Dodge Creek Bridge

Mill Creek Bridge


Linear regression equations for thickness loss in
5% NaCl Cyclic Corrosion tests.
Publication : FHWA-HRT-11-061, July 2011
Steel
Coefficient
Mill per Cycle
Predicted Life VS
ASTM A 588
ASTM A 1010 0.050 10.40
11Cr 0.056 9.30
9Cr 0.147 3.50
9Cr2Si 0.197 2.60
7Cr2Si 0.304 1.70
7Cr2Al 0.152 3.40
7Cr2Si2Al 0.275 1.90
ASTM A 588 0.519 1.00
CHARFY vNOTCH lMFAT TEST
FHWA FBLlCATlONS
SteelBridgeDesignHandbook
http://www.fhwa.dot.gov/bridge
/steel/pubs/if12052/
SteeI rIdge DesIgn Handbook
20. DesignExample:ThreespanContinuous Straight
IGirderBridge
21. DesignExample:TwospanContinuous
StraightI GirderBridge
22. DesignExample:TwospanContinuousStraightWide
FlangeBeamBridge
23. DesignExample:ThreespanContinuousCurvedI
GirderBeamBridge
24. DesignExample:ThreespanContinuousStraightTub
GirderBridge
25. DesignExample:ThreespanContinuousCurvedTub
GirderBridge
KHF
lS lT FRACTRE CRlTlCAL!
Shaped Charge to
Cut Flange
System Behavior
Deck Must Transfer Load From
Fractured Girder
Deck and Shear Stud Details
Control Behavior
Girder Must Hang From Shear
Studs- Stud Depth in Deck
Important Parameter
Cast in Place Bridge Rail
Greatly Increases Strength and
Stiffness of Girders
lS lT FRACTRE CRlTlCAL!
Bridge Behavior
Finaldeflectionafter
liveloadplacedon
bridgewas4.7 for
inside and5.3 for
exteriorgirder
Finalstressinbottom
flanges20ksi
KHF
Clip 1
Advantages of Steel Bridges:
Decreasessuperstructuresdepth
ErectionofSteelSuperstructures
Nofalsework
Liftingandplacingsteelgirderasaunit
eam PIacement
18
Atorod Azizinamini, Ph.D., P.E. Florida International University
Cross section of Mass DOT bridge
Cross section of Mass DOT bridge
Flacing Girder nit
Finished Structure
Current Systens
BridgeTechnology
Center(BTC):
Modules with steel
press-brake tub
girders
Galvanizedor
weathering
lndustry Fartners
Technicalworkinggroup:
StateDOTs
Mills/plate producers
Universities
Bridge design engineers
Fabricators
BTC Froposed lowa Concept
Bridgecrosssection:
Curved, Shallow
Girder Application
l5 / lZ5
lnterchange
I-5 Marquam
Portland
Famp F Dver SF 8J6, MIamI-Dade County FL
Advantages of Steel Bridges:
Decreases superstructures depth
AASHTO LRFD Table 2.5.2.6.3-1
Superstructure Simple Cont.
Precast I-Beams 0.045L 0.04L
Steel Beams 0.033L 0.027L
For L=100:
100(0.045-0.033)=1.2 depth reduction
Supper Structure Depth Lffect
Earth work at roadway per foot
Volume = [2(X+Y+4)+Z]*(change is superstructure depth)
1.2[2(4+12+0)=38.4 ft
3
/ft
Concretebridgesvalueengineeredtosteelbridges.
ApplegateRiverBridge
UpperPerryBridges
WHY NDT AS MANY STLLL FID6LS!
Advantages of Steel Bridges:
Longer span
Superstructures erection
Shorter construction time
Lighter superstructure
Innovative design and ideas
LnvIronmentaIIy FrIendIy
FecycIabIe
Thanks
Fairview Road Bridge
Waterville Bridge

You might also like