NO WORK PENDING
DONE/NOT
DONE
1 MONITOR APPROVAL SENT TO POWER WAITING FOR MATERIAL & INSTALLATION. FOLLOW CRIS D
2
CONDENSOR FAN MOTOR REWIND FINISH C
BLOCK 3RD FLOOR, UNIT 2 WAITING FOR INVOICE FOLLOW CRIS D
3
CONDENSOR FAN MOTOR REWIND FINISH C
BLOCK 4TH FLOOR, UNIT 2 WAITING FOR INVOICE FOLLOW CRIS D
4
COMPRESSOR A BLOCK LIFT LOBBY BASEMENT
CHANGE FINISHED WAITING FOR INVOICE FOLLOW CRIS D
5
PAINITING RECTIFICATION WORKS IN
CORRIDORS,CLUB HOUSE
JAMEEL (PAINTER) - WORK IN PROGRESS FOLLOW JAMEEL:
0551359077 D
6
CALL WEEKLY ONCE FOR CAPRENTOR FOR
RECTIFICATION WORKS FOLLOW CARPENTOR: 0552502732 D
7
ALSABBAH MONTHLY SERVICE COMING ON
26TH MAY 2014 FOLLOW ALSABBAH D
8
FIRE ALARM PANEL ERROR,NEED TO CHANGE
HEAT DETECTOR & RE PROGRAMMING. VISION
SAFETY ALREADY QUOTED FOLLOW KASPER & VISION SAFETY ND
9
C BLOCK LIFT NO 1 DELAY OPENING DURING
FIRE ALARM.FIRE ALARM PANEL NEED TO
RECTIFY. VISION SAFETY ALREADY QUOTED. FOLLOW KASPER & VISION SAFETY ND
10
FOLLOW AMC PAYMENT FOR POWER FOR
MARCH MONTH FOLLOW KASPER D
11 LANDSCAPING TIMING & FLOW TO BE ADJUST FOLLOW RENATO: 0566500983 D
12 FOLLOW PENDING PPM & JUNE MONTH PPM
PPM LIST ALREAADY GIVEN TO YOU. IF ANY DOUBT CLARIFY
WITH JAY PRAKASH D
13
VILLA-9 NEED TO COLLECT 50 AED FOR
ACCESS CARD FOLLOW KAMRUL D
14 KID POOL DRAIN FILTER PLATE BROKEN FOLLOW DEEP BLUE TO CHANGE: 0557901241 D
15
FOLLOW 420 AED FROM SARAVANAN SIR FOR
REMOTE PURCHASE. BILL ALREADY SENT GIVE THAT AMOUNT TO KASPER D
16
STATUS REPORT FOR SWIMMING POOLPUMP.
NOW 1 PUMP RUNNING. FOLLOW SARAVANAN SIR. D
17
FOLLOW WATER PROOFING QUOTATIONS
SENT FOR APPROVAL FOLLOW KASPER SIR. ND
18 GATE BARRIER A BLOCK PROBLEM CALL NEWLINE SYSTEMS SEKAR: 0508409595 ND
19 APARTMENT PAYMENTS PENDING ALREADY DETAILS GIVEN TO YOU ND
20
BIOLOGICAL REPORT FOR SWIMMING POOL-
JUNE MONTH FOLLOW DEEPBLUE : 0557901241 ND
S.NO WORK PENDING
DONE/NOT
DONE
1 Irrigation pump repalced in basement Work completed.Waiting for Invoice ND
2 FAHU Bag filter replaced in all block Work completed.Waiting for Invoice ND
3
FIRE ALARM PANEL ERROR,NEED TO CHANGE
HEAT DETECTOR & RE PROGRAMMING. VISION
SAFETY ALREADY QUOTED Already mail send to inam vision safety.Follow vision safety ND
4 KID POOL DRAIN FILTER PLATE BROKEN FOLLOW DEEP BLUE TO CHANGE: 0557901241 ND
5
FOLLOW WATER PROOFING QUOTATIONS
SENT FOR APPROVAL FOLLOW KASPER SIR. ND
6
BIOLOGICAL REPORT FOR SWIMMING POOL-
JUNE MONTH
FOLLOW DEEPBLUE : 0557901241
ND
7 One time job amount pending Collect that amount ND
RAMKUMAR TO MURUGANANDH FOLLOW UP & UPDATES (DATE : 24.5.2014)
MURUGANANDH TO RAMKUMAR FOLLOW UP ( DATE : 9.7.2014)
8 Swimming pool pump no:2 quotation pending FOLLOW KASPER SIR. ND
9 Get Sample paint for KURB STONE Follow sarvanan sir. D
10 June month AMC amount pending Follow kasper sir. ND
11 C block 4th floor Unit 1 compressor Get approval to kasper sir ND
12
C block 4th floor Unit 3 Condensor Fan motor
replaced PREPARE INVOICE
13 GATE BARRIER A BLOCK PROBLEM CALL NEWLINE SYSTEMS SEKAR: 0508409595 ND
14
A311 board member Condensor fan motor
problem Changed the new fan motor.Inform to saravanan sir. D
15 1 new remote have Kamrul
Sell remote at 200.So profit for 3 remote 150 and balance 50 is
Apt B006 money D
S.NO DATE WORKS
1 27.05.2014
Replaced the Condensor fan motor in C block 3rd floor 2nd unit
and C block 4th floor unit 2 work completed and received the
invoice
2 27.05.2014 I arranged the requirement material from our company
3 1.06.2014
I collected the fire blanket details with photos as per the vision
safety service report
4 1.06.2014
Bag filter quotation is approved.So I informed to our company
and sub contractor
5 1.06.2014
I requested to invoice for our company for replaced the new
compressor in A block basement lift lobby
6 02.06.2014
C block 4th floor 3rd unit fan motor burned.So informed to
kasper sir and prepared the quotation then I send the quotation
to kasper sir mail for approval
7 02.06.2014
C block 4th floor 1st unit compressor got grounded.So informed
to kasper sir and prepared the quotation then I send the
quotation to kasper sir mail for approval
8 02.06.2014
Prepared the May month report and I send to the company
9 04.06.2014
I requested to invoice for our company for replaced the new
CCTV monitorwith 21inch display.
10 08.06.2014
I arranged the safety training for Technicians,securities and
cleaners
11 10.06.2014
I send the warranty letter for replaced the CCTV monitor
12 10.06.2014
Fire blanket issue solved and verified the problem to vision
safety
13 11.06.2014
Security complaint for drinking water supplier knocking the
door to board member.So I investigated and prepared the
security report
14 17.06.2014 C block lift no:1 during the fire alarm it got grounded very
slowly.So I send the mail to inam for submit the report
15 17.06.2014
I send the requisition mail for changing the new belt for FAHUS.
16 21.06.2014
C block lift no:1 during the fire alarm it got grounded very
slowly.so I got the service report from Naresh fire alarm
engineer.
17 22.06.2014
I received the AC cooling low complaint from Gym.So I changed
the set point temperature at 22*C
18 22.06.2014
The pressure vessel tank in fault.So I send the quotation to
kasper sir
19 25.06.2014
The landscape pressure vessel tank quotation is approved.I
informed to our supplier
ACTIVITIES BY MURUGANANDH FROM 25.5.2014 TO 6.7.2014
20 25.06.2014
I send the mail for access card issued details to kasper sir
21 25.06.2014
Vision safety came for PPM service for june month without
getting any information.So I send the warning mail to inam
vision safety
22 26.06.2014
I prepared the report B-403 AC connection changing problem
23 28.06.2014
Our technicians installed the pressure vessel tank in c block
basement area
24 29.06.2014 Our technicians fixed the Bag filters in A,B and C block
25 29.06.2014
Swimming pool colour changed issue.i informed to our sub
contractor and the swimming pool closed upto next day for
maintenance
26 1.07.2014 We opened the pool at normal PH and chlorine level
27 3.07.2014
Gym equipments issue.I send the snags to sports link throug
mail.
28 3.07.2014
I send the mail to vision safety inam for changing the 2 smoke
detector with programming
29 3.07.2014 I submitted the monthly report to our company
30
6.7.2014
I send the completion report for Irrigation pressure vessel and
bag filter to our company
S.NO WORK PENDING
1 Irrigation pump repalced in basement Work completed.Waiting for Invoice
2 FAHU Bag filter replaced in all block Work completed.Waiting for Invoice
3
FIRE ALARM PANEL ERROR,NEED TO CHANGE
HEAT DETECTOR & RE PROGRAMMING. VISION Already mail send to inam vision safety.Follow vision safety
4 KID POOL DRAIN FILTER PLATE BROKEN FOLLOW DEEP BLUE TO CHANGE: 0557901241
5
FOLLOW WATER PROOFING QUOTATIONS SENT
FOR APPROVAL FOLLOW KASPER SIR.
6
BIOLOGICAL REPORT FOR SWIMMING POOL- JUNE
MONTH
FOLLOW DEEPBLUE : 0557901241
7 One time job amount pending Collect that amount
8
Intouch Apt C-409 and C-313 flush fittings
quotation approved Follow saravanan sir
9 Swimming pool pump no:2 quotation pending FOLLOW KASPER SIR.
10 Get Sample paint for car parking Follow sarvanan sir.
11 June month AMC amount pending Follow kasper sir.
12 C block 4th floor Unit 1 compressor Get approval to kasper sir
13
C block 4th floor Unit 3 Condensor Fan motor
replaced Get approval to kasper sir
14 GATE BARRIER A BLOCK PROBLEM CALL NEWLINE SYSTEMS SEKAR: 0508409595
15
A311 board member Condensor fan motor
problem Changed the new fan motor.Inform to saravanan sir.
16 1 new remote have Kamrul Sell remote at 200.So profit for 3 remote 150 and balance 50 is Apt B006 money
1 27.05.2014
Replaced the Condensor fan motor in C block 3rd floor 2nd unit and C block 4th floor
unit 2 work completed and received the invoice
2 27.05.2014 I arranged the requirement material from our company
3 1.06.2014
I collected the fire blanket details with photos as per the vision safety service report
4 1.06.2014
Bag filter quotation is approved.So I informed to our company and sub contractor
5 1.06.2014
I requested to invoice for our company for replaced the new compressor in A block
basement lift lobby
6 02.06.2014 C block 4th floor 3rd unit fan motor burned.So informed to kasper sir and prepared the
quotation then I send the quotation to kasper sir mail for approval
7 02.06.2014 C block 4th floor 1st unit compressor got grounded.So informed to kasper sir and
prepared the quotation then I send the quotation to kasper sir mail for approval
8 02.06.2014 Prepared the May month report and I send to the company
9 04.06.2014
I requested to invoice for our company for replaced the new CCTV monitorwith 21inch
display.
10 08.06.2014 I arranged the safety training for Technicians,securities and cleaners
11 10.06.2014 I send the warranty letter for replaced the CCTV monitor
12 10.06.2014 Fire blanket issue solved and verified the problem to vision safety
13 11.06.2014
Security complaint for drinking water supplier knocking the door to board member.So I
investigated and prepared the security report
14 17.06.2014
C block lift no:1 during the fire alarm it got grounded very slowly.So I send the mail to
inam for submit the report
15 17.06.2014 I send the requisition mail for changing the new belt for FAHUS.
16 21.06.2014
C block lift no:1 during the fire alarm it got grounded very slowly.so I got the service
report from Naresh fire alarm engineer.
17 22.06.2014
I received the AC cooling low complaint from Gym.So I changed the set point
temperature at 22*C
18 22.06.2014 The pressure vessel tank in fault.So I send the quotation to kasper sir
19 25.06.2014
The landscape pressure vessel tank quotation is approved.I informed to our supplier
20 25.06.2014 I send the mail for access card issued details to kasper sir
21 25.06.2014
Vision safety came for PPM service for june month without getting any information.So I
send the warning mail to inam vision safety
22 26.06.2014 I prepared the report B-403 AC connection changing problem
23 28.06.2014 Our technicians installed the pressure vessel tank in c block basement area
24 29.06.2014 Our technicians fixed the Bag filters in A,B and C block
25 29.06.2014
Swimming pool colour changed issue.i informed to our sub contractor and the
swimming pool closed upto next day for maintenance
26 1.07.2014 We opened the pool at normal PH and chlorine level
27 3.07.2014 Gym equipments issue.I send the snags to sports link throug mail.
28 3.07.2014
I send the mail to vision safety inam for changing the 2 smoke detector with
programming
29 3.07.2014 I submitted the monthly report to our company
30
6.7.2014 I send the completion report for Irrigation pressure vessel and bag filter to our company