You are on page 1of 6

QUESTIONNAIRE FOR THE ENVIRONMENTAL IMPACT

ASSESSMENT OF NEW CONSTRUCTION PROJECTS



I. BACKGROUND INFORMATION OF THE PROPOSED PROJECT
State clearly the objective of the project: Group Housing Project
Location of the project (attach map to a suitable scale): Attached as
annexure VII
Town/Tehsil: Rajiv Gandhi Nagar, District Kota, State Rajasthan
Latitude: 2508'08.53"N
Longitude: 7551'13.89" E
Google Map is enclosed as Annexure- VII.
Names & distances from the nearest :
Dakaniya Talaav Railway Station:- At about 1.67 km towards NE
Kota Railway Station:- At about 10.12 km towards NNE
Kota Airbase:- At about 2.9 km towards North
NH- 12:- At about 0.02 km towards East.
Name of the agency proposing the new construction project: M/s Sunprime
Infratech Pvt. Ltd. proposing this new group housing project in the name of
Skyline
Name of the Chief Executive & Postal Address: Mr. Ramesh Kumar Yadav
(Authorized Signatory & Director),
1/A, Rajeev Gandhi Nagar, Opp. City Mall, J halawar Road, Kota, Rajasthan
Pin Code-324005
Contact particulars (Tel/e-mail): Tel: 09414188396
E-mail: hindustanmetals@yahoo.co.in &
yadavtractors_kota@yahoo.com
Estimated cost of the project
i. Land cost: 27.03 Crores
ii. Plant, machinery & construction cost: 45 Crores
iii. Total cost of project: 72.03 Crores
II. SITUATION WITHIN 10 KM RADIUS FROM PROJECT SITE
General topography: Plain
Specify general features of land: The Proposed project is located in
developing municipal area of Kota. The proposed site has been converted for
residential purpose by UIT and allocated to project proponent. Land Documents
are enclosed as Annexure-III.
Tree cover-prominent species: Details enclosed as Annexure- XVI.
Fauna-wildlife/domesticated: Details enclosed as Annexure- XVI.
Avifauna: Details enclosed as Annexure- XVI.
Soil characteristics: Fine grained sand stone
Natural drainage pattern: No, proposal wont involve alteration of natural
drainage systems.
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
Flood prone areas: No
Natural drainage pattern: No, proposal wont involve alteration of natural
drainage systems.
Geological features including seismic zone: Area is under seismic zone II as
per NBC 2005. Map of India showing seismic zones of India is enclosed as
Annexure- XVII.
Existing land use (area &percentages) map: Area is completely urbanized
and development is mixed used i.e. residential, commercial and institutional (to
include agricultural & non-agricultural uses, Commercial, industrial dense/open
forests, Fallow land, human settlements, Water bodies, transport systems etc.).
Predominant activities (residential, institutional, commercial etc): Residential
Special features (Such as tourist spots, monuments/archaeological sites,
Hospitals, schools, institutions, religious places, Heritage areas and places of
other interests): The site is located in the Kota city which has number of
hospital, schools, colleges institute, residential colonies etc.
Specific environmental problems, if any (Such as water and air pollution,
land spoliation, by natural & manmade factors, endemic diseases, traffic
congestion spots in the vicinity of project site, loss of tree cover, open spaces
etc.): No
Ground level concentrations (major parameters) like SPM/RSPM, SO
2
,
NO
x
, HC, and Noise: This is a small group housing project. So, there is no
requirement to do monitoring within the 10 Km Radius from the project site.
However ambient air monitoring at the project site has been done and the
results are given below:
Monitoring
Station
PM
10

g/ m
3

PM
2.5

g/ m
3

SO
2
g/ m
3

NO
2
g/ m
3

CO
mg/ m
3

NAAQ
Standards
100 60 80 80 4
Project Site 57.58 19.92 5.15 11.57 0.44

Furnish wind rose diagram: Enclosed as Annexure- XVIII.
General meteorological data (wind direction, speed, rainfall, temperature):
Enclosed as Annexure- XVIII.
Details if any of heat islands, inversions, venturi effect Impacts on the
conceptualization of the proposal: The proposed project is as per the master
plan approved by UIT Kota therefore the conceptualization of proposal will not
have any significant contribution in urban heat islands, inversions, venturi
effect.
Human Resources: Project site is located at Plot No. 1-A, Rajiv Gandhi
Nagar, Kota which is fast developing area of Kota district and is having high
growth rate. Human settlement and growth is high because of establishment of
institutions and residential colonies.
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
The project is of small construction project listed as Category 8 (a). The project
as per EIA Notification-2006 do not require detailed EIA & is required to be
decided on the basis of Form-1, Form-1A & Conceptual Plan. Therefore
detailed study has not been carried for Socio-economy.
a. Population of study area (10 km radius), Kota has Population of 1950491
as per census 2011.
b. Decadal growth rate, 24.34 % settlement pattern and growth.
c. Socio-economic conditions The socio economic condition of that area is
well due to lot off opportunity of employment
d. Health: Endemic diseases, Mortality, Epidemics.
Environmental assessment and suitability of the proposed development
(specifically identifying the limits): The proposed Residential Project will
create lot off employment opportunity which is necessary for state and country
socio- economic development.
III. PROMINENT FEATURES WITHIN ABOUT 100 METRES RADIUS FROM
THE SITE BOUNDARY (LOCAL AND IMMEDIATE VICINITY)
General description (Contours at 1m intervals): No, proposal wont involve
alteration of natural drainage systems.
Natural resources: Laboratory reports are enclosed as Annexure- X, XI, XII,
and XIII.
i. Water: Ground water table, rate of recharge Present restrictions on
drawl, available yield, Quality of water (physical, chemical, biological)
surface water location, source and yield, Present use (for agriculture,
human consumption, industry, etc.)
ii. Ambient air quality levels (standard parameters including noise):
The daily maximum concentrations of different parameters in ambient
air during our measurements were as given below.
Monitoring
Station
PM
10

g/ m
3

PM
2.5

g/ m
3

SO
2
g/ m
3

NO
2
g/ m
3

CO
mg/ m
3

NAAQ
Standards
100 60 80 80 4
Project Site 57.58 19.92 5.15 11.57 0.44


iii. Minerals: type, location, quantum (estimated): There are no mineral
sources.
iv. Energy (Consumption pattern for hydrocarbons, gas, electricity and any
other non-conventional energy source): Electricity
v. Details of new construction: New project

Total Plot Area 7582.62 Sq. m
Built up Area 35549.12 Sq. m
Gross Built up Area 42251.02 Sq. m
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
Floor Area
Ratio
Permissible 2.25 (17060.89 Sq. m)
Total Net FAR
Achieved
3.13 =2.25+0.88*
(23760.37 Sq. m)

Ground
Coverage
Permissible 35 % (2653.91 Sq. m)
Achieved 25.59 % (1940.98 Sq. m)
Height Achieved 44.90 m (up to Terrace
Floor)
52.65 m (up to Machine
Room)
*By Laws Permitting purchase of FAR is enclosed as
Annexure XXVII.
Building materials for construction Enclosed as Annexure- I.

vi. Details of public utilities required for the project during (May be
indicated separately for Construction & operation phases):
a. Water supply (Source of water supply and quantities to be drawn)
PHED Supply:-
During construction: 15 KLD (Authorized Local Suppliers)
Post Construction : 115 KLD (86 KLD from PHED Supply and 29
from recycled water from STP)
The detailed water requirement & water balance is available at Point No.
2 of Form-1A.
b. Type of treatment, if any: During Construction Phase- Septic tank
followed by soak pit will be used and During Post Construction Phase-
STP of capacity 125 KLD of SBR Technology will be used.
c. Continuous/Intermittent supply: Continuous
d. Sewage, Collection, Treatment & Disposal: Through Sewer lines and
treated in STP. Details enclosed as Annexure- VIII.
e. Mode of collection of domestic effluent: Underground
f. Mode of treatment: STP of capacity 125 KLD
g. Mode of disposal: Total sewage generated will be about 93 KLD. After
treatment 90% i.e. 83.7 KLD will be available. Out of which 29 KLD
will be used for flushing & gardening and remained 54.7 KLD recycled
water will be discharged in drains maintained by PHED after taking
necessary permission from PHED.

IV. Solid Wastes
Estimated quantity of each types of solid waste: Domestic Waste
Dry garbage: 292.8 Kg/day
Wet garbage: 195.2 Kg/day
Total waste: 488 Kg/day
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
Mode of collection and disposal: It will be collected in separate bins and
handed over to authorized vendors.
Recycling to be instituted, if any:
i) Construction Waste will be used for road construction.
ii) Dry waste would be separated and stored at designated place and
would be disposed through authorized vendor.
iii) Green waste will be converted into manure by vermiculture
provisions are made close to STP.
V. Power System
Sources of power and supply capacity: Total power requirement of the
project will be 1723 KW which will be met from JVVNL and received at 11
KV supply voltage, it will be stepped down to 0.433 KV through 1 transformer
of capacity 2500 kVA.
Distribution System: N.A.
Alternate supply for essential services: 1 D.G. Set of capacity 160 kVA
DG Set: Type of fuel used and capacity: HSD, 41.3 liters/hr
VI. Impact of the new development on the surrounding areas:
There will not be any adverse impacts from proposed project of group housing on the
existing structures as the area is being used for the same activity, i.e. for residential
purposes. However all precaution will be taken to mitigate the impacts to water, air and
noise environment during construction and operational phase.
1. Traffic management at peak hours: Security staff will monitor parking
facilities.
2. Provision of service roads: Internal roads are proposed to look after smooth
traffic as well as service roads.
3. Buffer zone planned, if so, details: NA
4. Activities likely to come up in the surrounding areas
5. From the project during construction & operation phases: It is a planned
residential area.
6. Agencies and the measures proposed to regulate planned developments
like slums, shops, etc.: Not envisaged
VII. State briefly impacts predicted on the quality and quantity of natural resources
from the proposed new development:
Air quality: The proposed project is a group housing project and its impact on
existing air quality will be insignificant.
Vegetation: Yes, the green belt development in the premises of project will
enhance the green cover of the locality.
Animal/Aquatic life: Not significant as the area is already urbanized.
Surface/ Ground Water: There will be no impact as the water will be
procured from PHED. There will be recharge of ground water by adopting
water harvesting.
State briefly impacts predicted on the quality and quantity of manmade features
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
from the proposed new development: No significant impact.
Transport Linkages: The proposed project is small and its impact on transport
system of locality will be insignificant.
Heritage areas/ecologically sensitive areas: There are no heritage and
ecological sensitive area within 15 Km radius of project.
Landscaping /Tree Plantation
i. Numbers and types of trees to be planted inside & outside the plot: It is
proposed to plant 70 large trees in additional to shrubs and other small plants.
The landscape plan including native varieties of tree will be prepared to
implement.
a. Parks and gardens: Landscaping as per rules will be done in
proposed project of group housing.
b. Along roads and pedestrian movement Yes trees will be planted
along internal roads and parking area.
c. In public areas

ii. Other special features of proposed landscape design: No

iii. Likely impacts from proposed landscaping: It will have positive impact
Any other relevant information of environmental significance-such as disabled-
friendly design, flyash utilization, Greening of supply chain, heat
islands/inversions/venturi effects, Timber-free construction, Green rating,
energy efficiency for lighting & ventilation, Intelligent building, life cycle costs,
measurable design impacts on human health, indoor environment related to
occupational health etc.


******




M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant