Environmental
Balancing Bureau.
UV: Ultra violet light.
BMS: Building management system.
MIMS: Mineral-insulated metal-
sheathed.
UPVC: Unplasticised polyvinyl
chloride.
1.4 CONTRACT DOCUMENTS 1.4 VN BN HP NG
General
Diagrammatic layouts: Layouts of
service lines, plant and equipment
shown on the drawings are
diagrammatic only, except where
figured dimensions are provided or
calculable. Before commencing work,
obtain measurements and other
Tng quan
B tr biu : B tr ca cc tuyn h
thng, phng my v thit b trn bn
v ch c tnh cht biu minh ha,
tr khi c cc con s kch thc c
cung cp cho tnh ton. Trc khi bt
u cng vic, ly li cc kch thc v
thng tin cn thit.

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 4 of 30 of A4 18 September 2007
necessary information.
Levels: Spot levels take precedence
over contour lines and ground profile
lines.
Cao : Cc cao ring l u tin hn
trn cc tuyn bao v tuyn nghing so
vi mt t.
1.5 DESIGN 1.5 THIT K
Design Responsibility
Where ever a worksection includes a
reference to design, the contractor is to
assume a design responsibility to
complete the works as specified therein
and including the referenced standards.
The contractor is to allow for any
additional re-design, materials and
equipment necessary to meet these
design requirements to meet the
requirements of the contract
documents.
Trch nhim thit k
Trong bt k chng no c ni n
thit k, nh thu c trch nhim thit
k hon tt cc cng tc c ch ra
trong v bao gm c cc tiu chun
tham chiu. Nh thu cng t chu cc
chi ph cho vic thc hin thit k li
b sung, cc vt t v thit b cn thit
p ng cc yu cu thit k v cc
yu cu trong vn bn hp ng.
Space requirements
Check space requirements of
equipment and services indicated
diagrammatically in the contract
documents and submit a report on
consequent variations to the design.
Allow for all necessary modifications.
Yu cu v khng gian
Kim tra li khng gian yu cu cho
trang thit b v h thng c biu
din s trong cc vn bn hp ng
v trnh mt bo co v cc thay i
pht sinh nh hng n thit k. Nh
thu t chu chi ph cho cc s thay i
cn thit.
Electrical supply system
380 V, 3-phase, 4-wire and earth,
50 Hz.
Variation +/- 10%.
H thng in ngun
380 V, 3-pha, 4 dy v t, 50 Hz.
Mc tri st p +/- 10%.
Design Temperature & Humidity
Conditions
Design conditions for load calculation
shall be based on the data set out
below.
Summer Conditions
Outside:
34.7 C DB 29.4 C WB
Inside:
General areas
24 C DB 60% RH
Winter Conditions
Outside: 10C DB
Inside:
General areas
24 C DB 60% RH
The above set points shall apply unless
other specific conditions are stipulated.
iu kin m v nhit thit k
iu kin thit k tnh ton ti da
trn cc s liu sau y.
Vo ma h
Ngoi tri:
34.7 C DB 29.4 C WB
Trong nh: cc khu vc chung
24 C DB 60% RH


Vo ma ng
Ngoi tri: 10C DB
Trong nh: Cc khu vc
chung
24 C DB 60% RH
Cc gi tr chn ni trn c s dng
tr khi c cc c s ring bit khc
c qui nh.
Radio frequency interference
Provide equipment which generates
interference within limits set by
AS/NZS 1044. If necessary, provide
suppression devices. If appropriate,
shield equipment to AS/NZS 1044.

S nhiu tn s sng v tuyn
Cung cp cc trang thit b pht ra s
nhiu sng trong cc gii hn theo tiu
chun AS/NZS 1044. Nu cn thit,
trang b cng c dp tt s nhiu sng.
Khi thch hp th che chn trang thit
b theo tiu chun AS/NZS 1044
Electromagnetic compatibility
Electrical and electronic apparatus: To
Tnh tng hp in t
Cc thit b in v in t: tun th
tiu chun AS/NZS 4251.1 v

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 5 of 30 of A4 18 September 2007
AS/NZS 4251.1 and AS/NZS 4252.1. AS/NZS 4252.1
Fault level protection
To withstand the fault level of the
incoming supply at the equipment
location.
Bo v cp li (dng ngn mch)
Chu ng c cc mc li (dng
ngn mch) ca in ngun v tr t
thit b.
Rotating and reciprocating
machinery noise and vibration
Vibration severity: At least
Satisfactory, to AS 2625.3 or
AS 2625.4.
run v n ca my mc
chuyn ng quay v chuyn ng
pitton
Rung ng cho php: t nht tha mn
tiu chun AS 2625.3 hay AS 2625.4
Mechanical system resistances
Calculate system resistances and check
the pressure drop of ancillary
equipment. Submit a report on
consequent variations to the design.
Tr lc ca h thng c hc
Tnh ton tr lc ca h thng v kim
tra st p ca cc thit b l thuc.
trnh bo co cc thay i h qu
nh hng n thit k.
Co-ordination
Allow for detail co-ordination of
services within areas or rooms. Allow
for the redesign of services within
particular rooms and areas. Layouts of
services are provisional and are subject
to re-layout by the client, all to the
contractors expense. Allow for all
necessary documentation, time and
installation costs related with such.
S phi hp
Nh thu t chu chi ph cho s phi
hp chi tit ca tt c cc h thng
trong phm vi cc khu vc hoc phng.
Nh thu t chu chi ph cho vic thit
k li cc h thng cho cc phng hoc
khu vc ring bit. B tr ca cc h
thng l tm thi v ph thuc vo vic
ti b tr ca ch u t, do cc nh
thu t chu chi ph. bao gm cc
chi ph cho tt c cc ti liu, thi gian,
v chi ph lp t cn thit lin quan
Inclusions
Allow for all ancilliary items as
required to complete the services as
specified, required by the reference
standards, required by good
engineering practices, or required to
complete the systems as complete and
fully functioning systems.

Allow for all necessary design,
documentation, procurement, time and
installation costs related with such.
Nhng bao gm khc
Nh thu t chu chi ph cho tt c cc
h thng ph tr khc c yu cu
hon tt cc h thng theo tiu chun,
c yu cu bi cc tiu chun tham
chiu, c yu cu bi thc hnh thi
cng tt, hay c yu cu hon tt
v y chc nng cho h thng hot
ng.
Gi trng thu bao gm chi ph cho
tt c cc thit k cn thit, cc ti liu,
s mua sm, thi gian v chi ph lp
t lin quan.
2 QUALITY 2 CHT LNG
2.1 INSPECTION 2.1 GIM NH
Notice
Witness points: If notice of inspection
is to be given in respect of parts of the
works, advise if and when those parts
are to be concealed.


Hold points: If notice of inspection is
to be given in respect of parts of the
works, do not conceal those parts
without approval.
Minimum notice for inspections to be
made: 4 hours for on-site inspectors,
otherwise 2 working days.
Concealed services: Give notice so that
inspection may be made of services to
Thng bo trc
Nhng im chng kin: Nu c thng
bo yu cu Nh t vn kim tra v cc
phn ca cng vic, thng bo r phn
cng vic ny c s b che lp hay
khng v thi im cc phn cng tc
ny c kt thc hay che lp.
Nhng im ngng: Nu c thng bo
ngh Nh t vn kim tra v cc
phn ca cng vic, phi ngng ton b
cc cng tc thi cng tip theo cho n
khi ni dung kim tra c ph duyt.
Thi hn bo trc ti thiu cho cng
tc kim tra: 4 gi cho kim tra vin ti
cng trng, hoc 2 ngy lm vic.
Cc h thng thi cng m: bo trc

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 6 of 30 of A4 18 September 2007
be concealed. cho cc h thng ny c kim tra
trc khi b che lp.
2.2 TESTS 2.2 TH NGHIM
Notice
General: Give sufficient notice so that
designated tests may be witnessed.

Hold points: Do not carry out
designated tests without approval.

Minimum notice for tests to be
witnessed:
- 5 working days for site tests; and
- 10 working days for local pre-
delivery tests.
S bo trc
Tng qut: Cung cp cc thng bo
trc hn cho cc cng tc th
nghim c ch nh c chng
kin.
Nhng im ngng: Khng thc hin
cc cng tc th nghim khi khng
c chp thun.
Thi hn bo trc ti thiu cho vic
chng kin cc cng tc th nghim:
- 5 ngy lm vic cho cc th nghim
ti cng trng.
- 10 ngy lm vic cho cc th nghim
ti ch trc khi giao hng
Testing authorities
General: Except for site tests, have
tests carried out by authorities
accredited by NATA to test in the
relevant field, or an organisation
outside Australia recognised by NATA
through a mutual recognition
agreement, or an organisation approved
by the Engineer. Cooperate as required
with testing authorities.



Site tests: Use instruments calibrated
by authorities accredited by NATA, or
an organisation approved by the
Engineer.
Cc c quan c chc nng th
nghim
Tng qut: ngoi tr cc th nghim ti
cng trng, phi thc hin cc th
nghim bi cc c quan c y quyn
bi t chc NATA th nghim trong
lnh vc lin quan, hay mt t chc bn
ngoi nc c c NATA cng nhn
thng qua mt tho thun cng nhn
tng h, hay l mt t chc c chp
thun bi Nh t vn. Yu cu hp tc
vi cc c quan c chc nng th
nghim.
Th nghim ti cng trng: S dng
cc thit b o kim c hiu chun
bi cc c quan u quyn ca NATA,
hoc t chc c Nh t vn chp
thun.
Reports
General: Submit copies of test reports,
including certificates for type tests,
showing the observations and results of
tests and compliance or non-
compliance with requirements.
Number of copies of test certificates: 3
off
Bo co
Tng qut: trnh cc bo co th
nghim, bao gm giy chng nhn th
nghim mu, ch ra s theo di v kt
qu th nghim, s ph hp hay khng
ph hp vi cc yu cu.
S bn ca giy chng nhn th
nghim: 3 bn
Endorsement
If tests are to be carried out on parts of
the works, do not conceal those parts
and do not commence further work on
those parts until the tests have been
satisfactorily completed and
compliance verified.
Chng thc
Nu th nghim c thc hin trn
cc phn ca cng tc, khng c kt
thc cc phn ny v khng c bt
u cng tc tip theo trn cc phn
cho n khi kt qu th nghim hon
tt tha mn v s ph hp c
thm tra.
2.3 PRE-COMPLETION TESTS 2.3 TH NGHIM TRC KHI
HON TT
Motor rotation
Check correct motor rotation while
maintaining correct phase sequence at
the switchgear and controlgear
assembly, and if necessary alter
Chiu quay m t
Kim tra chiu quay ng ca m t
trong khi m bo th t pha ti t in
iu khin, thay i u ni nu cn.
Kim tra s thng hng ca khp ni

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 7 of 30 of A4 18 September 2007
connections.
Check motor coupling alignment with
pipework decoupled and coupled, and
ensure coupling alignment is within
0.05mm or other agreed limits.
m t vi ng ng, tho ri v ni
li, m bo rng s ng trc khp
ni trong gii hn 0.05mm hoc mt
gi tr khc c ng .

2.4 SAMPLES 2.4 MU VT T
Timing
Delays: Coordinate submissions of
related samples. Do not cause delays
by making late submissions or
submitting inadequate samples.
Thi im
Chm tr: Phi hp trnh duyt cc
mu vt t c lin quan vi nhau.
Khng c gy ra chm tr trong vic
trnh duyt mu hay trnh duyt cc
mu khng tng xng.
Quantity
General: Submit a sample of each
designated item and 2 copies of
supporting documentation. Include
ancillary items such as fasteners,
flashings and seals.
S lng
Tng qut: Trnh duyt mt mu vt t
ch nh v hai bn sao ti liu lin
quan. Bao gm cc vt t ph tr nh
kha, nim, tm ngn.
Identification
Identify the project, contractor,
subcontractor or supplier,
manufacturer, applicable product,
model number and options, as
appropriate and include pertinent
contract document references. Include
service connection requirements and
product certification. Identify non-
compliances with project requirements,
and characteristics which may be
detrimental to successful performance
of the completed work.
Nhn bit
Nhn bit d n, nh thu, nh thu
ph hay nh cung cp, nh sn xut,
trang thit b p dng, s model v cc
ty chn thch ng bao gm cc tham
chiu ti liu hp ng thch ng. Bao
gm cc yu cu kt ni cc h thng.
Nhn dng nhng im khng ph hp
vi yu cu ca d n, v cc c im
c th gy bt li cho s thc hin
thnh cng ca cng vic c hon
tt.
Approval
General: Do not commence work
affected by samples until the samples
have been approved. Submit further
samples as necessary.
Ph duyt
Tng qut: Khng bt u cng vic c
s dng mu vt t cho n khi cc
mu vt t c ph duyt. trnh b
sung thm mu vt t khi cn thit.
Retention
Keep approved samples in good
condition on site, until practical
completion.
Lu gi
Gi cc mu vt t c ph duyt
iu kin tt trn cng trng cho n
khi hon tt thc t.
Incorporation
Incorporate in the works samples
which have been approved for
incorporation. Do not incorporate other
samples.
Hp nht vo thi cng
Hp nht cc mu vt t c ng
s dng cho thi cng. Khng s dng
cc mu vt t khc.
Criteria
Match approved samples throughout
the works.
Tiu chun
Ph hp vi cc mu vt t c ph
duyt trong sut thi gian thi cng.
2.5 SUBMISSIONS 2.5 TRNH DUYT
Timing
General: Submit documents in a timely
manner, to suit the construction
program. Advise if any of the
documents are to be returned.
Delays: Coordinate submissions of
related items. Do not cause delays by
making late or inadequate submissions.
Thi im
Tng qut: trnh duyt ti liu ng
thi gian, p ng c tin thi
cng. Thng bo nu c ti liu no
c tr v.
Chm tr: Phi hp trnh duyt cc
hng mc c lin quan vi nhau.
Khng c gy ra chm tr trong vic
trnh duyt hay thc hin cc trnh

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 8 of 30 of A4 18 September 2007
duyt khng tng xng.
Quantity
Bound documents: 5 copies.
Loose documents & drawings:
5 copies.
Standard contract drawing sizes:
A0,A1,A2 A3, A4
Electronic copies with all hard copies:
1 copy via extranet or CD.
S lng
Cc ti liu ng sch: 5 b
Cc ti liu & bn v ri tng t: 5 b

Kch thc bn v theo hp ng:
A0,A1,A2 A3, A4
Bn sao cc tp tin ca tt c cc bn in
giy: 1 b trn CD hay extranet.
Identification
Identify the project, contractor,
subcontractor or supplier,
manufacturer, applicable product,
model number and options, as
appropriate and include pertinent
contract document references. Include
service connection requirements and
product certification. Identify non-
compliances with project requirements,
and characteristics which may be
detrimental to successful performance
of the completed work.
Nhn bit
Nhn dng d n, nh thu, nh thu
ph hay nh cung cp, nh sn xut,
trang thit b p dng, s model v cc
ty chn thch ng bao gm cc tham
chiu ti liu hp ng ph hp. Bao
gm cc yu cu kt ni cc h thng.
Nhn dng nhng im khng ph hp
vi yu cu ca d n, v cc c im
c th gy bt li cho s thc hin
thnh cng ca cng tc.
Endorsement
Witness points: Give notice before
commencing work affected by
contractors submissions, unless the
submissions have been endorsed as
satisfactory.
Hold points: Do not commence work
affected by contractors submissions
until, if appropriate, the submissions
have been endorsed as satisfactory,
Errors: If a document contains errors,
submit a new or amended document as
appropriate, indicating changes since
the previous submission.
Chng thc
Nhng v tr chng kin: Thng bo
trc khi bt u cng vic c s dng
kt qu ca s trnh duyt, tr khi s
trnh duyt c chng thc l tho
mn.
Nhng im ngng: Khng bt u
cng vic c s dng cc kt qu trnh
duyt cho n khi cc trnh duyt c
chng thc l tho mn.
Li: Nu cc ti liu c li, trnh li ti
liu mi hay sa i cho ph hp, ch
ra cc thay i so vi ln trnh duyt
trc
Design
General: If part or all of an installation
is to be designed by the contractor,
submit documents showing the layout
and details of the installation.
Variation documents: If it is proposed
to change the installation from that
shown on the contract documents, or if
changes are required by statutory
authorities, submit variation documents
showing the proposed changes.
Thit k
Tng qut: Nu phn hay ton b ca 1
cng tc c thit k bi nh thu,
trnh duyt cc vn bn ch ra b tr v
chi tit lp t.
Cc vn bn pht sinh: Nu c ngh
thay i lp t so vi nhng thit k
trong cc vn bn hp ng, hay cc
thay i c yu cu bi c quan nh
nc thm quyn, trnh duyt vn bn
pht sinh ch ra cc thay i ngh.

Shop drawings
General: Submit dimensioned drawings
showing details of the fabrication and
installation of services and equipment,
including relationship to building
structure and other services, wall, slab
and roof penetration details, plinth
details, cable type and size, and
marking details.
Diagrammatic layouts: Coordinate
work shown diagrammatically in the
contract documents, and submit
Bn v thi cng
Tng qut: Trnh cc bn v c kch
thc ch r cc chi tit ch to v lp
t cc h thng v thit b, bao gm
cc s lin quan vi kt cu to nh v
cc h thng khc, v chi tit l thng
tng, sn, mi, chi tit mng cho thit
b, chng loi v kch thc dy cp,
v chi tit nh du.
B tr biu : Phi hp cc cng tc
c th hin c tnh cht s trong
cc ti liu hp ng, v trnh duyt

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 9 of 30 of A4 18 September 2007
dimensioned set-out drawings. CAD
files of diagrammatic layouts are not to
be used in the preparation of shop
drawings without the written consent of
the copyright owners. Pay all charges
associated with the permission to use
the files.

Drawings format: Prepare all drawings
using AutoCad 2007. Submit proposed
layering, block and pen formats for
information.
Equipment details: Show for each item
of equipment the relevant performance
data including make, model, speed,
capacity etc as appropriate.
Loads: Detail all loads (static and
dynamic to be imposed on the
structure.
Standards: To AS 1100.01 and AS
1100.201
Re-submission: Re-submit drawings
after alterations are made complete
with a print of the original marked up
(s).
Issue for construction: Issue
construction drawings of up to 10 sets
on the advice of the Engineer.
Program: Allow 2 weeks for the return
of shop drawings.


Revisions: Ensure that the drawings
always incorporate the latest
architectural, structural and other
design details. Amend and re-issue
shop drawings in accordance with:
. Comments
. Changes to the services
. Changes to the architectural,
structural & other services
. Information provided by the
Owner and other persons
. Information provided by
suppliers
. Site measurements
. Coordination
. Other changes that affect the
work
Drawings for co-ordination: Provide
shop drawings in electronic form with
suitable layering for the preparation of
1:100 drawings showing all services,
and 1:25 drawings for details such as
risers, plantrooms etc.
Comments: Any comments on the shop
drawings or other submitted documents
relate only to compliance with the
design intent of the specification and
drawings. Regardless of such
cc bn v c kch thc chi tit. Cc
tp tin CAD ca cc b tr biu
khng c s dng trong s bin dch
bn v thi cng nu khng c s
ng bng vn bn ca tc gi. Nh
thu phi thanh ton cc chi ph cng
tc cho vic c php s dng cc tp
tin.
nh dng ca bn v: S dng
AutoCad 2007 lp cc bn v. Trnh
cc phn lp ngh, khi v nh
dng bt v.
Chi tit trang thit b: Th hin cho mi
mt trang thit b cc d liu hiu sut
lin quan bao gm nh sn xut, model,
tc , cng sut,.v.v. cho ph hp.
Ti: Chi tit ca tt c cc loi ti (ti
tnh v ti ng tc ng ln kt cu)
Tiu chun: theo AS 1100.01 v
AS1100.201
Trnh duyt li: trnh duyt li cc bn
v sau khi sa i v in li bn mi c
cp nht.
Ban hnh cho thi cng: Ban hnh cc
bn v cho thi cng vi s lng c th
ln n 10 b ty theo yu cu ca Nh
t vn.
Tin : Bn v thi cng s c ph
duyt trong vng 02 tun l, cn trnh
bn v t nht 2 tun trc khi cn cho
vic thi cng.
Sot xt: m bo rng cc bn v lun
s dng thit k kin trc, kt cu v
cc chi tit thit k khc mi nht. Sa
i v ban hnh li bn v thi cng ph
hp vi:
. Cc gp
. Cc thay i ca cc h thng
. Cc thay i ca kin trc, kt
cu v cc h thng khc.
. Cc thng tin do Ch u t v
cc bn lin quan cung cp.
. Cc thng tin t nh cung cp.
. Cc bin php gii quyt trn
cng trng
. Cc s iu phi
. Cc thay i khc tc ng ln
cng tc thi cng.

Bn v cho cng tc iu phi: Cung
cp bn v thi cng dng in t vi
cc phn lp ph hp theo t l 1:100
th hin ton b cc h thng, v 1:25
cho cc bn v chi tit nh l trc
thng tng, phng my,..v.v..
Cc gp : bt k cc gp trn bn v
thi cng hay trn cc ti liu trnh duyt
ch nhm mc ch lm cho ph hp
vi b qui nh k thut v cc bn v.
Bt chp cc gp ny hay vic thiu
cc gp ny trang b cho tt c cc

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 10 of 30 of A4 18 September 2007
comments or the absence of comments
furnish all work and materials
necessary to complete the works and
for co-ordination with other trades and
services.
cng tc v vt t cn thit hon tt
cc cng tc v phi hp vi cc h
thng hay trao i khc.
Authorities
Correspondence: Submit copies of
correspondence and notes of meetings
with authorities.
Authorities approvals: Submit
documents showing approval of the
authorities whose requirements apply
to the work.
C quan nh nc
Th tn: Trnh gi cc bn sao ca cc
th tn v cc ch gii ca cc cuc
hp vi c quan nh nc.
Ph duyt ca c quan nh nc: Trnh
cc vn bn th hin s ph duyt ca
cc c quan nh nc c yu cu i
vi cng tc thi cng.
Tests
Tests program: Submit a testing and
commissioning program which is
consistent with the construction
program. Include particulars of test
stages and procedures.

Test records: For designated tests,
including pre-delivery tests, record
results and submit reports or
certificates in a form suitable for
inclusion in operation and maintenance
manuals.
Th nghim:
Tin th nghim: trnh mt tin
th nghim v chy th nghim thu
thch hp vi tin thi cng. Bao
gm c cc giai on th nghim v
th tc thc hin.
H s th nghim: i vi cc th
nghim c ch nh, bao gm th
nghim trc khi giao hng, lp h s
th nghim v trnh duyt bo co hay
giy chng nhn theo mu c th
nh km chung vi s tay vn hnh v
bo tr.
Samples
If it is intended to incorporate samples
into the works, submit proposals.

Mu vt t
Phi trnh xut nu c d nh s
dng cc mu trnh duyt vo cho cng
tc thi cng,
Materials and components
Product data: For proprietary
equipment, submit the manufacturers
product data including:
- technical specifications and
drawings;
- type test reports;
- performance and rating tables; and
- recommendations for installation and
maintenance.
- Model name, designation & number
- Country of origin and manufacture
- Capacity of system and all elements
- Size, including clearances for
installation, operation &
maintenance.
- Materials used in the construction.
Proposed products schedules: For
major products not specified as
proprietary items, within 3 weeks of
site possession submit a schedule of
those proposed for use.

Product certification: If products must
comply with product certification
schemes, submit evidence of
compliance.
Vt t v cc chi tit, ph kin
Ti liu trang thit b: i vi cc thit
b nguyn b ch to sn, trnh duyt
ti liu trang thit b ca nh sn xut:
- c im k thut v bn v;
- Bo co th nghim mu;
- Bng xp loi v hiu sut; v
- Cc hng dn lp t v bo tr
- Model: tn, s
- Nc sn xut v nh sn xut
- Kh nng ti ca h thng v tt c
cc chi tit cu thnh
- Kch thc, khng gian cn thit cho
lp t, vn hnh, bo tr
- Vt t cn thit cho thi cng
Bng lit k cc trang thit b kin
ngh: i vi cc trang thit b chnh
yu m cha c qui nh l nguyn
b ch to sn, trong vng 3 tun l t
ngy vo cng trng, trnh duyt bng
lit k cc trang thit b d kin s
dng.
Giy chng nhn trang thit b: Trnh
bng chng ca s ph hp nu trang
thit b phi tun th k hoch chng
nhn trang thit b.
Execution Thc hin

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 11 of 30 of A4 18 September 2007
Fixing of services: Submit typical
details of locations, types and methods
of fixing of services to structure, before
installation.
Embedded services: Submit proposals
for embedding services in concrete
walls or floors, or chasing into concrete
or masonry walls.

Inaccessible services: If services will
be enclosed and not accessible after
completion, submit proposals for
location of service runs and fittings.
Acceptance of substrate: Submit
installers statements verifying that the
substrate is satisfactory for receiving
the installation.
C nh cc h thng: trnh duyt cc
chi tit in hnh v v tr, kiu v cch
thc lp cc h thng vo cc kt cu
trc khi thi cng.
Cc h thng m: Trnh duyt cc
ngh thi cng m cc h thng trong
tng hoc sn bton, hay c tng
bton hay tng gch.
Cc h thng khng th tip cn: Khi
h thng s b che lp v khng th tip
cn c, trnh duyt cc ngh v v
tr thi cng v cc ph kin.
S chp thun ca iu kin thi cng:
trnh quan im ca bn lp t, thm
tra li rng iu kin thi cng th tho
mn c th chu c vic thi cng lp
t.
3 MATERIALS AND
COMPONENTS
3 VT T V CC CHI TIT
PH KIN
3.1 GENERAL 3.1 TNG QUT
Sources policy
Products, materials &/or components
sourced in Vietnam with established
record and service support are
preferred. Such products, materials
&/or components may comply with
recognised international standards,
other than those specified, on the
approval of the Engineer, on the
condition that the products, materials
&/or components meet the intended
quality of the specified standards, in
the view of the Engineer.
Chnh sch ngun gc
Trang thit b, vt t, v/hay cc chi
tit ph kin c ngun gc t Vit Nam
vi h s c cng b v cc h tr
dch v c khuyn khch hn. Trang
thit b, vt t, v/hay cc chi tit ph
kin ny c th tun theo cc tiu
chun quc t c cng nhn, khc
vi nhng ci c nh ra, theo s
ph duyt ca Nh t vn, vi iu
kin l trang thit b, vt t, v/hay cc
chi tit ph kin p ng c mc
cht lng d tnh ca tiu chun nh
ra, theo quan im ca Nh t vn.
Proprietary items
Implication: Identification of a
proprietary item does not necessarily
imply exclusive preference for the item
so identified, but indicates the
necessary properties of the item.
Alternatives: If alternatives are
proposed, submit proposed alternatives
and include samples, available
technical information, reasons for
proposed substitutions and cost. If
necessary, provide an English
translation. State if provision of
proposed alternatives will necessitate
alteration to other parts of the works
and advise consequent costs.
Nhng trang thit b nguyn b ch
to sn
S lin quan: S nhn dng r 1 loi
trang thit b nguyn b ch to sn
khng ng mt cch cn thit dnh
thin v c quyn cho hng mc c
xc nh, m ch r ra nhng c tnh
cn thit phi c ca hng mc.
Nhng s ty chn: nu c nhiu chn
la c xut, trnh duyt km theo
hng mu, l do v chi ph cho cc thay
th ngh. Khi cn thit, cung cp 01
bn dch ting Anh. Nu r nu nh
cc s chn la l cn thit thay th
nhng phn khc ca cng tc thi cng
v thng bo r cc chi ph cn thit.
Listed Items
Where the reference standards require
listed products (eg NFPA standards),
and alternative standards are
specifically referenced, compliance
with the quoted standards or other
approved international standards will
be accepted as listed or complying
products, subject to the approval of the
local authorities. Otherwise UL or FM
Nhng trang thit b c lit k
Ni m tiu chun tham chiu yu cu
nhung trang thit b lit k (ngha l
tiu chun NFPA), v nhng tiu chun
ty chn c tham chiu r rng, ph
hp vi cc tiu chun trch dn hay
nhng tiu chun quc t c chp
thun khc s c ng theo nh
c lit k hay cc trang thit b ph
hp, ph thuc vo c quan nh nc

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 12 of 30 of A4 18 September 2007
listed products are required.

a phng. Ngc li th yu cu cung
cp cc trang thit b c lit k theo
UL hay FM.
Manufacturers or suppliers
recommendations
General: Select, if no selection is given,
and transport, deliver, store, handle,
protect, finish, adjust, prepare for use,
and provide manufactured items in
accordance with the current written
recommendations and instructions of
the manufacturer or supplier.
Instructions: Submit the
recommendations and instructions, and
advise of conflicts with other
requirements.
Project modifications: Advise of
activities that supplement, or are
contrary to, manufacturers or
suppliers written recommendations
and instructions.
Product certification: If products must
comply with product certification
schemes, provide them in accordance
with the certification requirements.
Nhng yu cu ca Nh sn xut
hay Nh cung cp
Tng quan: Chn, nu khng c s
chn la no, v vn chuyn, giao
hng, lu kho, vn chuyn, bo v,
hon thin, iu chnh, chun b s
dng v cung cp cc hng ha c
sn xut ph hp vi cc li khuyn /
ch dn bng vn bn hin hu ca nh
sn xut hay nh cung cp.
Nhng ch dn: trnh cc li khuyn
/ ch dn, v ch r nhng mu thun
vi cc yu cu khc.
Hiu chnh d n: Thng bo cc hnh
ng b sung, hay i ngc vi
Cc li khuyn / ch dn vn bn ca
nh sn xut hay nh cung cp.
Giy chng nhn trang thit b: Nu
trang thit b phi tun th vi k
hoch chng nhn trang thit b, cung
cp c bng chng ng theo vi cc
yu cu chng nhn
Sealed containers
If materials or products are supplied by
the manufacturer in closed or sealed
containers or packages, bring the
materials or products to point of use in
the original containers or packages.
Nhng cng ten n kn
Nu trang thit b vt t c cung cp
bi nh sn xut trong cc dng ng
gi thng hay cng ten n kn hay c
nim phong, chuyn trang thit b vt
t n ni s dng dng nguyn nh
vy
Consistency
For the whole quantity of each material
or product use the same manufacturer
or source and provide consistent type,
size, quality and appearance.
Tnh thng nht
S dng cng nh sn xut, ngun
cung cp v cung cp thng nht chng
loi, kch thc, cht lng v hnh
thc cho ton b khi lng vt t
trang thit b.
Services - Computer software
Provide all computer software integral
to the operation and management of
building services systems and
equipment including the following:
- Full listings of all software supplied
which has been developed, modified
or adapted to meet the requirements
of this project.
- Back-up copies of software in
electronic format.
- Record drawings, functional
specifications and point schedules of
all systems.
- All software and manuals necessary
to modify or extend the software.

- Absolute right and all necessary
facilities for the principal to modify,
extend or reduce any or all functions,
hardware and software which form
part of the system.
Cc dch v - Phn mm vi tnh
Cung cp b trn gi phn mm vi tnh
cho hot ng v qun l ca cc h
thng dch v cng trnh v cc trang
thit b:
- Danh sch y ca tt c cc phn
mm c vit, hiu chnh, sa i
cho ph hp vi cc yu cu ca d
n ny c cung cp.
- Sao lu cc bn sao phn mm
dng in t.
- Ghi nhn bn v, cc c im k
thut chc nng v bng lit k mu
cht ca tt c cc h thng dch v.
- Tt c cc phn mm v sch hng
dn cn thit cho vic hiu chnh hay
m rng phn mm.
- Thm quyn tuyt i v tt c cc
phng tin h tr ca ngun hiu
chnh, m rng hay gim bt bt k
hay ton b cc chc nng, phn
cng hay phn mm cu thnh
phn/b phn ca h thng.

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 13 of 30 of A4 18 September 2007

- Installation of all software updates
issued before the end of the defects
liability period.
- Passwords.
- Ci t tt c cc cp nht c
ban hnh cho phn mm trc khi
kt thc giai on trch nhim sa
cha khuyt tt.
- Mt m.
3.2 ELECTRIC MOTORS 3.2 M T IN
General
Dimensions and performance: To
AS 1360.11.
Installation: To AS 1359.107.
Motors 0.75 kW: Three phase.
Noise and vibration: Support motors to
minimise noise and vibration.
Noise and vibration limits: To
AS 1359.109 and AS 1359.114.
Tng qut
Kch thc v c tnh: AS 1360.11
Lp t: tun th tiu chun
AS 1359.107
M t 0.75 kW:3 pha.
n v rung: Chng cho m t
gim n v rung.
Gii hn run v n: tun th tiu chun
AS 1359.109 v AS 1359.114
Motor selection
Select motors in accordance with
AS 1359.101, motor manufacturers
recommendations and the following:
- Starting performance: To
IEC 60034-12 and AS 1359.41.
- Speed and torque: To suit required
by the driven equipment. Ensure
each motor develops torque relative
to the starting load of the driven
machine such that it runs up to full
speed steadily and within a time
period compatible with motor
winding temperatures, class of
insulation and rating of the starting
equipment.
- Starting method: As specified or, if
none specified, appropriate to the
driven equipment, electrical services
infrastructure and supply authority
requirements.
- Motor operation: Select motor for
mode of operation, appropriate to the
duty e.g. continuous, frequent
starting and stopping.
- Motor power rating: The greater of
. the specified minimum motor
capacity; and
. 110% of the maximum load of the
driven equipment.
- Temperature rating: Select motors
for continuous operation at an
ambient 40C.
- Motor enclosure: As specified or, if
none specified, as appropriate to the
environment in which the motor
operates. Enclosure classification to
conform to AS 1359.20 and
AS 1939.
Motors supplied from variable
frequency drives:
- Select for low noise and vibration
under all operating conditions.
Chn la m t
Chn m t theo tiu chun AS
3591.101, theo li khuyn ca nh sn
xut m t v theo:
- c tnh khi ng: tun th tiu
chun IEC 60034-12 v AS 1359.41
- Tc v lc xon: p ng yu cu
dn ng ca thit b. m bo rng
mi m t pht huy lc xon lin
quan n ti khi ng ca thit b
cn dn ng cho n chy t tc
ti a mt cch nh v trong
thi gian gii hn tng thch vi
nhit cun dy m t, lp cch
in v xp loi thit b khi ng.
- Phng php khi ng: Nh c
nh r, hay nu cha nh r, tng
thch vi thit b cn dn ng, c s
h tng h thng in v cc yu cu
ca c quan nh nc cung cp.
- Vn hnh m t: Chn m t theo
loi hot ng, tng thch vi
nhim v, ngha l chy v dng lin
tc hay i khi.
- Mc cng sut m t: chn theo ci
no ln hn ca:
. Cng sut m t ti thiu nh r;
v
. 110% ca mc ti ti a ca thit
b cn dn ng.
- Mc nhit : chn m t theo ch
vn hnh lin tc nhit mi
trng 40C
- V m t: Nh c nh r, hay
nu cha nh r, tng thch vi
mi trng lp t. Phn lp v m
t tun th tiu chun AS 1359.20 v
AS 1939
M t iu khin t b iu tc bin
tn:
- Chn la theo n v run thp di
mi ch hot ng.
- Cung cp cch in theo lp F, s

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 14 of 30 of A4 18 September 2007
- Provide Class F insulation, with
Class B temperature rise or better.
tng nhit theo lp B hay cao hn.
Overload protection
Provide each motor with overload
protection.
Motors 22 kW: Fit embedded
winding temperature thermistors
complying with AS 1023.1 in each
phase. Match trip operating
temperature to motor winding
insulation classification.
Bo v qu ti
Trang b bo v qu ti cho mi m t.
M t 22 kW: c gn in tr nhit
trn cun dy tun t tiu chun AS
1023.1 trn mi pha. Ph hp vi nhit
tc ng ct ca phn lp cch in
cun dy m t.

Motor efficiency and power factor
Motors specified as high efficiency: To
AS/NZS 1359.5 Section 3.
All other motors: To AS/NZS 1359.5
Section 2.
Power factor: Not less than the value in
the Minimum power factor table for
the respective motor size.

Hiu sut m t v h s cng sut
M t c nh r hiu sut cao: tun
th tiu chun AS/NZS 1359.5 Section
3
Tt c cc m t khc: tun th tiu
chun AS/NZS 1359.5 Section 2
H s cng sut: khng thp hn gi tr
trong bng h s cng sut ti thiu
cho ln m t tng ng.

Minimum power factor table
Rated output kW Minimum power
factor at rated
output
0.37 0.72
> 0.37 to 0.55 0.76
> 0.55 to 3.0 0.83
> 3.0 to 18.5 0.86
> 18.5 to 37 0.87
> 37 0.88

Bng h s cng sut ti thiu
Cng sut danh
nh kW
H s cng sut
ti thiu cng
sut danh nh
0.37 0.72
> 0.37 to 0.55 0.76
> 0.55 to 3.0 0.83
> 3.0 to 18.5 0.86
> 18.5 to 37 0.87
> 37 0.88

4 EXECUTION 4 THC HIN THI CNG
4.1 INSTALLATION 4.1 LP T
General
General: Install equipment and services
plumb, fix securely and organise
reticulated services neatly. Allow for
movement in both structure and
services.

Arrangement: Arrange services so that
services running together are parallel
with each other and with adjacent
building elements. Under suspended
ground floors, keep services at least
150 mm clear above ground surface,
additional to insulation, and ensure
access is not impeded.
Lifting: Provide permanent fixtures
attached to the equipment, for lifting
heavy items of equipment, as
recommended by the manufacturer.
Tng qut
Tng qut: lp t trang thit b v cc
h thng thng ng, gn chc chn v
t chc cc h thng an xen mt li
cht ch. bao gm cc s di chuyn
trong c hai h kt cu v cc h thng
dch v.
B tr: B tr cc h thng sao cho cc
h thng cng nhau hot ng song
song vi nhau v vi cc kt cu to
nh gn k. Bn di sn trt treo, m
bo cc h thng cch mt t pha trn
t nht 150mm, khng tnh lp cch
nhit, v m bo c th truy cp c
m khng b tr ngi.
H thang nng: Trang b thit b nng
thng trc gn km vi trang thit b,
nng cc chi tit nng ca trang thit
b, theo li khuyn ca nh sn xut.

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 15 of 30 of A4 18 September 2007
4.2 WALL CHASING
Holes and chases
General: If holes and chases are
required in masonry walls, provide
proposals to demonstrate that the
structural integrity of the wall is
maintained. Chasing by mechanical
machinery is required; hammer and
chisel are not permitted. Do not chase
walls nominated as fire rated or
acoustic. Parallel chases or recesses on
opposite faces of a wall shall not be
closer than 600 mm to each other.
Chasing of blockwork: Only in core-
filled hollow blocks or in solid blocks
which are not designated as structural
and shall be to the Concrete
blockwork chasing table.
4.3 CT C TNG
Khoan l v ct c
Tng qut: nu yu cu khoan l v ct
c tng gch, cung cp cc xut
nhm m bo cu trc ca tng. Phi
tin hnh ct c bng my; khng
c s dng ba v c. Khng c
ct c cc tng c ch nh l
tng chng chy hay tng cch
m.Cc ng ct song song hay m
trn cc mt i din ca tng khng
c gn nhau hn 600 mm
Ct c tng gch block b tng. Ch
cc gch c lp y cc l bng
b tong hay gch c c m chng
khng c ch nh nh l kt cu
chnh v tun th theo Bng cng tc
ct c tng gch block b tng.
Block thickness (mm) Depth of chase (maximum mm)
Chiu dy gch c (mm) su ct c (ti a mm)
190 35
140 25
90 20


4.4 AUTHORITIES & SERVICES
CONNECTIONS
4.2 U NI CC H THNG
DCH V VI H THNG
CNG CNG
Statutory authorities requirements
If the authorities elect to perform or
supply part of the works, make the
necessary arrangements. Install
equipment supplied, but not installed,
by the authorities.
Yu cu ca c quan nh nc
Nu c quan nh nc thc hin mt
phn ca cng tc thi cng, Nh thu
phi b tr cc cng tc cn thit. Nh
thu lp t cc thit b do c quan nh
nc cung cp, nhng khng lp t.
Connections
Connect to statutory authorities
services or service points. Excavate to
locate and expose connection points.
On completion reinstate the surfaces
and facilities which have been
disturbed.
u ni
u ni vo cc h thng dch v cng
cng. o t nh v v lm l ra
cc im u ni. Khi hon tt, ti lp
li b mt v cc phng tin h tr b
nh hng.
Authorities fees
Include for all authorities fees
including, but not limited to, fire
services, water, sewage and electricity.
Chi ph cho c quan nh nc
Bao gm mi chi ph cho c quan nh
nc, nhng khng gii hn, dch v
phng chy cha chy, cp thot nc
v in.
Approvals
Allow for liaison with authorities on
behalf of the client, and for the
obtaining of, for all necessary
approvals required for the mechanical
and electrical services, including but
not limited to,

- Fire systems approvals
- Pressure vessel approvals
S ph duyt
Nh thu t chu chi ph cho s lin lc
vi c quan nh nc i din cho ch
u t, v t c mi s ph duyt
cn thit c yu cu cho h thng
in v h thng c kh, bao gm
nhng khng b gii hn,
- S ph duyt h thng phng chy
cha chy.
- S ph duyt thit b p lc

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 16 of 30 of A4 18 September 2007
- Electrical services connections
- Water systems connections
- Waste water discharge connections
- Storm water connections
- u ni H thng in
- u ni H thng cp nc
- u ni H thng thot nc thi
- u ni h thng thot nc ma
4.5 SYSTEM INTEGRATION 4.3 PHI HP CC H THNG
General
Interconnect system elements so that
the installations perform their
designated functions.
Tng qut
Phi hp cc thnh phn h thng vi
nhau sao cho ton b vic lp t thc
hin c nhng chc nng yu cu.
4.6 SERVICES COORDINATION 4.4 S PHI HP CC H
THNG
General
Documentation: Prepare detailed
drawings of the proposed positioning
of plant and equipment:
- Ensure coordination with other
building and service elements.
- Show adjusted positions on the shop
and record drawings.
- Provide details of all loadings
imposed on the structure.
Tng qut
Ti liu: chun b bn v chi tit v tr
ngh ca phng my v trang thit
b:
- m bo phi hp vi to nh v cc
h thng dch v khc.
- Th hin v tr iu chnh trn phn
xng v ghi nhn vo bn v.
- Cung cp chi tit cc ti trng tc
ng ln kt cu.
4.7 BUILDING PENETRATIONS 4.5 CC L XUYN SN/
TNG
Piping sleeves
General: Provide metal or UPVC
sleeves formed from pipe sections, for
piping penetrations through building
elements.
Sleeve diameter (for non fire-rated
building elements): Sufficient to
provide an annular space around the
pipe or pipe insulation of at least
12 mm.
Minimum sleeve thickness:
- Metal: 1 mm.
- UPVC: 3 mm.
Sleeve terminations:
- If cover plates are fitted: Flush with
the finished building surface.
- In floors draining to floor wastes:
50 mm above finished floor.
- In fire-rated and acoustic-rated
building elements: 50 mm beyond
finished building surface.
- Roof: 20 cm above roof
- Elsewhere: 20mm beyond finished
building surface.
- Finish: Prime paint ferrous surfaces.
Caulk with glass wool and sealed at
top and bottom with butyl mastic, or
intumescent putty
ng lt
Tng qut: Lp t cc ng lt kim loi
hoc uPVC to ra t nhng on ng,
cho cc l xuyn qua kt cu xy dng
dnh cho cc tuyn ng.
ng knh ng lt (i vi cc kt
cu xy dng khng chu la): ln
to ra mt khe h vng xuyn xung
quanh ng hoc cho cch nhit ng dy
t nht 12mm.
Chiu dy ng lt ti thiu:
- Kim loi: 1mm
- uPVC: 3mm
Phn u cui ng lt:
- Nu tm bt c s dng th ng lt
bng mt vi cc kt cu xy dng.
- Trong cc sn nh thot nc v pha
phu thu: 50mm cao hn sn.
- Trong cc kt cu xy dng chu la
v cch m: 50mm vt qu b mt
cc kt cu xy dng.
- Mi nh: 20mm cao hn mi.
- Nhng v tr khc: 20mm vt qu
b mt cc kt cu xy dng.
- Hon thin: Sn lt chng r. Trt
kn bng len thy tinh v nim kn
hai u bng mat tit butyl hoc mat
tit ni.
Cable sleeves
Provide UPVC sleeves formed from
pipe sections, for penetrations through
ng lt cho dy cp in
Lp t cc ng lt uPVC to thnh t
nhng on ng, cho nhng l xuyn

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 17 of 30 of A4 18 September 2007
ground floor slabs and beams and
external walls by cables not enclosed in
conduit. In addition, for MIMS cables,
provide sleeves for penetrations
through masonry.
qua sn trt v v tng bn ngoi
dnh cho dy cp in khng c
lun trong ng in. i vi cp
MIMS, lp t cc ng lt cho nhng
l xuyn qua cc kt cu va h.
Fire rated building elements
Seal penetrations with a system
conforming to AS 4072.1
Cc kt cu xy dng chu la
Lp y cc l xuyn bi cc vt liu
tun th tiu chun AS 4072.1
Non-fire rated building elements
Seal penetrations around conduits and
sleeves. Seal around cables within
sleeves. If the building element is
acoustic rated, maintain the rating.
Cc kt cu xy dng khng chu
la
Lp kn cc l xuyn xung quanh ng
in v ng lt. Lp kn xung quanh
dy cp in ti ni c ng lt. Nu cc
kt cu xy dng l cch m, phi m
bo cch m.
Limitations
General: Do not penetrate or fix to the
following without approval:
- Structural building elements
including external walls, fire walls,
fire doors and access panels, other
tested and rated assemblies or
elements, floor slabs and beams.
- Membrane elements including damp-
proof courses, waterproofing
membranes and roof coverings.
Membranes: If approval is given to
penetrate membranes, provide a
waterproof seal between the membrane
and the penetrating component.
Cc gii hn
Tng qut: Khng thi cng xuyn qua
hay gn ln trn cc kt cu sau m
khng c ph duyt:
- Cc kt cu xy dng bao gm tng
ngoi, tng ngn chy, ca ngn
chy v cc ca thm, cc kt cu lp
rp th nghim v xp loi, sn
nh v .
- Cc kt cu dng mng bao gm
gch chng thm, mng chng
thm v mi che.
Cc dng mng: Nu c chp thun
cho thi cng xuyn qua mng chng
thm, phi thi cng nim chng thm
gia kt cu mng v chi tit xuyn
qua.
Puddle flanges
Where mechanical services pass
through waterproof structures such as
tank walls, puddle flanges are to be
installed.
Puddle flanges will typically include.
- welded black steel and heavy duty
hot dipped galvanised construction.
- flanges on either side for connection
to other services
- a flange in the middle of the
waterproofed structural element.
- a waterproofing compound that
expands on contact with water.
- integration into the structure
waterproofing system.
Mt bch ngn m
Nhng ch m c cc h thng c kh
i xuyn qua cc kt cu chng thm
nh thnh h, phi s dng mt bch
ngn m.
Mt bch ngn m in hnh bao gm:
Cc kt cu hn thp en v m km
nhng nng t trng cao.
Cc mt bch c ni n cc h thng
khc.
Mt bch nm bn trong kt cu chng
thm.
Mt hp cht chng thm gin n ra
tip xc vi nc.
Tch hp vi h thng chng thm ca
kt cu.
4.8 CONCRETE PLINTHS 4.6 MNG BETON
Construction
General: Provide galvanized steel
surround at least 75 mm high AFFL
and 1.6 mm thick, fixed to floor with
masonry anchors. Fill with concrete.
Reinforcement: Single layer of F62
fabric.
Concrete: Grade N20.
- Finish: Steel float flush with the
Thi cng
Tng qut: Lp t thp trng km
xung quanh cao t nht 75mm AFFL v
dy 1.6mm, c nh vo sn nh bng
bulon mng. y bng beton.
Ct thp: Mt lp li F62
Beton: mc N20
- Hon thin: bng thp bng mt vi
xung quanh.

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 18 of 30 of A4 18 September 2007
surround.
4.9 VIBRATION SUPPRESSION 4.7 GIM RUNG
General
Minimise the transmission of vibration
and noise from rotating or
reciprocating equipment to other
building elements.
Tng qut
Gim thiu ti a rung ng v ting
n t cc trang thit b quay v chuyn
ng xoay chiu pittong n cc kt
cu xy dng.
Services connections
Provide flexible connections to rotating
machinery and assemblies containing
rotating machinery. Isolate ducts by
flexible connections. Isolate pipes by
incorporating sufficient flexibility into
the pipework or by use of proprietary
flexible pipe connections installed so
that no stress is placed on pipes due to
end reaction.
u ni cc h thng
Lp t nhng lin kt mm n cc
my mc chuyn ng quay v cc h
thng c cha cc thit b chuyn ng
quay. Cch ly tuyn ng gi bng cc
ng mm. Cch ly tuyn ng ng
bng cch s dng ng ni mm vo
tuyn ng hoc s dng nhng ni ng
mm nguyn b ch to sn lp t
sao cho khng c lc cng trn tuyn
ng do phn ng cui tuyn.
Services speeds
Where no maximum speed is
prescribed do not exceed 1500 rpm for
direct driven equipment.
Tc
Tc thit b cn dn ng trc tip
khng c vt qu 1500 v/ph
nhng ni khng c qui nh tc ti
a.
Equipment requiring vibration
isolation mountings
Except for external equipment which is
not connected to the structure of any
building, support rotating or
reciprocating equipment on mountings
as follows:
- For static deflections < 15 mm:
Single or double deflection neoprene
in-shear mountings incorporating
steel top and base plates and a tapped
hole for bolting to equipment.
- For static deflections 15 mm:
Spring mountings.
Trang thit b yu cu c chn
cch ly rung ng
Ngoi tr cc trang thit b bn ngoi
khng kt ni vi cc kt cu xy
dng, s dng cc chn cho thit b
quay v chuyn ng xoay chiu nh
sau:
- i vi vng tnh < 15 mm: chn
cao su tng hp vng n hay
kp tch hp vi tm trn v tm nn
c l ren bt bulon vi trang thit
b.
- i vi vng tnh 15 mm: dng
lo xo.
Selection of vibration isolation
mountings
Select mountings to achieve 95%
isolation efficiency at the normal
operating speeds of the equipment.
Chn la chn cch ly rung ng
Chn chn t c 95% hiu
sut cch ly tc vn hnh bnh
thng ca trang thit b.

Spring mountings
Type: Free-standing laterally stable
springs with at least 12 mm clearance
between springs and other members
such as bolts and housing.
Characteristics:
- Ratio of mean coil diameter to
compressed length at the designated
minimum static deflection: 0.8:1.
- Minimum travel to solid of at least
150% of the designated minimum
static deflection.
- Levelling bolts and lock nuts.
- 5 mm neoprene acoustic isolation
pads between baseplate and support.
- Vertical resilient limit stops: To
Chn l xo
Chng loi: L xo ng t do n nh
nghing c t nht khe h 12mm gia
l xo vi cc chi tit khc nh bulon v
hp che.
c tnh:
- T l gia ng knh cun chnh vi
chiu di nn ti vng tnh ti
thiu ch nh: 0.8:1.
- Khong dch chuyn ti thiu n
khi cng ti thiu bng 150%
vng tnh ti thiu ch nh.
- C bulon chnh cao v ai c
kha.
- C tm lt cch ly n bng neoprene
dy 5mm gia tm y vi khung .

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 19 of 30 of A4 18 September 2007
prevent spring extension when
unloaded, to serve as blocking during
erection, and which remain out of
contact during normal operation.
- Snubbing: Snub the springs to
prevent bounce at start-up.
- Ci chn gii hn n hi ng:
nga l xo b bt khi tho ti, dng
nh l ci kha khi lp t, v khng
ng ti khi hot ng bnh thng.
- u chn l xo: Chn l xo li ngay
lp tc ngn nga bt ln khi khi
ng.
Installation
Set and adjust vibration isolation
mounting supports to give adequate
clearance for free movement of the
supports.
Lp t
Lp t v cn chnh chn cch ly
rung ng to ra khe h tng thch
cho chuyn ng t do ca cc chi tit.
Inertia bases
General: Provide inertia bases with
mass appropriate to the required level
of vibration isolation.
Construction: Steel, or steel-framed
reinforced concrete. Position
foundation bolts for equipment before
pouring concrete.
Supports: Support on vibration
isolation mountings using height saving
support brackets.
qun tnh
Tng qut: lp t qun tnh c
trng lng tng thch vi mc
yu cu cch ly rung ng.
Thi cng: Thp, hay khung thp vi
beton ct thp. nh v bulon mng cho
trang thit b trc khi beton.
Khung : S dng thanh ging loi
thp cho khung cch ly rung ng.
4.10 FIXING 4.8 LP C NH
General
If equipment and services are not
suitable for fixing to non-structural
building elements, fix directly to
structure and trim around holes or
penetrations in non-structural elements.
Tng qut
Trong trng hp trang thit b v h
thng khng thch hp lp vo cc
kt cu khng thuc kt cu xy dng,
lp trc tip ln cc kt cu xy dng
v ta xung quanh l hay l xuyn qua
cc kt cu khng thuc kt cu xy
dng.
4.11 UNDERGROUND METAL
PIPING
4.9 NG CHN NGM
Corrosion protection
General: Provide corrosion protection
for:
- underground ferrous piping; and
- underground non-ferrous metal
piping in corrosive areas.
Protection methods: Select from the
following:
- Continuous wrapping using
proprietary petroleum taping
material, plus impermeable flexible
plastic coating or sealed
polyethylene sleeve.
- Cathodic protection: Sacrificial
anodes or impressed current.
Incorporate a facility for periodic
testing.
Standard: Comply with the
recommendations of AS 2832.1.
Bo v chng n mn
Tng qut: Lp t bin php chng n
mn cho:
- ng kim loi chn ngm; v
- ng phi kim loi chn ngm trong
khu vc n mn.
Phng php bo v: Chn mt trong
cc cch sau:
- Dng bng keo nha ha du nguyn
b ch to sn qun lin tc, sn ph
plastic do khng thm nc hoc
qun lt polyethylene.
- Bo v cc m: S dng cc dng
ha hay dng in dn. Phi hp cc
h thng th nghim nh k.
Tiu chun: Tun th cc li khuyn
ca tiu chun AS 2832.1
4.12 PIPING 4.10 NG NG
Cleaning
General: Before installation, remove
V sinh
Tng qut: trc khi lp t, v sinh

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 20 of 30 of A4 18 September 2007
loose scale, burrs, fins and
obstructions.
Protection: During construction,
prevent the entry of foreign matter into
the piping system by temporarily
sealing the open ends of pipes and
valves with purpose-made covers of
pressed steel or rigid plastic.
sch cc r, cu, gai, vy, ng cc,
Bo v: Trong qu trnh thi cng, ngn
nga s ri rt cc vt l vo trong h
thng bng cch nim kn tm thi cc
u cui h ca ng v van bng cc
np y bng thp hay nha cng.
Installation
General: Install piping in straight lines
at uniform grades with no sags.
Arrange to prevent air locks. Provide
sufficient unions, flanges and isolating
valves to allow removal of piping and
fittings for maintenance or replacement
of plant.
Arrangement: Arrange and support
piping so that it remains free from
vibrations whilst permitting necessary
movements. Minimise the number of
joints.
Spacing: Provide at least 25 mm clear
between pipes and between pipes and
building elements, additional to
insulation.
Dissimilar metals: Join dissimilar
metals with fittings of electrolytically
compatible material.
Thi cng
Tng qut: lp t ng ng theo
ng thng c dc ng nht
khng b vng.
B tr khng b nght gi. Lp nhiu
cc ni sng, mt bch v van cch ly
c th tho c ng ng cho bo
tr v thay th trang thit b.
B tr: B tr v tuyn ng sao cho
khng b rung ng trong khi cho php
dch chuyn cn thit. S dng tht t
cc mi ni.
Khe h: t nht phi c khe h 25mm
gia cc tuyn ng v gia tuyn ng
vi cc kt cu xy dng, k c lp
cch nhit.
Kim loi khng ng nht: Ni cc kim
loi khc nhau bng cc vt liu tng
thch in phn.
Accessibility
Provide access and clearance at fittings
which require maintenance or
servicing, including control valves and
joints intended to permit pipe removal.
Arrange piping so that it does not
interfere with the removal or servicing
of associated equipment or valves or
block access or ventilation openings.
c tnh tip cn
Phi to ra li vo cho cc ph kin
yu cu bo tr hay kim tra, thay th,
bao gm cc van iu khin v cc mi
ni tho rp tuyn ng. B tr tuyn
ng sao cho khng nh hng n vic
tho rp, hay bo tr thay th thit b h
tr, hay cc van iu khin hay lm kt
li vo hay cc l thng gi.
Embedded piping
Expansion and contraction: Sheath or
sleeve metal piping chased into
masonry or encased in concrete so that
expansion or contraction can take place
without damage to the pipe or to the
material or surface finish of the
surrounding element.
ng b che lp
S gin n hay co rt: Lm mng bao
che hay ng lt cho ng kim loi trong
h hay trong beton s gin n hay
co rt c th xy ra m khng lm h
ng hay h vt liu hay h b mt hon
thin ca cc chi tit xung quanh.

Cover plates
If piping emerges from exposed
building surfaces, provide cover plates
of non-ferrous metal, finished to match
the pipe, or of stainless steel, close
fitting and firmly fixed in place.
Tm y
Nu ng li ra b mt cc kt cu xy
dng trong tm nhn, lp cc tm y
phi kim loi, sn ph hon thin tng
thch vi ng, hay bng thp khng r,
gn cht vo v tr.
Cover plate sizes table Bng kch thc tm y
Nominal pipe
size, DN
Cover plate
diameter
Kch thc ng, DN ng knh
tm y
< 20 65 mm < 20 65 mm
20, < 50 100 mm 20, < 50 100 mm
50 50 mm larger than
pipe
50 50 mm ln
hn ng
Support system
General: Provide proprietary support
H thng :
Tng qut: Lp t h thng nguyn

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 21 of 30 of A4 18 September 2007
systems of galvanized or zinc-coated
steel construction.
Vertical pipes: Provide anchors and
guides to maintain long pipes in
position, and supports to balance the
mass of the pipe and its contents.
b ch to sn bng kt cu thp trng
hay m km.
ng ng: Lp t cc neo c nh v
cc thanh dn duy tr v tr cc ng
di, v cc thanh cn bng trng
lng ng v cc ti trng.
4.13 PAINTING SERVICES AND
EQUIPMENT
4.11 SN CC H THNG DCH
V V TRANG THIT B
General
If exposed to view, paint new services
and equipment including in plant
rooms, except chromium, anodised
aluminium, GRP, UPVC, stainless
steel, non-metallic flexible materials
and normally lubricated machined
surfaces. Repaint proprietary items
only if damaged
Tng qut
Nu l ra trong tm nhn, sn cc h
thng v trang thit b trong phng
my, ngoi tr vt liu chrome, nhm
dng, GRP, uPVC, thp khng r, phi
kim loi do v cc b mt bi trn.
Sn li cc chi tit nguyn b ch to
sn khi b h.
4.14 MARKING 4.12 NH DU
General
General: Mark equipment, electrical
wiring, piping, valves, conduits and
ducts, to provide a ready means of
identification.
Piping, conduits and ducts: To
AS 1345, as applicable.
Tng qut
Tng qut: nh du trang thit b, dy
in, tuyn ng, van, ng in, v ng
gi, lp t cc phng tin nhn bit.
ng, ng in v ng gi: tun th tiu
chun AS 1345, cho thch hp.
Language
English & Vietnamese.
Ngn ng
Ting Anh v ting Vit
Labels
Type: Select from the following:
- For indoor applications only,
engraved two-colour laminated
plastic.
- Engraved and black filled lettering
on stainless steel or brass, minimum
thickness 1 mm.
- Cast metal.
- For duct and pipe labels only, self
adhesive vinyl signage.
Label edges: If labels exceed 1.5 mm
thickness, radius or bevel the edges.
Nhn
Chng loi: Chn mt trong cc cch
sau:
- i vi trong nh: Nha 2 mu khc
ch.
- Ch khc v sn en trn thp khng
r hay thau, dy ti thiu 1mm.
- Kim loi c.
- i vi ng v ng gi: nhn vinyl
t dnh.
Cnh ca nhn: Nu dy hn 1.5mm,
bo trn hay vt xin cc cnh.

Minimum lettering heights
Equipment nameplates: 40 mm
Valve and pump identification: 20 mm
Warning notices: 7 mm
Automatic controls and electrical
equipment: 5 mm
Isolating switches: 5 mm
Inside electrical enclosures: 3.5 mm
Other: 3 mm
Chiu cao k t ti thiu
Nhn thit b: 40 mm
Nhn van v bm: 20mm
Thng bo nhc nh: 7mm
iu khin t ng v thit b in:
5mm
Cng tc cch ly: 5mm
Bn trong cc t in: 3.5mm
Khc: 3mm
Location
General: Locate labels so that they are
easily seen and are either attached to,
below or next to the item being
marked.
Exposed locations: Provide durable
V tr
Tng qut: Gn ti cc v tr sao cho d
dng nhn thy v lp t, bn di hay
bn cnh trang thit b c nh du.
Cc v tr nhn thy: Dng cc vt liu
bn lu.

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 22 of 30 of A4 18 September 2007
materials.
Fixing
General: Mechanical fixing. Do not
penetrate vapour barriers.
Valves and pumps: Screw fix to body
or attach by key ring to valve
handwheels.
Gn lp
Tng qut: Lp c kh, khng xuyn
qua lp cn hi.
Van v bm: Dng vis cy vo thn
hay nh vo tay van bng vng cha
kha.
Contents
General: Match terminology of record
drawings.
Valves and pumps: Correlate pumps to
starters and valves.
Ni dung
Tng qut:: S dng cng thut ng
trn bn v.
Van v bm: Tng thch gia bm,
van v cc khi ng.
Pressure vessels
Mount manufacturers certificates in
glazed frames on wall next to the
vessel.
Thit b chu p lc
Treo giy chng nhn nh sn xut
trong khung knh ln tng bn cnh
thit b.
Piping
Identify throughout its length,
including in concealed spaces.
ng ng
Nhn bit xut chiu di, c trong cc
ni b che khut.
Electrical
Mark operable control devices,
indicators, isolating switches and
outlets to provide a ready means of
identification.
Phn in
nh du dng c iu khin cho php
vn hnh, cng tc cch ly v cc
cm c sn cc phng cch nhn
bit.
5 COMPLETION 5 HON TT
5.1 GENERAL 5.1 TNG QUT
Samples
Remove unincorporated samples on
completion.

Vt t mu
Mang i cc vt t mu khng dng
lp t.
Contractors submissions
Within 2 weeks after practical
completion, submit 3 copies of
designated documents.
Trnh duyt ca nh thu
Trong vng hai tun l sau khi hon tt
thc t, trnh duyt ba b h s ch
nh.
Warranties
General: Name the Owner as
warrantee. Register with manufacturers
as necessary. Retain copies delivered
with components and equipment.
Commencement: Commence warranty
periods at practical completion or at
acceptance of installation, if acceptance
is not concurrent with practical
completion.
Approval of installer: If installation is
not by manufacturer, and product
warranty is conditional on the
manufacturers approval of the
installer, submit the manufacturers
written approval of the installing firm.
Bo hnh
Tng qut: Tn ca Ch u t l
ngi c hng bo hnh. ng k
vi nh sn xut nu cn thit. Gi li
cc h s i km vi ph kin v trang
thit b.
Bt u: Bt u thi gian bo hnh k
t ngy hon tt thc t hoc ngy s
thi cng c chp thun, nu s hon
tt thi cng khng trng vi ngy hon
tt thc t.
S ph duyt nh lp t: Nu nh sn
xut khng lp t, v s bo hnh sn
phm i hi iu kin s ph dhun
ca nh sn xut i vi nh lp t,
phi trnh duyt vn bn chp thun
nh lp t ca nh sn xut.
5.2 RECORD DRAWINGS 5.2 H S BN V
General
Submit record drawings. Show the as
Tng qut
Trnh duyt h s bn v. Th hin cc

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 23 of 30 of A4 18 September 2007
installed locations of building
elements, plant and equipment. Show
off-the-grid dimensions where
applicable.
v tr lp t thc t hon cng ca
cc kt cu xy dng, trang thit b v
my mc. Th hin cc tuyn trc ni
c th.
Services
Show dimensions, types and location of
equipment, cables, piping and
ductwork in relation to permanent site
features and other underground
services. Include relationship to
building structure and other services,
and changes made during
commissioning and the maintenance
period. Include diagrammatic drawings
of each system showing piping and
wiring, and Owner items of equipment.
Cc h thng
Th hin kch thc, chng loi v v
tr trang thit b, tuyn cp, tuyn ng,
v ng gi tng quan vi cc c tnh
ni bt c nh ca cng trng v cc
h thng ngm. Bao gm c mi lin
h gia cc kt cu xy dng v cc h
thng khc, v cc thay i trong qu
trnh chy th v nghim thu v giai
on bo tr. Bao gm cc bn v gin
ca mi h thng th hin tuyn ng
v tuyn dy dn v thit b.
Format
Use the same borders and title block as
the contract drawings.
nh dng
S dng cng loi ng vin bao v
khung tn nh bn v hp ng.
5.3 OPERATION AND
MAINTENANCE MANUALS
5.3 S TAY VN HNH V BO
DNG
General
General: Submit operation and
maintenance manuals for installations.
Authors and compilers: Personnel
experienced in the maintenance and
operation of equipment and systems
installed, and with editorial ability.
Subdivision: By installation or system,
depending on project size.

Referenced documents: If referenced
documents or technical worksections
require that manuals be submitted,
include corresponding material in the
operation and maintenance manuals.
Original copies: Include original copies
of all manufacturers literature in all
manuals (requirements to included in
purchase order documentation).
Tng qut
Tng qut: Trnh duyt s tay vn hnh
v bo tr ca cc cng tc thi cng.
Ngi bin son: Nhng ngi c kinh
nghim trong vic vn hnh v bo tr
h thng v trang thit b c lp t,
v c kh nng bin son.
S phn chia nh: Tu thuc vo
ln ca d n, chia theo s lp t hay
h thng.
Cc ti liu tham chiu: Nu nh
nhng ti liu tham chiu hay cc
chng k thut yu cu rng s tay
phi c trnh duyt, bao gm c cc
ti liu tham chiu lin quan trong s
tay vn hnh v bo tr.
Bn gc: Bao gm tt c cc bn gc
ca ti liu nh sn xut trong tt c
cc s tay (bao gm c cc ti liu mua
hng)
Quantity
Provide operational maintenance
manuals in the following forms and
quantities:
- Hardcopy:
. Number of copies: 3
- Electronic copies:
. Number of copies: 1
. Medium: 1

S lng
Cung cp S tay vn hnh v bo tr
theo hnh thc v s lng nh sau:
- Bn giy:
. S bn: 3
- Bn in t:
. S bn: 1
. Truyn thanh truyn hnh: 1
Format hardcopy
A4 size loose leaf, in commercial
quality, 4 ring binders with hard
covers, each indexed, divided and
titled. Include the following features:
- Pagination: Number pages
consecutively.
nh dng bn giy
Kh A4 c th tho ri tng t, theo
cht lng thng mi, loi 4 cng gi
c ba cng, mi ci c ch mc,
chia nh v t tn ba. Bao gm cc
c tnh sau:
- Phn trang: nh s trang lin tip

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 24 of 30 of A4 18 September 2007
- Cover: Identify each binder with
typed or printed title OPERATION
AND MAINTENANCE MANUAL,
to spine. Identify title of project,
volume number, volume subject
matter, and date of issue.
- Ring size: 50 mm maximum, with
compressor bars.
- Text: Manufacturers printed data,
including associated diagrams, or
typewritten, single-sided on bond
paper, in clear concise English.
- Dividers: Durable divider for each
separate element, with typed
description of system and major
equipment components. Clearly print
short titles under laminated plastic
tabs.
- Drawings: Fold drawings to A4 size
and accommodate them in the
binders so that they may be unfolded
without being detached from the
rings. Provide with reinforced
punched binder tabs.
nhau.
- Ba: nhn bit mi ba bng tn in
S TAY VN HNH, trn gy.
Ghi r tn d n, s th t cun, tn
h thng, ngy ban hnh.
- Kch thc vng: ti a 50mm, c
thanh p cht.
- Ti liu: Ti liu in n ca nh sn
xut, bao gm cc s lin i hay
cc bn in, trn giy mt mt, bng
ting Anh chnh xc.
- Tm ngn: Dng tm ngn nha cho
mi h thng ring bit, c nh ch
m t h thng v cc ph kin trang
thit b chnh. In r rng tiu rt
gn gia cc nhn nha p lp.

- Bn v: Xp bn v li theo kh A4
v t chung vo cc ba c th
tho ri chng ra m khng cn ly
ra khi vng. S dng cc vng gia
cng cho ch bm l.
Format - electronic copies
Scope: Provide the same material as
specified for hardcopy in electronic
format.
Printing: Except for drawings required
in the Record drawings clause provide
material that can be legibly printed on
A4 size paper.
File format: Autocad 2000
nh dng Bn in t
Phm vi: Cung cp cng loi ch nh
th hin trn bn giy cho dng in t.
In n: Ngoi tr nhng bn v c
yu cu trong phn H s bn v, cung
cp cc ni dung c th in n trn kh
A4.
nh dng tp tin: Autocad 2000
Contents - general
Include the following:
- Table of contents: For each volume.
Title to match cover.
- Directory: Names, addresses, and
telephone and facsimile numbers of
Owner, consultant, subconsultants,
contractor, subcontractors and names
of responsible parties.
- Installation description: General
description of the installation.
- Systems descriptions: Technical
description of the systems installed,
written to ensure that the Owners
staff fully understand the scope and
facilities provided. Identify function,
normal operating characteristics, and
limiting conditions.
- Systems performance: Technical
description of the mode of operation
of the systems installed.
- Equipment descriptions:
. Manufacturers technical literature
for equipment installed, assembled
specifically for the project,
excluding irrelevant matter. Mark
each product data sheet to clearly
identify specific products and
Ni dung Tng qut
Bao gm cc ni dung sau:
- Bng lit k ni dung: cho mi cun,
tn ph hp vi ba.
- Th mc: Tn, a ch, s in thoi
v s fax ca Ch u t, Nh t
vn, Nh thu, Nh thu ph v tn
ca cc bn c trch nhim lin quan.
- M t s lp t: M t chung tng
qut s lp t.
- M t h thng: M t k thut h
thng lp t, vit sao cho m bo
rng nhng nhn vin ca ch u t
thu hiu ton b pham vi v nhng
tin ch c lp t. Nhn bit r
tnh nng, c tnh vn hnh bnh
thng v cc iu kin gii hn.
- c tnh ca h thng: M t k
thut cc ch vn hnh ca h
thng lp t.
- M t trang thit b:
. Ti liu k thut nh sn xut cho
thit b lp t, lp rp ring cho
d n, khng bao gm cc im
khng lin quan. nh du trn
mi t ti liu sn phm xc
nh r cc sn phm, phn ph
kin s dng cho lp t, v cc d

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 25 of 30 of A4 18 September 2007
component parts used in the
installation, and data applicable to
the installation.
. Supplements to product data to
illustrate relations of component
parts. Include typed text as
necessary.
. Name, address and telephone and
facsimile numbers of the
manufacturer and supplier of items
of equipment installed, together
with catalogue list numbers.
. Schedules (system by system) of
equipment, stating locations,
duties, performance figures and
dates of manufacture. Provide a
unique code number cross-
referenced to the record and
diagrammatic drawings and
schedules, including spare parts
schedule, for each item of
equipment installed.
- Maintenance procedures:
. Manufacturers technical literature
as appropriate. Register with
manufacturer as necessary. Retain
copies delivered with equipment.
. Detailed recommendations for
preventative maintenance
frequency and procedures.
. Safe trouble-shooting,
disassembly, repair and
reassembly, cleaning, alignment
and adjustment, balancing and
checking procedures. Provide
logical step-by-step sequence of
instructions for each procedure.
. Schedule of spares recommended
to be held on site, being those
items subject to wear or
deterioration and which may
involve the Owner in extended
deliveries when replacements are
required. Include complete
nomenclature and model numbers,
and local sources of supply.
- Certificates:
. Copies of manufacturers
warranties.
. Certificates from authorities.
. Product certification.
- Drawings:
. Record drawings, full size.
. Switchgear and controlgear
assembly circuit schedules
including electrical service
characteristics, controls and
communications.
. Charts of valve tag numbers, with
location and function of each
valve, keyed to flow and control
liu s dng trong lp t.
. B sung thm vo cc s liu sn
phm minh ho mi quan h
gia cc phu kin. C th m t
thm nu cn.
. Tn, a ch, s in thoi v s
fax ca nh sn cut v nh cung
cp ca cc trang thit b, hng
mc lp t, chung vi s lit k
sch.
. Lp bng lit k (theo tng h
thng) trang thit b, ghi r v tr,
nhim v, nhng con s hiu sut
v c tnh, v ngy sn xut. S
dng mt m s tham chiu ng
nht trn h s v bn v s v
bng lit k, bao gm c bng lit
k ph tng d tr, cho mi trang
thit b v hng mc lp t.


- Th tc bo tr:
. Ti liu k thut nh sn xut cho
tng thch. ng k vi nh sn
xut nu cn thit.Gi li cc bn
ti liu i km vi trang thit b
my mc.
. Nhng li khuyn chi tit v th
tc v tn s bo tr phng nga.
. X l s c, tho ri, sa cha v
lp rp li, v sinh, chnh ng
trc, cn bng v cc th tc kim
tra. Ch r th t logic cc bc
thc hin cho mi th tc.
. Bng lit k cc ph tng d tr
ngh nn c sn ti d n, l cc
ph tng c th b mn hay h
hng m c th Ch u t b
chm tr do giao hng lu khi cn
thay th. Bao gm c mc lc v
s model v ni cung cp trong
nc.


- Giy chng nhn:
. Giy bo hnh ca nh sn xut
. Giy chng nhn t c quan nh
nc
. Giy chng nhn sn phm
- Bn v:
. Lp h s bn v, kh ln nht.
. Bng lit k s lp rp t in
v t iu khin bao gm c tnh
in, s iu khin v s giao tip
qua li.
. Biu s nhn van, vi v tr v
tnh nng mi van, kha dng chy
v s iu khin.
. Bn v v ti liu k thut: cn
thit cho s vn hnh v bo tr h

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 26 of 30 of A4 18 September 2007
diagrams.
. Drawings and technical data: As
necessary for the efficient
operation and maintenance of the
installation.
- Operation procedures:
. Safe starting up, running-in,
operating and shutting down
procedures for systems installed.
Include logical step-by-step
sequence of instructions for each
procedure.
. Control sequences and flow
diagrams for systems installed.
. Legend for colour-coded services.
. Schedules of fixed and variable
equipment settings established
during commissioning and
maintenance.
. Procedures for seasonal
changeovers.
- Maintenance procedures:
. Schedule of normal consumable
items, local sources of supply, and
expected replacement intervals up
to a running time of 40,000 hours.
Include lubricant and lubrication
schedules for equipment.
. Instructions for use of tools and
testing equipment.
. Emergency procedures, including
telephone numbers for emergency
services, and procedures for fault
finding.
. Material safety data sheets
(MSDS).
- Certificates:
. Copies of test certificates for the
mechanical installation and
equipment used in the installation.
. Test and balancing reports
thng hiu qu.



- Th tc vn hnh:
. Th tc khi ng an ton, chy
th, vn hnh v dng h thng.
Ch r th t logic cc bc thc
hin cho mi th tc.
. Trnh t iu khin v s dng
chy ca h thng lp t.
. Ch gii mu sc ca cc h thng
. Bng lit k ca cc thng s ci
t c nh v thay i ca trang
thit b trong qu trnh chy th v
nghim thu v bo tr.
. Th tc khi i ma kh hu.


- Th tc bo tr:
. Lp bng lit k ca cc hng mc
tiu dng thng xuyn, ngun
cung cp trong nc, v nhng s
thay th d on ngt qung n
40,000 gi. Bao gm c du nht
bi trn v k hoch bi trn cho
thit b.
. Nhng ch dn cho vic s dng
dng c v thit b th nghim.
. Th tc i vi trng hp khn
cp, bao gm s in thoi phc
v khn cp, th tc truy tm li.
. Thng tin an ton sn phm
(MSDS).
- Giy chng nhn:
. Giy chng nhn th nghim cho
h thng c kh v cc trang thit
b s dng trong lp t.
. Bo co th nghim v cn bng
h thng
Timing and quantity
Draft manuals: Submit 2 draft manuals
8 weeks before the date for practical
completion to enable the Owners staff
to familiarise themselves with the
installation. Include provisional record
drawings and preliminary performance
data.
- Format: As for the final manuals,
with temporary insertions for items
which cannot be finalised until the
installation is commissioned and
tested.
Revised draft manuals: Submit revised
draft manuals 2 weeks before
commissioning.
Progressive: For equipment put into
service during construction and
operated by Owner, submit manuals
Thi im v s lng
Bn phc tho: tm tun l trc ngy
hon tt thc t, trnh duyt 2 bn phc
tho nhng nhn vin ca ch u
t c th lm quen vi cc h thng lp
t. Bao gm c h s bn v v d
liu thc hin s b.
- nh dng: Ging nh bn cui
cng, vi nhng phn tm thi cho
cc hng mc cha kt thc c
cho n khi h thng c chy
th v nghim thu v th nghim.
Bn tho c chnh sa: hai tun l
trc ngy chy th v nghim thu,
trnh duyt bn d tho chnh sa.
S tng tc: i vi cc thit b c
s dng trong qu trnh thi cng v
c vn hnh bi ch u t, cung
cp s tay trong vng 2 tun sau khi

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 27 of 30 of A4 18 September 2007
within 2 weeks after acceptance.
Final drafts: Submit for review after
completion of commissioning and no
later than 2 weeks before the date for
practical completion. If available,
include certificates from authorities,
and warranties.
Final copies: Submit 3 sets of final
volumes within 2 weeks after practical
completion. Incorporate feedback from
review and from training of Owners
staff, including preparation and
insertion of additional data.
Revisions: Submit 3 sets of loose leaf
amendments for insertion in the
manuals, incorporating feedback from
the maintenance period, within 2 weeks
after completion.
c chp thun.
Bn d tho cui cng: trnh duyt sau
khi hon tt chy th nghim thu v
khng tr hn 2 tun trc ngy hon
tt thc t. Nu c sn th bao gm c
giy chng nhn ca cc c quan nh
nc v giy bo hnh.
Bn chnh sau cng: Trnh duyt 3 b
ca bn sau cng trong vng 2 tun sau
khi hon tt thc t. Thng nht cc
xem xt v cc hun luyn cho nhn
vin ca ch u t, bao gm c s
thc hin v thm vo cc s liu b
sung.
Sot xt: trnh duyt 3 b cc thay i
trn giy ri chn thm vo s tay,
tch hp cc phn hi trong giai on
bo tr, trong vng 2 tun l sau khi
hon tt.
5.4 TRAINING 5.4 HUN LUYN
General
Operation and maintenance manuals:
Use items and procedures listed in the
final draft operation and maintenance
manuals as the basis for instruction.
Review contents with the Owners staff
in detail.
Format: Conduct training at agreed
time, at system or equipment location.
Tng qut
S tay vn hnh v bo tr: S dng cc
hng mc v th tc c lit k trong
bn d tho cui cng ca s tay vn
hnh v bo tr. nh gi li nhng ni
dung chi tit vi cc nhn vin ca Ch
u t.
nh dng: thc hin hun luyn vo
thi gian thng nht, ti v tr lp t
trang thit b hay h thng.
Operation
Immediately after practical completion,
explain and demonstrate to the
Owners staff the purpose, function and
operation of the installations.
Vn hnh
Ngay sau khi hon tt thc t, gii
thch v minh ho mc ch, tnh nng
v vn hnh ca h thng cho nhn
vin ca Ch u t.
Maintenance
Immediately after practical completion,
explain and demonstrate to the
Owners staff the purpose, function and
maintenance of the installations.
Bo tr
Ngay sau khi hon tt thc t, gii
thch v minh ho mc ch, tnh nng
v s bo tr ca h thng cho nhn
vin ca Ch u t.
Demonstrators
Qualified manufacturers
representatives who are knowledgeable
about the installations.
Ngi thuyt trnh
i din t cch ca nh sn xut,
ngi nm bt rnh r v cc h thng
lp t.
Seasonal operation
For equipment requiring seasonal
operation, demonstrate during the
appropriate season and within 6
months.
Vn hnh theo ma
i vi cc trang thit b yu cu phi
vn hnh theo ma, hun luyn li theo
ma v trong vng 6 thng.

5.5 SPARES 5.5 PH TNG
General
Schedule: At least 8 weeks before the
date for practical completion, submit a
schedule of spare parts necessary for
maintenance of the installation. State
against each item the recommended
quantity, and the manufacturers
current price, including for:
Tng qut
Bng lit k: t nht 8 tun trc ngy
hon tt thc t, trnh duyt mt bng
lit k cc ph tng cn thit cho bo
tr ca h thng. Ch r s lng nn
c, gi hin hu ca nh sn xut cho
mi hng mc, bao gm c:
- Chi ph ng gi v giao hng n

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 28 of 30 of A4 18 September 2007
- packaging and delivery to site;
- checking receipt, marking and
numbering in accordance with the
spare parts schedule;
- referencing equipment schedules in
the operation and maintenance
manuals; and
- painting, greasing and packing to
prevent deterioration during storage.
ni d n;
- Kim tra bin nhn, nh du v
nh s ph hp vi bng lit ph
tng.
- Bng lit k cc trang thit b tham
chiu trong s tay bo tr v vn
hnh; v
- Sn, bi m v ng gi ngn
nga h hng trong qu trnh lu
kho.
5.6 TOOLS 5.6 DNG C
General
General: At practical completion,
supply 2 complete sets of special tools
and portable indicating instruments
necessary for operation and
maintenance of equipment together
with suitable means of identifying,
storing and securing the tools and
instruments. Include instructions for
use.
Tng qut
Tng qut: Khi hon tt thc t, cung
cp 2 b dng c c bit v cc thit
b o cm tay cn thit cho vn hnh v
bo tr cng vi cc phng tin nhn
bit, lu kho v bo v cho dng c v
thit b o.
5.7 COMMISSIONING 5.7 CHY TH V NGHIM THU
Reports
Submit reports indicating observations
and results of tests and compliance or
non-compliance with requirements.
Bo co
Trnh duyt cc bo co ch ra nhng
quan st v kt qu th nghim v s
ph hp hay khng ph hp vi yu
cu.
Notice
Give sufficient notice for inspection to
be made of the commissioning of the
installation.
Thng bo
Thng bo sm thch ng vic
kim tra c thc hin cho chy th
v nghim thu h thng lp t.
Starting up
General: Coordinate schedules for
starting up of various systems and
equipment. Give 5 working days notice
before starting up each item.
Checks: Before starting, verify that
each piece of equipment has been
checked for proper lubrication, drive
rotation, belt tension, control sequence,
circuit protection or for other
conditions which may cause damage.
Tests: Verify that tests, meter readings,
and specified electrical characteristics
agree with those required by the
manufacturer.
Wiring: Verify wiring and support
components for equipment are
complete and tested.
Manufacturers representatives: Have
authorised manufacturers
representatives present on site to
inspect, check, and approve equipment
or system installation prior to starting
up, and to supervise placing equipment
and operation.
- Starting up: Execute starting up
under supervision of manufacturers
Khi ng
Tng qut: phi hp cc k hoch
khi ng cc h thng v trang thit b
khc nhau. Thng bo trc 05 ngy
khi khi ng mi h thng.
Kim tra: trc khi khi ng, thm tra
li rng mi phn/ b phn ca trang
thit b c kim tra bi trn ng
n, chiu dn ng, sc cng ai, trnh
t iu khin, mch bo v hoc nhng
iu kin khc c th gy ra h hng.
Th nghim: Thm tra li rng cc th
nghim, kt qu ch s v cc c tnh
in ring bit ph hp vi cc gi tr
c nh sn xut yu cu.
u dy: Thm tra rng u dy v h
thng trang thit b hon tt v
th nghim.
i din nh sn xut: Phi c mt i
din nh sn xut trn cng trng
kim tra, kim tra v ph duyt trang
thit b hay h thng c lp t trc
khi khi ng, v gim st thit b giao
cho v khi ng.
- Khi ng: Thc hin khi ng
di s gim st ca i din nh sn
xut v nhng nhn s tng thch

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 29 of 30 of A4 18 September 2007
representative and appropriate
contractors personnel, in accordance
with manufacturers instructions.
Report: Submit a report demonstrating
that equipment has been properly
installed and is functioning correctly.
ca nh thu, tun theo ch dn ca
nh sn xut.
Bo co: trnh duyt bo co minh ho
c rng trang thit b c lp t
ng n v vn hnh ng tnh nng.
Circuit protection
Confirm that circuit protective devices
are sized and adjusted to protect
installed circuits.
Mch bo v
Xc nhn rng dng c bo v mch
in l ng kch c v c iu
chnh bo v mch in lp t.
Controls
Calibrate, set and adjust control
instruments, control systems and safety
controls.
iu khin
Hiu chun, ci t v iu chnh cc
thit b o, h thng iu khin v kim
sot an ton.
5.8 COMPLETION TESTS 5.8 KIM TRA HON TT
General
Carry out acceptance tests and final
tests.
Tng qut
Thc hin cc th nghim chp thun
v cc th nghim sau cng
Functional checks
Carry out functional and operational
checks on energised equipment and
circuits and make adjustments for the
correct operation of safety devices.
Kim tra tnh nng
Thc hin cc kim tra vn hnh v
kim tra tnh nng i vi cc trang
thit b hot ng v cc mch in
v iu chnh cc thit b an ton
hot ng chnh xc.
Hydraulic site tests
Preparation for pressure testing:
Securely anchor pipes and fittings in
position to prevent movement during
tests. Leave pipe joints exposed to
enable observation during tests.
Disconnect equipment which is not
designed to carry the test pressure.
Th nghim thy lc ti cng
trng
Chun b th p lc: Sit cht cc neo
ng ng v ph kin ngn nga di
chuyn trong qu trnh th nghim.
Cha cc cc ch ni ng c th
quan st thy trong khi th nghim.
Cch ly cc trang thit b khng c
thit k cho th p lc.
Functional checks
Residual current devices: Verify earth
leakage tripping times and currents.
Kim tra tnh nng
Thit b bo v chng r t: Thm tra
dng in v thi gian ngt khi r t.
5.9 CLEANING 5.9 V SINH
General
At practical completion, clean the
following:
- Luminaires. Relamp luminaires
used during construction.
- Insides of switchgear and
controlgear assemblies.
- Switchgear and contactors, and
other electrical contacts. Adjust as
necessary.
Tng qut
Khi hon tt thc t, v sinh cc:
- n: Thay th cc bng n s dng
trong thi gian thi cng.
- Bn trong cc t in v t iu
khin.
- T in v cc tip im, v cc tip
im in khc. iu chnh khi cn
thit.
5.10 MAINTENANCE 5.10 BO DNG
General
General: During the maintenance
period, carry out periodic inspections
and maintenance work as
recommended by manufacturers of
supplied equipment, and promptly
rectify faults.
Tng qut
Tng qut: Trong sut qu trnh bo tr,
thc hin nhng kim tra nh k v
thc hin bo tr theo li khuyn ca
nh sn xut ca thit b cung cp, v
sa cha cc li ngay lp tc.
Tnh trng khn cp: p ng (c mt)

GENERAL REQUIREMENTS
The English language version prevails. u tin ting Anh khi c tranh chp
Centrepoint Page 30 of 30 of A4 18 September 2007
Emergencies: Attend emergency calls
promptly.
ngay cc cuc gi khn cp.
Maintenance program
Submit details of maintenance
procedures and program, relating to
installed plant and equipment, 6 weeks
before the date for practical
completion. Indicate dates of service
visits. State contact telephone numbers
of service operators and describe
arrangements for emergency calls
K hoch bo tr
Trnh duyt chi tit k hoch v th tc
bo tr ca cc trang thit b v my
mc lp t, 6 tun l trc ngy hon
tt thc t. Ch ra nhng ngy s n
thc hin. Ch ra s in thoi lin lc
ca nhng nhn vin thc hin bo tr
v vch ra ng ph i vi cc cuc
gi khn cp.
Site control
Report to the Owners designated
representative on arriving at and before
leaving the site.
Kim sot cng trng
Bo co cho i din ch nh ca Ch
u t khi n v khi ri cng trng.
Maintenance records
General: Submit, in binders which
match the manuals, loose leaf log book
pages designed for recording
completion activities including
operational and maintenance
procedures, materials used, test results,
comments for future maintenance
actions and notes covering the
condition of the installation. Include
completed log book pages recording
the operational and maintenance
activities performed up to the time of
practical completion.
Number of pages: The greater of 100
pages or enough pages for the
maintenance period and a further 12
months.
Certificates: Include test and approval
certificates.
Service visits: Record comments on the
functioning of the systems, work
carried out, items requiring corrective
action, adjustments made and name of
service operator. Obtain the signature
of the Owners designated
representative.
Referenced documents: If referenced
documents or technical worksection s
require that log books or records be
submitted, include this material in the
maintenance records.
Certification: On satisfactory
completion of the installation, submit
certificates stating that each installation
is operating correctly.
H s bo tr
Tng qut: trnh duyt trong cc ba h
s tng t nh s tay, cc trang h s
tho ri c, c thit k ghi
nhn li cc hot ng thc hin hon
tt, bao gm cc th tc vn hnh v
bo tr, vt t s dng, kt qu th
nghim, nhng gp cho ln bo tr
sp ti v cc ghi ch v tnh trng ca
h thng. Bao gm nhng trang ghi
chp hon tt ca cc hot ng vn
hnh v bo tr thc hin cho n ngy
hon tt thc t.
Tng s trang: Hn 100 trang hoc
cho ton thi gian bo tr v 12 thng
tip theo.
Giy chng nhn: Bao gm giy chng
nhn chp thun v th nghim.
Nhng chuyn phc v: Ghi chp li
nhng nhn xt v hot ng ca h
thng, cng vic thc hin, cc hng
mc cn c hnh ng khc phc,
nhng iu chnh c thc hin v tn
ca ngi thc hin bo tr. Xin ch l
ca i din ch nh ca Ch u t.
Cc ti liu tham chiu: Nu nh
nhng ti liu tham chiu hay cc
chng k thut yu cu rng s ghi
chp hoc h s phi c trnh duyt,
th bao gm c ti liu tham chiu ny
trong h s bo tr.

You might also like