HEAD WORKS:PRE
POST
SANCTIONED SANCTIONED
AMOUNT
AMOUNT
Diff. of amount
SN ITEMS
1 E/W Excavation in foundation
1650700.09
1775908.78
-125208.69
2 Extra for marshy land
372738.73
0
372738.73
3 Extra for wet soil
61836.84
44352
17484.84
4 Etra for lift in cutting
247347.36
266109.12
-18761.76
5 Etra for lead in cutting
123673.68
0
123673.68
6 E/W in filling
3890651.97
1500106.8
2390545.17
7 Extra for lift in filling
617019.7
237902.4
379117.3
8 Exra for lead in filling
617019.7
0
617019.7
9 Compaction
1242609.11
479109
763500.11
10 Stripping
1050557.45
0
1050557.45
11 Filling in foundation
356706.75
0
356706.75
12 P.C.C.-M 10
5398829.77
782017.86
4616811.91
13 P.C.C.-M15
29044519.27
29122267.7
-77748.43
14 C.C. BLOCK pitching
9012094.45
7073002.36
1939092.09
15 R.C.C. M2027677241 26996864.76
680376.24
16 Deck slab
1267134.75
1267134.75
0
17 Brick work
973833.25
1850419.71
-876586.46
18 Sheet pile
27072486 17853201.33
9219284.67
19 M.S Steel bar
45244012.7 15146789.24 30097223.46
20 Stone boulder
19628353.39
10096422.5
9531930.89
21 Pitching above apron and on slope
2474613.6
0
2474613.6
22 Gravel filter
115226.84
115234.56
-7.72
23 Dewatering
10237984.6
2891428.25
7346556.35
24 Shuttering in barrage portion
2025908.94
2006924.18
18984.76
25 Shuttering in deck slab
363317.33
363317.33
0
26 Brick on edge
1777133.6
0
1777133.6
27 Copper seal
2400804
2130378.74
270425.26
28 Rubber seal
400000
346000
54000
29 Bituminous board
18231940
15770628.1
2461311.9
30 Outlet in Kasath & Bhojpur distry.
400000
0
400000
31 Transformer purchase
20000000
0
20000000
32 Weep holes
179840
98055
81785
33 Carriage Sheet pile Lead-150 km
300437.78
198126.42
102311.36
34 Carriage of stonechips Lead-260 km
43099367.29
39037826.4
4061540.89
35 Carriage of sand Lead-65 km p+1 km k
6446691.01
5758550.07
688140.94
37 Carriage of steel Lead-30 km
214811.59
99441.9
115369.69
38 Carriage of bricks lead-7 km p+ 1 km k
314452.52
141674.62
172777.9
39 Carriage of cement Lead-30 km
1796494.83
1596911.93
199582.9
40 Carriage of gravel Lead-260 km
439911.01
439941.99
-30.98
TOTAL
286768300.9 185486047.8 101282253.1
E/W Excavation in foundation
1650700.09
1775908.78
-125208.69
Extra for marshy land
372738.73
0
372738.73
Extra for wet soil
61836.84
44352
17484.84
Etra for lift in cutting
247347.36
266109.12
-18761.76
Etra for lead in cutting
123673.68
0
123673.68
E/W in filling
Extra for lift in filling
Exra for lead in filling
Compaction
Stripping
Filling in foundation
P.C.C.-M 10
P.C.C.-M15
C.C. BLOCK pitching
R.C.C. M20Deck slab
Brick work
Sheet pile
M.S Steel bar
Stone boulder
Pitching above apron and on slope
Gravel filter
Dewatering
Shuttering in barrage portion
Shuttering in deck slab
Brick on edge
Copper seal
Rubber seal
Bituminous board
Outlet in Kasath & Bhojpur distry.
Transformer purchase
Weep holes
Carriage Sheet pile Lead-150 km
Carriage of stonechips Lead-260 km
Carriage of sand Lead-65 km p+1 km k
Carriage of steel Lead-30 km
Carriage of bricks lead-7 km p+ 1 km k
Carriage of cement Lead-30 km
Carriage of gravel Lead-260 km
TOTAL
3890651.97
617019.7
617019.7
1242609.11
1050557.45
356706.75
5398829.77
29044519.27
9012094.45
27677241
1267134.75
973833.25
27072486
45244012.7
19628353.39
2474613.6
115226.84
10237984.6
2025908.94
363317.33
1777133.6
2400804
400000
18231940
400000
20000000
179840
300437.78
43099367.29
6446691.01
214811.59
314452.52
1796494.83
439911.01
286768300.9
1500106.8
237902.4
0
479109
0
0
782017.86
29122267.7
7073002.36
26996864.76
1267134.75
1850419.71
17853201.33
15146789.24
10096422.5
0
115234.56
2891428.25
2006924.18
363317.33
0
2130378.74
346000
15770628.1
0
0
98055
198126.42
39037826.4
5758550.07
99441.9
141674.62
1596911.93
439941.99
185486047.8
2390545.17
379117.3
617019.7
763500.11
1050557.45
356706.75
4616811.91
-77748.43
1939092.09
680376.24
0
-876586.46
9219284.67
30097223.46
9531930.89
2474613.6
-7.72
7346556.35
18984.76
0
1777133.6
270425.26
54000
2461311.9
400000
20000000
81785
102311.36
4061540.89
688140.94
115369.69
172777.9
199582.9
-30.98
101282253.1
SN
ITEMS
E/W in excavation in foundation
Sand filling in foundation
Brick flat soling in foundation
Foundation slab -P.C.C.-M150 (1:2:4)
5a Brick work in foundation (1:4)
5b Brick work in super structure (1:4)
6 R.C.C. in super structure M200(1:1.5:3)
7 Weep holes
8 R.C.C. in super structure M200(1:1.5:3)
1
2
3
4
PRE
POST
SANCTIONED SANCTIONED
AMOUNT
AMOUNT
9738.93
6006.06
48331.44
345244.46
134579.29
262312.7
28356.59
5395.2
167391.52
Diff. of amount
9738.93
6006.06
48331.44
345244.46
134579.29
262312.7
28356.59
5395.2
167391.52
18
19
20
21
22
23
0
327828.49
24258.79
11783.08
99286.95
7143.9
0
41804.08
16831.88
105783.4
319196.05
1556.14
7094.7
1969923.65
0
327828.49
24258.79
11783.08
99286.95
7143.9
0
41804.08
16831.88
105783.4
319196.05
1556.14
7094.7
1969923.65
6662.85
5925.31
10422.29
23010.45
6662.85
5925.31
10422.29
23010.45
9550.99
2639.00
1137.34
21230.14
9141.42
9550.99
2639
1137.34
21230.14
9141.42
0
2678.21
1343.82
47720.92
2040655.02
2678.21
1343.82
47720.92
2040655.02
SN
1
2
3
4
5a
5b
6
7
8
9
10
11
12
ITEMS
E/W in excavation in foundation
Sand filling in foundation
Brick flat soling in foundation
Foundation slab -P.C.C.-M150 (1:2:4)
Brick work in foundation (1:4)
Brick work in super structure (1:4)
R.C.C. in super structure M200(1:1.5:3)
Weep holes
R.C.C. in super structure M200(1:1.5:3)
M.S. Steel Fe 415
M.S. Steel Fe 515
Cement plaster (1:3)
Shuttering
Back fillinf of foundation
PRE
POST
SANCTIONED SANCTIONED
AMOUNT
AMOUNT
7493.18
2361.86
34261.56
261866.25
102145.5
190254.00
214012
3596.8
101691.96
0
201822.29
17468.51
8317.77
47623.73
Diff. of amount
7493.18
2361.86
34261.56
261866.25
102145.5
190254
214012
3596.8
101691.96
0
201822.29
17468.51
8317.77
47623.73
18
19
20
21
22
23
3426.62
0
28785.59
9562.05
52179.86
215615.44
957.89
2789.56
1506232.42
3426.62
0
28785.59
9562.05
52179.86
215615.44
957.89
2789.56
1506232.42
6662.85
5925.31
10422.29
23010.45
6662.85
5925.31
10422.29
23010.45
9550.99
2639.00
1137.34
21230.14
9141.42
9550.99
2639
1137.34
21230.14
9141.42
0
2678.21
1343.82
47720.92
1576963.79
2678.21
1343.82
47720.92
1576963.79
SN
1
2
3
4
5a
6
7
8
14
ITEMS
E/W in excavation in foundation
Sand filling in foundation
Brick flat soling in foundation
Foundation slab -P.C.C.-M150 (1:2:4)
Brick work in foundation (1:4)
Cement plaster (1:3)
Laying fitting fixing og NP2 PIPE
Supply of NP2 Pipe
Carriage of materials
Bricks
cement
Sand
Stone chips
Local sand
PRE
POST
SANCTIONED SANCTIONED
AMOUNT
AMOUNT
2728.43
223.08
2672.16
5586.48
33098.49
1038.09
1502.06
1823.12
0
2532.28
352.91
2159.43
3484.95
263.58
57465.06
Diff. of amount
2728.43
223.08
2672.16
5586.48
33098.49
1038.09
1502.06
1823.12
0
2532.28
352.91
2159.43
3484.95
263.58
57465.06